DOUGLAS MINERAL SANDS PROJECT
Secondary Processing Plant (Msp) For Heavy Minerals project at 6 km south of, Hamilton, VIC 3300 in the Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls). The Mineral Separation Plant ("MSP") for processing mine concentrates. The capacity has been almost doubled from 30 tonnes to 55 tonnes per hour. Click for more details...

HAZELWOOD COAL OPERATIONS
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project for Renovations, Refurbishments etc. development. Boilermaking, sandblasting and painting structures. Click for more details...

FOSTERVILLE GOLD OPERATIONS
A project in the VIC Within Greater Bendigo. Design and supply of conveyors CV1 and CV2. Click for more details...

CITITECH BUSINESS PARK
New project of Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at 312 Lorimer St, Port Melbourne, VIC 3207. High technology office park. Civil works to include roads & services. Click for more details...

DOUGLAS MINERAL SANDS PROJECT - ACAPULCO/BONDI/ECHO
A project in the VIC Within West Wimmera. A $270 million project to develop the Douglas mine, mineral separation plant and associated infrastructure. The project approved is larger than the original proposal. The initial capacity of the mineral separation plant has been almost doubled from 30 to 55 tonnes per hour. Click for more details...

BALLARAT GOLD PROJECT
A project in the VIC Within Ballarat. Construction of a 300,000tpa plant for a minimum of 80,000oz of gold per year expected to include a gravity circuit & carbon-in-pulp module. Contract to involve all associated services & power distribution. Click for more details...

NEW BENDIGO GOLD PROJECT - KANGAROO FLAT MINE - RESOURCE
Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) New project at via, Bendigo, VIC 3550. This type is Operating Mine with Private ownership. The plant is currently treating low-grade ore which was stockpiled during mining operations in 2006/2007. The first ore parcel from Gill reef is planned to be processed in late June, with trial gold production ramping up during the September 2008 quarter. Click for more details...

NEW BENDIGO GOLD PROJECT - KANGAROO FLAT MINE - RESOURCE
Mining - Infrastructure (Tailings, Dams, Water supply dams) New project at via, Bendigo, VIC 3550. This type is Operating Mine with Private ownership. The plant is currently treating low-grade ore which was stockpiled during mining operations in 2006/2007. The first ore parcel from Gill reef is planned to be processed in late June, with trial gold production ramping up during the September 2008 quarter. Click for more details...

HAZELWOOD COAL OPERATIONS - HAZELWOOD WEST
A project in the VIC Within La Trobe. International Power Hazelwood proposes to extend the Hazelwood Mine beyond the existing mining licence boundary, to allow continuation of the company's coal supply for the commercial operating life of the power station. Includes the extension of the mining licence to access the western part of the Morwell seam, diversion and restoration of the Morwell River, diversion and restoration of Eel Hole and Wilderness Creeks, as well as deviation of the Strzelecki Highway. More specifically the Strzelecki Highway will be raligned up to 1000 metres west of current alignment. Seven kilometres of the Morwell River will be relocated and rebuilt on a new alignment. The river will taken out of the concrete pipe and returned to a natural riverline environment. The Yinnar Driffield road will be upgraded to accommodate over dimensional 9 traffic. Marrets road and Brodribb road will be closed for parts of the construction period. Click for more details...

HAZELWOOD COAL OPERATIONS
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Mine site, Morwell, VIC 3840 of Conveyor - Repairs/Refurbishment type of Renovations, Refurbishments etc. development. Grit blasting, repairs and painting of M171 rising conveyor, repairs to raw coal bunker slot conveyors M195 and M196, supply and fit spill trays on rising conveyors M171, M172, M173 and M174. Click for more details...

BALLARAT EAST GOLD PROJECT - WOOLSHED GULLY DECLINE
Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) project In The Ballarat Council Area of Decline Development type. Includes development, ground support and services works. Click for more details...

NEW BENDIGO GOLD PROJECT - INFRASTRUCTURE
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Greater Bendigo Council Area of Infrastructure type. Infrastructure includes upgrading power and dewatering facilities. Surface facilities include a new vent site, security building, workshop, muster room, car parks. A new evaporation pond is to be constructed at Woodvale which is 16 km from the mine. Click for more details...

PORT OF PORTLAND FACILITIES EXPANSION
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Glenelg Council Area of Private ownership. Development includes the construction of a new 50,000 tonne mineral and sand product storage facility warehouse. Shiploading infrastructure will be constructed that is capable of transferring product at 1500 tonnes per hour. This will include manual front end loaders, hoppers, outloader conveyor and shiploader. It is expected that Iluka will ship 260,000 tonnes per annum through the new port facilities. Click for more details...

BENAMBRA MINE REHABILITATION PROJECT - STAGE 3 - EARTHWORKS
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Alpine Council Area for New development. Three main areas of the mine require rehabilitation. They are the Core Farm, Plant Site and the Tailings Dam. Development comprises excavating and removing material to one or more nominated locations, removing all refuse material from site; excavating, emptying, removing and disposing of waste oil tanks, excavating and removing hydrocarbon contaminated soil from site, neutralising all acid waters contained in storage tanks, transporting treated water for disposal into the tailings dam, demolishing sheds and concrete structures, demolishing (crushing to 50mm max) above ground concrete structures and stockpile for reuse, cracking heavy concrete foundations (drill, punch or crack), re-levelling tailings using a dredge, strengthening dam wall and construction of a spillway, dam works involving the movement and or placement of a round 25,000 cubic metres of material, surfacing ripping nominated areas and removal of disused access roads, road rehabilitation (1.5 Km) and upgrading (2.5 Km), water monitoring and installation of monitoring system. Click for more details...

