WEIPA BAUXITE OPERATIONS - LORIM POINT/NEWEIPA
Stacker - Erection & Miscellaneous Work project at At, Weipa, QLD 4874 in the Mining - Primary And Secondary Processing (Minerals Processing). At Lorim Point. Click for more details...

GOONDICUM CRATER PROJECT
Private ownership Mining - Primary And Secondary Processing (Minerals Processing) project In The North Burnett Regional Council Area for New development. Consultants are to review the plans for the Demonstration Plant utilising the natural slope of the land to reduce construction costs. A design throughput rate of 20 tonnes per hour remains and the plant is planned to run for 75 days to produce a minimum of 1000 tonnes ilmenite, 2400 tonnes feldspar, 300 tonnes apatite and 600 tonnes titano-magnetite. Click for more details...

CRACOW GOLD PROJECT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Banana Shire Council Area of Private ownership. Dismantling of some of the process equipment prior to refurbishment of the plant. Click for more details...

BLACKWATER COMET PROJECT
Structural Steelwork project at Via, Blackwater, QLD 4717 in the Mining - Primary And Secondary Processing (Coal Processing). More than one package. Click for more details...

KUNWARARA MAGNESITE OPERATIONS - KG2 EXTN
A project in the QLD Within Rockhampton Regional. Installation of a new crushing and screening circuit. Click for more details...

LADY ANNIE/MOUNT KELLY COPPER PROJECT - PROCESSING FACILITY
New project of Mining - Primary And Secondary Processing (Piping) project at Adjacent to Lady Loreta Mine 140 Km North West of, Mount Isa, QLD 4825. To construct a 1900 tpa copper SXEW plant and heap leach. Total copper recovery is expected to be 89% of the ore processed. Click for more details...

RINGTAIL QUARRY
A project in the QLD Within Sunshine Coast Regional. For crushing of 32,000 cubic metres of various grades of gravel. Click for more details...

DRUMMOND BASIN PROJECT - WIRRALIE
Mining - Primary And Secondary Processing (Minerals Processing) project In The Whitsunday Regional Council Area of Private ownership. Preliminary feasibility study results show heap leach processing, rather than using existing plant could improve economics. Click for more details...

LAKE VERMONT COAL PROJECT - COAL PREPARATION PLANT
New project of Mining - Primary And Secondary Processing (Coal Processing) project at Approx 15 km northeast of, Dysart, QLD 4745. For a 4 Mtpa plant. Click for more details...

YABULU NICKEL REFINERY EXTENSION - NICKEL PRODUCT BUILDING CONTRACT
Mining - Primary And Secondary Processing (Minerals Processing) project at Refinery site at, Yabulu, QLD 4818 for New. Contract package 6 & 7 covers nickel carbonate recovery, calcination and the final nickel product. The contract will involve the construction of a hydrometallurgical facilities including a calciner, furnaces and the production of nickel compacts. Work will be largely greenfield. A second nickel product plant will be constructed to provide capacity for additional throughput. Includes precipitation, filtration, calcining, reduction, sintering and packaging. Click for more details...

ROLLESTON COAL PROJECT - COAL HANDLING/INFRASTRUCTURE
Mining - Primary And Secondary Processing (Coal Processing) New project at 16km west of, Rolleston, QLD 4702. This type is Crushing & Mine Site Infrastructure with Private ownership. Initial development will be for 6mtpa. Expansion to 8 mtpa allowed for. Click for more details...

BLACKWATER/COMET CHPP PROJECT
Via, Blackwater, QLD 4717 Has Blackwater/Comet Chpp Project currently at Planning stage. The project manager's role will include design work for earthworks and related services (ensuring no mismatches between earthworks construction and CHPP construction), construction and related managment and contract administration for CHPP design construct package, once awarded (contract superintendent). Click for more details...

BAJOOL SALT OPERATIONS - PORT ALMA
New project of Mining - Primary And Secondary Processing (Other processing including salt, sand etc) project at At, Bajool, QLD 4699. One new shed/warehouse. One replacement. Click for more details...

