List of Mining - Primary And Secondary Processing Projects in QLD


GOONDICUM CRATER PROJECT
Private ownership Mining - Primary And Secondary Processing (Minerals Processing) project In The North Burnett Regional Council Area for New development. Consultants are to review the plans for the Demonstration Plant utilising the natural slope of the land to reduce construction costs. A design throughput rate of 20 tonnes per hour remains and the plant is planned to run for 75 days to produce a minimum of 1000 tonnes ilmenite, 2400 tonnes feldspar, 300 tonnes apatite and 600 tonnes titano-magnetite. Click for more details...

GOONDICUM CRATER PROJECT
Private ownership Mining - Primary And Secondary Processing (Other processing including salt, sand etc) project In The North Burnett Regional Council Area for New development. Consultants are to review the plans for the Demonstration Plant utilising the natural slope of the land to reduce construction costs. A design throughput rate of 20 tonnes per hour remains and the plant is planned to run for 75 days to produce a minimum of 1000 tonnes ilmenite, 2400 tonnes feldspar, 300 tonnes apatite and 600 tonnes titano-magnetite. Click for more details...

CRACOW GOLD PROJECT - KLONDYKE/ROYAL SHOOT/CROWN/ROSES PRIDE
Private ownership Mining - Primary And Secondary Processing (Minerals Processing) project In The Banana Shire Council Area for Renovations, Refurbishments etc. development. The development scheme involves refurbishing and upgrading the existing treatment plant and infrastructure at Cracow. Ore processing is based on a mining rate of 250,000 tonnes per year and involves the introduction of a third stage of crushing and additional grinding capacity. Click for more details...

BLACKWATER COMET PROJECT
Structural Steelwork project at Via, Blackwater, QLD 4717 in the Mining - Primary And Secondary Processing (Coal Processing). More than one package. Click for more details...

ROSEBY COPPER PROJECT - EXPLORATION JOINT VENTURE
Mining - Primary And Secondary Processing (Minerals Processing) project at North west of, Cloncurry, QLD 4824 of Processing - Sulphide Mineralisation type of New development. Likely to involve modifications to circuits at the Oxide processing facility, which incorporates grinding and flotation. To be developed at a later date. Click for more details...

BLACKWATER/COMET CHPP PROJECT
Coal Handling & Preparation Plant project at Via, Blackwater, QLD 4717 In The Council Area Of Central Highlands Regional of Private. Comet CPP project. Raw coal and product coal areas included. The new facility will be located adjacent to the current Blackwater North preparation plant and will replace the high cost North, South and Thermal Coal Plants. Click for more details...

BLACKWATER COMET CHPP PROJECT
Mining - Primary And Secondary Processing (Coal Processing) project In The Central Highlands Regional Council Area of Prep Plant/Raw Coal Area/Loadout/High Voltage - Design/Const Package (Combined) type. Now includes the Comet CPP Project (Preparation Plant), and all coal handling facilities, as well a high voltage electrical package. Click for more details...

DRUMMOND BASIN PROJECT - WIRRALIE
Mining - Primary And Secondary Processing (Minerals Processing) project In The Whitsunday Regional Council Area of Private ownership. Preliminary feasibility study results show heap leach processing, rather than using existing plant could improve economics. Click for more details...

LAKE VERMONT COAL PROJECT - COAL PREPARATION PLANT
New project of Mining - Primary And Secondary Processing (Coal Processing) project at Approx 15 km northeast of, Dysart, QLD 4745. For a 4 Mtpa plant. Click for more details...

YABULU NICKEL REFINERY EXTENSION - MHP RECEIVAL/TREATMENT FACILITIES CONTRACT
New project of Mining - Primary And Secondary Processing (Piping) project at Refinery site at, Yabulu, QLD 4818. Contract package 4 involves a MHP leach area, ammonical solvent extraction area and a stripping stills and gas absorption area. This package involves construction on top of concrete, structural, mechanical, piping, electrical, instrumentation and controls for what are generally hydrometallurgical facilities. The contract involves both greenfield and brownfield work. The MHP Receival & Treatment Facilities include container storage and unloading and primary and secondary leaching facilities. The intermediate product (MHP) from Ravensthorpe will be received at Yabulu where it will be stockpiled in a weatherproof environment prior to feeding into a two stage leaching process. New material handling equipment will be constructed to process the additional MHP. Extension of the existing utilities plant will be required to provide additional power, steam and process gases. This includes a package plant for nitrogen generation by the pressure swing absorption process. Anhydrous ammonia will be imported to supplement ammonia currently produced on site. Click for more details...

