State

Categories

Sub Categories

Click Here to Find Current Projects

List of Mining - Primary And Secondary Processing⊂category= Projects in ®ion= in region


DOUGLAS MINERAL SANDS PROJECT
Secondary Processing Plant (Msp) For Heavy Minerals project at 6 km south of, Hamilton, VIC 3300 in the Mining - Primary And Secondary Processing (Other processing including salt, sand etc). The Mineral Separation Plant ("MSP") for processing mine concentrates. The capacity has been almost doubled from 30 tonnes to 55 tonnes per hour. Click for more details...

AUGUSTA/COSTERFIELD PROCESSING FACILITY
Currently at the Construction stage In Greater Bendigo is a project estimated to be $ 10000000. This project Development comprises the modification and and refurbishment of the existing Costerfield CIL plant and the construction of a new crushing/processing plant. Work comprises earthworks; contract project management, layout and design drafting for various sections of the plant; sourcing, inspecting and acquiring various items of second hand equipment; design of main and distribution switchboards, current limiting device and main switch for installation adjacent to transformer substation reserve; refurbishment of float cells, Knelson concentrators and process circuit pumps. Click for more details...

LIDDELL COAL COLLIERY - RESOURCE
Mine - Coal New project In The Singleton Council Area. Existing operation produces 4.5 Mtpa of Rom coal and the CHPP processes 700 tonnes per hour. A proposal has been approved to increase ROM coal production to 8 Mtpa. Associated development will comprise the construction of a new Coal Handling Plant, establishment of a new supplementary stockpile with capacity of 450,000 tonnes, alter the planned 1500 ML Dam 13B footprint, construct a bridge over the main Northern Railway to improve transport between existing coal pits, alter an access road to the CHPP, relocation of offices, workshop and storage area and an associated access road, and the construction of a desalination unit within the CHPP area for the treatment of mine water. Capital expenditure on the Washplant upgrade alone was approx $100 million. Click for more details...

LADY ANNIE/MOUNT KELLY COPPER PROJECT - PROCESSING FACILITY
New project of Mining - Primary And Secondary Processing (Piping) project at Adjacent to Lady Loreta Mine 140 Km North West of, Mount Isa, QLD 4825. To construct a 1900 tpa copper SXEW plant and heap leach. Total copper recovery is expected to be 89% of the ore processed. Click for more details...

OLYMPIC DAM COPPER/GOLD/URANIUM OPERATIONS
Mining - Primary And Secondary Processing (Minerals Processing) Addition project at Via, Roxby Downs, SA 5725. This type is E-Duc System Upgrade/Drop Out Box For Ccd Area - Plant Optimisation with Private ownership. In addition to undertaking the drop-out box for the CCD area previously reported Issue 41/01, Eimco will be undertaking the upgrade of the E-Duc systems fitted to the CCD thickeners. Click for more details...

BLACKWATER COMET PROJECT
New project of Mining - Primary And Secondary Processing (Coal Processing) project at Via, Blackwater, QLD 4717. Part of Comet CPP project. Coal Handling. Click for more details...

ROSEBY COPPER PROJECT - PROCESSING FACILITY
New project of Mining - Primary And Secondary Processing (Civil works at processing facilities) project at North west of, Cloncurry, QLD 4824. The process plant is to be located immediately adjacent the Blackard Pit. The basic processes include: primary crushing, comprising feed bin, apron feeder, crusher and dust suppression, grinding in a single stage SAG mill and classification in cyclones, optional stockpiling of primary crushed or to de-couple the grinding and flotation processes for the crushing operations, rougher and scavenger flotations, rougher concentrate regrinding to improve final concentrate grade, two stages of cleaner flotation, concentrate thickening and filtration and filter cake storage before transportation, tailings thickening and disposal storage facility and reagents preparation and services. The process plant has been designed to treat approximately 3 Mtpa of sulphide feed, as this will be the case for the initial 4 years of production. Following this, the processing plant may require adaptation to process oxide ores, as the style of ore mineralisation vary. These throughputs are based on a 24 hour per day, 7 days per week operations. The flotation concentrate would be saleable for smelter feed. The proposed process plant comprises the following: Run of Mine (ROM) ore bin fed by either a front end loader or by trucks direct tipping ore, grizzly feeder to remove fines less than 150mm, conveyor feeding combined grizzly and crusher products to the mill, a SAG mill with single 3 MW drives, a ball miss with single 3MW drive, two sets of rougher/scavenger flotation cells (2x7x160 cubic metres), concentrate regrind mill with 550kW drive, cleaner flotation cells (6x50 cubic metres cells), recleaner flotation (4x20 cubic metres cells), concentrate thickening and filtration, reagents, air and water services and pumps, service cranes and hoists. Click for more details...

