List of Mining - Primary And Secondary Processing⊂category= Projects in NSW®ion= in region


RASP SILVER LEAD & ZINC OPERATIONS EXTENSION - PROCESSING PLANT
New project of Mining - Primary And Secondary Processing (Minerals Processing) project at via, Broken Hill, NSW 2880. A plant to handle increased Stage 2 production of 750,000 tonnes per annum (tpa) ore throughput to produce an average of 65,000tpa zinc concentrate (50% zinc) & 35,000tpa lead concentrate (70% lead) containing 800,000 ounces silver. Click for more details...

RASP SILVER LEAD & ZINC OPERATIONS EXTENSION
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. Continuation of production at the Rasp Mine through a combination of open cut & underground workings. The existing Kintore open cut pit to be extended over 4 years for an anticipated 1.5-2 million tonnes (Mt) production comprising 16% lead plus zinc & 200g/t silver. A decline from the existing Kintore pit allows underground access to another 10Mt in the previously unmined Western & Centenary Mineralisations. Initially underground workings will focus on high grade pillars with the ore trucked out for processing at the Endeavour Mine. Construction of a processing plant to accommodate Stage 2 follow on underground mining of the Western & Centenary lodes for around 750,000 tonnes per annum (tpa). Power, water and rail access already connected to the site with buildings, workshops and general amenities also in place. Click for more details...

BULGA COAL OPERATIONS - REDBANK II COAL TAILINGS PREPARATION & WASTE MANAGEMENT
Coal Tailings Dewatering Plant & Associated Infrastructure New project In The Singleton Council Area. The proposal included construction & operation of a tailings dewatering plant (DBT) and associated infrastructure and facilities. Supply of BDT fuel to the Redbank 2 power plant and receipt and disposal of fly ash, water treatment plant sludge, and wastewater from the Redbank 2 power plant. Click for more details...

TAHMOOR COLLIERY - TAHMOOR NORTH EXPANSION STAGE THREE/COAL PREPARATION PLANT
Tahmoor Colliery - Tahmoor North Expansion Stage Three/Coal Preparation Plant is currently at the Tenders & Building stage, valued at about $ 5000000 it is Part of proposed Tahmoor North expansion from 1.9 million tonnes ROM in 2002 rising to 3.2 million tonnes ROM by end 2004 of high quality coking coal. The project is currently scheduled for completion by early 2004 and will proceed in three stages. Expressions of interest are invited for supply of equipment for each stage of the project. Click for more details...

HILL END PROJECT - GOLD RESOURCE
Mining - Primary And Secondary Processing (Minerals Processing) project at 2 km northwest of, Hill End, NSW 2850 for New. The plant is processing material from the test drive on the M2 vein set, which has averaged over two ounces per tonne recovered grade with some material producing over four ounces per down. About 80 tonnes of M2 material have been stockpiled from the high grade north end of the test drive, which face sampling indicated would contain up to four ounces per tonne. An additional 200 tonne M2 stockpile of various grades is ready to be processed and narrow driving on the high grade M2 is continuing to the north and south of the test drive to produce plant feed material. Click for more details...

HILL END GOLD PROJECT - HAWKINS HILL/REWARD
Mining - Primary And Secondary Processing (Minerals Processing) project In The Bathurst Council Area of Mining/Processing Equipment - Supply type. The company has sourced some additional mining & processing equipment. Click for more details...

GALONG LIMESTONE OPERATIONS
Eubinal Rd, Galong, NSW 2585 Has Galong Limestone Operations currently at Planning stage. Boral intends to expand the Galong lime operation by installing a 150,000 tonnes per annum vertical shaft lime kiln at the site, subject to regulatory approvals. The acquisition and the kiln installation will involve approximately $30 milliion. The upgrade is expected to be completed by June/July 2004. Click for more details...

GLOUCESTER RUBY MINE
Mine - Rubies project at Mid way between Scone and, Gloucester, NSW 2422 In The Council Area Of Gloucester of Private. Mine production for December Quarter 2006 was 15,281 tonnes of gemstones. Click for more details...