BLACKWATER/COMET CHPP PROJECT
Via, Blackwater, QLD 4717 Has Blackwater/Comet Chpp Project currently at Planning stage. The project manager's role will include design work for earthworks and related services (ensuring no mismatches between earthworks construction and CHPP construction), construction and related managment and contract administration for CHPP design construct package, once awarded (contract superintendent). Click for more details...

MOUNT GORDON COPPER OPERATIONS
Mining - Primary And Secondary Processing (Minerals Processing) project at 155 km north of, Mount Isa, QLD 4825 of Mine/Infrastructure type of New development. Resource estimate is 495,000 tonnes of contained copper metal. Recent drilling at the Mammoth deposit has increased the resource estimate and the mine life has now been extended to late 2008. Click for more details...

MONTO MINERAL INDUSTRIAL MINERALS PROJECT - ILMENITE RESOURCE
Currently at the Construction stage In North Burnett Regional is a project estimated to be $ 50000000. This project Resource estimate in the measured category is Ilmenite 57,678 tonnes @ 5.2% for 3002 tonnes of mineral, Feldspar 5260 tonnes @ 12.3% for 647 tonnes, Apatite 5,950 tonnes @ 1.9% for 114 tonne and Titanomagnetic 57,678 tonnes @ 3.1% for 1,773 tonnes. Indicated Mineral resource is Ilmenite 21,334 tonnes @ 4.4% for 934 tonnes, Feldspar 12,740 tonnes @ 14.7% for 1870 tonnes, Apatite 12,050 tonnes @2.1% for 252 tonnes and Titanomagnetic 21,334 tonnes @ 2.2% for 477 tonnes. Inferred mineral resource is Feldspar 55,000 tonnes @ 12.3% for 6800 tonnes and Apatite 55,000 tonnes @ 1.9% for 1000 tonnes. Multi product operation producing feldspar, ilmenite, titano-magnetite and apatite. Click for more details...

GLADSTONE INTERNATIONAL NICKEL PROJECT - MARLBOROUGH
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Gladstone Regional Council Area of Processing Plant type. Processing of laterite ore. Ore likely to be sourced from New Caledonia via Cape size shipping through Gladstone's deepwater port, supplemented by ore from the deposits at Marlborough. This is likely to be a two stage development. Stage one to 65,000 tpa producing nickel cobalt suplhide will involve a 4 autoclave plant. Stage two would be likely to involve doubling of capacity. Click for more details...

WILKIE CREEK COAL OPERATIONS
A project in the QLD Within Western Downs Regional. To upgrade the wash plant from 2 to 2.5 mtpa. Click for more details...

YABULU NICKEL REFINERY EXTENSION - BOILER REFURBISHMENT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Townsville City Council Area of Boiler No 3 Refurbishment Contract type. An existing boiler will be refurbished to generate high-pressure steam for power generation and process requirements. This boiler will be converted from oil firing to gas firing, utilising coal seam methane gas to be delivered by the new Moranbah to Townsville gas pipeline. A new boiler feedwater plant will also be installed. Click for more details...

BARALABA COAL PROJECT
Mining - Primary And Secondary Processing (Civil works at processing facilities) project at 155 km west of Gladstone at, Baralaba, QLD 4702 of Rail Loadout type of New development. The loadout facility will consist of an earth pad and front end loaders. Click for more details...

RAVENSWOOD GOLD OPERATIONS - SARSFIELD
Mining - Primary And Secondary Processing (Minerals Processing) project at via, Ravenswood, QLD 4816 for New. The crushing circuit from the now-closed Kidston gold mine is being relocated to Sarsfield. Click for more details...

MOUNT ISA MINES COPPER SMELTER - EXPANSION STAGE ONE
Mount Isa Mines Copper Smelter - Expansion Stage One is currently at the Construction stage, valued at about $ 410000 it is The expansion includes installation of a second rotary holding furnace, a copper slag cleaning furnace, a converter slag treatment plant and associated plant, all designed to increase the smelter's capacity from 240,000 tpa to 280,000 tpa. Click for more details...

