State

Categories

Sub Categories

Click Here to Find Current Projects

List of Mining - Primary And Secondary Processing Projects in NSW


COAL & ALLIED OPERATIONS - HUNTER VALLEY/MOUNT THORLEY/WARKWORTH/BENGALLA
Renovations, Refurbishments etc. project of Mining - Primary And Secondary Processing (Coal Processing) project at Via, Singleton, NSW 2330. Includes professional services for the maintenance of the many screenbowl centrifuges at the above location. All work will comply to stringent Coal & Allied safety standards. Involves overhaul of rotating assemblies and gearboxes;removal, installation and commissioning of all components, maintenance and general servicing of components; design and process expertise. Click for more details...

HILLGROVE PROJECT - GOLD & ANTIMONY RESOURCE
Mining - Primary And Secondary Processing (Minerals Processing) project In The Armidale Dumaresq Council Area of Private ownership. Inferred resource is 3.9 Mt @ 5.1 g/t Au & 2% Sb. A deposit of tungsten is also part of the project. The mine is expected to produce 10,000 tonnes of antimony metal, 20,000 ounces of gold and 300 tonnes of tungsten per annum. Click for more details...

BULGA COAL OPERATIONS - REDBANK II COAL TAILINGS PREPARATION & WASTE MANAGEMENT
Coal Tailings Dewatering Plant & Associated Infrastructure New project In The Singleton Council Area. The proposal included construction & operation of a tailings dewatering plant (DBT) and associated infrastructure and facilities. Supply of BDT fuel to the Redbank 2 power plant and receipt and disposal of fly ash, water treatment plant sludge, and wastewater from the Redbank 2 power plant. Click for more details...

HUNTER VALLEY COAL OPERATIONS
Product Coal Feed Bin project at Lemington Rd, Lemington, NSW 2330 In The Council Area Of Singleton of Private. Coal and Allied Operations Pty Ltd operates open cut coal mines and coal preparation plants in the Hunter Valley at Mount Thorley, Hunter Valley Operations (Howick, Hunter Valley and Lemington), Warkworth, Ravensworth and Bengalla Mines. Coal and Allied is interested in receiving Expressions of Interest from companies that can provide professional services for the staged design and construction of a product coal feed bin at the Hunter Valley Operations Load Point. Stage 1 will include site investigation, conceptual design and budget preparation. Stage 2 will encompass design and construction for the completion of the works. all works will comply to stringent Coal & Allied safety standards. It is envisaged that the design process will be highly consultative iwth existing operations, with a key element of the work being the minimisation of disruptions to current train loading facilities during construction. It is envisaged that conceptual works and budget preparation be completed by 1 December 2001 with final works completed (pending internal finanical approval) by the third quarter of 2002. Click for more details...

LIDDELL COAL COLLIERY - RESOURCE
Mine - Coal New project In The Singleton Council Area. Existing operation produces 4.5 Mtpa of Rom coal and the CHPP processes 700 tonnes per hour. A proposal has been approved to increase ROM coal production to 8 Mtpa. Associated development will comprise the construction of a new Coal Handling Plant, establishment of a new supplementary stockpile with capacity of 450,000 tonnes, alter the planned 1500 ML Dam 13B footprint, construct a bridge over the main Northern Railway to improve transport between existing coal pits, alter an access road to the CHPP, relocation of offices, workshop and storage area and an associated access road, and the construction of a desalination unit within the CHPP area for the treatment of mine water. Capital expenditure on the Washplant upgrade alone was approx $100 million. Click for more details...

HILL END PROJECT - GOLD RESOURCE
Mining - Primary And Secondary Processing (Minerals Processing) project at 2 km northwest of, Hill End, NSW 2850 for New. The plant is processing material from the test drive on the M2 vein set, which has averaged over two ounces per tonne recovered grade with some material producing over four ounces per down. About 80 tonnes of M2 material have been stockpiled from the high grade north end of the test drive, which face sampling indicated would contain up to four ounces per tonne. An additional 200 tonne M2 stockpile of various grades is ready to be processed and narrow driving on the high grade M2 is continuing to the north and south of the test drive to produce plant feed material. Click for more details...

