GRIFFIN BLUEWATERS POWER PROJECT - COAL-FIRED POWER STATION
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Lot 8 Wellington Loc 796 approx 3km north east of, Collie, WA 6225 for New. The commissioning of the coal-fired power station at Collie will commence October 2008. Click for more details...

COBURN MINERAL SANDS PROJECT - MINING CONTRACT
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Shark Bay Council Area for New development. Mining will be carried out in a three stage process. Firstly top soil removed by scrappers and stockpiled for rehabilitation. Secondly, overburden removed by bucket wheel excavator and conveyed into the void left by mining of the ore. Lastly the ore mined by a second bucket wheel excavator is screened in the pit, mixed with water and pumped to the concentrator near the edge of the pit. Click for more details...

NIMARY - GOLD
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Wiluna Council Area of Private ownership. Contract period of 2 (option 3) years envisaged during which time the first pit (Nimone/Two) is expected to be completed & the second open cut commenced. A strip ratio of 18.1:1 is anticipated for these mines. Diluted open pit reserve currently estimated at 3.4mt grading 6.35gpt gold. Nimone/Two has an initial planned depth of 110m, Nimthree 180m & Nimfour 150m. Mine site preparation, access & haul road construction, waste dumps & associated stockpiles & tailings dam to form part of this tender. Encouraging results from ongoing programme of deeper drilling including 11m grading 84.6gpt gold. Two new zones Nimsix & Nimseven have been identified. Click for more details...

THREE MILE - GOLD
Mining - Infrastructure (Tailings, Dams, Water supply dams) Addition project at Approximately 5 km east of, Coolgardie, WA 6429. This type is Operations - Tailings Dam with Private ownership. Approximately 135,000 cu m expansion of existing facility required. Contract to include site preparation & embankments. Award anticipated early September 1995. Click for more details...

EWINGTON 2 COAL OPERATIONS
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at 8 km east of, Collie, WA 6225 of Bulk Earthworks type of New development. Contract involves placement of waste dump & stockpile areas plus site levelling for new mine. Earthworks also required for rail line & site access roads. ((Tracklaying to be carried out by Westrail.)) Click for more details...

MT KEITH - NICKEL
Mt Keith - Nickel is currently at the Construction stage, valued at about $ 12500000 it is Project underwent EPA assessment on the consultative environmental review level. Proposal is to reduce saline seepage risk & increase system stability. A total tailings storage capacity of about 240mt is required due to increased operations. Proposed facility to incorporate a 5 km diameter x 3m x 5m high embankment plus ring main distribution pipe & will feed 9 vertical risers (purchased). Tailings slurry will be discharged through risers & will flow out to form a series of low, overlapping cones (approximately 3% slope). Tailings water & stormwater runoff to be recycled as plant process water. Works approval granted by EPA for associated works (grinding & milling). Main components of the contract will be earthworks & steel piping. Click for more details...

PARABURDOO IRON ORE OPERATIONS
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Ashburton Council Area of Private ownership. To raise the tailings dam wall. Click for more details...

MOUNT GIBSON PROJECT
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The City Of Greater Geraldon - Mullewa Council Area of Transfer Station type. A transfer station facility where iron ore will be transferred to rail for transport to the Port of Geraldton. Click for more details...

YANDICOOGINA IRON ORE OPERATIONS
A project in the WA Within East Pilbara. Expansion to 36 million tpa .Some conveyor work involved. Flow modifications. A current project to increase output to 24 million tonnes per annum is nearing completion. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - MINDY MINDY
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) New project at 60 km Northwest of, Newman, WA 6753. This type is Resource - Iron Ore with Private ownership. Resource estimate is 44.8 Mt @ 55.2% Fe. The ore at Mindy Mindy will be directly shipped. Strip mining with progressive backfilling of the open pit will be the preferred mining method. Infrastructure to be constructed will comprise a semi-mobile crusher; sealed haul road or overland conveyor system from crushing/screening plant to rail loading facility ; secondary crushers; iron ore product stockpile and train loading facilities; administrative and maintenance hub; connection to the proposed 132 kv transmission line to Newman with capcity upgrade at Newman or a 6 MW power station (to be provided and maintained by an external supplier); Mine dewatering pumps and pipeline; airstrip upgrade at Mindy Mindy and an Accommodation village. Click for more details...