ALICE RIVER GOLD MINE
Cape York Peninsula 140 km northwest of, Laura, QLD 4871 Has Alice River Gold Mine currently at Planning stage. The Company plans to produce gold from tailings, underpinned by pre-existing on site and fully operational infrastructure including: a CIP Processing Plant, a water supply dam, a Tailings dam with a capacity of approximately 200,000 tonnes, and accessibility by road and air. Accommodation units, laboratory, communications facilities are also included. Click for more details...

TEXAS SILVER PROJECT - TWIN HILLS - RESOURCE
Currently at the Construction stage In Southern Downs Regional is a project estimated to be $ 20000000. This project Resource estimate is 44.5 million ounces of silver. Measured resource is 7.37 million ounces, Indicated resource is 13.15 million ounces and inferred is 23.98 million ounces. Click for more details...

GLADSTONE INTERNATIONAL NICKEL PROJECT - MARLBOROUGH
Mining - Primary And Secondary Processing (Minerals Processing) project In The Gladstone Regional Council Area of Processing Plant type. Processing of laterite ore. Ore likely to be sourced from New Caledonia via Cape size shipping through Gladstone's deepwater port, supplemented by ore from the deposits at Marlborough. This is likely to be a two stage development. Stage one to 65,000 tpa producing nickel cobalt suplhide will involve a 4 autoclave plant. Stage two would be likely to involve doubling of capacity. Click for more details...

KOGAN CREEK COAL/POWER STATION PROJECT
Mining - Primary And Secondary Processing (Coal Processing) project In The Western Downs Regional Council Area of Private ownership. Proposed open cut coal mine and associated power station Click for more details...

YABULU NICKEL REFINERY EXTENSION - BOILER REFURBISHMENT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Townsville City Council Area of Boiler No 3 Refurbishment Contract type. An existing boiler will be refurbished to generate high-pressure steam for power generation and process requirements. This boiler will be converted from oil firing to gas firing, utilising coal seam methane gas to be delivered by the new Moranbah to Townsville gas pipeline. A new boiler feedwater plant will also be installed. Click for more details...

MOUNT ISA MINES COPPER SMELTER - EXPANSION STAGE ONE
Mount Isa Mines Copper Smelter - Expansion Stage One is currently at the Construction stage, valued at about $ 410000 it is The expansion includes installation of a second rotary holding furnace, a copper slag cleaning furnace, a converter slag treatment plant and associated plant, all designed to increase the smelter's capacity from 240,000 tpa to 280,000 tpa. Click for more details...

KOGAN CREEK POWER STATION - BOILER HOUSE/PIPING
Mining - Primary And Secondary Processing (Piping) project for New development. Spring hanger, constant hanger, snubber. Click for more details...

COLLINGWOOD TIN PROJECT - PLANT/INFRASTRUCTURE
Mining - Primary And Secondary Processing (Minerals Processing) project at 35 km south of, Cooktown, QLD 4871 for New. Water only gravity concentration process. Click for more details...

CLERMONT COAL PROJECT - ROM DUMP STATION
Mining - Primary And Secondary Processing (Coal Processing) New project at 10 km north of, Clermont, QLD 4721. This type is Rom Dump Station - For Coal Handling Preparation Plant with Private ownership. For the provision of a steel ROM dump station. Click for more details...

TEXAS SILVER PROJECT - TWIN HILLS - EARTHWORKS/LEACH PONDS
Mining - Primary And Secondary Processing (Minerals Processing) project at Via, Texas, QLD 4385 for New. Construction of the base for the Heap Leach Pads and excavate the sites for the three (3) proposed Leach Ponds. Upgrading of the mine access road will also be carried out. Click for more details...

YABULU NICKEL REFINERY EXTENSION - CARBONATE FACILITY
Mining - Primary And Secondary Processing (Piping) project at Refinery site at, Yabulu, QLD 4818 of Basic Nickel Carbonate Facility Contract type of New development. Scope of work involves the construction of two large tanks, a thickner and associated pipework. Click for more details...