TRITTON COPPER PROJECT - MURRAWOMBIE - MINING/EARTHWORKS CONTRACTS
Private ownership Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Bogan Council Area for New development. The construction of the box cut and the ROM development contract has been awarded to a local contractor ahead of full mobilisation to site later in February 2004 by the principal mining contractor. Click for more details...

TASMAN PROJECT - MOUNT SUGARLOAF
Mine Infrastructure New project In The Newcastle Council Area. Includes mine portal, conveyor, coal stockpile and truckloading area. Click for more details...

CUMNOCK NO 1 COLLIERY
Mining - Primary And Secondary Processing (Coal Processing) project In The Singleton Council Area of Mine - Coal type. The mine produces soft coking coal used in Asian steel mills. Coal is loaded at adjacent Ravensworth coal terminal and railed to Newcastle for export. Production for 2006 was 1,416,666 tonnes of raw coal. Click for more details...

HILL END GOLD PROJECT - PROCESSING FACILITIES UPGRADE
A project in the NSW Within Bathurst. Upgrade and recommissioning the Amalgamated gravity plant. Major work will be the installation of a gold room. The plant will be used for the bulk sampling program. Click for more details...

DRAYTON COAL OPERATIONS
Coal Treatment Unit - Design project at Lot 6 DP 701496, Thomas Mitchell Dr, Muswellbrook, NSW 2333 in the Mining - Primary And Secondary Processing (Coal Processing). The coal treatment unit (CTU) will be a closed working circuit with coal being fed through the existing coal handling plant. The current operation of Drayton requires the CTU in order to produce saleable export quality product for an excess of unsaleable domestic quality production. Click for more details...

HAWKS NEST MINERAL SANDS OPERATIONS - FULLERTON
Dredge - Dismantle & Relocation New project In The Upper Lachlan Council Area. MDL has finalised a comprehensive technical and commercial co-operation agreement with a private Indian company, Beach Minerals (Sands) Company Limited ("BMC"). The agreement will see the transfer of MDL's 9 million tonne per annum Fullerton dredge to BMC. MDL is providing technical expertise in respect of dredge mining programme at Kuttam. BMC will fund the costs associated with shipping the dredge from Australia and its reconfiguration and assembly in India. MDL is providing technical assistance to BMC in respect of their separation plant upgrade. Click for more details...

CHARBON COAL OPERATIONS - OPERATING MINE
Charbon Coal Operations - Operating Mine is currently at the Construction stage, valued at about $ 20000000 it is Developer is proposing to expand the open cut operations into stage 2 area of the mine. It will involve the production of 600,000 tonnes of coal per annum. The existing infrastructure at the mine will not be altered. Existing infrastructure includes a Coal Preperation Plant, stockpiles and transport infrastructure. Resource estimate is 7.1 Mt measured in-situ, 18.7 Mt indicated, 25.8 Mt recoverable, 5.8 Mt marketable. Click for more details...

COWAL GOLD PROJECT - ENDEAVOUR 42/ENDEAVOUR 46
Mining - Primary And Secondary Processing (Minerals Processing) project at Approx 45 kms north east of, West Wyalong, NSW 2671 of Resource - Gold/Infrastructure/Plant type of New development. The Cowal project has proven and probable reserves of 2.8 million ounces. The mine is expected to produce 220,000 to 235,000 ounces of gold per year on average. Mine and process plant construction is expected to take 21 months. Click for more details...

POWERCOAL COLLIERIES
Lifting Products - Supply project at Various sites lake Macquarie, Central Coast & Lithgow Regions, Lithgow, NSW 2790 In The Council Area Of Lithgow of Private. Supply and delivery of lifting and materials handling products (including winches, hoists, blocks, wire and fibre ropes, chains, shackles, tumbuckles etc) for an initial two year period with "optional" extension period. Click for more details...

CML 7 BROKEN HILL BASE METALS PROJECT
Mining - Primary And Secondary Processing (Minerals Processing) project at via, Broken Hill, NSW 2880 of Resource - Base Metals type of New development. Drilling to date has successfully intersected the shallow zinc lode mineralisation over a strike length of 120 metres with an average width of 80 metres. Drill intersections range from 4 to 13 metres at grades averaging greater than 10% lead and zinc. Click for more details...

REWARD GOLD PROJECT
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. Inferred resource estimate of 124,400 tonnes @ 19 g/t Au for 75,900 ounces of gold. If the trial mining and sampling studies are successful at the Exhibition area then underground mining will conducted at the rate of 100,000 tonnes @ 20-30 g/t. The process plant has been redesigned and commissioning has commenced. In addition to the gravity sampling plant, which has a nominal capacity of 5 tonnes per hour, a mini-bulk sampling facility is being established on site for gold recovery from small development samples to provide a qualitative assessment of the vein sets as development proceeds. Click for more details...

CSA COPPER OPERATIONS - CONCRETE REMOVAL
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Cobar Council Area of Concrete Removal type. This package may be combined with Steel Work contract ID: 2155418. Decision is yet to be made whether concrete may be replaced with steel flooring. Click for more details...

CSA COPPER OPERATIONS - CONCRETE REMOVAL
Mining - Primary And Secondary Processing (Minerals Processing) project In The Cobar Council Area of Concrete Removal type. This package may be combined with Steel Work contract ID: 2155418. Decision is yet to be made whether concrete may be replaced with steel flooring. Click for more details...

NARRABRI SHIRE COUNCIL - QUARRY BLASTING
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project at Quarry sites via, Narrabri, NSW 2390 of Quarry Blasting type of New development. Tenders invited from suitably licensed contractors with previous experience in quarry blasting works under a Full Service, Work-as-Ordered Contract. Click for more details...

COWAL GOLD PROJECT - CIVIL WORKS
Private ownership Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Bland Council Area for New development. Concrete foundations, sub-structure and structures. Includes concrete reclaim tunnels. Click for more details...

RIDGEWAY UNDERGROUND GOLD MINE - NEW UNDERGROUND PRIMARY CRUSHER
Mining - Primary And Secondary Processing (Minerals Processing) project at 50 Km West of, Cargo, NSW 2800 for New. The proposal to extend underground operations at Ridgeway includes the installation of a new primary crusher approx 360 metres lower in the mine workings. Click for more details...

MANDALONG COAL OPERATIONS - METHANE GAS DRAINAGE PLANT
Methane Gas Drainage Plant - Construct/Operate project at 3 km south west of, Morisset, NSW 2264 In The Council Area Of Lake Macquarie of Private. The coal haulage is 1,000 tonnes by road to Eraring and/or Vales Point power stations contract is likely to be added to existing contractor. The likely method to be used for the Methane Gas Drainage Plant at the first stage is to purge the gas to atmosphere using one of two options. A decision will be made by mid February 2005 on which option is to be used. Click for more details...

LIDDELL POWER STATION - REMOVAL OF ASH/DUST PLANT
Via, Liddell, NSW 2333 Has Liddell Power Station - Removal Of Ash/Dust Plant currently at Construction stage. The contract involves surveying the plant outline and producing cabling/wiring diagrams. Supply and commissioning new 115 V AC Power supplies. Supply and commissioning a new relay cabinet to control various items of plant. Install new start stop relays to motor control cubicles and modify control circuits. Recable direct from PLC cabinets or new relay cabinets to solenoid control cabinets at various locations. Splice or join dust solenoid control cables. Replace dust pump gland seal pressure switches with transmitters including PLC harware and cabling. Replace cabling to A Ash Train gland seal pressure switches. Install improved local dump valve position indication. PLC programme modifications. Removal of existing A & D cabinets and miscellaneous repairs to cabinets and doors. Click for more details...

LIDDELL POWER STATION - MAINTENANCE CONTRACT
Currently at the Construction stage In Muswellbrook is a project estimated to be $ 500000. This project The work covered by this specification generally encompasses the inspection, reporting, repairs, routine maintenance and emergency breakdown work on the Liddell Coal handling Plant and Hunter Valley gas Turbines for a period of two years. Click for more details...