KOGAN CREEK POWER PROJECT
Mining - Primary And Secondary Processing (Tankage, Silos) New project at South of, Brigalow, QLD 4412. This type is Feedwater Tank & Deaerator with Private ownership. High & Low Pressure Preheater: 4 Low Pressure Preheaters, 1 Low Pressure Drains Cooler, 2 High Pressure Feedwater Heaters, 1 Deaerator with Feedwater Storage Tank approx 250m3, 3 Plate Type Heat Exchanger (13MW each). Click for more details...

TEXAS SILVER PROJECT - TWIN HILLS
Mining - Primary And Secondary Processing (Minerals Processing) project at Via, Texas, QLD 4385 for New. Mobile Crushing Plant comprising jaw crusher, screens and core crusher and will be on site early April 2005. Click for more details...

LAKE VERMONT COAL PROJECT - PREPARATION PLANT - OPERATION
Preparation Plant - Operation project at Approx 15 km north east of, Dysart, QLD 4745 In The Council Area Of Isaac Regional of Private. for a 4 Mtpa plant. Click for more details...

COLLINGWOOD TIN PROJECT - PLANT/INFRASTRUCTURE
Mining - Primary And Secondary Processing (Minerals Processing) project at 35 km south of, Cooktown, QLD 4871 for New. Water only gravity concentration process. Click for more details...

YABULU NICKEL REFINERY EXTENSION - INITIAL SITE INFRASTRUCTURE CONTRACT
Refinery site at, Yabulu, QLD 4818 Has Yabulu Nickel Refinery Extension - Initial Site Infrastructure Contract currently at Construction stage. Scope of the work involves mainly roads and some early site concrete. Click for more details...

YABULU NICKEL REFINERY EXTENSION - CARBONATE FACILITY
Mining - Primary And Secondary Processing (Tankage, Silos) project at Refinery site at, Yabulu, QLD 4818 of Basic Nickel Carbonate Facility Contract type of New development. Scope of work involves the construction of two large tanks, a thickner and associated pipework. Click for more details...

YABULU NICKEL REFINERY EXTENSION - SITE WIDE CONCRETE CONTRACT
New project of Mining - Primary And Secondary Processing (Civil works at processing facilities) project at Refinery site at, Yabulu, QLD 4818. Scope of work involves concrete work to the entire refinery site. Click for more details...

YABULU NICKEL REFINERY EXTENSION - CARBON DIOXIDE PLANT CONTRACT
Refinery site at, Yabulu, QLD 4818 Has Yabulu Nickel Refinery Extension - Carbon Dioxide Plant Contract currently at Construction stage. The existing standby turbine alternator will be changed to generate power as required in conjuction with other units on site. The low pressure steam exhausted from the turbine in addition to other steam supplies on site will be reticulated throughout the site to the new plant for heating and process requirements. A carbon dioxide plant will be constructed as part of this process. Click for more details...

YABULU NICKEL REFINERY EXTENSION - AIR COMPRESSORS CONTRACT
Currently at the Construction stage In Townsville City is a project estimated to be $ 5000000. This project The existing standby turbine alternator will be changed to generate power as required in conjuction with other units on site. The low pressure steam exhausted from the turbine in addition to other steam supplies on site will be reticulated throughout the site to the new plant for heating and process requirements. The capacity of the existing cooler water systems will be augmented by the addition of a new cooling tower to cater for the additional heat loadings. Plant and instrument air sustems will be upgraded with the provision of additional air compressor units. Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION
A project in the QLD Within Isaac Regional. The project involves an expansion of the existing Goonyella Riverside open cut and the underground operations at Broadmeadow to increase the capacity from 16 Mt/a to 24 Mt/a. Mining and processing will yield a Hard Coking Coal product for the export market. The open cut expansion and underground expansions will result in an additional 5Mt/a and 3Mt/a of product coal respectively. The surface expansion will use the current open cut mining methods, which involve truck and shovel fleets and draglines exposing coal. Most of the open cut spoil from the expanded operations will be disposed of within mined out pits as is the current practice. However, it is expected that some of the spoil will need to be disposed of in out-of-pit spoil dumps. The existing Broadmeadow Mine, which extracts the Goonyella Middle Seam (GMS), will be expanded eastwards using either the conventional longwall mining practices currently being used for its operations or see the introduction of Longwall Top Coal Caving (LTCC) technology once its feasibility is proven as a means to improve the levels of resource recovery compared to conventional longwall mining methods. A second longwall mine is currently under investigation using either conventional longwall methods or LTCC method. The existing mine has much of the necessary infrastructure in place, however, there are infrastructure upgrades required for the expansion of the mine including: a new CHPP and upgrade to the existing CHPP; construction of an additional 66kV feeder adjacent to the present Goonyella 66kV line; expansion of the existing tailings storage facilities to accommodate increased tailings volumes; improvements to the existing mine water management system, including clean water diversion, disturbed area runoff collection and treatment, pit water management, water reuse and water disposal if there is surplus water at any time that cannot be reused on site. The expansion element of the project requires an additional coal preparation capacity of approximately 2 370 tonnes per hour (t/h) to achieve a production rate of 24 Mt/a. The options to achieve this throughput are to expand the existing CHPP's and/or build a new plant to supplement one or both existing plants. The new CHPP is likely to be tied into the existing product handling system. Alternatively a separate train load-out will be constructed on one of the existing rail loops. The product coal will be railed approximately 190km to the Hay Point and/or Dalrymple Bay coal terminals. Click for more details...

MIDDLEMOUNT COAL PROJECT - CONSTRUCT & OPERATE COAL HANDLING & PREPARATION PLANT
Mining - Primary And Secondary Processing (Coal Processing) project In The Isaac Regional Council Area of Private ownership. Includes 10 year operations contract operating the coal handling & preparation plant at 400 tonnes per hour. Click for more details...

LAKE VERMONT COAL PROJECT - EARTHWORKS FOR COAL PREPARATION PLANT
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 1200000. This project For a 4 Mtpa facility. Click for more details...

LAKE VERMONT COAL PROJECT - CONCRETE WORKS FOR COAL PREPARATION PLANT
A project in the QLD Within Isaac Regional. For a 4 Mtpa plant. Click for more details...

CLERMONT COAL PROJECT - COAL HANDLING PREPARATION PLANT
Private ownership Mining - Primary And Secondary Processing (Coal Processing) project In The Isaac Regional Council Area for New development. Off site fabrication & installation of 2 major (2500tph) & 3 minor (300tph) conveyors, a dump hopper, a wash plant (300tph). Associated process piping. Click for more details...

LAKE LINDSAY COAL PROJECT - CIVIL WORKS FOR MINE SITE
Civil Works - For Mine Site project at Approx 25 km from, Middlemount, QLD 4746 in the Mining - Primary And Secondary Processing (Civil works at processing facilities). Various civil & concrete works for the mine site. Click for more details...

CARBOROUGH DOWNS COAL MINE EXPANSION PROJECT - ELECTRICAL INSTRUMENTATION FOR CHPP
15 km east of, Moranbah, QLD 4744 Has Carborough Downs Coal Mine Expansion Project - Electrical Instrumentation For Chpp currently at Tenders & Building stage. For the provision of electrical instrumentation for the new 5Mpta CHPP. Click for more details...

CARBOROUGH DOWNS COAL MINE EXPANSION PROJECT - VALVES FOR MECHANICAL EQUIPMENT
New project of Mining - Primary And Secondary Processing (Coal Processing) project at 15 km east of, Moranbah, QLD 4744. For the provision of valves for the mechanical equipment for the new 5Mpta CHPP. Click for more details...

CARBOROUGH DOWNS COAL MINE EXPANSION PROJECT - PIPING FOR MECHANICAL EQUIPMENT
Mining - Primary And Secondary Processing (Piping) project In The Isaac Regional Council Area of Private ownership. For the provision of piping for mechanical equipment for the new 5Mpta CHPP. Click for more details...

DAUNIA COAL PROJECT - COAL HANDLING PREPARATION PLANT
Approximately 25km Southeast of, Moranbah, QLD 4744 Has Daunia Coal Project - Coal Handling Preparation Plant currently at Construction stage. The contract involves detailed design and procurement of a CHPP, with all key components scheduled for delivery during calendar 2009. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - SOCIAL IMPACT CONSULTANTS PANEL
Mining - Primary And Secondary Processing (Coal Processing) New project at Between Bowen Basin &, Curtis Island, QLD 4680. This type is Consultants Panel - Social Impact Management Plan with Private ownership. QCLNG is a project to develop coal seam gas wells in the Surat & Bowen Basins, pipe gas to a processing plant to be built on Curtis Island & then export product LNG by ship. A panel of providers is being sought to undertake contracted social performance services in the course of compiling a Social Impact Management Plan for the project. Click for more details...

