List of Mining - Primary And Secondary Processing Projects


WEIPA BAUXITE OPERATIONS - ANDOOM/NEWEIPA
New project of Mining - Primary And Secondary Processing (Civil works at processing facilities) project at At, Weipa, QLD 4874. Detailed earthworks, civil works and concrete. Click for more details...

WEIPA BAUXITE OPERATIONS - LORIM POINT/NEWEIPA
Stacker - Erection & Miscellaneous Work project at At, Weipa, QLD 4874 in the Mining - Primary And Secondary Processing (Minerals Processing). At Lorim Point. Click for more details...

DEPARTMENT OF INDUSTRY & RESOURCES
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. A consultancy study of "Energy for Minerals Development in the South West Coast Region of Western Australia". Click for more details...

BLACKWATER COMET PROJECT
Structural Steelwork project at Via, Blackwater, QLD 4717 in the Mining - Primary And Secondary Processing (Coal Processing). More than one package. Click for more details...

LADY ANNIE/MOUNT KELLY COPPER PROJECT - PROCESSING FACILITY
New project of Mining - Primary And Secondary Processing (Civil works at processing facilities) project at Adjacent to Lady Loreta Mine 140 Km North West of, Mount Isa, QLD 4825. To construct a 1900 tpa copper SXEW plant and heap leach. Total copper recovery is expected to be 89% of the ore processed. Click for more details...

BLACKWATER/COMET CHPP PROJECT
Coal Handling & Preparation Plant project at Via, Blackwater, QLD 4717 In The Council Area Of Central Highlands Regional of Private. Comet CPP project. Raw coal and product coal areas included. The new facility will be located adjacent to the current Blackwater North preparation plant and will replace the high cost North, South and Thermal Coal Plants. Click for more details...

TASMAN PROJECT - MOUNT SUGARLOAF
Mine Infrastructure New project In The Newcastle Council Area. Includes mine portal, conveyor, coal stockpile and truckloading area. Click for more details...

RAVENSWORTH EAST COAL OPERATIONS
Mining - Primary And Secondary Processing (Coal Processing) project for New development. The contract involves mining, coal beneficiation, stockpiling and loading of coal for both domestic and export markets.Planed production is 1.2 million tonnes per annum, with 600,000 tonnes per annum contracted to Macquarie Generation and the remainder to be sold to the export market. Click for more details...

YABULU NICKEL REFINERY EXTENSION - NICKEL PRODUCT BUILDING CONTRACT
Mining - Primary And Secondary Processing (Minerals Processing) project at Refinery site at, Yabulu, QLD 4818 for New. Contract package 6 & 7 covers nickel carbonate recovery, calcination and the final nickel product. The contract will involve the construction of a hydrometallurgical facilities including a calciner, furnaces and the production of nickel compacts. Work will be largely greenfield. A second nickel product plant will be constructed to provide capacity for additional throughput. Includes precipitation, filtration, calcining, reduction, sintering and packaging. Click for more details...

YABULU NICKEL REFINERY EXTENSION - MHP RECEIVAL/TREATMENT FACILITIES CONTRACT
New project of Mining - Primary And Secondary Processing (Minerals Processing) project at Refinery site at, Yabulu, QLD 4818. Contract package 4 involves a MHP leach area, ammonical solvent extraction area and a stripping stills and gas absorption area. This package involves construction on top of concrete, structural, mechanical, piping, electrical, instrumentation and controls for what are generally hydrometallurgical facilities. The contract involves both greenfield and brownfield work. The MHP Receival & Treatment Facilities include container storage and unloading and primary and secondary leaching facilities. The intermediate product (MHP) from Ravensthorpe will be received at Yabulu where it will be stockpiled in a weatherproof environment prior to feeding into a two stage leaching process. New material handling equipment will be constructed to process the additional MHP. Extension of the existing utilities plant will be required to provide additional power, steam and process gases. This includes a package plant for nitrogen generation by the pressure swing absorption process. Anhydrous ammonia will be imported to supplement ammonia currently produced on site. Click for more details...

YANDICOOGINA IRON ORE OPERATIONS
A project in the WA Within East Pilbara. Expansion to 36 million tpa .Some conveyor work involved. Flow modifications. A current project to increase output to 24 million tonnes per annum is nearing completion. Click for more details...