CAMBERWELL COAL OPERATIONS - CHPP STAGE 2 UPGRADE
Camberwell Coal Operations - Chpp Stage 2 Upgrade is currently at the Construction stage, valued at about $ 5000000 it is The upgrade will facilitate the removal of all particles greater than 0.5mm from tailings. As a result, the proportion of the smallest size fraction in the tailings reject material will increase after Stage 1B. The addition of the floatation process in Stage 2 will enable the removal of a proportion of the fine coal from tailings, the proportion of smaller to larger size particles will return to the current level. Click for more details...

ULAN COAL OPERATIONS - EXPANSION
Coal Mine Expansion/Associated Facilities New project In The Upper Hunter Council Area. The proposed expansion will include extending the existing open cut coal mine about 180 metres to the west of the approved limits, relocating the approved Ulan West surface infrastructure, upgrading the coal handling, storage and train loading facilities, constructing the Ulan West services corridor and extending the hub stockpile. Click for more details...

LIDDELL POWER STATION - SOLAR FARM/EARTH WORKS STAGE 1
Mining - Primary And Secondary Processing (Civil works at processing facilities) New project at At, Liddell, NSW 2333. This type is Solar Farm/Earth Works Stage 1 with Private ownership. Work involves the preparation of an area south of Liddell Power Station for the installation of a solar farm. Click for more details...

ASHTON COAL PREPERATION PLANT EXPANSION
Ashton Coal Preperation Plant Expansion is currently at the Construction stage, valued at about $ 50000000 it is Coal Preparation Plant Expansion from 400 tph to 1000 tph. Click for more details...

PORT WARATAH COAL SERVICES - PAINTING SERVICES CONTRACT
Private ownership Mining - Primary And Secondary Processing (Coal Processing) project In The Newcastle Council Area for New development. A two year contract with option for 5 years. Click for more details...

GLENNIES CREEK WASTE COAL MINE GAS POWER STATION
Private ownership Mining - Primary And Secondary Processing (Piping) project In The Singleton Council Area for New development. To construct 12 MW waste coal gas power stationcomprising a plant, a gas pipe distribution network and electrical transmission lines. The gas will be sourced from surface head wells draining the gas from an advancing longwall operation and will transported by polyethene pipe to the power station. The power station will comprise GE Jenbacher 320 spark ignition engines, gas handling systems, high voltage transformers and full automated control rooms. Click for more details...

LIDDELL COAL OPERATIONS - COAL HANDLING PREPARATION PLANT
Coal Handling Preparation Plant project at 20 Km North West of, Singleton, NSW 2330 In The Council Area Of Singleton of Private. Construction of a new Coal Handling Preparation Plant. This will involve the construction of a new preparation section, upgrades to the ROM receival and product coal facilities. The new preparation area will be located next to the old CHPP and its capacity will be 1200 tonnes per hour. This will include new screening, cyclone and spiral components for the plant. Upgrades to the ROM receival equipment include shortening of the apron feeder, a new rotating star wheel, new sizers and an increase in the drive power and length of the ROM conveyor. Modifications to the product handling equipment will include a short product conveyor to collect coal from the new CHPP to be deposited at a new transfer station onto the existing product stockpile rising conveyor. The existing road truck type coarse rejects bin will be replaced by a larger bin capable of loading mining sized trucks. The exisiting CHPP will be dismantled and recycled or disposed of over a one year period. Click for more details...

TAHMOOR COLLIERY - DRIFT CONVEYOR STAGE 3 UPGRADE - CIVIL WORKS - CONCRRETE FOR BUILDING & MEZZANINE FLOOR
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Wollondilly Council Area of Civil Works - Concrete For Builing/Mezzanine Floor type. Work is to coincide with the next dry season longwall changeover in 2008. Click for more details...

BENGALLA COAL OPERATIONS - CIVIL WORKS FOR ROM HOPPER CONSTRUCTION
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Muswellbrook Council Area of Private ownership. For the provision of civil works for the rom hopper construction. Click for more details...

BROKEN HILL SEPARATION PLANT UPGRADE
Currently at the Planning stage In Broken Hill is a project estimated to be $ 36000000. This project The upgrade of the separation plant is proposed to take into account the development of the nearby Snapper project. Upgrades will be undertaken for the plant itself and associated infrastructure. The plant upgrades planned are the additions of a rutile circuit and a zircon circuit. An option to locate a Wet High Intensity Magnetic Separator circuit from the mine site is also proposed. These addition will production to increase from 576,000 tpa to 650,000 tpa. The rutile, ilmenite and zircon circuit feed and rejects stockpiles will all be expanded. The non-magnetic concentrate heavy mineral concentrate receival area will also be expanded. The capacity of the two coal container storages will be expanded from 1000 tonnes to 1500 tonnes. Click for more details...

ROCGLEN COAL PROJECT - CRUSHING PLANT
Mining - Primary And Secondary Processing (Coal Processing) project at 25 km north of, Gunnedah, NSW 2380 for New. For the provision of a crushing plant. Click for more details...

ROCGLEN COAL PROJECT - SCREENING PLANT
Screening Plant project at 25 km north of, Gunnedah, NSW 2380 In The Council Area Of Gunnedah of Private. For the provision of a screening plant. Click for more details...

BROULA MAGNETITE & LIMESTONE PROJECT - PROCESSING PLANT & DISTRIBUTION FACILITY
Processing Plant/Distribution Facility project at 10km West South West of, Cowra, NSW 2794 In The Council Area Of Cowra of Private. For the development of a processing plant and distribution facility, to process the deposit which contains around 900 000 tonnes of recoverable magnetite, contained within 1.3 million tonnes of ore, and a simlar quantity of limestone. The ore is to be mined via open cut methods. Click for more details...

SUNNYSIDE OPEN CUT COAL PROJECT - CRUSHING & SCREENING PLANT
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Gunnedah Council Area of Crushing/Screening Plant type. Crushing and screening plant for 5 year operation of mine at around 1 million/annum. coal will then be trucked to Whitehaven's Gunnedah coal preparation plant. Click for more details...

SUNNYSIDE OPEN CUT COAL PROJECT - CRUSHING & SCREENING PLANT
Mining - Primary And Secondary Processing (Coal Processing) project In The Gunnedah Council Area of Crushing/Screening Plant type. Crushing and screening plant for 5 year operation of mine at around 1 million/annum. coal will then be trucked to Whitehaven's Gunnedah coal preparation plant. Click for more details...

RIDGEWAY DEEPS UNDERGROUND GOLD MINE EXTENSION PROJECT - PIPING - SUPPLY & INSTALL FOR SURFACE FACILITIES INFRASTRUCTURE
Mining - Primary And Secondary Processing (Piping) project In The Orange Council Area of Private ownership. For the supply & installation of piping. Click for more details...

BLAKEBROOK, LISMORE & TUCKOMBIL QUARRIES CRUSHING
Crushing project at Lismore & Ballina, ., NSW 2999 in the Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying). Crushing Click for more details...

WONAWINTA SILVER LEAD ZINC PROJECT - PROCESSING PLANT
Processing Plant project at 80km approx south of, Cobar, NSW 2835 In The Council Area Of Cobar of Private. Metallurgical testwork has indicated that crushing & grinding may not be required & a washing and scrubbing circuit may be sufficient to prepare the ore for processing. The majority of silver can be recovered as bullion by cyanidation treatment of the ore. Lead and residual silver can be recovered as by-product credits by producing a gravity concentrate. Preliminary modelling is based on a nominal output of 3m ounces of silver per annum. Click for more details...