WOLFRAM CAMP PROJECT - TUNGSTEN MOLYBDENUM & BISMUTH RESOURCE
Private ownership Mining - Primary And Secondary Processing (Minerals Processing) project In The Tablelands Regional Council Area for New development. Total resources in Wolfram Camp were increased by some 45% to 876,500 tonnes measured plus indicated @ 0.41% WO3 and 0.20%MoS2 and inferred is 211,500 tonnes @ 0.4%WO3 and 0.3%MoS2. Infrastructure to include processing plant, pipeline and electrical. Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION
A project in the QLD Within Isaac Regional. The project involves an expansion of the existing Goonyella Riverside open cut and the underground operations at Broadmeadow to increase the capacity from 16 Mt/a to 24 Mt/a. Mining and processing will yield a Hard Coking Coal product for the export market. The open cut expansion and underground expansions will result in an additional 5Mt/a and 3Mt/a of product coal respectively. The surface expansion will use the current open cut mining methods, which involve truck and shovel fleets and draglines exposing coal. Most of the open cut spoil from the expanded operations will be disposed of within mined out pits as is the current practice. However, it is expected that some of the spoil will need to be disposed of in out-of-pit spoil dumps. The existing Broadmeadow Mine, which extracts the Goonyella Middle Seam (GMS), will be expanded eastwards using either the conventional longwall mining practices currently being used for its operations or see the introduction of Longwall Top Coal Caving (LTCC) technology once its feasibility is proven as a means to improve the levels of resource recovery compared to conventional longwall mining methods. A second longwall mine is currently under investigation using either conventional longwall methods or LTCC method. The existing mine has much of the necessary infrastructure in place, however, there are infrastructure upgrades required for the expansion of the mine including: a new CHPP and upgrade to the existing CHPP; construction of an additional 66kV feeder adjacent to the present Goonyella 66kV line; expansion of the existing tailings storage facilities to accommodate increased tailings volumes; improvements to the existing mine water management system, including clean water diversion, disturbed area runoff collection and treatment, pit water management, water reuse and water disposal if there is surplus water at any time that cannot be reused on site. The expansion element of the project requires an additional coal preparation capacity of approximately 2 370 tonnes per hour (t/h) to achieve a production rate of 24 Mt/a. The options to achieve this throughput are to expand the existing CHPP's and/or build a new plant to supplement one or both existing plants. The new CHPP is likely to be tied into the existing product handling system. Alternatively a separate train load-out will be constructed on one of the existing rail loops. The product coal will be railed approximately 190km to the Hay Point and/or Dalrymple Bay coal terminals. Click for more details...

PINKENBA RUTILE PLANT UPGRADE
Mining - Primary And Secondary Processing (Other processing including salt, sand etc) project In The Brisbane City Council Area of Plant Upgrade type. Work comprises the replacement of older style electrostatic seperators and induced roll magnets with the latest generation of seperators and the installation of dust extraction equipment. Click for more details...

CHINCHILLA COAL SEAM GAS & UNDERGROUND COAL GASIFICATION PROJECT - STAGE 1 - STRUCTURAL STEEL FOR DEMONSTRATION PLANT
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 6000000. This project For a 1-5 barrels per day Gas to Liquids demonstration plant. Click for more details...

LUCKY BREAK HEAP LEACH PROJECT (NORNICO STAGE 2) - COMMERCIAL PLANT
Mining - Primary And Secondary Processing (Minerals Processing) project at Gregory Development Rd south of, Greenvale, QLD 4816 for New. For a 250,000 tpa plant to run 4-5 years. The building will be 40m x 60m & likely to be prefabricated. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - BUND 4A CIVIL WORKS
Bund 4a Civil Works New project In The Mackay Regional Council Area. To construct Bund 4A. Click for more details...

MIDDLEMOUNT COAL PROJECT - CONSTRUCT & OPERATE COAL HANDLING & PREPARATION PLANT
Mining - Primary And Secondary Processing (Coal Processing) project In The Isaac Regional Council Area of Private ownership. Includes 10 year operations contract operating the coal handling & preparation plant at 400 tonnes per hour. Click for more details...

