CAIRN HILL MAGNETITE COPPER GOLD PROJECT
Resource - Copper/Gold/Magnetite project at Stuart Highway 55 Km South East of, Coober Pedy, SA 5723 in the Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls). Resource of 10.5million tonnes indicated & 4.2million tonnes inferred of ore @ 51.9% Fe, 0.4% Cu, 0.12g/t Au. Phase 1 of the mine operations to consist of 2 open pits located to extract the northern and southern mineralisations. The project will initially involve a trial mining operation to remove and crush 20 000 tonnes of ore in order to refine engineering parameters. The main mining operation will then involve mining of an estimated 7.3 million tonnes of reserves in the western portion of the ML area, using open pit techniques. The project will involve on-site crushing with direct export of ore for processing. The ore will be transported in bulk by road to a proposed new rail siding (the Mast) and then by rail to Darwin for export by ship. Facilities at the site will include a mobile crushing plant, two waste rock dumps, diesel power plant and reverse osmosis plant. Associated infrastructure will include a water supply borefield and a site access/haulage road to the proposed rail siding. Phase 2 will target low copper & sulphur magnetite deposits immediately to the east of Phase 1 activity. Phase 3 involves expansion further east again. Detailed aeromagnetic surveys have identified targets for drilling to identify these easterly deposits. It is hoped these will come into operation when additional port capacity becomes available at Port Bonython or Darwin, leading to operations expanding up to 5Mtpa. Click for more details...

MIDDLEBACK RANGES IRON ORE/WHYALLA OPERATIONS
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Whyalla Council Area for New development. The crushing & screening plants will be relocated from Whyalla in a move to reduce dust emissions by eliminating the large number of conveyor transfer points incorporated in the pellet plant (which includes the crushing & screening plants). Some infrastructure at the mine site will need to be modified/constructed. Click for more details...

PENRICE SODA OPERATIONS
New project of Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at At, Osborne, SA 5017. Small project. Click for more details...

PENRICE SODA OPERATIONS
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Port Adelaide Enfield Council Area for New development. Involves a series of thirteen drying basins, a stockpile area, internal roadways linking site the the existing Penrice Soda products operations. Initial work will involve bulldozing stockpile area. The ponds will not be constructed in the short term Click for more details...

FLINDERS RANGES PROJECT - BELTANA - ZINC RESOURCE
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Far North Council Area of Resource - Zinc type. Mining operation will be 150-180,000 tonnes per annum. Indicated-Inferred resource is 941,000 tonnes @ 30.6% zinc for 300,000 tonnes of zinc. Beltana deposit resource is 365,200 tonnes @ 31.2% zinc for 57,400 tonnes of zinc. The Beltana deposit will be mined first with the existing pit to be deepened from 65 metres by another 30 metres. Click for more details...

MIDDLEBACK RANGE OPERATIONS - PROJECT MAGNET - CONSTRUCTION CONTRACT
Construction Contract For Plant New project In The Whyalla Council Area. Construction contract will include benefication facilities, a slurry pipeline, conversion of the pellet plant, construction of a desulphuriation plant and the upgrade of storage and handling facilities. Click for more details...

ANGAS ZINC PROJECT - DOUBLE LINING FOR TAILINGS STORAGE FACILITY
A project in the SA Within Alexandrina. The double lining is for a 540,000 bcm sized Tailings Storage Facility. Click for more details...

PROMINENT HILL GOLD COPPER PROJECT - TRANSMISSION LINE/SUBSTATION
A project in the SA Within Coober Pedy. Construction will comprise the building of a 164 km 132 kV transmission line and substation at the mine site. The power line will comprise approx 500 towers x 26 metre height pre-constructed of galvinised steel poles or lattice. Towers will take approx two days to construct on site. About 50,000 metres of service track will be constructed to service the transmission line. A substation and associated switchyard will be constructed at the mine site and will have a land area of 1 Hectare. The annual consumption of the mine and association infrastructure will be 211.1 GWh per annum. Click for more details...

PROMINENT HILL GOLD COPPER PROJECT - BULK EARTHWORKS
A project in the SA Within Coober Pedy. Bulk Earthworks for Process Plant Earth works and Plant Roads. Click for more details...

PROMINENT HILL GOLD COPPER PROJECT - CONVEYOR BELTING
Conveyor Belting project at 100 Km South east of Coober Pedy, ., SA 5999 in the Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling). Conveyor Belting Click for more details...

PECULIAR KNOB IRON ORE PROJECT - PORT FACILITIES
Currently at the Construction stage In Whyalla is a project estimated to be $ 60000000. This project For the construction of a rail loop, tip pocket, storage shed and barge loading facility. Click for more details...

PORT ADELAIDE BULK STORAGE & TRANSFER FACILITY
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Minnipa Rd & Grand Trunkway, Port Adelaide, SA 5015 for New. Proposed construction of two mineral sands storage sheds, two concentrate storage sheds with inloading and outloading conveyor systems and associated earthworks, roadways & stormwater infrastructure also includes the development of a rail spur running into the site from the Port Flat Rail Yards. Click for more details...

PORT ADELAIDE BULK STORAGE & TRANSFER FACILITY
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at Minnipa Rd & Grand Trunkway, Port Adelaide, SA 5015 for New. Proposed construction of two mineral sands storage sheds, two concentrate storage sheds with inloading and outloading conveyor systems and associated earthworks, roadways & stormwater infrastructure also includes the development of a rail spur running into the site from the Port Flat Rail Yards. Click for more details...

PORT BONYTHON FUEL STORAGE & DISTRIBUTION FACILITY STAGE 2
Currently at the Construction stage In Whyalla is a project estimated to be $ 110000000. This project For the construction and operation of a fuel storage and distribution facility at Port Bonython in South Australia's Upper Spencer Gulf Region. To include construction of fuel unloading facilities at Port Bonython Jetty. Construction of 5.3 km long fuel pipeline from jetty head to land owned by Port Bonython Fuels. Construction of tanks with a diesel storage capacity in excess of 100 million litres. Construction of truck loadout & associated facilities. Click for more details...

MIDDLEBACK RANGE OPERATIONS - PROJECT MAGNET PHASE 2
New project of Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at via Lincoln Hwy 55km south of, Whyalla, SA 5600. Extension of OneSteel's current mining & export operations through the North SMR (Southern Middleback Range) Development project. Construction in an area between existing rail corridor & mine pit on MPL51 of a new train loading facility serviced by a mobile crushing plant. To include a new rail spur line & siding & a short interconnecting haul road to the Iron Knight pit. Expansion over second half of 2009 of the existing Iron Knight mine pit by further cutting back & increase of associated waste rock dump areas. Construction around 2011/2012 of the new Iron Chieftain pit to the east of Iron Knight. Construction afterwards of a new haul road between the two pits. Click for more details...

PROMINENT HILL COPPER GOLD OPERATIONS - UNDERGROUND EXTENSION PROJECT - DECLINE
Private ownership Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) project In The Coober Pedy Council Area for New development. A 6 year, life-of-mine contract. To include construction of a decline from the existing open pit to allow evaluation drilling of the Main Underground & Western Deposits as well as mining access to the Western Copper deposit. Click for more details...

PORT PIRIE SHIP LOADING FACILITY UPGRADE
Private ownership Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Port Pirie Council Area for Renovations, Refurbishments etc. development. Upgrade to ship loading facility at No. 6 Berth & Techno Shed (lead & zinc ore loading & storage facilities). Click for more details...

PECULIAR KNOB IRON ORE PROJECT - TRANSHIPMENT STORAGE PORT FACILITY
At Berth 7, Port Pirie, SA 5540 Has Peculiar Knob Iron Ore Project - Transhipment Storage Port Facility currently at Construction stage. Contract for the design, procurement, construction & commissioning of an ore receival, storage & out-load facility at Port Pirie. To include train unloading, enclosed stockpiling in a storage shed (10,500 sqm), reclaiming/shiploading overland conveyors. Associated infrastructure/siteworks. Click for more details...

PORT OF WHYALLA NORTH HARBOUR EXPANSION
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Whyalla Council Area of Rail Facilities/Ship Loading type. Expansion of OneSteel's bulk export operations from 7 million tonnes per annum (Mtpa) approx to 12 Mtpa. To include construction of additional receival & storage facilities (rail infrastructure, tip pocket & storage sheds), ship loading facilities (conveyors, loader, berthing infrastructure) & expansion of transhipping operations. Click for more details...

CARRAPATEENA COPPER GOLD PROJECT - EXPLORATION DECLINE
A project in the SA Within Port Augusta. Construction of an exploration decline to determine rock stresses & structures for assessment of potential project mining methods (block cave, sub-level stoping, sub-level caving). Development using a tunnel boring machine. Geotechnical & exploration access areas to be developed at 625m & 1000m below the surface. Click for more details...

LUCKY BAY COMMON USER EXPORT FACILITY STAGE 1
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project for New development. Stage 1 - A rectangular dock & loading dock & acoustic enclosure also housing the crane loader & the barge. A hardstand of approx 2.5 ha in size (to be constructed in two stages). A haul road extending from the hardstand to the north-west to meet an existing unformed public road. Ancillary structures including an office, undercover vehicle storage & fuel storage. Employee amenities & car park. Stormwater detention U& sedimentation basin. Associated structures. Buffer Storage Facility. Click for more details...

GIFFEN WELL IRON ORE PROJECT - EXPORT FACILITIES
A project in the SA Within Port Pirie. Construction at Port Pirie of rail receival, storage & outloading facilities. To include construction in the Port Pirie marshalling yards of 2 equal length dead end sidings behind the tip pocket to allow for unloading in 3 sections. Construction adjacent the port of a 185,000t capacity, negatively pressured ore management shed including a rail unloader (tippler), conveyor to wharf & wash down facilities. Click for more details...

BP ONSHORE LOGISTICS FACILITY
Currently at the Construction stage In Port Adelaide Enfield is a project estimated to be $ 7000000. This project Change in the use of a portion of land to accommodate an on-shore logistics facility (associated with off-shore drilling operations) including a liquid mud plant; the piping, storage, loading & unloading of associated materials and equipment; and associated building work including new silos and portable buildings. Click for more details...

TARCOOLA GOLD PROJECT - HAUL ROAD UPGRADE
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Far North Council Area of Haul Road Upgrade type. For the provision of the upgrade to the haul road. Click for more details...