WORSLEY ALUMINA SHIP LOADING FACILITY
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project for New development. Includes shiploader, berth, tanks and conveyor belts. A dust minimising chute will be installed. Click for more details...

PORT OF BROOME
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Broome Council Area of Southern Wharf - Extn type. Proposed to extend wharf south of access jetty by 148 m to increase number of berths by 80%. Click for more details...

INDEE GOLD PROJECT - HEAP LEACH PLANT
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Port Hedland Council Area of Private ownership. The processing facility will initially treat oxide ores via carbon-in-leach technology. A two stage crushing and screening plant has been acquired. It comprises a feed hopper with vibrating screen and roller crusher, conveyors, 60 metre multi stage, heap leach conveying and stacking system, control room and CAT 320 kva generator. Heap leach pads, channel liners and pond liners are also to be supplied. Click for more details...

ALCOA OF AUSTRALIA - AREA K PROJECT
Mining - Infrastructure (Tailings, Dams, Water supply dams) Addition project at Lot 100 Postans Rd, Hope Valley, WA 6165. This type is Mechanical/Electrical Installation For Residue Disposal Expansion with Private ownership. This major mechanical/electrical package includes installation of piping for the tailings dam expansion. Click for more details...

HOPE DOWNS IRON ORE PROJECT - DEWATERING
New project of Mining - Infrastructure (Computer & telecommunication system for mine, scada) project at 75 Km Northwest of, Newman, WA 6753. Mine water usage will be 6.94 Mega litres per day. Work comprises the construction of the dewatering pipeline and discharge facilities for the Hope north pit. Construction will also include collector pipes, main discharge pipeline, 13 buried 152 mm diameter polythene spur lines, access roads and a collector dam of 12 ML. Further development in 2007 and 2008 will be the conversion of the initial 12 production bores to reticulated power, construction of collector pipelines to the collector dam, provision of a pumping station and installation of a telemetry system to relay operating information to a central control/monitor point. Click for more details...

HOPE DOWNS IRON ORE PROJECT - DEWATERING
New project of Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at 75 Km Northwest of, Newman, WA 6753. Mine water usage will be 6.94 Mega litres per day. Work comprises the construction of the dewatering pipeline and discharge facilities for the Hope north pit. Construction will also include collector pipes, main discharge pipeline, 13 buried 152 mm diameter polythene spur lines, access roads and a collector dam of 12 ML. Further development in 2007 and 2008 will be the conversion of the initial 12 production bores to reticulated power, construction of collector pipelines to the collector dam, provision of a pumping station and installation of a telemetry system to relay operating information to a central control/monitor point. Click for more details...

MOUNT WELD RARE EARTHS PROJECT - MINING CONTRACT
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Laverton Council Area of Mining Contract - Opencut type. Work comprises the development of an initial pit 150 metres wide x 300 metres long x 65 metres deep, comprising 35 metres of overburden and 30 metres of ore zone. The total mining quantity of ore and waste is 2,890,800 BCM. Of this, 541,256 tonnes of high grade ore (318,230 BCM) is scheduled to be crushed and stockpiled at the site. Optional work that can be included in the contract include the construction of 8.8 km of haul roads to the site. Also the supply and operation of a comminution circuit, which may comprise a jaw crusher or potentially a trommel screen that is to produce 100%<100 mm HG CZ 15% moisture content ore product for stockpiling on load out stockpiles at a minimum annual rate of 137,000 wet tpa. Click for more details...

DEPARTMENT OF INDUSTRY & RESOURCES - FIMISTON GOLD OPNS TAILINGS
Consultancy On Tailings Storage Facility Performance & Proposed Height Increase project at Golden Mile via, Kalgoorlie, WA 6430 In The Council Area Of Kalgoorlie-Boulder of Private. The Fimiston 1 review report concluded that the proposal is technically feasible, subject to additional studies of seepage interception and embankment design. Some environmental damage from seepage (tree stress/loss) has been identified. Some design modifications and a more targeted groundwater management plan are likely to be required. Click for more details...

