List of Mining - Primary And Secondary Processing Projects in QLD


WEIPA BAUXITE OPERATIONS - ANDOOM/NEWEIPA
New project of Mining - Primary And Secondary Processing (Civil works at processing facilities) project at At, Weipa, QLD 4874. Detailed earthworks, civil works and concrete. Click for more details...

WEIPA BAUXITE OPERATIONS - LORIM POINT/NEWEIPA
Stacker - Erection & Miscellaneous Work project at At, Weipa, QLD 4874 in the Mining - Primary And Secondary Processing (Minerals Processing). At Lorim Point. Click for more details...

GOONDICUM CRATER PROJECT
Private ownership Mining - Primary And Secondary Processing (Other processing including salt, sand etc) project In The North Burnett Regional Council Area for New development. Consultants are to review the plans for the Demonstration Plant utilising the natural slope of the land to reduce construction costs. A design throughput rate of 20 tonnes per hour remains and the plant is planned to run for 75 days to produce a minimum of 1000 tonnes ilmenite, 2400 tonnes feldspar, 300 tonnes apatite and 600 tonnes titano-magnetite. Click for more details...

CRACOW GOLD PROJECT - KLONDYKE/ROYAL SHOOT/CROWN/ROSES PRIDE
Currently at the Construction stage In Banana Shire is a project estimated to be $ 500000. This project CIL tankage. Click for more details...

KUNWARARA MAGNESITE OPERATIONS - KG2 EXTN
A project in the QLD Within Rockhampton Regional. Installation of a new crushing and screening circuit. Click for more details...

LADY ANNIE/MOUNT KELLY COPPER PROJECT - PROCESSING FACILITY
New project of Mining - Primary And Secondary Processing (Minerals Processing) project at Adjacent to Lady Loreta Mine 140 Km North West of, Mount Isa, QLD 4825. To construct a 1900 tpa copper SXEW plant and heap leach. Total copper recovery is expected to be 89% of the ore processed. Click for more details...

RINGTAIL QUARRY
A project in the QLD Within Sunshine Coast Regional. For crushing of 32,000 cubic metres of various grades of gravel. Click for more details...

BLACKWATER COMET PROJECT
New project of Mining - Primary And Secondary Processing (Coal Processing) project at Via, Blackwater, QLD 4717. Part of Comet CPP project. Coal Handling. Click for more details...

ROSEBY COPPER PROJECT - EXPLORATION JOINT VENTURE
Mining - Primary And Secondary Processing (Minerals Processing) project at North west of, Cloncurry, QLD 4824 of Processing - Sulphide Mineralisation type of New development. Likely to involve modifications to circuits at the Oxide processing facility, which incorporates grinding and flotation. To be developed at a later date. Click for more details...

THALANGA COPPER OPERATIONS
Mining - Primary And Secondary Processing (Minerals Processing) project In The Charters Towers Regional Council Area of Private ownership. The Thalanga mine reopened in mid June 2002. The processing facility is scheduled to reopen in October 2002 approx. Click for more details...

ROLLESTON COAL PROJECT - STAGE TWO/STAGE THREE
Mining - Primary And Secondary Processing (Coal Processing) project for New development. First production will of one million tonnes approx is expected in late 2005. Stage two to 8 mtpa will require only the purchase of an additional second hand dragline and some minor mobile plant. The crushing and mine site infrastructure for stage one will be sized to handle 8 mtpa.Stage two production levels are expected in 2008. The mine is expected to have a 20 year plus life and has further expansion potential to 12mtpa with additional minor capital. Click for more details...

BLACKWATER/COMET CHPP PROJECT
Via, Blackwater, QLD 4717 Has Blackwater/Comet Chpp Project currently at Planning stage. The project manager's role will include design work for earthworks and related services (ensuring no mismatches between earthworks construction and CHPP construction), construction and related managment and contract administration for CHPP design construct package, once awarded (contract superintendent). Click for more details...

KESTREL COAL OPERATIONS
New project of Mining - Primary And Secondary Processing (Coal Processing) project at 49 km north east of, Emerald, QLD 4720. The mine is capable of annual production of up to five million tonnes of high quality metallurgical coal and high energy thermal coal for export markets in Asia and Europe. The lease contains 190 million tonnes of recoverable reserves, part of total coal resources of 289 million tonnes. The purchase includes the nearby Gordonstone West property, which has additional recoverable resources of 126 million tonnes. Click for more details...