BENAMBRA MINE REHABILITATION PROJECT - STAGE 3 - EARTHWORKS
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Alpine Council Area for New development. Three main areas of the mine require rehabilitation. They are the Core Farm, Plant Site and the Tailings Dam. Development comprises excavating and removing material to one or more nominated locations, removing all refuse material from site; excavating, emptying, removing and disposing of waste oil tanks, excavating and removing hydrocarbon contaminated soil from site, neutralising all acid waters contained in storage tanks, transporting treated water for disposal into the tailings dam, demolishing sheds and concrete structures, demolishing (crushing to 50mm max) above ground concrete structures and stockpile for reuse, cracking heavy concrete foundations (drill, punch or crack), re-levelling tailings using a dredge, strengthening dam wall and construction of a spillway, dam works involving the movement and or placement of a round 25,000 cubic metres of material, surfacing ripping nominated areas and removal of disused access roads, road rehabilitation (1.5 Km) and upgrading (2.5 Km), water monitoring and installation of monitoring system. Click for more details...

NEW BENDIGO GOLD PROJECT - ACCESS ROAD/CAR PARK
New project of Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at 133 North Belmont Road, Eaglehawk, VIC 3556. Construction of an access road and car park. Click for more details...

DONALD MINERAL SANDS PROJECT - EPCM CONTRACT
Currently at the Construction stage In Buloke is a project estimated to be $ 2000000. This project Ccommissioning to include minerals processing, conveyors, water infrastructure, site buildings & power infrastructure. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - HAUL ROAD
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Mildura Council Area of Haul Road type. For the development of a haul road to Hamilton. Click for more details...

BALLARAT EAST GOLD PROJECT - UNDERGROUND MINE VENTILATION SYSTEM UPGRADE
Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) project for New development. Work comprises the refurbishment of the Southern Woah Hawp decline ventilation system and the internal extension of the New Princes extended ventilation shaft. Click for more details...

INTERNATIONAL POWER HAZELWOOD PULLEYS
A project in the VIC Within La Trobe. For the manufacture, supply and delivery of 3 x EA pulleys for conveyors within an open cut mine. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - INFILTRATION BASIN
Mining - Infrastructure (Tailings, Dams, Water supply dams) New project at 28 km east of, Ouyen, VIC 3490. This type is Infiltration Basin with Private ownership. For the provision of an infiltration basin to filter storm water runoff. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - WIRELESS BRIDGES
Currently at the Planning stage In Mildura is a project estimated to be $ 1200000. This project For the provision of wireless bridges. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - CCTV SYSTEM
Murray Basin Stage 2 - Kwr Mineral Sands Project - Cctv System is currently at the Planning stage, valued at about $ 1200000 it is For the provision of close circuit television system. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - PF CORRECTION EQUIPMENT
Mining - Infrastructure (Computer & telecommunication system for mine, scada) project In The Mildura Council Area of Pf Correction Equipment type. For the provision of power factor correction equipment. Click for more details...

YALLOURN JOINT VENTURE COAL OPERATIONS - YALLOURN COAL FIELD REALIGNMENT PROJECT
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Eastern Rd, Yallourn North, VIC 3825 for New. A project to reduce overburden removal in the southeast portion of the coal fields supplying the Yallourn W Power Station by boundary alteration. Relocation further to the east of the Maryvale Coal Field boundary. Coal & overburden systems to be located on this field's western batter with overburden placement at the base of the adjacent, currently producing East Field Mine. Construction activities associated with conveyors to include embankments & formation across the East Field Mine, footing installations as well as mechanical, structural & electrical installation. Associated infrastructure to include roads & ramps, installation of high voltage reticulation & fire services reticulation. Diversion also of the Morwell West Drain as its upper reaches will be subject to mining. Click for more details...

YALLOURN JOINT VENTURE COAL OPERATIONS - YALLOURN COAL FIELD REALIGNMENT PROJECT
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at Eastern Rd, Yallourn North, VIC 3825 for New. A project to reduce overburden removal in the southeast portion of the coal fields supplying the Yallourn W Power Station by boundary alteration. Relocation further to the east of the Maryvale Coal Field boundary. Coal & overburden systems to be located on this field's western batter with overburden placement at the base of the adjacent, currently producing East Field Mine. Construction activities associated with conveyors to include embankments & formation across the East Field Mine, footing installations as well as mechanical, structural & electrical installation. Associated infrastructure to include roads & ramps, installation of high voltage reticulation & fire services reticulation. Diversion also of the Morwell West Drain as its upper reaches will be subject to mining. Click for more details...

INGLEWOOD GOLDFIELD PROJECT - WOLFF SHOOT OPEN CUT
Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) New project at 45km northwest of, Bendigo, VIC 3552. This type is Resource - Gold with Private ownership. Establishment of open cut operations 400m south of the existing Maxwells underground mine shaft. In May 2009 Wolff Shoot open cut resource estimate stood at 102,900t @ 2% gold for 6600 ounces & 19,500t for 11,900 ounces of gold underground. An initial box cut expected to be 150m long, up to 3m wide & 50m deep. A decline to be built out from the side of the pit to access deposits 60m approx below ground. Click for more details...

WOODS POINT GOLD PROJECT - MORNING STAR OPERATIONS - TAILINGS DISPOSAL PLANT
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at West of, Woods Point, VIC 3723 of Structural Steel - For Paste Backfill Plant type of New development. Supply of structural steel for a paste backfill plant to allow for the disposal underground of tailings from the Gravity Mill plant. Click for more details...