WILPINJONG COAL OPERATIONS EXPANSION
A project in the NSW Within Mid Western Regional. A project at the existing open-cut mine to expand Run-of-Mine (RoM) coal production from 13million tonnes per annum (Mtpa) to 15Mtpa for 12Mtpa per annum of washed & unwashed product coal to be railed to domestic power customers & a port for export. To involve a 7m extension to the coal handling & preparation plant (CHPP) building to accommodate a capacity increase to 1200tonnes per hour (tph). Associated upgrading of the coal handling & stockpiling system to include an additional ROM hopper with associated sizing station & raw coal conveyor & stacker plus an additional product coal stockpile with associated stacking conveyor & reclaim conveyor. Other work to include minor earthworks, conveyors, transfer stations & relocation of site roads. Click for more details...

WILPINJONG COAL OPERATIONS EXPANSION - CHPP UPGRADE
Private ownership Mining - Primary And Secondary Processing (Coal Processing) project In The Mid Western Regional Council Area for New development. A 7m extension to the coal handling & preparation plant (CHPP) building to accommodate a capacity increase to 1200tonnes per hour (tph). Click for more details...

MAULES CREEK COAL PROJECT - PROCESSING PLANT
Coal Handling & Processing Plant project at 20km northeast of, Boggabri, NSW 2382 in the Mining - Primary And Secondary Processing (Coal Processing). Design & construction of a coal handling & preparation plant (CHPP). Wash plant system & bypass system each with a capacity of 1600tph (11.8 million tonnes per annum). Includes a secondary sizing station, Run-of-Mine (ROM) hoppers, thickener facility & train load out. Click for more details...

RAVENSWORTH COAL OPERATIONS EXPANSION - RAVENSWORTH NORTH PROJECT - CHPP STRUCTURAL STEEL SUPPLY
Mining - Primary And Secondary Processing (Coal Processing) project In The Singleton Council Area of Structural Steel - For Coal Handling & Preparation Plant type. Upgrade of an existing coal handling & preparation (CHPP) plant & construction of 2 new ones (Modules 2 & 3). Click for more details...

RAVENSWORTH COAL OPERATIONS EXPANSION - CHPP ELECTRICAL
Mining - Primary And Secondary Processing (Coal Processing) New project at Lemington Rd, Singleton, NSW 2330. This type is Electrical - For Coal Handling & Processing Plant with Private ownership. Low voltage power supply & reticulation as well as high voltage transmission supply & relocation. Click for more details...

PINE DALE COAL OPERATIONS STAGE 2 EXTENSION
Mining - Primary And Secondary Processing (Coal Processing) project In The Lithgow Council Area of Operating Mine - Extension type. A project to extend operations 10-15 years by incorporating 201ha in the Blackmans Flat area adjoining the now exhausted original Pine Dale mine & the recently approved 27ha Stage 1 Yarraboldy extension. Continued open cut operations accessing 14.2 million tonnes (Mt) at a rate of 2Mt product coal annually. Construction of a new mine industrial area to include a 600tph crushing & screening plant, 100,000t run-of-mine (ROM) stockpile, 200,000t product stockpiles & maintenance facilities. Construction or relocation of offices, amenities, workshop, water management infrastructure, electric power supply, explosives magazine & fuel storage area. Dewatering of existing pit prior to use for overburden & interburden emplacement. Reinstatement of the now derelict Wallerawang spur rail line & rail siding & construction of a rail load out facility. Internal access roads & private haul road crossing. An additional 60 employees expected at maximum production. Click for more details...

ASHTON COAL OPERATIONS GAS DRAINAGE PROJECT
Mining - Primary And Secondary Processing (Coal Processing) project at New England Hwy south of, Camberwell, NSW 2330 for New. A project to drain goaf methane gas from 8 longwall blocks over the remaining 10-12 years of underground mining. To include up to 80 boreholes on pads typically 5m x 5m & linked by a 16km long, 300-700m diameter high density polyethylene (HDPE) pipeline network to a central plant & enclosed gas flaring facility constructed in a 25m x 75m area. The plant to comprise up to 4 x 1500L/s electrically driven liquid ring vacuum pumps, a gas-water separator, flow control reticulation, control panel/room & gas analyser along with associated electrical transformer or on site generator & cooling water tank. Up to 15 construction jobs expected. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect