List of Mining - Primary And Secondary Processing Projects


WEIPA BAUXITE OPERATIONS - ANDOOM/NEWEIPA
New project of Mining - Primary And Secondary Processing (Civil works at processing facilities) project at At, Weipa, QLD 4874. Detailed earthworks, civil works and concrete. Click for more details...

NULLAGINE PROJECT/ BULLFINCH CIP PLANT
Consultancy For Pre-Feasibility Study New project In The East Pilbara Council Area. Pre-feasibility study includes: confirming mine rate of production; establishment of base design parameters for the process plant and site infrastructure; determine suitability of equipment for the Bulfinch plant for incorporation into the Nullagine plant; develop capital and operating costs for the process plant to an accuracy consistent with a feasibility study of pus or minus 25 per cent; compile the process plant study report. Click for more details...

EVANSTON - GOLD RESOURCE
Resource - Gold project at North of, Southern Cross, WA 6426 In The Council Area Of Yilgarn of Private. Resource estimate of 1,637,000 tonnes @ 2.3g/t for 127,000 ounces of Au. In the measured category the resource estimate is 1,321,000 tonnes @ 2.4% for 100,000 ounces of Au. Click for more details...

WESTONIA GOLD PROJECT
1 km north of, Westonia, WA 6423 Has Westonia Gold Project currently at Construction stage. The plant is in good condition and located at Mount Pleasant, near Kalgoorlie (683365Big Bell), approx 300 km from the mine site. The specifications will be incorporated into the bankable feasibility study. A greater throughput of 2.5mtpa is being modelled. The original 1.5mtpa design is also being evaluated in terms of project economics.The plant has formerly produced 3.5Mtpa.The plant is expected to be able to process 2.5Mtpa of Westonia ore with the addition of a secondary crusher. Click for more details...

HISMELT EXPANSION PROJECT
Mechanical Installation - Package 3 project at Leath Rd, Kwinana, WA 6167 in the Mining - Primary And Secondary Processing (Minerals Processing). One of three packages. Fabrication and installation. Click for more details...

DRAYTON COAL OPERATIONS
Coal Treatment Unit - Design project at Lot 6 DP 701496, Thomas Mitchell Dr, Muswellbrook, NSW 2333 in the Mining - Primary And Secondary Processing (Coal Processing). The coal treatment unit (CTU) will be a closed working circuit with coal being fed through the existing coal handling plant. The current operation of Drayton requires the CTU in order to produce saleable export quality product for an excess of unsaleable domestic quality production. Click for more details...

TARAWONGA COAL PROJECT - RESOURCE
Resource - Coal project at Maules Creek & Goonbri Rds, 15 km north east of, Boggabri, NSW 2382 In The Council Area Of Narrabri of Private. The expected mine life between 8 to 10 years, will yield close to 12 million tonnes of export quality low sulphur, low ash, high-energy semi-soft coking coal from the Forest View, Thuin and Nagero properties east of Boggabri (formerley named East Boggabri Coal Project). Click for more details...

FORRESTANIA NICKEL PROJECT - CONCENTRATE PLANT
Currently at the Construction stage In Yilgarn is a project estimated to be $ 35000000. This project The Stage 1 concentrate plant is designed with 250 000 tpa capacity and will initially treat ore from the high grade Flying Fox Nickel Mine. The proposed Stage 2 plant will have 650 000 to 700 000 tpa capacity and is intended to treat ore from Flying Fox, Diggers South and potentially the New Morning/Daybreak and Cosmic Boy deposits. Click for more details...

MOUNT GIBSON GOLD PROJECT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Yalgoo Council Area of Private ownership. The CIL plant has 3 ball mills (2 operational, 1 inoperative). The bankable feasibility study is examining the economics of resuming gold production at Mount Gibson using the existing gold processing plant. Metallurgical test work was carried out on PQ diamond drill samples obtained in the March 2003 quarter. Samples were from Yorktown, Capricorn and Saratoga and were representative of mineralisation selected for mining at those areas. Gravity spearation of free gold was excellent. Cyanide leachable gold test yielded recoveries up to 98% iwth fast leach times. Click for more details...