TASMAN PROJECT - MOUNT SUGARLOAF
Mine Infrastructure New project In The Newcastle Council Area. Includes mine portal, conveyor, coal stockpile and truckloading area. Click for more details...

HILL END GOLD PROJECT - PROCESSING FACILITIES UPGRADE
A project in the NSW Within Bathurst. Upgrade and recommissioning the Amalgamated gravity plant. Major work will be the installation of a gold room. The plant will be used for the bulk sampling program. Click for more details...

TARAWONGA COAL PROJECT - RESOURCE
Resource - Coal project at Maules Creek & Goonbri Rds, 15 km north east of, Boggabri, NSW 2382 In The Council Area Of Narrabri of Private. The expected mine life between 8 to 10 years, will yield close to 12 million tonnes of export quality low sulphur, low ash, high-energy semi-soft coking coal from the Forest View, Thuin and Nagero properties east of Boggabri (formerley named East Boggabri Coal Project). Click for more details...

POONCARIE MINERAL SANDS PROJECT - GINKGO - RESOURCE
South of, Menindee, NSW 2879 Has Pooncarie Mineral Sands Project - Ginkgo - Resource currently at Construction stage. Resource at gingko as at mid 2004 Measured 162Mt ore 5,767 kt heavy minerals, Indicated 43Mt, 856kt heavy minerals. Road construction and a construction camp will be part of the development. Click for more details...

TAHMOOR COLLIERY
New project of Mining - Primary And Secondary Processing (Coal Processing) project at At, Tahmoor, NSW 2573. Bolt-up in progress. The clean coal stockpile level has been built up to 284,000 tonnes to ensure that coal shipment could be met during the planned shutdown. The shutdown is required to enable completion of necessary capital works during the Tahmoor North Expansion. The longwall changeover is part of normal mining operations. Click for more details...

HAWKS NEST MINERAL SANDS OPERATIONS - FULLERTON
Dredge - Dismantle & Relocation New project In The Upper Lachlan Council Area. MDL has finalised a comprehensive technical and commercial co-operation agreement with a private Indian company, Beach Minerals (Sands) Company Limited ("BMC"). The agreement will see the transfer of MDL's 9 million tonne per annum Fullerton dredge to BMC. MDL is providing technical expertise in respect of dredge mining programme at Kuttam. BMC will fund the costs associated with shipping the dredge from Australia and its reconfiguration and assembly in India. MDL is providing technical assistance to BMC in respect of their separation plant upgrade. Click for more details...

BENGALLA COAL OPERATIONS EXPANSION PHASE 1
Mining - Primary And Secondary Processing (Coal Processing) New project at 4 km west of, Muswellbrook, NSW 2333. This type is Operating Mine - Expansion - Phase 1 with Private ownership. Expansion of open cut operations with Phase 1 to increase Run-of-Mine (RoM) coal to 9.3Mtpa for 7.5Mtpa approx product coal. To include upgrade of the existing 8.7million tonnes per annum (Mtpa) capacity coal washery to 2 stage washing. Purchase of additional mining equipment. Upgrades of associated mine infrastructure including a heavy vehicle workshop, bathhouse & wash bay. Click for more details...

COWAL GOLD PROJECT - ENDEAVOUR 42/ENDEAVOUR 46
Mining - Primary And Secondary Processing (Minerals Processing) project at Approx 45 kms north east of, West Wyalong, NSW 2671 of Resource - Gold/Infrastructure/Plant type of New development. The Cowal project has proven and probable reserves of 2.8 million ounces. The mine is expected to produce 220,000 to 235,000 ounces of gold per year on average. Mine and process plant construction is expected to take 21 months. Click for more details...

BENGALLA COAL OPERATIONS
Mine site, Bengalla, NSW 2333 Has Bengalla Coal Operations currently at Construction stage. The expansion involves additions of a second module. This will replicate module 1, which was designed to allow addition of a second module. The addition will expand production capacity to 3,000 tonnes per annum export capacity. Click for more details...

CSA COPPER OPERATIONS - CONCRETE REMOVAL
Mining - Primary And Secondary Processing (Minerals Processing) project In The Cobar Council Area of Concrete Removal type. This package may be combined with Steel Work contract ID: 2155418. Decision is yet to be made whether concrete may be replaced with steel flooring. Click for more details...

WEST CLIFF COLLIERY
Upgrade Conveyor Belts & Drive Units project at Wedderburn Rd, Appin, NSW 2560 In The Council Area Of Wollondilly of Private. The drive units involved are numbers 1.11, 1.5 & 1.9. Click for more details...

MANGOOLA COAL PROJECT - COAL HANDLING & PREPARATION PLANT
Mining - Primary And Secondary Processing (Coal Processing) project for New development. For the installation of a 10.5 Mtpa coal handling & preparation plant, including site-wide electrical, instrumentation, & control, 500 kV line relocation (subject to relevant regulatory approval), & 66kV supply to mine substation. Click for more details...

NARRABRI SHIRE COUNCIL - QUARRY BLASTING
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project at Quarry sites via, Narrabri, NSW 2390 of Quarry Blasting type of New development. Tenders invited from suitably licensed contractors with previous experience in quarry blasting works under a Full Service, Work-as-Ordered Contract. Click for more details...

BROULA KING GOLD PROJECT - TREATMENT PLANT
Mining - Primary And Secondary Processing (Minerals Processing) New project at 2715 Mid Western Highway, Bumbaldry, NSW 2794. This type is Treatment Plant with Private ownership. For the construction of a gold treatment plant. Click for more details...

RIDGEWAY UNDERGROUND GOLD MINE - NEW UNDERGROUND PRIMARY CRUSHER
Mining - Primary And Secondary Processing (Minerals Processing) project at 50 Km West of, Cargo, NSW 2800 for New. The proposal to extend underground operations at Ridgeway includes the installation of a new primary crusher approx 360 metres lower in the mine workings. Click for more details...

MANDALONG COAL OPERATIONS - METHANE GAS DRAINAGE PLANT
Methane Gas Drainage Plant - Construct/Operate project at 3 km south west of, Morisset, NSW 2264 In The Council Area Of Lake Macquarie of Private. The coal haulage is 1,000 tonnes by road to Eraring and/or Vales Point power stations contract is likely to be added to existing contractor. The likely method to be used for the Methane Gas Drainage Plant at the first stage is to purge the gas to atmosphere using one of two options. A decision will be made by mid February 2005 on which option is to be used. Click for more details...

LIDDELL POWER STATION - REMOVAL OF ASH/DUST PLANT
Via, Liddell, NSW 2333 Has Liddell Power Station - Removal Of Ash/Dust Plant currently at Construction stage. The contract involves surveying the plant outline and producing cabling/wiring diagrams. Supply and commissioning new 115 V AC Power supplies. Supply and commissioning a new relay cabinet to control various items of plant. Install new start stop relays to motor control cubicles and modify control circuits. Recable direct from PLC cabinets or new relay cabinets to solenoid control cabinets at various locations. Splice or join dust solenoid control cables. Replace dust pump gland seal pressure switches with transmitters including PLC harware and cabling. Replace cabling to A Ash Train gland seal pressure switches. Install improved local dump valve position indication. PLC programme modifications. Removal of existing A & D cabinets and miscellaneous repairs to cabinets and doors. Click for more details...

LIDDELL POWER STATION - WATER TREATMENT PLANT BUND REPAIRS
A project in the NSW Within Muswellbrook. The work involves improving the bulk chemical containment systems employed in the water treatment plant. Click for more details...

ENDEAVOR BASE METAL OPERATIONS - COPPER RECOVERY CIRCUIT
Mining - Primary And Secondary Processing (Minerals Processing) project at 40 Km North west of, Cobar, NSW 2835 for New. Copper recovery circuit is in design. Construction is expected to commence shortly. Testwork and detailed design has been completed. The circuit will treat the lead concentrate to extract a copper concentrate estimate to be 1000 tonnes of copper per annum. Click for more details...

ULAN COAL OPERATIONS - EXPANSION
Coal Mine Expansion/Associated Facilities New project In The Upper Hunter Council Area. The proposed expansion will include extending the existing open cut coal mine about 180 metres to the west of the approved limits, relocating the approved Ulan West surface infrastructure, upgrading the coal handling, storage and train loading facilities, constructing the Ulan West services corridor and extending the hub stockpile. Click for more details...

LIDDELL POWER STATION - MILL PYRITES
Mining - Primary And Secondary Processing (Piping) project at Via, Liddell, NSW 2333 for New. The supply and installation of new hydraulic pipelines and support structures from the Hydraulic Cabinets to the Mill Pyrites Hopper Isolating valves and Pyrites Spray Water Valves on Unit 1 A and B side, Unit 2 A side only and Unit 3 A and B sides. Installation of the new pipework will take place prior to outages. Cut over to the new pipework will begin during planned outages in Sept/Nov 2005, Dec/Jan 2006 and March/April 2006. Click for more details...

ASHTON COAL PREPERATION PLANT EXPANSION
Ashton Coal Preperation Plant Expansion is currently at the Construction stage, valued at about $ 50000000 it is Coal Preparation Plant Expansion from 400 tph to 1000 tph. Click for more details...

MANGOOLA COAL PROJECT - STRUCTURAL STEEL & MECHANICAL FOR RAIL LOADING INFRASTRUCTURE
Rail Loading Infrastructure - Structural Steel/Mechanical New project In The Muswellbrook Council Area. For the provision of structural steel & mechanical works. Click for more details...

HILLGROVE GOLD/ANTIMONY DEMONSTRATION PLANT
Demonstration Processing Plant project at 25 Km East of Armidale, at, Hillgrove, NSW 2350 in the Mining - Primary And Secondary Processing (Minerals Processing). To construct a 250,000 Mtpa plant. Some components of the exisiting processing plant at the mine site may be utilised in the demonstration plant. Click for more details...

LIDDELL POWER STATION - COAL UNLOADER MAINTENANCE
Liddell Power Station - Coal Unloader Maintenance is currently at the Construction stage, valued at about $ 4000000 it is Work comprises the sampling and analysis of coal supplied to Bayswater and Liddell Power Stations. This will include operation, routine inspection and maintenance of the two automatic coal samplers at Ravensworth Operations Narama/Ravensworth West Mine. Routine inspection and maintenance of three automatic coal samplers located on conveyors supplying coal from Howick Coal, Drayton Coal and the Macquarie Generation Ravensworth Coal Unloader. Collection and analysis of samples from Howick Coal, Drayton Coal, Mount Arthur North, Macquarie Generation Ravensworth Coal Unloader, Macquarie Generation Antiene Coal Unloader, Ravensworth Operations Narama/Ravensworth West Mine and Ravensworth Operations Ravensworth East Mine. Quarterly inspections of the automatic coal samplers located on the conveyors supplying coal from Mount Arthur North Mine, Ravensworth East Mine and the Macquarie Generation Antiene Coal Unloader. manual sample collection from trucks at Bayswater Power Station and analysis. Click for more details...

BENGALLA COAL OPERATIONS - CIVIL WORKS FOR ROM HOPPER CONSTRUCTION
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Muswellbrook Council Area of Private ownership. For the provision of civil works for the rom hopper construction. Click for more details...

BENGALLA COAL OPERATIONS - CIVIL WORKS FOR ROM HOPPER CONSTRUCTION
Mining - Primary And Secondary Processing (Coal Processing) project In The Muswellbrook Council Area of Private ownership. For the provision of civil works for the rom hopper construction. Click for more details...

BROKEN HILL SEPARATION PLANT UPGRADE
Currently at the Planning stage In Broken Hill is a project estimated to be $ 36000000. This project The upgrade of the separation plant is proposed to take into account the development of the nearby Snapper project. Upgrades will be undertaken for the plant itself and associated infrastructure. The plant upgrades planned are the additions of a rutile circuit and a zircon circuit. An option to locate a Wet High Intensity Magnetic Separator circuit from the mine site is also proposed. These addition will production to increase from 576,000 tpa to 650,000 tpa. The rutile, ilmenite and zircon circuit feed and rejects stockpiles will all be expanded. The non-magnetic concentrate heavy mineral concentrate receival area will also be expanded. The capacity of the two coal container storages will be expanded from 1000 tonnes to 1500 tonnes. Click for more details...

ROCGLEN COAL PROJECT - CRUSHING PLANT
Mining - Primary And Secondary Processing (Coal Processing) project at 25 km north of, Gunnedah, NSW 2380 for New. For the provision of a crushing plant. Click for more details...

RIDGEWAY DEEPS UNDERGROUND GOLD MINE EXTENSION PROJECT - SUPPLY & INSTALL OF PIPING FOR CONCENTRATOR UPGRADE
Currently at the Tenders & Building stage In Orange is a project estimated to be $ 2000000. This project Supply & installation of piping for the concentrator upgrade. Click for more details...

DRAYTON COAL OPERATIONS EXTENSION PROJECT
Mining - Primary And Secondary Processing (Coal Processing) project for New development. Mining of an additional resource of 30 million tonnes from the Greta Coal Measures (targeting the Rowan formation) at a rate of up to 8 Mtpa to extend the mine life to 2017. The extension of mining will predominantly progress to the South of current operations; however, additional areas within the North and East of the project area are also proposed to be mined. The project will require some additional items of equipment to accommodate an increased rate of production such as: 1 x excavator, 3 x track dozers, 5 x 280 tonne rear dump trucks, 1 x additional drill, grader and watercart, plus other minor ancillary equipment. The existing Coal Handling Plant (CHP) & associated stockpile reclamation system will be upgraded in order to align the facilities with the proposed increase in annual production. A new 80 000 tonnes product coal stockpile & a 40 000 tonne domestic product coal stockpile are proposed to further assist production efficiencies. Minor changes to Drayton's water management system are also proposed to maximise water management & use at the mine. Drayton will continue to utilise dragline, excavators, loaders and a fleet of trucks to both uncover the coal & transport it to on-site processing and load-out facilities. Blasting will continue to be required to assist with overburden & coal extraction. Drayton will continue to utilise existing infrastructure such as administration offices, workshops, parking facilities, conveyors, coal handling facilities and coal stockpiles. Click for more details...

BROKEN HILL SEPARATION PLANT UPGRADE - RUTILE CIRCUIT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Broken Hill Council Area of Rutile Circuit type. For a 650,000 tpa fixed plant for heavy mineral concentrate. Rutile circuit to be one package. Click for more details...

BROKEN HILL SEPARATION PLANT UPGRADE - WET MAGNETIC SEPARATOR CIRCUIT
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. Gravity wet plant for a 650,000 tpa facility is to be one package. Click for more details...

WONAWINTA SILVER LEAD ZINC PROJECT - PROCESSING PLANT
Processing Plant project at 80km approx south of, Cobar, NSW 2835 In The Council Area Of Cobar of Private. Metallurgical testwork has indicated that crushing & grinding may not be required & a washing and scrubbing circuit may be sufficient to prepare the ore for processing. The majority of silver can be recovered as bullion by cyanidation treatment of the ore. Lead and residual silver can be recovered as by-product credits by producing a gravity concentrate. Preliminary modelling is based on a nominal output of 3m ounces of silver per annum. Click for more details...

MANDALONG COAL OPERATIONS - POWER GENERATION PROJECT
Flares/Pilot Plant/Gas Engines project at 3km southwest of, Morisset, NSW 2264 In The Council Area Of Lake Macquarie of Private. Utilisation of the coal seam/methane bed gas from the mine's underground workings to produce up to 12MW of electricity to be fed into the NSW power grid via the mine's existing high voltage substation. Construction next to the existing methane drainage plant at the Mandalong Mine Access Site of gas flares & installation of multiple gas engines constructed off-site & to be located on formed gravel pads along with associated structures. Click for more details...

BOGGABRI COAL OPERATIONS EXPANSION - CHPP UPGRADE
Mining - Primary And Secondary Processing (Coal Processing) project at 386 Leard Forest Rd 17km northeast of, Boggabri, NSW 2382 for Renovations, Refurbishments etc.. Upgrade of the coal handling & preparation plant (CHPP) to increase throughput from 3 million tonnes per annum (Mtpa) to 6.9 Mtpa. Construction also of a new rail loop & load out facility & upgrade of the present one. Click for more details...

WILPINJONG COAL OPERATIONS EXPANSION - CHPP UPGRADE
Private ownership Mining - Primary And Secondary Processing (Coal Processing) project In The Mid Western Regional Council Area for New development. A 7m extension to the coal handling & preparation plant (CHPP) building to accommodate a capacity increase to 1200tonnes per hour (tph). Click for more details...

RAVENSWORTH COAL OPERATIONS EXPANSION - RAVENSWORTH NORTH PROJECT - CHPP STRUCTURAL STEEL SUPPLY
Mining - Primary And Secondary Processing (Coal Processing) project In The Singleton Council Area of Structural Steel - For Coal Handling & Preparation Plant type. Upgrade of an existing coal handling & preparation (CHPP) plant & construction of 2 new ones (Modules 2 & 3). Click for more details...

RAVENSWORTH COAL OPERATIONS EXPANSION - CHPP ELECTRICAL
Mining - Primary And Secondary Processing (Coal Processing) New project at Lemington Rd, Singleton, NSW 2330. This type is Electrical - For Coal Handling & Processing Plant with Private ownership. Low voltage power supply & reticulation as well as high voltage transmission supply & relocation. Click for more details...

PINE DALE COAL OPERATIONS STAGE 2 EXTENSION
Mining - Primary And Secondary Processing (Coal Processing) project In The Lithgow Council Area of Operating Mine - Extension type. A project to extend operations 10-15 years by incorporating 201ha in the Blackmans Flat area adjoining the now exhausted original Pine Dale mine & the recently approved 27ha Stage 1 Yarraboldy extension. Continued open cut operations accessing 14.2 million tonnes (Mt) at a rate of 2Mt product coal annually. Construction of a new mine industrial area to include a 600tph crushing & screening plant, 100,000t run-of-mine (ROM) stockpile, 200,000t product stockpiles & maintenance facilities. Construction or relocation of offices, amenities, workshop, water management infrastructure, electric power supply, explosives magazine & fuel storage area. Dewatering of existing pit prior to use for overburden & interburden emplacement. Reinstatement of the now derelict Wallerawang spur rail line & rail siding & construction of a rail load out facility. Internal access roads & private haul road crossing. An additional 60 employees expected at maximum production. Click for more details...

ASHTON COAL OPERATIONS GAS DRAINAGE PROJECT
Mining - Primary And Secondary Processing (Coal Processing) project at New England Hwy south of, Camberwell, NSW 2330 for New. A project to drain goaf methane gas from 8 longwall blocks over the remaining 10-12 years of underground mining. To include up to 80 boreholes on pads typically 5m x 5m & linked by a 16km long, 300-700m diameter high density polyethylene (HDPE) pipeline network to a central plant & enclosed gas flaring facility constructed in a 25m x 75m area. The plant to comprise up to 4 x 1500L/s electrically driven liquid ring vacuum pumps, a gas-water separator, flow control reticulation, control panel/room & gas analyser along with associated electrical transformer or on site generator & cooling water tank. Up to 15 construction jobs expected. Click for more details...

CENTENNIAL WESTERN COAL SERVICES - COAL WASHERY UPGRADE DESIGN CONTRACT
Design Contract - Coal Washery project at Castlereagh Hwy BLACKMANS FLAT 5km north of, Wallerawang, NSW 2845 In The Council Area Of Lithgow of Private. Design for expansion of the coal washery involving installation of new plant adjacent the existing plant for an overall capacity of 7 million tonnes per annum (Mtpa) along with additional conveyors & transfer points. Associated increase of reject disposal capacity. Click for more details...