List of Mining - Primary And Secondary Processing Projects


YABULU NICKEL REFINERY EXTENSION - CARBONATE FACILITY
Mining - Primary And Secondary Processing (Tankage, Silos) project at Refinery site at, Yabulu, QLD 4818 of Basic Nickel Carbonate Facility Contract type of New development. Scope of work involves the construction of two large tanks, a thickner and associated pipework. Click for more details...

LAKE VERMONT COAL PROJECT - ELECTRICAL FOR COAL PREPARATION PLANT
Approx 15 km north east of, Dysart, QLD 4745 Has Lake Vermont Coal Project - Electrical For Coal Preparation Plant currently at Construction stage. For a 4 Mpta plant. Click for more details...

MOUNT GARNET ZINC PROJECT TREATMENT FACILITY EXPANSION
Mining - Primary And Secondary Processing (Minerals Processing) Addition project at Via, Mount Garnet, QLD 4872. This type is Treatment Facility - Expansion/Dedicated Copper Circuit with Private ownership. An upgrade to increase plant capacity from the current 90,000 tonnes of concentrate per annum to 148,000 tonnes per annum. The zinc concentrate output will increase from 70,000 tonnes per annum to 110-120,000 tonnes per annum. A dedicated copper circuit will be installed as part of the upgrade. Click for more details...

MIDDLEBACK RANGES OPERATIONS - PROJECT MAGNET - CRUSHING/SCREENING EQUIPMENT
Crushing/Screening Equipment project at North west of, Whyalla, SA 5600 in the Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying). Project Magnet involves conversion of Whyalla steelworks to produce steel from magnetite rather than haematite ore. This will extend the life of the steelworks to at least 2027. Click for more details...

PARDOO IRON ORE PROJECT
Pardoo Iron Ore Project is currently at the Construction stage, valued at about $ 8300000 it is The project is based on an identified iron ore (hematite) resource of approximately 7.4Mt. The project proposes an ore production rate of 1.5 Mtpa, resulting in a mining life of 5 - 6 years. The project involves the open cut mining of eight small pits in five deposits to obtain direct-shipping quality iron ore. The ore will be crushed, screened and stockpiled on site prior to being loaded into rail trains for road haulage to the appropriate berth at Port Hedland. Ore will be stockpiled at the port until it is loaded onto ships for export to overseas customers. The major components of the Pardoo DSO Project are: minesite establishment, mining operations, product transport and export and decommissioning and closure. The minesite access road and temporary construction yard and administration area will be the first infrastructure constructed. The mining operations centre (MOC) will be located in the northern portion of the minesite and contains the following infrastructure: administration area including Atlas facilities, mining contractor's facilities, crushing and screening contractor's facilities, haulage contractors facilities, sewerage treatment and waste water storage, potable water storage, common parking area. The MOC will also contain a fuel storage and refuelling area, power station (diesel), crushing and screening plant, ROM ore pad and product stockpiling area, parking areas and portions of the access road and haul road, and combined contractor's laydown area. Haul roads will be constructed between the pits, waste rock dumps, stockpiles and ROM pad stockpile. Minor access roads will provide access to waste rock dumps and inspection points, dewatering equipment, water management structures, environmental discharge locations and other minesite management areas. The proposed mining operation will be a multiple, open pit mining operation, using conventional drill and blast and load and haul methods. Ore from the pits will be hauled directly to the ROM pad or temporarily stockpiled adjacent to the pits. The crushing and screening plant will provide primary and secondary crushing and screening. Click for more details...

BHP BILLITON RAPID GROWTH 5 IRON ORE PROJECT - CRUSHING FACILITIES & OVERLAND CONVEYORS
A project in the WA Within East Pilbara. For the provision of primary and secondry crushing facilites including overland conveyors. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - CCTV EQUIPMENT & INSTALLATION
Cctv Equipment/Installation - Supply Of New project In The Collie Council Area. For the supply of CCTV equipment and installation. Click for more details...

UNION REEFS GOLD OPERATIONS - MINE & PLANT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Katherine Town Council Area of Mine/Infrastructure type. Includes Union Reefs Gold Project and a 2.8mtpa gold plant, on care and maintenance since late 2003, and related site infrastructure. Situated 50 km south of Bocks Creek and Cosmo Deeps and approx 20 km north of Pine Creek. Click for more details...

GROOTE EYLANDT MANGANESE MINE EXPANSION
Mining - Primary And Secondary Processing (Other processing including salt, sand etc) New project at Groote Eylandt, Groote Eylandt, NT 0822. This type is Sands Benefication Plant with Private ownership. Extension to facility to increase the capacity by 0.5Mt/a by re-processing manganese ore stored in tailings stockpiles. Works to include detailed design, supply, fabrication, construction & commissioning of a sands beneficiation plant, port stockpile expansion & associated infrastructure. Click for more details...

YABULU NICKEL REFINERY EXTENSION - SITE WIDE CONCRETE CONTRACT
New project of Mining - Primary And Secondary Processing (Civil works at processing facilities) project at Refinery site at, Yabulu, QLD 4818. Scope of work involves concrete work to the entire refinery site. Click for more details...

HELLYER METALS PROJECT - MILL/INFRASTRUCTURE
A project in the TAS Within Waratah-Wynyard. Includes a 1.5mtpa mill, designed for differential flotation. The existing concentrator and facilities will be used for reagent handling, preparation, maintenance and office areas. Click for more details...

LAKE VERMONT COAL PROJECT - STRUCTURAL STEEL FOR COAL PREPARATION PLANT
Mining - Primary And Secondary Processing (Coal Processing) New project at Approx 15 km north east of, Dysart, QLD 4745. This type is Structural Steel - For Coal Preparation Plant with Private ownership. For a 4 Mtpa plant. Click for more details...

MURRIN MURRIN NICKEL HEAP LEACH PROJECT - DEMONSTRATION PLANT
Murrin Murrin Nickel Heap Leach Project - Demonstration Plant is currently at the Planning stage, valued at about $ 12000000 it is Final stages of a study on an initial 200,000tpa scats Heap Leach project reveal the operation is anticipated to be established in 2006. Continuous laboratory pilot plant testing to establish the optimum treatment of the heap leach solutions indicates the technical feasibility of integration into the existing Murrin Murrin process plant. Heap leach recoveries of above 80% of nickel have been achieved on the scats material in less than 180 days of leaching. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - GRATING & CAST IN ANGLE SUPPLY
Mining - Primary And Secondary Processing (Piping) project for New development. For the supply of grating & cast in angle. Click for more details...

WORSLEY ALUMINA EXPANSION EFFICIENCY & GROWTH PROJECT
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project In The Collie Council Area of Mine Expansion/Refinery - Upgrade type. Development comprises two parts. Expansion of the existing bauxite mining activities and an upgrade of the refinery. Mining will expand into the Saddleback, Marradong, Hotham North, East Quindanning, Morgans, Hotham North Extension, Central and Brookton mining envelopes. Throughput will expand to 16.5 Mtpa. The expansion of mining activities will involve the addition of three new primary crushers and a new crushed ore stockpile will be needed next to the existing secondary crusher to provide extra surge material to feed the overland bauxite conveyor. Additional conveyors include a 34 km extension from the Hotham North mining envelope which will cross both the Albany Highway and the Wandering-North Bannister road, a 16 Km spur from the south east of the Central mining envelope to the Luptons mining envelope and lastly a 28 Km extension from the Central mining envelope to the Brookton mining envelope. Additional bauxite conveyors spurs and haul truck transport may be needed in the future. Refinery expansion will involve an increase in the Bauxite stockpile of 0.5 Mt. At the Milling and Digestion plant an additional mill, an additional desilication tank and eight new slurry heaters will be required. At the Seperation plant, an extension of the residue washing tanks and an expansion of capacity of the causticiser circuit. At the Calcination plant an additional gas fired calciner with bag house with a new hydrate filtration building. Addition of a coal-fired co-generation facility with bag house designed to produce 350 tonnes of steam per hour (equivalent to 204 Mw) and 35 Mw of electrical power. Click for more details...

ROCKLANDS GROUP JOINT VENTURE COPPER PROJECT - PROCESSING PLANT INSTALLATION
Structural/Mechanical/Piping Installation New project In The Cloncurry Shire Council Area. Installation of a fully computerised & automated 3 million tonne per annum (Mtpa) processing plant for copper/gold, cobaltic-pyrite, native copper & magnetite concentrate production. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT - BULK EARTHWORKS
Bulk Earthworks - Phase 2 project at On, Finucane Island, WA 6721 In The Council Area Of Port Hedland of Private. Finucane Island Bulk Earthworks Phase 2. Click for more details...

BROKEN HILL MINE BASE METAL OPERATIONS - NORTH MINE EXTENSION
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project In The Broken Hill Council Area of Resource - Base Metals type. Resource estimate is 4.2 Million tonnes @ 11.2% Zn, 13.7% Pb and 214 g/t Ag. Likely to include two open cut pits, a waste rock emplacement, a haul road, facilities, stockpiling and crushing areas and associated infrastructure. Click for more details...

KWINANA ALUMINA REFINERY
Mining - Primary And Secondary Processing (Minerals Processing) project In The Kwinana Council Area of Carbonation Facility - Upgrade type. Includes installation of a new carbonation vessel, modifications to the existing carbonation facility, a new causticisation facility (2 causticisers and a 200 kL lime slurry storage tank and a new discharge pipeline between the causticisation facility and the residue disposal area H. Click for more details...

HISMELT EXPANSION PROJECT
Earthworks/Civil Works New project In The Kwinana Council Area. Roadworks, drainage. Click for more details...

FOSTERVILLE GOLD OPERATIONS
Mining - Primary And Secondary Processing (Minerals Processing) project In The Greater Bendigo Council Area of Private ownership. Two separate packages. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT
Consultancies For Feasibility Study project at Via, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Feasibility work includes rail and rolling stock design, rail signals and communications design, marine studies, offshore and onshore geotechnical investigations and port stockyard design. Click for more details...

COWAL GOLD PROJECT - CIVIL WORKS
Private ownership Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Bland Council Area for New development. Concrete foundations, sub-structure and structures. Includes concrete reclaim tunnels. Click for more details...

MONTO MINERAL INDUSTRIAL MINERALS PROJECT - ILMENITE RESOURCE
Currently at the Construction stage In North Burnett Regional is a project estimated to be $ 50000000. This project Resource estimate in the measured category is Ilmenite 57,678 tonnes @ 5.2% for 3002 tonnes of mineral, Feldspar 5260 tonnes @ 12.3% for 647 tonnes, Apatite 5,950 tonnes @ 1.9% for 114 tonne and Titanomagnetic 57,678 tonnes @ 3.1% for 1,773 tonnes. Indicated Mineral resource is Ilmenite 21,334 tonnes @ 4.4% for 934 tonnes, Feldspar 12,740 tonnes @ 14.7% for 1870 tonnes, Apatite 12,050 tonnes @2.1% for 252 tonnes and Titanomagnetic 21,334 tonnes @ 2.2% for 477 tonnes. Inferred mineral resource is Feldspar 55,000 tonnes @ 12.3% for 6800 tonnes and Apatite 55,000 tonnes @ 1.9% for 1000 tonnes. Multi product operation producing feldspar, ilmenite, titano-magnetite and apatite. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - CS RFWN FLANGES
Cs Rfwn Flanges project at On, Barrow Island, WA 6712 In The Council Area Of Ashburton of Private. For the provision of 300 CS RFWN flanges (1000 mm diameter, A105, Series A). Click for more details...

CSA COPPER OPERATIONS - CONCRETE REMOVAL
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Cobar Council Area of Concrete Removal type. This package may be combined with Steel Work contract ID: 2155418. Decision is yet to be made whether concrete may be replaced with steel flooring. Click for more details...

KOOLAN ISLAND PROJECT - PROCESS PLANT
Process Plant project at on, Koolan Island, WA 6733 in the Mining - Primary And Secondary Processing (Minerals Processing). The plant will comprise a conventional 2 stage crushing and screening plant at a nominal capacity of 600 tonnes per hour (4 mtpa) to produce lump and fines product for export. Click for more details...

KING ISLAND SCHEELITE PROJECT - OLD DOLPHIN MINE - MECHANICAL FOR PROCESSING FACILITY INCORPORATED INTO PROJECT ID 8691
Private ownership Mining - Primary And Secondary Processing (Minerals Processing) project In The King Island Council Area for New development. For the mechanical installation for the processing facility. Click for more details...

SOLOMON IRON ORE PROJECT - PRIMARY CRUSHING HUBS
Mining - Primary And Secondary Processing (Minerals Processing) project In The Ashburton Council Area of Primary Crushing Hubs type. For the engineering, procurement and construction works of the three primary crushing hubs. Click for more details...

MAGELLAN LEAD CARBONATE PROJECT - GAS PIPELINE
Mining - Primary And Secondary Processing (Minerals Processing) project at Goldfields Gas Transit pipeline to proposed Refinery near, Wiluna, WA 6646 for New. The gas pipeline is proposed to run from the proposed refinery to the main Goldfields Gas transit pipeline. Goldfields gas pipeline is 35 km from the minesite where the refinery is to be located nearby. Click for more details...

WHIM CREEK COPPER PROJECT
Infrastructure project at Via, Whim Creek, WA 6718 In The Council Area Of City Of Karratha of Private. Crushing & stacking facilities, site layout, crusher area works. Surplus plant from Girilambone to be utilised. A conventional SX-EW operation. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - SCREENS FOR PROCESSING PLANT
Screens - For Processing Plant project at 28 km east of, Ouyen, VIC 3490 In The Council Area Of Mildura of Private. For the provision of 3 screens for the processing plant. Click for more details...

RAVENSTHORPE NICKEL PROJECT - TREATMENT PLANT PACKAGES
A project in the WA Within Ravensthorpe. Processing includes a combination of pressure acid leach (PAL), atmospheric leach (AL) and Enhanced Pressure Acid Leach (EPAL). The EPAL process entails separate mining, stockpiling and beneficiation of Ilmonite ( high iron, low magnesium and calcium, upper levels) ore. The ilmonite is treated by PAL, whilst the saprolite is treated by AL using the PAL discharge and additional acid. This allows recovery of an additional 15,000 tpa of nickel. The process downstream of the leaching circuit uses the Cawse flowsheet with partial neutralisation, followed by separation of the barrren tailings from the nickel bearing solution, further impurity removal and preciptiation of MHP. This intermediate product is then transported to the QNI Yabulu refinery. Click for more details...

NULLAGINE GOLD PROJECT - MOBILE PLANT & EQUIPMENT HIRE
Nullagine Gold Project - Mobile Plant & Equipment Hire is currently at the Construction stage, valued at about $ 40000000 it is For the provision of mobile plant and equipment. Click for more details...

TWIN HILLS GOLD PROJECT - PROCESSING PLANT
Approx 40 km east of, Charters Towers, QLD 4820 Has Twin Hills Gold Project - Processing Plant currently at Construction stage. Rishton Treatment Plant was acquired and a gravity circuit will be added, some tanks will be converted for CIL and enhanced gold security provisions will be made. A sediment dam is to be constructed. Power plants will also be installed for the crushing circuit and the processing circuit. Click for more details...

MOUNT ISA MINE COPPER SMELTER - EXPANSION STAGE TWO
Mining - Primary And Secondary Processing (Minerals Processing) New project at At, Mount Isa, QLD 4825. This type is Smelter Expansion - Stage 2 with Private ownership. The copper smelter's capacity will be upgraded from 280,000 to 300,000 kt anode. This will involve the installation of a slag clearing furnance, converter slag crushing plant and two new oxygen plants. As part of the upgrade, the Townsville copper refinery capacity will be upgraded from 280,000 to 300,000 kt cathode. Click for more details...

ILUKA RESOURCES
Mining - Primary And Secondary Processing (Computerised systems for processing equipment) project In The Various Council Area of Information Technology - Support Services type. Includes server management, database support, desktop support, help desk, remote site support, network management including microwave and radio links and full data centre services. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - TRANSPORTABLE SUBSTATIONS CONTROL
Mining - Primary And Secondary Processing (Minerals Processing) project at Newman Hub, Newman, WA 6753 of Transportable Substations/Control - Supply Of type of New development. For the supply of transportable substations, control. Click for more details...

MONASH ENERGY COAL GASIFICATION & LIQUIDS PROJECT - SYNGAS PLANT
Mining - Primary And Secondary Processing (Coal Processing) project In The La Trobe Council Area of Private ownership. Construction of a plant adjacent to the Loy Yang Power Station to process coal into gas & then liquids. The demonstration phase will dry and gasify Latrobe Valley brown coal into syngas used to produce power. A subsequent commercial scale plant will convert the syngas into liquids such as synthetic diesel. Click for more details...

LAKE VERMONT COAL PROJECT - PIPING FOR COAL PREPARATION PLANT
Piping - For Coal Preparation Plant project at Approx 15 km north east of, Dysart, QLD 4745 In The Council Area Of Isaac Regional of Private. For a 4 Mtpa plant. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - JIMBELBAR - METAL DETECTOR
Currently at the Construction stage In East Pilbara is a project estimated to be $ 250000. This project For the supply of metal detector. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - SHELL NOZZLE REINFORCING
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area of Shell Nozzle Reinforcing type. For the provision of shell nozzle reinforcing. Click for more details...

BLOODWOOD CREEK UCG POWER PROJECT
Mining - Primary And Secondary Processing (Coal Processing) project In The Western Downs Regional Council Area of Private ownership. A power plant project based on underground coal gas (UCG) with late 2009 certified syngas reserves of 11PJ at 1P (proven) level of certainty, 743.9PJ at 2P (proven + probable) & 1042.8PJ at 3P (proven + probable + possible). The 5MW proof-of-concept power station powered by 4 GEC Alsthom Ruston low emission engines to be connected via a 12.6km overhead line to the power grid in October 2011. Development of a commercial scale 20-25MW power station to follow. Click for more details...

YABULU NICKEL REFINERY
Mining - Primary And Secondary Processing (Minerals Processing) project In The Townsville City Council Area of Private ownership. Gas scrubbing system to recover ammonia for re-use. Part of project to increase prodcution of cobalt. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE TANKS - ELECTRICAL CABLE GLANDS
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area of Electrical Cable Glands type. For the provision of M20 electrical cable glands. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - SLAB HEATING SYSTEM
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area of Private ownership. For the provision of a slab heating system. Click for more details...

KOOLYANOBBING IRON ORE OPERATIONS - RESOURCE
Mining - Primary And Secondary Processing (Minerals Processing) New project at 50 km north north east of, Southern Cross, WA 6426. This type is Resource - Iron Ore with Private ownership. Northern Tenements Expansion. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - BULL WHEEL GANTRY WALKWAY
Bull Wheel Gantry Walkway project at On, Barrow Island, WA 6712 In The Council Area Of Ashburton of Private. For the provision of a bull wheel gantry walkway. Click for more details...

COPPABELLA COAL OPERATIONS
Addition project of Mining - Primary And Secondary Processing (Coal Processing) project at Approx 130 km west of, Mackay, QLD 4740. The Coal Preparation Plant will become the largest single module plant in the world. Click for more details...

HISMELT EXPANSION PROJECT
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Kwinana Council Area of Earthworks - Preliminary Works type. Concrete works and pipebridges. A vertical package comprising both civil and mechanical works. Includes earthworks, stone column foundations, 10,000 cu m of reinforced concrete foundations and 1,000 tonnes of structural steel pipe racks, associated pipes, ducting and accessories. Click for more details...