ENDEAVOUR BASE METALS OPERATIONS - ELURA
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. The former Elura mine has now been renamed Endeavour. Various efficiencies including use of road trains for haulage have been introduced. Optimisation of the plant is planned by increasing flotation capacity. Click for more details...

BENGALLA COAL OPERATIONS EXPANSION PHASE 1
Mining - Primary And Secondary Processing (Coal Processing) New project at 4 km west of, Muswellbrook, NSW 2333. This type is Operating Mine - Expansion - Phase 1 with Private ownership. Expansion of open cut operations with Phase 1 to increase Run-of-Mine (RoM) coal to 9.3Mtpa for 7.5Mtpa approx product coal. To include upgrade of the existing 8.7million tonnes per annum (Mtpa) capacity coal washery to 2 stage washing. Purchase of additional mining equipment. Upgrades of associated mine infrastructure including a heavy vehicle workshop, bathhouse & wash bay. Click for more details...

MOUNT GORDON COPPER OPERATIONS
Mining - Primary And Secondary Processing (Minerals Processing) project at 155 km north of, Mount Isa, QLD 4825 of Mine/Infrastructure type of New development. Resource estimate is 495,000 tonnes of contained copper metal. Recent drilling at the Mammoth deposit has increased the resource estimate and the mine life has now been extended to late 2008. Click for more details...

DRUMMOND BASIN PROJECT - WIRRALIE
Processing Facility - Refurbishment Renovations, Refurbishments etc. project In The Whitsunday Regional Council Area. 1.5Mtpa CIP/CIL treatment plant. Heap leaching is now under consideration as a more economically attractive option. Click for more details...

KOGAN CREEK POWER PROJECT
Mining - Primary And Secondary Processing (Tankage, Silos) New project at South of, Brigalow, QLD 4412. This type is Feedwater Tank & Deaerator with Private ownership. High & Low Pressure Preheater: 4 Low Pressure Preheaters, 1 Low Pressure Drains Cooler, 2 High Pressure Feedwater Heaters, 1 Deaerator with Feedwater Storage Tank approx 250m3, 3 Plate Type Heat Exchanger (13MW each). Click for more details...

RAVENSTHORPE NICKEL PROJECT - VIBRATING SCREENS & GRIZZLY
New project of Mining - Primary And Secondary Processing (Minerals Processing) project at Via, Ravensthorpe, WA 6346. 314778-1M-P024 Vibrating Screens. 314978-IM-P205 Vibrating Grizzly. Click for more details...

DARWIN EAST ARM WHARF - OPERATORS/TESTING BUILDING
Darwin East Arm Wharf - Operators/Testing Building is currently at the Construction stage, valued at about $ 289000 it is The contract comprises the design, construction and installation of two buildings. The buildings are to comprise split system air conditioning, all fixed furniture, the installation of a safety shower and additional security fencing with gates. Connections to existing power, water and sewerage services is to be carried out. Click for more details...

RAVENSTHORPE NICKEL PROJECT - PAL DIP TUBES
Mining - Primary And Secondary Processing (Minerals Processing) project In The Ravensthorpe Council Area of Pal Dip Tubes/Inserts type. Pal Dip Tubes and Inserts. Click for more details...

NEW ACLAND COAL STAGE 2 EXPANSION PROJECT - WASHPLANT
New Acland Coal Stage 2 Expansion Project - Washplant is currently at the Construction stage, valued at about $ 10000000 it is This package is for a new washplant. Click for more details...

MIDDLEBACK RANGES OPERATIONS - PROJECT MAGNET - EXPORT FACILITIES UPGRADE
Port of, Whyalla, SA 5600 Has Middleback Ranges Operations - Project Magnet - Export Facilities Upgrade currently at Construction stage. Construction and upgrade of a hematite export facilities at the Port of Whyalla. Click for more details...

ASHTON COAL PREPERATION PLANT EXPANSION
Ashton Coal Preperation Plant Expansion is currently at the Construction stage, valued at about $ 50000000 it is Coal Preparation Plant Expansion from 400 tph to 1000 tph. Click for more details...

KALGOORLIE SUPERPIT GOLD MINE - CYANIDE PIPING UPGRADE
Mining - Primary And Secondary Processing (Minerals Processing) project at 15 Km North of, Kalgoorlie, WA 6430 of Fimiston Cil Plant/Gidji Roaster Upgrade type of New development. Fabrication and installation of 316l stainless steel piping, high quality diaphragm valves and flanges with suitable transparent flange covers for extra protection. Click for more details...

WORSLEY ALUMINA EXPANSION EFFICIENCY & GROWTH PROJECT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Collie Council Area of Mine Expansion/Refinery - Upgrade type. Development comprises two parts. Expansion of the existing bauxite mining activities and an upgrade of the refinery. Mining will expand into the Saddleback, Marradong, Hotham North, East Quindanning, Morgans, Hotham North Extension, Central and Brookton mining envelopes. Throughput will expand to 16.5 Mtpa. The expansion of mining activities will involve the addition of three new primary crushers and a new crushed ore stockpile will be needed next to the existing secondary crusher to provide extra surge material to feed the overland bauxite conveyor. Additional conveyors include a 34 km extension from the Hotham North mining envelope which will cross both the Albany Highway and the Wandering-North Bannister road, a 16 Km spur from the south east of the Central mining envelope to the Luptons mining envelope and lastly a 28 Km extension from the Central mining envelope to the Brookton mining envelope. Additional bauxite conveyors spurs and haul truck transport may be needed in the future. Refinery expansion will involve an increase in the Bauxite stockpile of 0.5 Mt. At the Milling and Digestion plant an additional mill, an additional desilication tank and eight new slurry heaters will be required. At the Seperation plant, an extension of the residue washing tanks and an expansion of capacity of the causticiser circuit. At the Calcination plant an additional gas fired calciner with bag house with a new hydrate filtration building. Addition of a coal-fired co-generation facility with bag house designed to produce 350 tonnes of steam per hour (equivalent to 204 Mw) and 35 Mw of electrical power. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT/AREA C - RR CUBICLES/NE RESISTORS
Mining - Primary And Secondary Processing (Computerised systems for processing equipment) project at Near, Newman, WA 6753 for New. Rotor Resistance Cubicles and Neutral Earthing Resistors. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - 415 V MOTOR CONTROL CENTRES & LOAD CENTRES
Mining - Primary And Secondary Processing (Minerals Processing) project at 15 Km South east of, Collie, WA 6225 of 415 V Motor Control Centres/Load Centres - Supply type of New development. 415 V Motor Control Centres (MCC) and Load Centres. Click for more details...

GLENNIES CREEK WASTE COAL MINE GAS POWER STATION
Private ownership Mining - Primary And Secondary Processing (Piping) project In The Singleton Council Area for New development. To construct 12 MW waste coal gas power stationcomprising a plant, a gas pipe distribution network and electrical transmission lines. The gas will be sourced from surface head wells draining the gas from an advancing longwall operation and will transported by polyethene pipe to the power station. The power station will comprise GE Jenbacher 320 spark ignition engines, gas handling systems, high voltage transformers and full automated control rooms. Click for more details...

MURRAY BASIN STAGE 2 MINERAL SANDS PROJECT - WET CONCENTRATION PLANT
Currently at the Construction stage In Mildura is a project estimated to be $ 2000000. This project For the construction of a wet concentration plant. Click for more details...

BODDINGTON GOLD MINE EXPANSION - CONSTRUCTION/ACCOMMODATION CAMP
Mining - Primary And Secondary Processing (Piping) project for New development. A 1250 person construction camp and associated civil works to be constructed. Facilities will include a permanent dry and wet mess and recreation facilities. The initial 200 person fly camp has been constructed. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - ORE PREPERATION PLANT
Mining - Primary And Secondary Processing (Minerals Processing) project at Cloud Break Mine Site, Pilbara area via, Newman, WA 6753 for New. Ore Preparation Plant (OPP) is to comprise a crushing and screening operations. The facilities include a screen house, crushers, stockpiles and trainloader. The operation will process ore transported by a conveyor firstly to a portable crusher and sizer located at the operating face of the Cloud Break mine. When the ROM ore has been crushed and sized it will be transported via a conveyor to the screener and crusher. Ore will be sorted into super value fines, high grade fines, high grade lump and lower grade ore. The first three types of ore will be conveyed to the train loading station and shipped to Port Hedland. The low grade will be stockpiled for the future when the Christmas Creek Beneficiation Plant is constructed. Operating facilities at the plant will comprise a Sample Tester, Plant/Workshop store, Communication Tower, High Voltage Switchyard, Sewage Treatment Plant, Potable Water Plant including a Water Tank, Temporary Diesel Power Station, Control Room, Workshops, Laboratories, Amenities area, OPP Administration area including a Store, Laboratory, Emergency Response Centre and Administration building, Mining administration area, Car Parks, two Fuel Farms and a Vehicle Washdown Facility including a washdown slab and an oil separator and automated facilities. A desliming plant will also be constructed. Future expansion of the OPP will include a Desand Plant and associated infrastructure. The developer is currently designing the Desanding plant. Click for more details...

TAHMOOR COLLIERY - DRIFT CONVEYOR STAGE 3 UPGRADE - CIVIL WORKS - CONCRETE PIERS/COLUMNS
Civil Works - Concrete For Piers/Columns project at Hume Highway, Tahmoor, NSW 2573 In The Council Area Of Wollondilly of Private. Work is to coincide with the next dry season longwall changeover in 2008. Click for more details...

KING ISLAND SCHEELITE PROJECT - STRUCTURAL STEEL FOR SECONDARY CRUSHING & SCREENING PLANT
Private ownership Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project In The King Island Council Area for New development. For the provision of structural steel for the secondary crushing & screening plant. Click for more details...

LAKE VERMONT COAL PROJECT - MECHANICAL FOR COAL PREPARATION PLANT
Mechanical - For Coal Preparation Plant project at Approx 15 km north east of, Dysart, QLD 4745 In The Council Area Of Isaac Regional of Private. For a 4 Mtpa plant. Click for more details...

PECULIAR KNOB IRON ORE PROJECT - PORT FACILITIES
Currently at the Construction stage In Whyalla is a project estimated to be $ 60000000. This project For the construction of a rail loop, tip pocket, storage shed and barge loading facility. Click for more details...

RIDGEWAY DEEPS UNDERGROUND GOLD MINE EXTENSION PROJECT - PIPING - SUPPLY & INSTALL FOR SURFACE FACILITIES INFRASTRUCTURE
Mining - Primary And Secondary Processing (Piping) project In The Orange Council Area of Private ownership. For the supply & installation of piping. Click for more details...

DAUNIA COAL PROJECT - COAL HANDLING PREPARATION PLANT
Approximately 25km Southeast of, Moranbah, QLD 4744 Has Daunia Coal Project - Coal Handling Preparation Plant currently at Construction stage. The contract involves detailed design and procurement of a CHPP, with all key components scheduled for delivery during calendar 2009. Click for more details...

MOOLARBEN JOINT VENTURE COAL OPERATIONS - STAGE 1 ROM STOCKPILE
Mining - Primary And Secondary Processing (Civil works at processing facilities) project at 40km northeast of, Mudgee, NSW 2850 for New. Construction of a 100,000tonne Run-of-Mine (ROM) stockpile for Stage 1 operations. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - CS PLATES TO EN 10025-2
Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - Cs Plates To En 10025-2 is currently at the Construction stage, valued at about $ 750000 it is For the provision of CS plates to EN 10025. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - J-CHANNEL GASKET, WHITE
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - J-Channel Gasket, White currently at Construction stage. For the provision of (70 Nitrile 30 Vinyl) J-channel gaskets. Click for more details...

MOUNT WELD RARE EARTHS OPERATIONS PLANT EXPANSION
Mining - Primary And Secondary Processing (Minerals Processing) project at near, Laverton, WA 6440 for New. Increase of initial 11,000 tonnes per annum (tpa) capacity to 22,000tpa through plant expansion from 120,000tpa to 240,000tpa throughput. Click for more details...