LAKE VERMONT COAL PROJECT - EARTHWORKS FOR COAL PREPARATION PLANT
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 1200000. This project For a 4 Mtpa facility. Click for more details...

LAKE VERMONT COAL PROJECT - PIPING FOR COAL PREPARATION PLANT
Piping - For Coal Preparation Plant project at Approx 15 km north east of, Dysart, QLD 4745 In The Council Area Of Isaac Regional of Private. For a 4 Mtpa plant. Click for more details...

KUNIOON COAL PROJECT - CONSULTANCY FOR COAL MINE INFRASTRUCTURE & OVERLAND CONVEYOR SYSTEM
A project in the QLD Within South Burnett Regional. Engineering consultancy for Kunioom mine infrastructure & overland conveyor. Click for more details...

MT COOLON CENTRAL TREATMENT PLANT
Mining - Primary And Secondary Processing (Minerals Processing) project at Via, Mount Coolon, QLD 4804 for New. For the construction of a central treatment plant and related infrastructure. Click for more details...

CARBOROUGH DOWNS COAL MINE EXPANSION PROJECT - ELECTRICAL INSTRUMENTATION FOR CHPP
15 km east of, Moranbah, QLD 4744 Has Carborough Downs Coal Mine Expansion Project - Electrical Instrumentation For Chpp currently at Tenders & Building stage. For the provision of electrical instrumentation for the new 5Mpta CHPP. Click for more details...

DAUNIA COAL PROJECT - COAL HANDLING PREPARATION PLANT
Approximately 25km Southeast of, Moranbah, QLD 4744 Has Daunia Coal Project - Coal Handling Preparation Plant currently at Construction stage. The contract involves detailed design and procurement of a CHPP, with all key components scheduled for delivery during calendar 2009. Click for more details...

SOUTHERN CROSS/IMPEL LNG PROJECT
Private ownership Mining - Primary And Secondary Processing (Tankage, Silos) project In The Gladstone Regional Council Area for New development. Proposed staged construction of a liquefied natural gas (LNG) plant with up to 3 trains ranging from 0.07-1.3million tonnes per annum (Mtpa) capacity. Associated facilities expected to include a construction jetty; an LNG dock & jetty to handle vessels up to 200,000cu m; cryogenic pipelines; LNG storage tanks up to 210,000cu m capacity & 400km approx pipeline with spur lines. The project is expected to generate 300-350 jobs during construction & 80-90 when fully operational. Click for more details...

LAKE VERMONT COAL OPERATIONS - CHPP EXPANSION
Mining - Primary And Secondary Processing (Coal Processing) project In The Isaac Regional Council Area of Coal Handling & Preparation Plant - Expansion type. A contract to design, procure, construct & commission an extension to the existing coal handling & preparation plant (CHPP). To provide an additional 4million tonnes per annum (Mtpa) capacity to the 2009 commissioned plant. Click for more details...

OAKY CREEK COAL OPERATIONS - LONGWALL PROJECT STAGE 4
Mining - Primary And Secondary Processing (Coal Processing) project for New development. A project to increase production over 5 years by expanding into additional sections of the mine tenement. To include a new longwall mining system & associated development suite. Expansion of the existing coal handling & preparation plant (CHPP). Upgrade of the electrical system. Click for more details...

CAVAL RIDGE COAL PROJECT - SUMP PUMPS
Sump Pumps - For Coal Processing Plant project at 16km south of, Moranbah, QLD 4744 In The Council Area Of Isaac Regional of Private. Electric water pumps. To include both end suction & split case types. Click for more details...

GEORGINA BASIN PHOSPHATE PROJECT - FERTILISER COMPLEX
Mining - Primary And Secondary Processing (Minerals Processing) project at MICA CREEK 10km south of, Gunpowder, QLD 4825 for New. Chemical processing including a 1600ktpa sulphuric acid plant, a 600ktpa phosphoric acid plant, a 1200ktpa Di/Mono Ammonium Phosphate (DAP/MAP) plant & a 30ktpa aluminium fluoride plant. Associated utilities & facilities. Click for more details...

CAVAL RIDGE COAL PROJECT - COAL PREPARATION PLANT & RAIL FACILITIES
Mining - Primary And Secondary Processing (Coal Processing) project at 16km south of, Moranbah, QLD 4744 of Coal Preparation Plant/Rail Loadout/Conveyor/Roads type of New development. The proposed Caval Ridge CHPP will have a nominal feed capacity of 2 000 t/h and is capable of processing 14-16 Mt/a to produce a nominal 8 Mt/a of hard coking coal, 5.5 Mt/a of which will be sourced from the Caval Ridge Mine & the balance to come by conveyor from the expanded Peak Downs mine. The facility shall operate seven days per week on a continuous basis. The CHPP will consist of: ROM dump hopper for primary sizing; secondary and tertiary sizers with intermediate screening; raw coal stockpiles with mechanised stacking and reclaim facilities; 2 module coal preparation plant, nominally 1000 tph, per module; product coal stockpiles with mechanised stacking and reclaim facilities; train loadout to the north of the Peak Downs Highway, a conveyor will transport material crossing the highway; reject bin and handling system and ultrafine tailings dewatering system. Water supply to be a combination of site water reuse & a raw water supply via a new off take pipeline from existing bulk pipelines. Process plant water will be recycled to minimise raw water make-up requirements for the site. The product coal will be railed approximately 185km to the Hay Point and/or Dalrymple Bay coal terminals for shipment. Click for more details...

ROCKLANDS GROUP JOINT VENTURE COPPER PROJECT - PROCESSING PLANT INSTALLATION
Structural/Mechanical/Piping Installation New project In The Cloncurry Shire Council Area. Installation of a fully computerised & automated 3 million tonne per annum (Mtpa) processing plant for copper/gold, cobaltic-pyrite, native copper & magnetite concentrate production. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - QUARRY MANAGEMENT & GRAVEL SUPPLY
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project at West of WANDAON, east of TARA & west of, Chinchilla, QLD 4413 for New. A 3 year contract for management of a quarry stockpile & associated works to ensure continuous gravel supply. To include establishment of a quarry pit with access roads. Operate & maintain a surface crushing plant. Manage crushed & uncrushed ore stockpiles in various locations including blending & tramming of material. Click for more details...

DUGALD RIVER BASE METAL PROJECT CRUSHING & SCREENING PLANT
A project in the QLD Within Mt Isa City. Crushing & screening plant for an underground mining operation of 2million tonnes per annum (Mtpa) of zinc/lead/silver plus 1Mtpa of copper for 200,000tpa zinc concentrate. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - COMPRESSION STATIONS ECI CONTRACT
Mining - Primary And Secondary Processing (Coal Processing) project In The Western Downs Regional Council Area of Compression Stations - Early Contractor Involvement type. Contract for the early civil site works (bulk earthworks, piling & concrete foundations) & front end planning work for 5 x compression stations & a central processing plant at the Woleebee Creek block southwest of Wandoan & 3 field compression stations & a central processing plant at the Bellevue block east of Miles. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - 6 + 1 UPSTREAM CONTRACT
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 300000000. This project Construction of 6 field compressor stations & a central processing plant within 60km of Dalby with works extending into the Chinchilla & Miles regions. Click for more details...

DUGALD RIVER BASE METAL PROJECT - CONCENTRATOR
Concentrator Plant/Associated Plant New project In The Mt Isa City Council Area. The concentrator will have an annual production of approximately 160,000 tonnes of zinc in zinc concentrate, plus by-products, over an estimated 28 year mine life. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - AGGREGATES
New project of Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project at Around DALBY to DINGO, ., QLD 4999. As support for well engineering operations, supply & haul/deliver rock, armour rock/spalls, aggregate, roadbases, select fill & concrete products in an area from around Dalby in the south to Dingo in the north. Click for more details...