GLOUCESTER RUBY MINE
Mine - Rubies project at Mid way between Scone and, Gloucester, NSW 2422 In The Council Area Of Gloucester of Private. Mine production for December Quarter 2006 was 15,281 tonnes of gemstones. Click for more details...

MEEKATHARRA GOLD OPERATIONS - BLUEBIRD PLANT
Currently at the Planning stage In Meekatharra is a project estimated to be $ 1000000. This project Modifications will include changing the circuit, incorporating some parts (already on hand) not currently in use. To accommodate the harder ore, rates will be adjusted from 3mtpa to 1 -1.5mtpa. Click for more details...

ST IVES GOLD MINE - JUNCTION MINE
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project for New development. PART 1- Crushing system & PART 2 - Transfer system have been sold. PART 3 - Winding system - Victor Winder - headed double type, single 600 KW DC motor - Immaculate condition including all spares, infrastructure and drawings. PART 4 - Headframe system - Head frame, stacker with all rope and frame spares and drawings. Click for more details...

YABULU NICKEL REFINERY EXTENSION - NICKEL PRODUCT BUILDING CONTRACT
Mining - Primary And Secondary Processing (Minerals Processing) project at Refinery site at, Yabulu, QLD 4818 for New. Contract package 6 & 7 covers nickel carbonate recovery, calcination and the final nickel product. The contract will involve the construction of a hydrometallurgical facilities including a calciner, furnaces and the production of nickel compacts. Work will be largely greenfield. A second nickel product plant will be constructed to provide capacity for additional throughput. Includes precipitation, filtration, calcining, reduction, sintering and packaging. Click for more details...

THALANGA COPPER OPERATIONS
Mining - Primary And Secondary Processing (Minerals Processing) project In The Charters Towers Regional Council Area of Private ownership. The Thalanga mine reopened in mid June 2002. The processing facility is scheduled to reopen in October 2002 approx. Click for more details...

EASTERN RANGES PROJECT - PARABURDOO
Eastern Ranges Project - Paraburdoo is currently at the Construction stage, valued at about $ 1000000 it is Includes modifications to plant at existing facilities (brownfields) and new project area (greenfields). Conveyor work involved. Click for more details...

HAWKS NEST MINERAL SANDS OPERATIONS - FULLERTON
Dredge - Dismantle & Relocation New project In The Upper Lachlan Council Area. MDL has finalised a comprehensive technical and commercial co-operation agreement with a private Indian company, Beach Minerals (Sands) Company Limited ("BMC"). The agreement will see the transfer of MDL's 9 million tonne per annum Fullerton dredge to BMC. MDL is providing technical expertise in respect of dredge mining programme at Kuttam. BMC will fund the costs associated with shipping the dredge from Australia and its reconfiguration and assembly in India. MDL is providing technical assistance to BMC in respect of their separation plant upgrade. Click for more details...

MUNGARI WEST PROJECT - WHITE FOIL
18 km northeast of, Coolgardie, WA 6429 Has Mungari West Project - White Foil currently at Construction stage. Resource of 11.8 million tonnes at 2.42g/t gold for 915,000 ounces of gold. Click for more details...