LAKE VERMONT COAL OPERATIONS - CHPP EXPANSION
Mining - Primary And Secondary Processing (Coal Processing) project In The Isaac Regional Council Area of Coal Handling & Preparation Plant - Expansion type. A contract to design, procure, construct & commission an extension to the existing coal handling & preparation plant (CHPP). To provide an additional 4million tonnes per annum (Mtpa) capacity to the 2009 commissioned plant. Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION - UNDERGROUND
Goonyella Riverside Broadmeadow Coal Operations Expansion - Underground is currently at the Construction stage, valued at about $ 900000000 it is The existing underground Broadmeadow Mine to be expanded eastwards using either conventional longwall mining as used currently or alternatively Longwall Top Coal Caving (LTCC). Additional coal handling & preparation plant (CHPP) capacity of 2370 tonnes per hour (t/h) approx required to achieve a production rate of 24 Mt/a which may include an upgrade of the existing plant as well as a new CHPP. Associated infrastructure upgrades expected to include a second 66kV feeder adjacent to the present line; expanded tailings storage facilities & improvements to the existing mine water management system (clean water diversion, disturbed area runoff collection & treatment, pit water management, water reuse & water disposal if required). The product coal will be railed approximately 190km to the Hay Point and/or Dalrymple Bay coal terminals. Click for more details...

OAKY CREEK COAL OPERATIONS - LONGWALL PROJECT STAGE 4
Mining - Primary And Secondary Processing (Coal Processing) project for New development. A project to increase production over 5 years by expanding into additional sections of the mine tenement. To include a new longwall mining system & associated development suite. Expansion of the existing coal handling & preparation plant (CHPP). Upgrade of the electrical system. Click for more details...

CAVAL RIDGE COAL PROJECT - SUMP PUMPS
Sump Pumps - For Coal Processing Plant project at 16km south of, Moranbah, QLD 4744 In The Council Area Of Isaac Regional of Private. Electric water pumps. To include both end suction & split case types. Click for more details...

ROCKLANDS GROUP JOINT VENTURE COPPER PROJECT - PROCESSING PLANT INSTALLATION
Structural/Mechanical/Piping Installation New project In The Cloncurry Shire Council Area. Installation of a fully computerised & automated 3 million tonne per annum (Mtpa) processing plant for copper/gold, cobaltic-pyrite, native copper & magnetite concentrate production. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - QUARRY MANAGEMENT & GRAVEL SUPPLY
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project at West of WANDAON, east of TARA & west of, Chinchilla, QLD 4413 for New. A 3 year contract for management of a quarry stockpile & associated works to ensure continuous gravel supply. To include establishment of a quarry pit with access roads. Operate & maintain a surface crushing plant. Manage crushed & uncrushed ore stockpiles in various locations including blending & tramming of material. Click for more details...

DUGALD RIVER BASE METAL PROJECT CRUSHING & SCREENING PLANT
A project in the QLD Within Mt Isa City. Crushing & screening plant for an underground mining operation of 2million tonnes per annum (Mtpa) of zinc/lead/silver plus 1Mtpa of copper for 200,000tpa zinc concentrate. Click for more details...

BARALABA COAL OPERATIONS EXPANSION MIA
Mining - Primary And Secondary Processing (Tankage, Silos) project at near, Baralaba, QLD 4702 for New. Construction of all infrastructure associated with 20 year expansion for central, south & north pits. To include workshops, wash down area, administration, fuel tanks, water & sewerage treatment & other civil infrastructure. Concrete, structural steel, civil/earthworks, hydraulics & drainage, piling & electrical works. Click for more details...

BRISBANE CITY COUNCIL QUARRY BLASTING & DRILLING SERVICES
Drilling/Blasting/Materials Supply New project In The Brisbane City Council Area. A contract for drilling and/or blasting and/or supply of materials at 2 quarries. Click for more details...

DUGALD RIVER BASE METAL PROJECT - CONCENTRATOR
Concentrator Plant/Associated Plant New project In The Mt Isa City Council Area. The concentrator will have an annual production of approximately 160,000 tonnes of zinc in zinc concentrate, plus by-products, over an estimated 28 year mine life. Click for more details...

LORENA JOINT VENTURE GOLD OPERATIONS RECOMMENCEMENT - MOBILE MINERAL PROCESSING PLANT
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. For the supply, commissioning & operation of a mobile mineral processing plant. Units to be constructed off-site & transported to site fully commissioned. Click for more details...