BHP BILLITON IRON ORE OPERATIONS - ASSET DEVELOPMENT PROJECTS
Port Facilities - Upgrades New project In The Port Hedland Council Area. Upgrades of existing facilities. Part of a proposed additional expansion to 145Mtpa. The feasibility study is being undertaken by MPDJV (Mine & Port Joint Venture). Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - MATERIALS HANDLING FACILITY
New project of Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at At Anderson Point, Port Hedland, WA 6721. Design, manufacture and commissioning of a train unloader at Anderson Point by Metso Minerals. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - MINING CONTRACT
Pilbara Iron Ore & Infrastructure Project - Mining Contract is currently at the Construction stage, valued at about $ 200000000 it is Work will be carried out in two stages. The first stage comprises mine planning, equipment selection, procurement and commissioning, mine infrastructure planning, operator input to design, pre-production of initial bulk earthworks, pre-strip, pre-production ore mining, construction of haul roads, service reticulation, dewatering, installation and commissioning of mine site conveyancing and development of all mine site management systems. The second stage comprises ore production and mine planning to optimise annual operations and annual operating targets of the mine. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - PORT HEDLAND PORT FACILITIES
Currently at the Construction stage In Port Hedland is a project estimated to be $ 689700000. This project Port facilities comprise a stockyard at 2.5 Mt capacity. Materials handling facility comprising a Train unloader, 22 Conveyors and transfer points, Rescreening plant , two Stackers (8000 tph each), a Reclaimer (10,000 tph), two 300,000 tonne stock piles and a bulk stockpile area. The Materials handling facility will use a rotary car dumping cell to simultaneously tip two ore carriages. Iron ore from each wagon will be dumped into individual surge hoppers and then onto conveyors located at the base of the structure which will deliver the ore through an upward sloping tunnel to the nearby stockpiling area. In order to house the the Train Loader a 22 metre high concrete vault will be constructed to allow ore carriages to be tipped in an efficient manner. Extensive excavation work will be required because approxiamtely 18 metres is below existing ground surface. An associated ramp and conveyor system will be constructed. During excavation construction a significant ammount of dewatering will be required. Port development will include a proposed 750m long single wharf, a Shiploader (10,000 tph), 3.3 million cubic metres of dredging with ongoing maintenance dredging, shipping berth to allow for two 250,000 DWT vessels to be berthed. One berth includes wharf and shiploader. The other includes a berth only. Supporting infrastructure includes a shift office, control room and amenities, wharf amenities, package treatment plant and substations. Click for more details...

HISMELT - FREMANTLE PORT STOCKPILE
A project in the WA Within Kwinana. A concrete stockpile pad and associated loadout facilities to export bulk products from the existing Hismelt plant. Includes a 270 metre reclaim conveyor, concrete pad, fixed hopper with apron feeder and new access road and bridge over reclaim conveyor. Click for more details...

JAGUAR BASE METALS PROJECT - SITE PREPARATION WORKS/BOX CUT MINING CONTRACT
A project in the WA Within Leonora. Development comprises the movement of 1 million cubic metres of material over five months. Work will involve site clearing, mining the box cut, construction of haul roads, initial processing plant earthworks, and tailings dams construction. Click for more details...

BHP BILLTION RAPID GROWTH PROJECT 2 - PORT ADDITIONS
Via, Port Hedland, WA 6721 Has Bhp Billtion Rapid Growth Project 2 - Port Additions currently at Planning stage. Includes construction of a new car dumper and ancillary works. Initial capacity fo car dumper 8Mtpa. Ultimate capacity of 40Mtpa, following future expanison projects. Additional car dumping capacity will allow upgrades to existing dumpers to be undertaken ready for future market growth. Click for more details...

WESTONIA GOLD PROJECT - ACCESS ROAD/EVAPORATION POND/EARTHWORKS
Currently at the Construction stage In Westonia is a project estimated to be $ 5000000. This project Earthworks will involve the construction of an access road, the construction and refurbishment of evaporation ponds and pit floor clean up. Click for more details...