NEW BENDIGO GOLD PROJECT - KANGAROO FLAT MINE - RESOURCE
Mining - Primary And Secondary Processing (Minerals Processing) New project at via, Bendigo, VIC 3550. This type is Operating Mine with Private ownership. The plant is currently treating low-grade ore which was stockpiled during mining operations in 2006/2007. The first ore parcel from Gill reef is planned to be processed in late June, with trial gold production ramping up during the September 2008 quarter. Click for more details...

KOGAN CREEK POWER STATION PROJECT - CONCRETE & FINISHING WORKS
New project of Mining - Primary And Secondary Processing (Civil works at processing facilities) project at 9 km south of, Brigalow, QLD 4412. Procurement, (fabrication) and erection of: 36,500 m³ concrete for foundations, walls, columns, ceilings and turbine foundation. 3,500 to reinforcement, 49,000 m² formwork for foundations, walls, columns, ceilings and turbine foundation. 1,570 m³ Brickwork 17,5 cm to 36,5 cm thickness, 600 m² Brickwork 12 cm thickness, 8,770 m² Plastering of walls, columns, ceilings, 24,300 m² Painting of walls, columns, ceilings, 2,150 m² Ceramic tiles for walls and floors, 2,200 m² Carpet tiles / linoleum flexible sheets, 2,000 m² Suspended ceilings, 350 m² Raised floors, 210 No Toilets, washbasins, showers, urinal. Click for more details...

MINDARIE MINERAL SANDS PROJECT - PROCESSING FACILITY
Processing Facilities/Infrastructure project at Via, Karoonda, SA 5307 In The Council Area Of Karoonda of Private. To construct a processing plant comprising a product separation plant (Dry) and HMC separation plant (Wet) and a warehouse to store equipment and product. Click for more details...

ADELONG GOLD PROJECT - CHALLENGER
Mining - Primary And Secondary Processing (Minerals Processing) project for Renovations, Refurbishments etc. development. A crushing plant has been purchased and two ball mills installed. Click for more details...

KOGAN CREEK POWER PROJECT - TANKS/VESSELS
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Western Downs Regional Council Area of Tanks/Vessels type. 1 Clean Drains Tank 12 m³ (carbon steel), - 1 Clean Drains Flash Tank 6m³ (carbon steel), - 1 Volume Expansion Tank 5m³ (carbon steel), - 1 Potable Water Tank 20m³, stainless steel or GRP, - 1 Vacuum Drains Tank 14m³ (carbon steel). Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - CIVILS/PRELIMINARYWORKS
Civil Works Packages project at At, Gove, NT 0880 In The Council Area Of East Arnhem Shire of Private. Various. Civil works likely to include a wharf. Click for more details...

COWAL GOLD PROJECT - CIVIL WORKS
Private ownership Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Bland Council Area for New development. Concrete foundations, sub-structure and structures. Includes concrete reclaim tunnels. Click for more details...

MANDALONG COAL OPERATIONS - METHANE GAS DRAINAGE PLANT
Methane Gas Drainage Plant - Construct/Operate project at 3 km south west of, Morisset, NSW 2264 In The Council Area Of Lake Macquarie of Private. The coal haulage is 1,000 tonnes by road to Eraring and/or Vales Point power stations contract is likely to be added to existing contractor. The likely method to be used for the Methane Gas Drainage Plant at the first stage is to purge the gas to atmosphere using one of two options. A decision will be made by mid February 2005 on which option is to be used. Click for more details...

PARDOO IRON ORE PROJECT
Pardoo Iron Ore Project is currently at the Construction stage, valued at about $ 8300000 it is The project is based on an identified iron ore (hematite) resource of approximately 7.4Mt. The project proposes an ore production rate of 1.5 Mtpa, resulting in a mining life of 5 - 6 years. The project involves the open cut mining of eight small pits in five deposits to obtain direct-shipping quality iron ore. The ore will be crushed, screened and stockpiled on site prior to being loaded into rail trains for road haulage to the appropriate berth at Port Hedland. Ore will be stockpiled at the port until it is loaded onto ships for export to overseas customers. The major components of the Pardoo DSO Project are: minesite establishment, mining operations, product transport and export and decommissioning and closure. The minesite access road and temporary construction yard and administration area will be the first infrastructure constructed. The mining operations centre (MOC) will be located in the northern portion of the minesite and contains the following infrastructure: administration area including Atlas facilities, mining contractor's facilities, crushing and screening contractor's facilities, haulage contractors facilities, sewerage treatment and waste water storage, potable water storage, common parking area. The MOC will also contain a fuel storage and refuelling area, power station (diesel), crushing and screening plant, ROM ore pad and product stockpiling area, parking areas and portions of the access road and haul road, and combined contractor's laydown area. Haul roads will be constructed between the pits, waste rock dumps, stockpiles and ROM pad stockpile. Minor access roads will provide access to waste rock dumps and inspection points, dewatering equipment, water management structures, environmental discharge locations and other minesite management areas. The proposed mining operation will be a multiple, open pit mining operation, using conventional drill and blast and load and haul methods. Ore from the pits will be hauled directly to the ROM pad or temporarily stockpiled adjacent to the pits. The crushing and screening plant will provide primary and secondary crushing and screening. Click for more details...

RAVENSTHORPE NICKEL PROJECT - LIMESTONE BALL MILL
Ravensthorpe Nickel Project - Limestone Ball Mill is currently at the Construction stage, valued at about $ 10000000 it is Limestone Ball Mill Click for more details...

LIDDELL POWER STATION - WATER TREATMENT PLANT BUND REPAIRS
A project in the NSW Within Muswellbrook. The work involves improving the bulk chemical containment systems employed in the water treatment plant. Click for more details...

PARABURDOO IRON ORE OPERATIONS - MINE SOFTWARE MANAGEMENT SYSTEM
Mine Site, Paraburdoo, WA 6754 Has Paraburdoo Iron Ore Operations - Mine Software Management System currently at Construction stage. The Ampla software will be used to replace the mines existing plant downtime and production monitoring system. It will comprise a downtime, production and metrics modules to be installed by the contractor. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C/PORT - ELECTRICAL/CONTROLS
Near, Newman, WA 6753 Has Iron Ore Rapid Growth 3 Project - Area C/Port - Electrical/Controls currently at Construction stage. Area C Electrical and Controls. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C/PORT - NETWORK EQUIPMENT
Mining - Primary And Secondary Processing (Computerised systems for processing equipment) project at Near, Newman, WA 6753 for New. NETWORK EQUIPMENT Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - ELECTRICAL CONTRACT
Electrical Work For Temporary Facilities/Infrastructure/Process Plant project at 15 Km South east of, Collie, WA 6225 in the Mining - Primary And Secondary Processing (Minerals Processing). Work for the Electrical, Instrumentation & Control - Infrastructure package includes Power Distribution, Instrumentation and Control System Infrastructure to the Refinery, Mine and Port inclusive of materials handling facilities. Battery limits include the 132kV WPC tie-in, 11.5kV power distribution to EDCs and 415/240V Distribution Boards and MCCs as well as the control system from the Central Control Room to the Marshalling Panels within the EDCs. Work for the Electrical, Instrumentation & Control - Process Plant includes Power, Instrumentation and Control from the field side of the MCCs, Distribution Boards and Control Marshalling Panels within the EDCs to the Refinery, Mine and Port inclusive of materials handling facilities. Click for more details...

LEONORA GOLD OPERATIONS - TARMOOLA PIT - RESOURCE
Leonora Gold Operations - Tarmoola Pit - Resource is currently at the Early Planning stage, valued at about $ 20000000 it is Resource estimate is 35,000,000 tonnes @ 1.2 g/t for 1,300,000 ounces of Au. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - ONSHORE OUTLOADING CONVEYOR SYSTEM
Dalrymple Bay Coal Terminal Expansion - Onshore Outloading Conveyor System is currently at the Construction stage, valued at about $ 60000000 it is To fabricate and erect an Onshore Outloading Conveyor System. The conveyor will be one kilometre in length and will be constructed of fabricated steel. There will be a minor civil work component to the project involving concreting. All the mechanics have been supplied. Click for more details...

WOLFRAM CAMP PROJECT - PROCESSING PLANT
15 Km North west of, Dimbulah, QLD 4872 Has Wolfram Camp Project - Processing Plant currently at Construction stage. Construction of a 150,000 tpa treatment plant. The developer has sourced a suitable second hand ball mill and is inspecting a second hand front end crushing and screening facility. Click for more details...

BENGALLA COAL OPERATIONS - CIVIL WORKS FOR ROM HOPPER CONSTRUCTION
Mining - Primary And Secondary Processing (Coal Processing) project In The Muswellbrook Council Area of Private ownership. For the provision of civil works for the rom hopper construction. Click for more details...

BURBANK PROCESSING PLANT UPGRADE
Mining - Primary And Secondary Processing (Minerals Processing) project In The Coolgardie Council Area of Processing Plant Upgrade type. The processing facility comprises a two stage crushing, ball milling and a carbon in pulp circuit of 180,000 tpa. Other infrastructure includes a laboratory, offices, maintenance facilities and tailings storage facility. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - YANDI ORE PROCESSING PLANT UPGRADE
Iron Ore Rapid Growth 4 Project - Yandi Ore Processing Plant Upgrade is currently at the Planning stage, valued at about $ 50000000 it is Work comprises upgrading the 42 Mtpa ore processing plant. Click for more details...

CARBOROUGH DOWNS COAL MINE EXPANSION PROJECT - PIPING FOR MECHANICAL EQUIPMENT
Mining - Primary And Secondary Processing (Piping) project In The Isaac Regional Council Area of Private ownership. For the provision of piping for mechanical equipment for the new 5Mpta CHPP. Click for more details...

DAUNIA COAL PROJECT - COAL HANDLING PREPARATION PLANT
Approximately 25km Southeast of, Moranbah, QLD 4744 Has Daunia Coal Project - Coal Handling Preparation Plant currently at Construction stage. The contract involves detailed design and procurement of a CHPP, with all key components scheduled for delivery during calendar 2009. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - PERLITE - INSULATION
Mining - Primary And Secondary Processing (Tankage, Silos) project at On, Barrow Island, WA 6712 for New. For the provision of loose fill perlite insulation for use in non evacuated low temperature & cryogenic vessels. Click for more details...

MAULES CREEK COAL PROJECT - PROCESSING PLANT
Coal Handling & Processing Plant project at 20km northeast of, Boggabri, NSW 2382 in the Mining - Primary And Secondary Processing (Coal Processing). Design & construction of a coal handling & preparation plant (CHPP). Wash plant system & bypass system each with a capacity of 1600tph (11.8 million tonnes per annum). Includes a secondary sizing station, Run-of-Mine (ROM) hoppers, thickener facility & train load out. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT - RAIL DUPLICATION
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) New project at Emu Siding to Cape Lambert via, Karratha, WA 6714. This type is Rail Duplication with Private ownership. A project to duplicate the 70km rail line between Emu Creek Siding & Cape Lambert as part of a project to increase iron ore capacity to 320 million tonnes per annum (Mtpa). To include construction of a marshalling yard adjacent to Cape Lambert Port, a locomotive refuelling facility, a ballast loadout facility & Arches Siding. Crossovers between the existing & duplicate rail line at Arches, Harding, Green Pool & Emu Sidings. Installation of communication cabling, asset protection & signalling equipment including works to support Automated Train Operation facilities. Modification of existing Harding Siding & expansion of the existing 50km quarry. Extension to the existing Emu Siding to service Deepdale Line. Water for the 5 year construction period expected to be supplied via Harding Dam with new bores also under consideration. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - GRATING & CAST IN ANGLE SUPPLY
Mining - Primary And Secondary Processing (Piping) project for New development. For the supply of grating & cast in angle. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - QUARRY MATERIALS
Quarry Materials - Supply project at Various locations, ., QLD 4999 in the Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying). Supply of quarry materials for earthworks & road works associated with the APLNG pipeline. Locations include: Miles, Wandoan, Lighthouse, Fairview, Cockatoo, Mungungal, Biloela/Callide, Mt Larcom & Gladstone. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - EARTHING LUG
Currently at the Construction stage In Ashburton is a project estimated to be $ 50000. This project For the provision of an earthing lug. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - SS & CS PIPE & PIPE MATERIALS
Mining - Primary And Secondary Processing (Tankage, Silos) project at On, Barrow Island, WA 6712 of Ss/Cs Pipe/Materials type of New development. For the provision of SS & CS pipe & pipe materials. To include: pipe, flanges, fittings, gaskets & fasteners. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - LNG STORAGE & CONDENSATE TANKS - CONCRETE EQUIPMENT
Currently at the Construction stage In Ashburton is a project estimated to be $ 500000. This project For the provision of concrete equipment. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - COMPRESSION STATIONS ECI CONTRACT
Mining - Primary And Secondary Processing (Coal Processing) project In The Western Downs Regional Council Area of Compression Stations - Early Contractor Involvement type. Contract for the early civil site works (bulk earthworks, piling & concrete foundations) & front end planning work for 5 x compression stations & a central processing plant at the Woleebee Creek block southwest of Wandoan & 3 field compression stations & a central processing plant at the Bellevue block east of Miles. Click for more details...

PAYNES FIND GOLD OPERATIONS RECOMMENCEMENT - PROCESSING PLANT
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project In The Perth Council Area of Private ownership. Plant to produce eluvial/alluvial gold, from small scale open cast workings, utilising its existing alluvial gravity circuit plant with mill & knudsen concentrator. The plant is capable of processing at a rate of 50 tonnes/hour, current expectations are targetting the processing of approximately 9,000 tonnes per month with an average head grade based on historical results of between 0.3 to 0.5 grams per tonne. Click for more details...

BROWNS RANGE HREE PROJECT - PROCESSING PLANT
Browns Range Hree Project - Processing Plant is currently at the Construction stage, valued at about $ 40000000 it is The pilot plant is stage 1 of the new business plan for the Browns Range project. Stage 1 incorporates the construction of a Pilot Plant at Browns Range wotj a 60,000tpa capacity to produce 49,000kg dysprosium, in 590,000kg TREO per annum. The Pilot Plant will de-risk the full scale project. As ore processing occurs via a 2 stage process, the construction of the Pilot Plant will include beneficiation & hydrometallurgical process pilot plants. Beneficiation unit operations are proposed to be a crushing circuit, grinding in semi-autogenous grinding (SAG) mill &/or a ball mill, two stage wet high gradient magnetic separation (WHGMS) process, flotation circuit to produce a mineral concentrate, tailings thickening of residues from the WHGMS & flotation circuits co-mingling with the hydrometallurgical tailings for disposal in the tailings storage facility. The hydrometallurgical plant process comprises drying of the mineral concentrate followed by acidification & roasting to crack the mineral structure, water leaching to bring metals into solution, purification & ion exchange to remove impurities, precipitation of RE using oxalic acid & calcinations to convert RE oxalates to oxides, neutralisation & thickening of waste streams prior to co-mingling with the beneficiation tailings & subsequent delivery to the tailings storage facility. Click for more details...

LONGFORD TO LONG ISLAND POINT GAS PIPELINE REPLACEMENT
Longford To Long Island Point Gas Pipeline Replacement is currently at the Construction stage, valued at about $ 10000000 it is Construction of a replacement 350mm diameter pipeline alongside the existing 700m pipeline which will be mothballed. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect