List of Mining - Primary And Secondary Processing Projects in NSW


RASP SILVER LEAD & ZINC OPERATIONS EXTENSION - PROCESSING PLANT
New project of Mining - Primary And Secondary Processing (Minerals Processing) project at via, Broken Hill, NSW 2880. A plant to handle increased Stage 2 production of 750,000 tonnes per annum (tpa) ore throughput to produce an average of 65,000tpa zinc concentrate (50% zinc) & 35,000tpa lead concentrate (70% lead) containing 800,000 ounces silver. Click for more details...

RASP SILVER LEAD & ZINC OPERATIONS EXTENSION
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. Continuation of production at the Rasp Mine through a combination of open cut & underground workings. The existing Kintore open cut pit to be extended over 4 years for an anticipated 1.5-2 million tonnes (Mt) production comprising 16% lead plus zinc & 200g/t silver. A decline from the existing Kintore pit allows underground access to another 10Mt in the previously unmined Western & Centenary Mineralisations. Initially underground workings will focus on high grade pillars with the ore trucked out for processing at the Endeavour Mine. Construction of a processing plant to accommodate Stage 2 follow on underground mining of the Western & Centenary lodes for around 750,000 tonnes per annum (tpa). Power, water and rail access already connected to the site with buildings, workshops and general amenities also in place. Click for more details...

BULGA COAL OPERATIONS - REDBANK II COAL TAILINGS PREPARATION & WASTE MANAGEMENT
Coal Tailings Dewatering Plant & Associated Infrastructure New project In The Singleton Council Area. The proposal included construction & operation of a tailings dewatering plant (DBT) and associated infrastructure and facilities. Supply of BDT fuel to the Redbank 2 power plant and receipt and disposal of fly ash, water treatment plant sludge, and wastewater from the Redbank 2 power plant. Click for more details...

HUNTER VALLEY COAL OPERATIONS
Product Coal Feed Bin project at Lemington Rd, Lemington, NSW 2330 In The Council Area Of Singleton of Private. Coal and Allied Operations Pty Ltd operates open cut coal mines and coal preparation plants in the Hunter Valley at Mount Thorley, Hunter Valley Operations (Howick, Hunter Valley and Lemington), Warkworth, Ravensworth and Bengalla Mines. Coal and Allied is interested in receiving Expressions of Interest from companies that can provide professional services for the staged design and construction of a product coal feed bin at the Hunter Valley Operations Load Point. Stage 1 will include site investigation, conceptual design and budget preparation. Stage 2 will encompass design and construction for the completion of the works. all works will comply to stringent Coal & Allied safety standards. It is envisaged that the design process will be highly consultative iwth existing operations, with a key element of the work being the minimisation of disruptions to current train loading facilities during construction. It is envisaged that conceptual works and budget preparation be completed by 1 December 2001 with final works completed (pending internal finanical approval) by the third quarter of 2002. Click for more details...

HILL END GOLD PROJECT - HAWKINS HILL/REWARD
Mining - Primary And Secondary Processing (Minerals Processing) project In The Bathurst Council Area of Mining/Processing Equipment - Supply type. The company has sourced some additional mining & processing equipment. Click for more details...

GALONG LIMESTONE OPERATIONS
Eubinal Rd, Galong, NSW 2585 Has Galong Limestone Operations currently at Planning stage. Boral intends to expand the Galong lime operation by installing a 150,000 tonnes per annum vertical shaft lime kiln at the site, subject to regulatory approvals. The acquisition and the kiln installation will involve approximately $30 milliion. The upgrade is expected to be completed by June/July 2004. Click for more details...

GLOUCESTER RUBY MINE
Mine - Rubies project at Mid way between Scone and, Gloucester, NSW 2422 In The Council Area Of Gloucester of Private. Mine production for December Quarter 2006 was 15,281 tonnes of gemstones. Click for more details...

TRITTON COPPER PROJECT - MURRAWOMBIE - MINING/EARTHWORKS CONTRACTS
Private ownership Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Bogan Council Area for New development. The construction of the box cut and the ROM development contract has been awarded to a local contractor ahead of full mobilisation to site later in February 2004 by the principal mining contractor. Click for more details...

CUMNOCK NO 1 COLLIERY
Mining - Primary And Secondary Processing (Coal Processing) project In The Singleton Council Area of Mine - Coal type. The mine produces soft coking coal used in Asian steel mills. Coal is loaded at adjacent Ravensworth coal terminal and railed to Newcastle for export. Production for 2006 was 1,416,666 tonnes of raw coal. Click for more details...

DARTBROOK COAL OPERATIONS - KAYUGA
Mining - Primary And Secondary Processing (Coal Processing) project In The Muswellbrook Council Area of Reject Emplacement Works type. Tailings dewatering. Click for more details...

HILL END GOLD PROJECT - PROCESSING FACILITIES UPGRADE
A project in the NSW Within Bathurst. Upgrade and recommissioning the Amalgamated gravity plant. Major work will be the installation of a gold room. The plant will be used for the bulk sampling program. Click for more details...

TARAWONGA COAL PROJECT - RESOURCE
Resource - Coal project at Maules Creek & Goonbri Rds, 15 km north east of, Boggabri, NSW 2382 In The Council Area Of Narrabri of Private. The expected mine life between 8 to 10 years, will yield close to 12 million tonnes of export quality low sulphur, low ash, high-energy semi-soft coking coal from the Forest View, Thuin and Nagero properties east of Boggabri (formerley named East Boggabri Coal Project). Click for more details...

CROOM QUARRY PROJECT - STAGES 1 - 6
Croom Quarry Project - Stages 1 - 6 is currently at the Planning stage, valued at about $ 1000000 it is The proposed quarry extension will involve: (1) construction of screening bunds; (2) topsoil removal and stockpiling for later use over bunds or rehabiliated areas; (3) removal of overburden for use in creating screen bunds, rehabilitation of disused sections of the extraction area or for delivery to the market as a general fill material; (4) extraction of resource; (5) haulage of extracted material to the processing plant; (6) crushing, screening and stockpiling of extracted material; (7) transportation of the processed quarry products from the site; and (8) backfilling of depleted quarry areas with clean material to achieve a free draining surface and consistent with the approved final rehabilitation plan. The extraction is proposed in 6 stages with each stage taking approximately 5 years. Click for more details...

BROKEN HILL MINE BASE METAL OPERATIONS - NORTH MINE EXTENSION
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project In The Broken Hill Council Area of Resource - Base Metals type. Resource estimate is 4.2 Million tonnes @ 11.2% Zn, 13.7% Pb and 214 g/t Ag. Likely to include two open cut pits, a waste rock emplacement, a haul road, facilities, stockpiling and crushing areas and associated infrastructure. Click for more details...

POONCARIE MINERAL SANDS PROJECT - GINKGO
Pooncarie Mineral Sands Project - Ginkgo is currently at the Construction stage, valued at about $ 5000000 it is Includes construction of mine pit, tailings/water storage dam and overburden storage areas. Click for more details...

TAHMOOR COLLIERY
New project of Mining - Primary And Secondary Processing (Coal Processing) project at At, Tahmoor, NSW 2573. Bolt-up in progress. The clean coal stockpile level has been built up to 284,000 tonnes to ensure that coal shipment could be met during the planned shutdown. The shutdown is required to enable completion of necessary capital works during the Tahmoor North Expansion. The longwall changeover is part of normal mining operations. Click for more details...

CHARBON COAL OPERATIONS - OPERATING MINE
Charbon Coal Operations - Operating Mine is currently at the Construction stage, valued at about $ 20000000 it is Developer is proposing to expand the open cut operations into stage 2 area of the mine. It will involve the production of 600,000 tonnes of coal per annum. The existing infrastructure at the mine will not be altered. Existing infrastructure includes a Coal Preperation Plant, stockpiles and transport infrastructure. Resource estimate is 7.1 Mt measured in-situ, 18.7 Mt indicated, 25.8 Mt recoverable, 5.8 Mt marketable. Click for more details...

COWAL GOLD PROJECT - ENDEAVOUR 42/ENDEAVOUR 46
Mining - Primary And Secondary Processing (Minerals Processing) project at Approx 45 kms north east of, West Wyalong, NSW 2671 of Resource - Gold/Infrastructure/Plant type of New development. The Cowal project has proven and probable reserves of 2.8 million ounces. The mine is expected to produce 220,000 to 235,000 ounces of gold per year on average. Mine and process plant construction is expected to take 21 months. Click for more details...

ARDLETHAN TIN OPERATIONS - TAILINGS TREATMENT
Tailings Treatment project at Via, Ardlethan, NSW 2665 In The Council Area Of Coolamon of Private. Involves treatment of 8,000,000 tonnes of tailings. Click for more details...

POWERCOAL COLLIERIES
Lifting Products - Supply project at Various sites lake Macquarie, Central Coast & Lithgow Regions, Lithgow, NSW 2790 In The Council Area Of Lithgow of Private. Supply and delivery of lifting and materials handling products (including winches, hoists, blocks, wire and fibre ropes, chains, shackles, tumbuckles etc) for an initial two year period with "optional" extension period. Click for more details...

BENGALLA COAL OPERATIONS
Mine site, Bengalla, NSW 2333 Has Bengalla Coal Operations currently at Construction stage. The expansion involves additions of a second module. This will replicate module 1, which was designed to allow addition of a second module. The addition will expand production capacity to 3,000 tonnes per annum export capacity. Click for more details...

TRITTON COPPER PROJECT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Bogan Council Area of Private ownership. Includes a 660,000 tpa copper concentrator (expandable to 900,000 tpa), a tailings dam and surface infrastructure such as roads and bridges. Click for more details...

ARDLETHAN TIN OPERATIONS - ERECTION/INSTALLATION PACKAGES
Erection/Installation Packages New project In The Coolamon Council Area. Packages include mechanical, structural, piping and electrical work for the processing area. Click for more details...

CSA COPPER OPERATIONS - CONCRETE REMOVAL
Mining - Primary And Secondary Processing (Minerals Processing) project In The Cobar Council Area of Concrete Removal type. This package may be combined with Steel Work contract ID: 2155418. Decision is yet to be made whether concrete may be replaced with steel flooring. Click for more details...

MANGOOLA COAL PROJECT - COAL HANDLING & PREPARATION PLANT
Mining - Primary And Secondary Processing (Coal Processing) project for New development. For the installation of a 10.5 Mtpa coal handling & preparation plant, including site-wide electrical, instrumentation, & control, 500 kV line relocation (subject to relevant regulatory approval), & 66kV supply to mine substation. Click for more details...

LIDDELL POWER STATION - WATER TREATMENT PLANT BUND REPAIRS
A project in the NSW Within Muswellbrook. The work involves improving the bulk chemical containment systems employed in the water treatment plant. Click for more details...

CAMBERWELL COAL OPERATIONS - CHPP STAGE 2 UPGRADE
Camberwell Coal Operations - Chpp Stage 2 Upgrade is currently at the Construction stage, valued at about $ 5000000 it is The upgrade will facilitate the removal of all particles greater than 0.5mm from tailings. As a result, the proportion of the smallest size fraction in the tailings reject material will increase after Stage 1B. The addition of the floatation process in Stage 2 will enable the removal of a proportion of the fine coal from tailings, the proportion of smaller to larger size particles will return to the current level. Click for more details...

BERRIMA CEMENT WORKS - NO 7 CEMENT MILL
A project in the NSW Within Wingecarribee. The capacity of the new mill will be approximately 800,000 tonnes per year which is an increase of 400,000 tonnes per year above the existing cement milling capacity. The new mill will use the existing feed system and recently installed high efficiency separator from Cement Mill 5, and will be installed in a new building located in the centre of the Works adjacent to the existing mills. A new dust collector will be installed to further reduce dust emissions. No major earthworks will be required for the development. Click for more details...

GLENNIES CREEK WASTE COAL MINE GAS POWER STATION
Private ownership Mining - Primary And Secondary Processing (Piping) project In The Singleton Council Area for New development. To construct 12 MW waste coal gas power stationcomprising a plant, a gas pipe distribution network and electrical transmission lines. The gas will be sourced from surface head wells draining the gas from an advancing longwall operation and will transported by polyethene pipe to the power station. The power station will comprise GE Jenbacher 320 spark ignition engines, gas handling systems, high voltage transformers and full automated control rooms. Click for more details...

DRAYTON COAL OPERATIONS - CRANAGE - FOR COAL TREATMENT UNIT
Mining - Primary And Secondary Processing (Coal Processing) project at Thomas Mitchell Dr, Muswellbrook, NSW 2333 for New. This will be a 3 year contact with a further option of 12 months. Click for more details...

LIDDELL COAL OPERATIONS - COAL HANDLING PREPARATION PLANT
Coal Handling Preparation Plant project at 20 Km North West of, Singleton, NSW 2330 In The Council Area Of Singleton of Private. Construction of a new Coal Handling Preparation Plant. This will involve the construction of a new preparation section, upgrades to the ROM receival and product coal facilities. The new preparation area will be located next to the old CHPP and its capacity will be 1200 tonnes per hour. This will include new screening, cyclone and spiral components for the plant. Upgrades to the ROM receival equipment include shortening of the apron feeder, a new rotating star wheel, new sizers and an increase in the drive power and length of the ROM conveyor. Modifications to the product handling equipment will include a short product conveyor to collect coal from the new CHPP to be deposited at a new transfer station onto the existing product stockpile rising conveyor. The existing road truck type coarse rejects bin will be replaced by a larger bin capable of loading mining sized trucks. The exisiting CHPP will be dismantled and recycled or disposed of over a one year period. Click for more details...

TAHMOOR COLLIERY - DRIFT CONVEYOR STAGE 3 UPGRADE - CIVIL WORKS - CONCRETE PIERS/COLUMNS
Civil Works - Concrete For Piers/Columns project at Hume Highway, Tahmoor, NSW 2573 In The Council Area Of Wollondilly of Private. Work is to coincide with the next dry season longwall changeover in 2008. Click for more details...

TAHMOOR COLLIERY - DRIFT CONVEYOR STAGE 3 UPGRADE - CIVIL WORKS - CONCRRETE FOR FOOTINGS
Private ownership Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Wollondilly Council Area for New development. Work is to coincide with the next dry season longwall changeover in 2008. Click for more details...

BENGALLA COAL OPERATIONS - CIVIL WORKS FOR ROM HOPPER CONSTRUCTION
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Muswellbrook Council Area of Private ownership. For the provision of civil works for the rom hopper construction. Click for more details...

BENGALLA COAL OPERATIONS - CIVIL WORKS FOR ROM HOPPER CONSTRUCTION
Mining - Primary And Secondary Processing (Coal Processing) project In The Muswellbrook Council Area of Private ownership. For the provision of civil works for the rom hopper construction. Click for more details...

ROCGLEN COAL PROJECT - CRUSHING PLANT
Mining - Primary And Secondary Processing (Coal Processing) project at 25 km north of, Gunnedah, NSW 2380 for New. For the provision of a crushing plant. Click for more details...

SUNNYSIDE OPEN CUT COAL PROJECT - CRUSHING & SCREENING PLANT
Mining - Primary And Secondary Processing (Coal Processing) project In The Gunnedah Council Area of Crushing/Screening Plant type. Crushing and screening plant for 5 year operation of mine at around 1 million/annum. coal will then be trucked to Whitehaven's Gunnedah coal preparation plant. Click for more details...

SUNNYSIDE OPEN CUT COAL PROJECT - CRUSHING & SCREENING PLANT
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project In The Gunnedah Council Area of Crushing/Screening Plant type. Crushing and screening plant for 5 year operation of mine at around 1 million/annum. coal will then be trucked to Whitehaven's Gunnedah coal preparation plant. Click for more details...

BROKEN HILL SEPARATION PLANT UPGRADE - RUTILE CIRCUIT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Broken Hill Council Area of Rutile Circuit type. For a 650,000 tpa fixed plant for heavy mineral concentrate. Rutile circuit to be one package. Click for more details...

BROKEN HILL SEPARATION PLANT UPGRADE - WET MAGNETIC SEPARATOR CIRCUIT
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. Gravity wet plant for a 650,000 tpa facility is to be one package. Click for more details...

RIDGEWAY DEEPS UNDERGROUND GOLD MINE EXTENSION PROJECT - PIPING - SUPPLY & INSTALL FOR SURFACE FACILITIES INFRASTRUCTURE
Mining - Primary And Secondary Processing (Piping) project In The Orange Council Area of Private ownership. For the supply & installation of piping. Click for more details...

WEST CLIFF COLLIERY WASHERY UPGRADE
New project of Mining - Primary And Secondary Processing (Coal Processing) project at 4km southeast of, Appin, NSW 2560. Upgrade of the West Cliff Washery over the life of the Bulli Seam Operations Project to handle up to 105Mtpa throughput. To include installation of new components such as rotary breaker & screen house, coarse & fine coal storage bins, triple roll crusher, small coal circuit modules (eg desliming screens, primary & secondary cyclones, centrifuges), flotation cells & a teetered bed separator, coal & tailings thickeners, belt filters & tailings presses. Replacement of the existing Baum jig with a dense medium drum. Upgrades of existing conveyor systems, piping, pumps, sumps, safety & auxiliary systems. Upgrades of power supply systems to provide additional capacity & back up supply. Click for more details...

MANDALONG COAL OPERATIONS - POWER GENERATION PROJECT
Flares/Pilot Plant/Gas Engines project at 3km southwest of, Morisset, NSW 2264 In The Council Area Of Lake Macquarie of Private. Utilisation of the coal seam/methane bed gas from the mine's underground workings to produce up to 12MW of electricity to be fed into the NSW power grid via the mine's existing high voltage substation. Construction next to the existing methane drainage plant at the Mandalong Mine Access Site of gas flares & installation of multiple gas engines constructed off-site & to be located on formed gravel pads along with associated structures. Click for more details...

WILPINJONG COAL OPERATIONS EXPANSION - CHPP UPGRADE
Private ownership Mining - Primary And Secondary Processing (Coal Processing) project In The Mid Western Regional Council Area for New development. A 7m extension to the coal handling & preparation plant (CHPP) building to accommodate a capacity increase to 1200tonnes per hour (tph). Click for more details...

RAVENSWORTH COAL OPERATIONS EXPANSION - CHPP ELECTRICAL
Mining - Primary And Secondary Processing (Coal Processing) New project at Lemington Rd, Singleton, NSW 2330. This type is Electrical - For Coal Handling & Processing Plant with Private ownership. Low voltage power supply & reticulation as well as high voltage transmission supply & relocation. Click for more details...

PINE DALE COAL OPERATIONS - YARRABOLDY EXTENSION
Currently at the Construction stage In Lithgow is a project estimated to be $ 1400000. This project Further operations at the former Yarraboldy open cut pit to extract 800,000t approx of coal over a 3 year period. To commence with construction of an amenity bund prior to 2 years of open cut mining followed by 6 months of final rehabilitation works (minimally backfill/ reshaping/ revegetating of 10.3ha). Construction also of internal roads & a new intersection with the existing private coal haul road crossing. Decommissioning of the existing crushing facility & construction of new plant along with a crushing, stockpiling & maintenance area in the Extension. Click for more details...

MOUNT BOPPY GOLD MINE RECOMMENCEMENT
Mining - Primary And Secondary Processing (Minerals Processing) New project at 46km East of, Cobar, NSW 2835. This type is Mine - Recommencement with Private ownership. Mount Boppy Mine recommencement. Ore to be delivered to the recently refurbished Manuka Silver Mine (formerly Wonawinta Silver Mine) Processing Plant for processing. Click for more details...

PINE DALE COAL OPERATIONS STAGE 2 EXTENSION
Mining - Primary And Secondary Processing (Coal Processing) project In The Lithgow Council Area of Operating Mine - Extension type. A project to extend operations 10-15 years by incorporating 201ha in the Blackmans Flat area adjoining the now exhausted original Pine Dale mine & the recently approved 27ha Stage 1 Yarraboldy extension. Continued open cut operations accessing 14.2 million tonnes (Mt) at a rate of 2Mt product coal annually. Construction of a new mine industrial area to include a 600tph crushing & screening plant, 100,000t run-of-mine (ROM) stockpile, 200,000t product stockpiles & maintenance facilities. Construction or relocation of offices, amenities, workshop, water management infrastructure, electric power supply, explosives magazine & fuel storage area. Dewatering of existing pit prior to use for overburden & interburden emplacement. Reinstatement of the now derelict Wallerawang spur rail line & rail siding & construction of a rail load out facility. Internal access roads & private haul road crossing. An additional 60 employees expected at maximum production. Click for more details...

ASHTON COAL OPERATIONS GAS DRAINAGE PROJECT
Mining - Primary And Secondary Processing (Coal Processing) project at New England Hwy south of, Camberwell, NSW 2330 for New. A project to drain goaf methane gas from 8 longwall blocks over the remaining 10-12 years of underground mining. To include up to 80 boreholes on pads typically 5m x 5m & linked by a 16km long, 300-700m diameter high density polyethylene (HDPE) pipeline network to a central plant & enclosed gas flaring facility constructed in a 25m x 75m area. The plant to comprise up to 4 x 1500L/s electrically driven liquid ring vacuum pumps, a gas-water separator, flow control reticulation, control panel/room & gas analyser along with associated electrical transformer or on site generator & cooling water tank. Up to 15 construction jobs expected. Click for more details...

CENTENNIAL WESTERN COAL SERVICES - COAL WASHERY UPGRADE DESIGN CONTRACT
Design Contract - Coal Washery project at Castlereagh Hwy BLACKMANS FLAT 5km north of, Wallerawang, NSW 2845 In The Council Area Of Lithgow of Private. Design for expansion of the coal washery involving installation of new plant adjacent the existing plant for an overall capacity of 7 million tonnes per annum (Mtpa) along with additional conveyors & transfer points. Associated increase of reject disposal capacity. Click for more details...