FIMISTON GOLD MINE OPERATIONS EXTENSION STAGE 3
Gold Mine Expansion project at Goldfields Highway Via, Kalgoorlie, WA 6430 In The Council Area Of Kalgoorlie-Boulder of Private. Development will comprise the expansion of the open pit, waste rock dumps and Tailings Storage Facility (TSF). The open pit expansion known as the Golden Pike Cutback will be widened and deepened to approx 670 metres and therby extending the life of the mine until 2017. The Golden Pike Cutback is estimated to hold 2 million ounces of gold. There a number of options for tailings disposal. Option preferred is to heighten the level of the two existing TSF from 30 metres to 40 metres. Other options include recommissioning the Kaltails TSF or constructing Fiminsto 3 TSF. This would cover an area of 150 hectares and would comprise associated infrastructure such as roads and recant ponds. Associated infrastructure include the realignment of the environmental noise bund, extension of the loopline railway. Click for more details...

DAMPIER IRON ORE PORT UPGRADE PROJECT
Port Expansion Phase B New project In The City Of Karratha Council Area. Expansion of port capacity from 116 Mtpa to 140 Mtpa of iron ore. Presently construction works for the previous expansion to 95 Mtpa will be completed by December 2005. A proposal to expand to 120 Mtpa is before State Government authorities at present but does not involve any new construction, only utilising existing infrastructure at Parker Point. Expansion to 140 Mtpa will involve significant new construction work. Development options include upgrading the Parker Point and East Intercourse Island operations and the development of a new greenfields site. Infrastructure required for the expansion includes new car dumpers, screen house replacement, stackers and reclaimers, stockpiles, conveyors, ship loaders and berth works. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - INFRASTRUCTURE
Infrastructure project at Near, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Area C Infrastructure Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - PRECOATED STEEL PILES
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Supply of precoated steel piles for extension of Berth 5 and Berth 6. Piles of 762 mm and 508 mm diameter. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - MATERIAL HANDLING SYSTEM TO BERTH 4
A project in the WA Within City Of Greater Geraldton. Material Handling System to Berth 4. Package 1. Fabrication, supply, installation & commissioning of material handling system. Click for more details...

ARGYLE DIAMOND OPERATIONS - UNDERGROUND INFRASTRUCTURE CONTRACT
110 Km South South West of, Kununurra, WA 6743 Has Argyle Diamond Operations - Underground Infrastructure Contract currently at Construction stage. Work comprises 30 kilometres of underground development work with all the associated infrastructure needed for a block cave mine. More specifically the contractor will construct two underground crusher chambers, undertake vertical development and do initial cave draw production. As part of the underground expansion the existing tailings dam will be expanded. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - SWITCHGEAR
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) New project at Geraldton Port, Marine Terrace, Geraldton, WA 6530. This type is Switchgear - Supply with Private ownership. Supply of Switchgear Click for more details...

FORRESTANIA NICKEL PROJECT - SPOTTED QUOLL
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) New project at Approximately 80km East of, Hyden, WA 6359. This type is Resource - Nickel with Private ownership. The prospect contains approximately 545 600 tonnes of ore averaging 6.3% Nickel; current estimates set the open pit mine-life at four years. The waste dump will be designed for 16 million tonnes of waste rock. Ore will be trucked via upgraded established roads to Flying Fox. Likely infrastructure to include: pit and pit access, ROM, waste dump, settling pond(s), administration building(s), lay-down, haul road, pipeline and power. Mine dewatering pipelines consisting of 450 mm HDPE buried to a depth in excess of 300 mm, parallel to the haul road, will convey mine water to established mine dewatering infrastructure at the Flying Fox mine. Click for more details...

PLUTO LNG PROJECT - JETTY BERTH
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The City Of Karratha Council Area of Jetty Berth type. For the construction of a 300m long approach jetty. The LNG jetty berth will include a 38m x 50m platform, four breasting dolphins, six mooring dolphins and navigational aids. Click for more details...

BHP BILLITON RAPID GROWTH 5 IRON ORE PROJECT - CRUSHING FACILITIES & OVERLAND CONVEYORS
A project in the WA Within East Pilbara. For the provision of primary and secondry crushing facilites including overland conveyors. Click for more details...

RAPID GROWTH 6 IRON ORE PROJECT - POINT NELSON DREDGING
Dredging/Reclamation/Piling project at Nelson Point & Lumsden Point, Port Hedland, WA 6721 In The Council Area Of Port Hedland of Private. Dredging of 6 million cubic metres of material between Nelson & Burgess Points adjacent BHP Billiton's existing berths in Port Hedland Inner Harbour. To provide 2 new berth pockets & upgrade the existing departure channel & swing basin to accommodate vessels up to 250,000DWT. Spoil removed by a Backacter dredge to be placed offshore near the existing Spoil Ground I. Material removed by a Cutter Suction dredge to be sent by floating, submerged & onshore pipeline for placement in an area of over 200ha between Lumsden Point & the light industrial area of Wedgefield. Construction of a perimeter bund using 250,000cu m of fill for an initial 5m height then dredge material to be used to take it up to 9m. Construction also of a 60m approx wide corridor to carry 2 x 900mm diameter pipelines. Driving of marine piles for future wharf construction. Click for more details...

DAMPIER IRON ORE PORT OPERATIONS - PARKER POINT UPGRADE
A project in the WA Within City Of Karratha. A project which is part of Rio Tinto's Growth Program to increase its Pilbara ore handling capacity to 330million tonnes per annum (Mtpa). Upgrade of its Parker Point facility at Dampier Port by 5Mtpa to give an overall 230Mtpa capacity. To include 2 new conyeyors including transfer stations with shuttle heads as well as 2 new surge bins with hydraulically driven belt feeders. During a pause to change a ship's hatch, fine ore to be continuously fed by an existing conveyor to a surge bin & then loaded rapidly afterwards. Existing reclaimers also used to maximum extent by loading via the new surge bins & the top up belt. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - MARINE WORKS
Access Jetty/Wharf project at Port Walcott 40km east of, Karratha, WA 6714 In The Council Area Of City Of Karratha of Private. Construction of a 920m long access jetty & a 2-berth wharf along with new shiploading facilities. Click for more details...

ANDERSON POINT PORT FACILITIES - BERTH 3
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) New project at Anderson Point, Port Hedland, WA 6721. This type is Port Facilities with Private ownership. The expansion will provide an additional 400m of wharf superstructure, 7 berthing dolphins, navigational aids and associated mechanical components. Click for more details...

ARGYLE DIAMOND OPERATIONS UNDERGROUND EXPANSION - CRUSHERS, CONVEYORS & DEWATERING
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) New project at 110km south-southwest of, Kununurra, WA 6743. This type is Crushers/Conveyors/Dewatering Pump Stations with Private ownership. Supply of 2 underground crushers. 1.2km of conveyors. Dewatering pump stations. Associated piping, electrical, instrumentation & control equipment. Click for more details...

ROY HILL IRON ORE PROJECT - PORT MARINE - QUICK RELEASE HOOKS
A project in the WA Within East Pilbara. For the provision of quick release hooks. Click for more details...

RIO TINTO PILBARA AUTOHAUL RAIL PROJECT ANCILLARY WORKS
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at Pilbara region, ., WA 6999 for New. A staged project to develop driverless trains on the existing 1500km approx train network linking Pilbara mines with ports through development of centralised servers & onboard equipment fitted to existing trains. To also involve wayside development such as construction of signalling pads & equipment installation, trenching for the installation of new signal cables, construction of permanent access roads & ramps as well as storm water drainage, fencing & gates at level crossings. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - PORT NON PROCESS - COMMUNICATION & DATA
A project in the WA Within East Pilbara. For the provision of communication & data services. Click for more details...

NAMMULDI BWT MINE EXPANSION PROJECT - ROAD MAINTENANCE & MISCELLANEOUS EARTHWORKS
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project for New development. For the provision of road maintenance & miscellaneous earthworks. Click for more details...

MATILDA GOLD MINE TAILINGS DAM
Currently at the Construction stage In Wiluna is a project estimated to be $ 100000000. This project Construction of tailings dam at Matilda Gold Mine. Click for more details...

YANDI OXBOW PROJECT (YOP) - BULK EARTHWORKS/CIVIL WORKS
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project for New development. For bulk earthworks & civil works to sustain current production at the Yandi Mine. To include construction of a 4.5km haul road, construction of a heavy vehicle bridge over the existing railway, over 700,000cm of embankment construction, over 3200 lineal metres of culverts & upgrades, re-routing & extensions to existing light vehicle access roads. Click for more details...