CROOM QUARRY PROJECT - STAGES 1 - 6
Croom Quarry Project - Stages 1 - 6 is currently at the Planning stage, valued at about $ 1000000 it is The proposed quarry extension will involve: (1) construction of screening bunds; (2) topsoil removal and stockpiling for later use over bunds or rehabiliated areas; (3) removal of overburden for use in creating screen bunds, rehabilitation of disused sections of the extraction area or for delivery to the market as a general fill material; (4) extraction of resource; (5) haulage of extracted material to the processing plant; (6) crushing, screening and stockpiling of extracted material; (7) transportation of the processed quarry products from the site; and (8) backfilling of depleted quarry areas with clean material to achieve a free draining surface and consistent with the approved final rehabilitation plan. The extraction is proposed in 6 stages with each stage taking approximately 5 years. Click for more details...

OLYMPIC DAM COPPER/GOLD/URANIUM OPERATIONS
Olympic Dam Copper/Gold/Uranium Operations is currently at the Planning stage, valued at about $ 40000000 it is The slag furnace will be modified during the smelter shutdown in August/September 2003 to enhance cooling capacity and increase campaing durations from one to four years. Click for more details...

KOOLYANOBBING IRON ORE OPERATIONS - JACKSON/WINDARLING/BUNGALBIN/MAYFIELD
New project of Mining - Primary And Secondary Processing (Computerised systems for processing equipment) project at 5km north east of, Southern Cross, WA 6426. Limited infrastructure including a single persons camp and communications requirements: computer, phone (microwave link). Click for more details...

MIDDLEBACK RANGE IRON ORE OPERATIONS
Currently at the Construction stage In Adelaide is a project estimated to be $ 170000000. This project Includes mining, crushing, trainloading. Click for more details...

POONCARIE MINERAL SANDS PROJECT - GINKGO
Pooncarie Mineral Sands Project - Ginkgo is currently at the Construction stage, valued at about $ 5000000 it is Includes construction of mine pit, tailings/water storage dam and overburden storage areas. Click for more details...

HUNTLY BAUXITE OPERATIONS - MCCOY CRUSHER MINE RELOCATION PROJECT%
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project at North Spur Rd, Pinjarra, WA 6208 for New. Crusher to be relocated 9 km north of existing White Road Crusher site once infrastructure and other related preparations are completed. Crusher relocation is undertaken every 10 years. Click for more details...

LEICHARDT COPPER OPERATIONS - MOUNT CUTHBERT- PROCESSING PLANT
Private ownership Mining - Primary And Secondary Processing (Minerals Processing) project In The Cloncurry Shire Council Area for New development. The plant is a 5500 tpa solvent extraction/electrowinning (SX/EW) facility with associated leach pad and pond system. Supporting infrastructure includes roads, airstrips, power station, water supply, environmental protection facilities and an accommodation village. Click for more details...

NELSON POINT ORE HANDLING FACILITY - PACE
Structural/Mechanical Works For Finance Island Tunnel New project In The Port Hedland Council Area. Supply and installation of structural and mechanical works for Finance Island tunnel, shiploading routes and lump rescreening plant. Click for more details...

NEW BENDIGO GOLD PROJECT - KANGAROO FLAT MINE - RESOURCE
Mining - Primary And Secondary Processing (Minerals Processing) New project at via, Bendigo, VIC 3550. This type is Operating Mine with Private ownership. The plant is currently treating low-grade ore which was stockpiled during mining operations in 2006/2007. The first ore parcel from Gill reef is planned to be processed in late June, with trial gold production ramping up during the September 2008 quarter. Click for more details...

KOGAN CREEK POWER PROJECT
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 5000000. This project Detailing, procurement, fabrication and erection of 2660 to structural steel works painted, 57 to sundry metal works, 3200m2 hot-dip galvanised gratings, 2420m railings, 210m step ladders. Click for more details...

RAVENSTHORPE NICKEL PROJECT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Ravensthorpe Council Area of Desalination Plant& Water Treatment Plants type. Seawater will be piped to site via a 48 km long pipeline system and then desalinated on site, producing fresh water for steam production while the waste brine stream will be used in the beneficiation circuit. Water treatment plants for the project include potable water treatment plant and waste water treatment plants. Click for more details...

TEXAS SILVER PROJECT - TWIN HILLS
Surface Infrastructure project at via, Texas, QLD 4385 in the Mining - Primary And Secondary Processing (Civil works at processing facilities). Likely to be small scale infrastructure requirements, including demountables. Some demountables are already in place for administration of exploration project. Only 1-2 additional demountables likely to be required. Likely to be sourced locally. NO accommodation requirements, as the project is located only 7 km from Texas. Heap leach operation will require earthworks to prepare leach pads. Likely to be part of mining operation. Click for more details...

MOUNT EGERTON GOLD TAILINGS PROJECT
Mining - Primary And Secondary Processing (Minerals Processing) project at 9 Blackhorse Lane, Mount Egerton, VIC 3345 for New. There are 25,000 tonnes of heap leach material to produce 12-15 kg gold. JORC compliant indicated resources 50,000 tonnes at 0.5 oz gold. Further exploration will continue for approximately 18 months. The proposed new joint venture partner will work on suring up the high grade resource to a mineable resource. Click for more details...

CENTRAL WEST COAL PROJECT - ENEABBA - PIG IRON PLANT
Central West Coal Project - Eneabba - Pig Iron Plant is currently at the Early Planning stage, valued at about $ 200000000 it is A 500,000 tpa pig iron facility to utilise 400,000 tpa of coal and 700,000tps of iron ore. Rotary hearth technology. The pig iron facility would co-generate up to 50 Mw of electricity to sell to the grid. Click for more details...

BROWNS OXIDE PROJECT - PROCESSING PLANT/ LEACHING FACILITIES
Processing Plant/Leaching Facilities project at South East of, Darwin, NT 0800 in the Mining - Primary And Secondary Processing (Minerals Processing). The plant will treat 1.3 million tonnes per year. All major items of equipment for the plant have been acquired including grinding and classification circuit, Cawse solvent extraction, electrowinning plant, thickners and tanks have also been acquired. Other equipment is being custom designed and fabricated offsite. Detailed engineering design works of the plant are in progress. Finalisation of processing plant flowsheet and confirmatory metallurgical testwork are also in progress. Testwork has already shown that the valuable copper, cobalt and nickel minerals are dissolved in acid. Once the metals are in the solution, the liquor is separated from the leached solids which are then washed and sent to the tailings storage facility. Testwork is confirming solvent extraction design criteria for concentrating metals in solution ahead of copper electrowinning of high purity cathode product. The facility will comprise a solvent extraction plant, electrowiring plant, tankage and product filtering equipment. Click for more details...

DONALD PROJECT - PILOT PLANT - DESIGN
Donald Project - Pilot Plant - Design is currently at the Planning stage, valued at about $ 1000000 it is Various pieces of equipment to be modified. Click for more details...

LIDDELL POWER STATION - MAINTENANCE CONTRACT
Currently at the Construction stage In Muswellbrook is a project estimated to be $ 500000. This project The work covered by this specification generally encompasses the inspection, reporting, repairs, routine maintenance and emergency breakdown work on the Liddell Coal handling Plant and Hunter Valley gas Turbines for a period of two years. Click for more details...

ENDEAVOR BASE METAL OPERATIONS - COPPER RECOVERY CIRCUIT
Mining - Primary And Secondary Processing (Minerals Processing) project at 40 Km North west of, Cobar, NSW 2835 for New. Copper recovery circuit is in design. Construction is expected to commence shortly. Testwork and detailed design has been completed. The circuit will treat the lead concentrate to extract a copper concentrate estimate to be 1000 tonnes of copper per annum. Click for more details...

ABBOT POINT COAL TERMINAL EXPANSION STAGE 3
Mining - Primary And Secondary Processing (Coal Processing) project at Abbot Point 25 km north west of, Bowen, QLD 4805 of Coal Terminal Expansion - Stage 3 type of New development. Expansion of terminal capacity from 15 mtpa to 50 mtpa. Key components of the stage 3 expansion will involve the construction of a second berth, a second rail loop and train dump facilities and associated second in loading conveyor. Installation of a new stockyard bund and two new stockpile rows. Up to three new stacker reclaimers and a new yard conveyor and transfer towers will be installed. A second outloading conveyor to the offshore berth, using the existing jetty structure will be installed. Installation of a second offshore berth and a second shiploader on the new berth. Lastly there will dredging work associated with the second berth and the dredge material will be disposed of on either land or sea. Click for more details...

MOUNT NORMA LEACH VAT NUMBER FIVE
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Cloncurry Shire Council Area of Private ownership. Construction will comprise earthworks, lining of the vats, filters, electrical installation, crushing and loading of the vats. The vat is to contain 30,000 tonnes of high leach copper oxide. Click for more details...

PERSEVERANCE JOINT VENTURE PROJECT - GOLD RESOURCE
Resource - Gold project at Via, Coolgardie, WA 6429 In The Council Area Of Coolgardie of Private. Recently completed grade control drilling has resulted in a 28% increase in the Indicated Resource from 448 000t @ 6.4%g/t for 92 100 contained ounces to 490 700t @ 7.5%g/t for 118 500 ounces as a result of the conversion of additional ounces. Click for more details...

MONTO MINERALS INDUSTRIAL MINERALS PROJECT - FELDSPAR WASH PLANT
Feldspar Wash Plant New project In The North Burnett Regional Council Area. Development comprises the construction of a treatment facility that will comprise a hot acid leach plant and associated equipment. The ore will be shipped from the mine to the feldspar plant at Dakiel Railroad Station where it will be loaded and sent to Gladstone and then be shipped to Brisbane. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - SANDING SYSTEM DESIGN/FABRICATE
Private ownership Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project In The East Pilbara Council Area for New development. Sanding System Design and Fabricate. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT/AREA C - UPS SYSTEM
Mining - Primary And Secondary Processing (Computerised systems for processing equipment) project In The Port Hedland Council Area of Private ownership. Uninterruptible Power Supply System. Click for more details...

JIMBLEBAR IRON ORE OPERATIONS - MINING CONTRACT
Open Cut Mining Contract project at 60 Km East of, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Work will comprise drilling, blasting, mining, crushing and train loading operations. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - ELECTRICAL CONTRACT
Electrical Work For Temporary Facilities/Infrastructure/Process Plant project at 15 Km South east of, Collie, WA 6225 in the Mining - Primary And Secondary Processing (Minerals Processing). Work for the Electrical, Instrumentation & Control - Infrastructure package includes Power Distribution, Instrumentation and Control System Infrastructure to the Refinery, Mine and Port inclusive of materials handling facilities. Battery limits include the 132kV WPC tie-in, 11.5kV power distribution to EDCs and 415/240V Distribution Boards and MCCs as well as the control system from the Central Control Room to the Marshalling Panels within the EDCs. Work for the Electrical, Instrumentation & Control - Process Plant includes Power, Instrumentation and Control from the field side of the MCCs, Distribution Boards and Control Marshalling Panels within the EDCs to the Refinery, Mine and Port inclusive of materials handling facilities. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - FIRE DETECTION & ALARMING
Mining - Primary And Secondary Processing (Minerals Processing) project at 15 Km South east of, Collie, WA 6225 for New. For the supply of fire detection and alarming. Click for more details...

PINKENBA RUTILE PLANT UPGRADE
Mining - Primary And Secondary Processing (Other processing including salt, sand etc) project In The Brisbane City Council Area of Plant Upgrade type. Work comprises the replacement of older style electrostatic seperators and induced roll magnets with the latest generation of seperators and the installation of dust extraction equipment. Click for more details...

DRAYTON COAL OPERATIONS - CRANAGE - FOR COAL TREATMENT UNIT
Mining - Primary And Secondary Processing (Coal Processing) project at Thomas Mitchell Dr, Muswellbrook, NSW 2333 for New. This will be a 3 year contact with a further option of 12 months. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - RECLAMATION
Mining - Primary And Secondary Processing (Civil works at processing facilities) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Reclamation. Core rubble fill with armour rock facing at southern end of Berth 5. Click for more details...

CHINCHILLA COAL SEAM GAS & UNDERGROUND COAL GASIFICATION PROJECT - STAGE 1 - STRUCTURAL STEEL FOR DEMONSTRATION PLANT
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 6000000. This project For a 1-5 barrels per day Gas to Liquids demonstration plant. Click for more details...

LIDDELL COAL OPERATIONS - COAL HANDLING PREPARATION PLANT
Coal Handling Preparation Plant project at 20 Km North West of, Singleton, NSW 2330 In The Council Area Of Singleton of Private. Construction of a new Coal Handling Preparation Plant. This will involve the construction of a new preparation section, upgrades to the ROM receival and product coal facilities. The new preparation area will be located next to the old CHPP and its capacity will be 1200 tonnes per hour. This will include new screening, cyclone and spiral components for the plant. Upgrades to the ROM receival equipment include shortening of the apron feeder, a new rotating star wheel, new sizers and an increase in the drive power and length of the ROM conveyor. Modifications to the product handling equipment will include a short product conveyor to collect coal from the new CHPP to be deposited at a new transfer station onto the existing product stockpile rising conveyor. The existing road truck type coarse rejects bin will be replaced by a larger bin capable of loading mining sized trucks. The exisiting CHPP will be dismantled and recycled or disposed of over a one year period. Click for more details...

WHITE DAM PROJECT - GOLD PROCESSING PLANT
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. Refurbishment, dismantling, transporting and reassembling of a 2 Mtpa heap leach process plant. Click for more details...

LIDDELL POWER STATION - COAL UNLOADER MAINTENANCE
Liddell Power Station - Coal Unloader Maintenance is currently at the Construction stage, valued at about $ 4000000 it is Work comprises the sampling and analysis of coal supplied to Bayswater and Liddell Power Stations. This will include operation, routine inspection and maintenance of the two automatic coal samplers at Ravensworth Operations Narama/Ravensworth West Mine. Routine inspection and maintenance of three automatic coal samplers located on conveyors supplying coal from Howick Coal, Drayton Coal and the Macquarie Generation Ravensworth Coal Unloader. Collection and analysis of samples from Howick Coal, Drayton Coal, Mount Arthur North, Macquarie Generation Ravensworth Coal Unloader, Macquarie Generation Antiene Coal Unloader, Ravensworth Operations Narama/Ravensworth West Mine and Ravensworth Operations Ravensworth East Mine. Quarterly inspections of the automatic coal samplers located on the conveyors supplying coal from Mount Arthur North Mine, Ravensworth East Mine and the Macquarie Generation Antiene Coal Unloader. manual sample collection from trucks at Bayswater Power Station and analysis. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - TRANSPORTABLE SUBSTATIONS CONTROL
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project at Newman Hub, Newman, WA 6753 of Transportable Substations/Control - Supply Of type of New development. For the supply of transportable substations, control. Click for more details...

LAKE VERMONT COAL PROJECT - PIPING FOR COAL PREPARATION PLANT
Piping - For Coal Preparation Plant project at Approx 15 km north east of, Dysart, QLD 4745 In The Council Area Of Isaac Regional of Private. For a 4 Mtpa plant. Click for more details...

BROKEN HILL SEPARATION PLANT UPGRADE - RUTILE CIRCUIT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Broken Hill Council Area of Rutile Circuit type. For a 650,000 tpa fixed plant for heavy mineral concentrate. Rutile circuit to be one package. Click for more details...

BHP BILLITON RAPID GROWTH 5 IRON ORE PROJECT - CRUSHING FACILITIES & OVERLAND CONVEYORS
A project in the WA Within East Pilbara. For the provision of primary and secondry crushing facilites including overland conveyors. Click for more details...

PINE DALE COAL OPERATIONS - YARRABOLDY EXTENSION
Currently at the Construction stage In Lithgow is a project estimated to be $ 1400000. This project Further operations at the former Yarraboldy open cut pit to extract 800,000t approx of coal over a 3 year period. To commence with construction of an amenity bund prior to 2 years of open cut mining followed by 6 months of final rehabilitation works (minimally backfill/ reshaping/ revegetating of 10.3ha). Construction also of internal roads & a new intersection with the existing private coal haul road crossing. Decommissioning of the existing crushing facility & construction of new plant along with a crushing, stockpiling & maintenance area in the Extension. Click for more details...