PINE DALE COAL OPERATIONS - YARRABOLDY EXTENSION
Currently at the Construction stage In Lithgow is a project estimated to be $ 1400000. This project Further operations at the former Yarraboldy open cut pit to extract 800,000t approx of coal over a 3 year period. To commence with construction of an amenity bund prior to 2 years of open cut mining followed by 6 months of final rehabilitation works (minimally backfill/ reshaping/ revegetating of 10.3ha). Construction also of internal roads & a new intersection with the existing private coal haul road crossing. Decommissioning of the existing crushing facility & construction of new plant along with a crushing, stockpiling & maintenance area in the Extension. Click for more details...

CAIRN HILL PHASE 2 IRON ORE PROJECT
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. Resource estimate of 8.37 Mt at 46.7% Fe using a 35% Fe cut off grade. Likely infrastructure to include a dry magnetic separation plant. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - SUPPLY & INSTALL HDPE LINER
Mining - Primary And Secondary Processing (Piping) project at Both on & off, Barrow Island, WA 6712 for New. For the supply & installation of the HDPE liner. Click for more details...

CAVAL RIDGE COAL PROJECT - COAL PREPARATION PLANT & RAIL FACILITIES
Mining - Primary And Secondary Processing (Coal Processing) project at 16km south of, Moranbah, QLD 4744 of Coal Preparation Plant/Rail Loadout/Conveyor/Roads type of New development. The proposed Caval Ridge CHPP will have a nominal feed capacity of 2 000 t/h and is capable of processing 14-16 Mt/a to produce a nominal 8 Mt/a of hard coking coal, 5.5 Mt/a of which will be sourced from the Caval Ridge Mine & the balance to come by conveyor from the expanded Peak Downs mine. The facility shall operate seven days per week on a continuous basis. The CHPP will consist of: ROM dump hopper for primary sizing; secondary and tertiary sizers with intermediate screening; raw coal stockpiles with mechanised stacking and reclaim facilities; 2 module coal preparation plant, nominally 1000 tph, per module; product coal stockpiles with mechanised stacking and reclaim facilities; train loadout to the north of the Peak Downs Highway, a conveyor will transport material crossing the highway; reject bin and handling system and ultrafine tailings dewatering system. Water supply to be a combination of site water reuse & a raw water supply via a new off take pipeline from existing bulk pipelines. Process plant water will be recycled to minimise raw water make-up requirements for the site. The product coal will be railed approximately 185km to the Hay Point and/or Dalrymple Bay coal terminals for shipment. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - MANUAL VALVES - (MR-15130)
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area of Manual Valves type. For the provision of manual valves. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - SHELL SECTION
Mining - Primary And Secondary Processing (Tankage, Silos) New project at On, Barrow Island, WA 6712. This type is Shell Section with Private ownership. For the provision of shell section. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - 6 + 1 UPSTREAM CONTRACT
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 300000000. This project Construction of 6 field compressor stations & a central processing plant within 60km of Dalby with works extending into the Chinchilla & Miles regions. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - ROOF SEAL
Roof Seal New project In The Ashburton Council Area. For the provision of a roof seal. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - CS RFWN FLANGES
Cs Rfwn Flanges project at On, Barrow Island, WA 6712 In The Council Area Of Ashburton of Private. For the provision of 300 CS RFWN flanges (1000 mm diameter, A105, Series A). Click for more details...

DUGALD RIVER BASE METAL PROJECT - CONCENTRATOR
Concentrator Plant/Associated Plant New project In The Mt Isa City Council Area. The concentrator will have an annual production of approximately 160,000 tonnes of zinc in zinc concentrate, plus by-products, over an estimated 28 year mine life. Click for more details...

ASHBURTON RIVER SAND & SHINGLE OPERATIONS EXPANSION
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project at via Old Onslow Rd 32km S of, Onslow, WA 6710 of Operating Mine - Expansion type of New development. Sand & gravel extraction during the dry season from the Ashburton River bed & banks between Ten Mile Pool & Mungaroo Well. Excavation to 4m deep with material processed by sand separation followed by crushing & screening to produce aggregates placed in product stockpiles for distribution. Click for more details...

NOVA NICKEL PROJECT - PROCESSING & PASTE PLANT
New project of Mining - Primary And Secondary Processing (Minerals Processing) project at 30km north of Eyre Hwy 120km E/NE of, Norseman, WA 6443. For the provision of a processing plant including crushing, grinding, flotation & dewatering & paste plant. Click for more details...