MONTO MINERAL INDUSTRIAL MINERALS PROJECT - ILMENITE RESOURCE
Currently at the Construction stage In North Burnett Regional is a project estimated to be $ 50000000. This project Resource estimate in the measured category is Ilmenite 57,678 tonnes @ 5.2% for 3002 tonnes of mineral, Feldspar 5260 tonnes @ 12.3% for 647 tonnes, Apatite 5,950 tonnes @ 1.9% for 114 tonne and Titanomagnetic 57,678 tonnes @ 3.1% for 1,773 tonnes. Indicated Mineral resource is Ilmenite 21,334 tonnes @ 4.4% for 934 tonnes, Feldspar 12,740 tonnes @ 14.7% for 1870 tonnes, Apatite 12,050 tonnes @2.1% for 252 tonnes and Titanomagnetic 21,334 tonnes @ 2.2% for 477 tonnes. Inferred mineral resource is Feldspar 55,000 tonnes @ 12.3% for 6800 tonnes and Apatite 55,000 tonnes @ 1.9% for 1000 tonnes. Multi product operation producing feldspar, ilmenite, titano-magnetite and apatite. Click for more details...

GLADSTONE INTERNATIONAL NICKEL PROJECT - MARLBOROUGH
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Gladstone Regional Council Area of Processing Plant type. Processing of laterite ore. Ore likely to be sourced from New Caledonia via Cape size shipping through Gladstone's deepwater port, supplemented by ore from the deposits at Marlborough. This is likely to be a two stage development. Stage one to 65,000 tpa producing nickel cobalt suplhide will involve a 4 autoclave plant. Stage two would be likely to involve doubling of capacity. Click for more details...

DRUMMOND BASIN PROJECT - WIRRALIE
300 km west of Mackay via, Mount Coolon, QLD 4804 Has Drummond Basin Project - Wirralie currently at Early Planning stage. Assets include a 315,000 ounce gold resource at the Wirralie gold mine, three tenement packages totalling some 3,200 sqkm with excellent exploration potential and the Wirralie 1.5 Mtpa CIP treatment plant, infrastructure, administration buildings, Camp Yandan heap leach pad. The Wirralie treatment plant is currently on care and maintenance. The company plans to begin mining the relatively straightforward oxide ore and then using the time and cash flow to expand the suplhide resrouce base. The sulphide resource is beneath the oxide resource. Click for more details...

WILKIE CREEK COAL OPERATIONS
A project in the QLD Within Western Downs Regional. To upgrade the wash plant from 2 to 2.5 mtpa. Click for more details...

YABULU NICKEL REFINERY
Mining - Primary And Secondary Processing (Minerals Processing) project In The Townsville City Council Area of Private ownership. Gas scrubbing system to recover ammonia for re-use. Part of project to increase prodcution of cobalt. Click for more details...

KOGAN CREEK POWER PROJECT - COMMUNICATION SYSTEM
A project in the QLD Within Western Downs Regional. Includes telephone system with PABX and hardwired and cordless telephones (cordless telephones must operate in the complete power plant area). Also includes an alarm response pocket pager system with on- and off-site pagers Click for more details...

TEXAS SILVER PROJECT - TWIN HILLS
Mining - Primary And Secondary Processing (Minerals Processing) project at Via, Texas, QLD 4385 for New. Mobile Crushing Plant comprising jaw crusher, screens and core crusher and will be on site early April 2005. Click for more details...

TWIN HILLS GOLD PROJECT - PROCESSING PLANT
Approx 40 km east of, Charters Towers, QLD 4820 Has Twin Hills Gold Project - Processing Plant currently at Construction stage. Rishton Treatment Plant was acquired and a gravity circuit will be added, some tanks will be converted for CIL and enhanced gold security provisions will be made. A sediment dam is to be constructed. Power plants will also be installed for the crushing circuit and the processing circuit. Click for more details...

TEXAS SILVER PROJECT - TWIN HILLS - EARTHWORKS/LEACH PONDS
Mining - Primary And Secondary Processing (Minerals Processing) project at Via, Texas, QLD 4385 for New. Construction of the base for the Heap Leach Pads and excavate the sites for the three (3) proposed Leach Ponds. Upgrading of the mine access road will also be carried out. Click for more details...

NEWLANDS COAL OPERATIONS - STRUCTURAL STEEL ERECTION
New project of Mining - Primary And Secondary Processing (Coal Processing) project at 13 km west of, Glenden, QLD 4743. Two Ultra Fine Coal buildings and one Portal building. Click for more details...

YABULU NICKEL REFINERY EXTENSION - INITIAL SITE INFRASTRUCTURE CONTRACT
Refinery site at, Yabulu, QLD 4818 Has Yabulu Nickel Refinery Extension - Initial Site Infrastructure Contract currently at Construction stage. Scope of the work involves mainly roads and some early site concrete. Click for more details...

YABULU NICKEL REFINERY EXTENSION - CARBONATE FACILITY
Mining - Primary And Secondary Processing (Minerals Processing) project at Refinery site at, Yabulu, QLD 4818 of Basic Nickel Carbonate Facility Contract type of New development. Scope of work involves the construction of two large tanks, a thickner and associated pipework. Click for more details...

YABULU NICKEL REFINERY EXTENSION - CARBONATE FACILITY
Mining - Primary And Secondary Processing (Piping) project at Refinery site at, Yabulu, QLD 4818 of Basic Nickel Carbonate Facility Contract type of New development. Scope of work involves the construction of two large tanks, a thickner and associated pipework. Click for more details...

YABULU NICKEL REFINERY EXTENSION - CARBONATE FACILITY
Mining - Primary And Secondary Processing (Tankage, Silos) project at Refinery site at, Yabulu, QLD 4818 of Basic Nickel Carbonate Facility Contract type of New development. Scope of work involves the construction of two large tanks, a thickner and associated pipework. Click for more details...

YABULU NICKEL REFINERY EXTENSION - SITE WIDE CONCRETE CONTRACT
New project of Mining - Primary And Secondary Processing (Civil works at processing facilities) project at Refinery site at, Yabulu, QLD 4818. Scope of work involves concrete work to the entire refinery site. Click for more details...

YABULU NICKEL REFINERY EXTENSION - CARBON DIOXIDE PLANT CONTRACT
Refinery site at, Yabulu, QLD 4818 Has Yabulu Nickel Refinery Extension - Carbon Dioxide Plant Contract currently at Construction stage. The existing standby turbine alternator will be changed to generate power as required in conjuction with other units on site. The low pressure steam exhausted from the turbine in addition to other steam supplies on site will be reticulated throughout the site to the new plant for heating and process requirements. A carbon dioxide plant will be constructed as part of this process. Click for more details...

MOUNT NORMA LEACH VAT NUMBER FIVE
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Cloncurry Shire Council Area of Private ownership. Construction will comprise earthworks, lining of the vats, filters, electrical installation, crushing and loading of the vats. The vat is to contain 30,000 tonnes of high leach copper oxide. Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION
A project in the QLD Within Isaac Regional. The project involves an expansion of the existing Goonyella Riverside open cut and the underground operations at Broadmeadow to increase the capacity from 16 Mt/a to 24 Mt/a. Mining and processing will yield a Hard Coking Coal product for the export market. The open cut expansion and underground expansions will result in an additional 5Mt/a and 3Mt/a of product coal respectively. The surface expansion will use the current open cut mining methods, which involve truck and shovel fleets and draglines exposing coal. Most of the open cut spoil from the expanded operations will be disposed of within mined out pits as is the current practice. However, it is expected that some of the spoil will need to be disposed of in out-of-pit spoil dumps. The existing Broadmeadow Mine, which extracts the Goonyella Middle Seam (GMS), will be expanded eastwards using either the conventional longwall mining practices currently being used for its operations or see the introduction of Longwall Top Coal Caving (LTCC) technology once its feasibility is proven as a means to improve the levels of resource recovery compared to conventional longwall mining methods. A second longwall mine is currently under investigation using either conventional longwall methods or LTCC method. The existing mine has much of the necessary infrastructure in place, however, there are infrastructure upgrades required for the expansion of the mine including: a new CHPP and upgrade to the existing CHPP; construction of an additional 66kV feeder adjacent to the present Goonyella 66kV line; expansion of the existing tailings storage facilities to accommodate increased tailings volumes; improvements to the existing mine water management system, including clean water diversion, disturbed area runoff collection and treatment, pit water management, water reuse and water disposal if there is surplus water at any time that cannot be reused on site. The expansion element of the project requires an additional coal preparation capacity of approximately 2 370 tonnes per hour (t/h) to achieve a production rate of 24 Mt/a. The options to achieve this throughput are to expand the existing CHPP's and/or build a new plant to supplement one or both existing plants. The new CHPP is likely to be tied into the existing product handling system. Alternatively a separate train load-out will be constructed on one of the existing rail loops. The product coal will be railed approximately 190km to the Hay Point and/or Dalrymple Bay coal terminals. Click for more details...

MONTO MINERALS INDUSTRIAL MINERALS PROJECT - FELDSPAR WASH PLANT
Feldspar Wash Plant New project In The North Burnett Regional Council Area. Development comprises the construction of a treatment facility that will comprise a hot acid leach plant and associated equipment. The ore will be shipped from the mine to the feldspar plant at Dakiel Railroad Station where it will be loaded and sent to Gladstone and then be shipped to Brisbane. Click for more details...

SONOMA COAL PROJECT - COAL HANDLING PREPERATION PLANT - STAGE 1
Mining - Primary And Secondary Processing (Coal Processing) New project at 7 Km South of, Collinsville, QLD 4804. This type is Coal Handling Preperation Plant - Stage 1 with Private ownership. Subcontract packages include: Train Loadout Bin - fab/install; ROM Hopper - fab/install; conveyor - fab/install; Motor Control Centre; Concrete Works; and, High Voltage Reticulation. Click for more details...

QUEENSLAND ALUMINA RED MUD DAM REDEVELOPMENT
Dam/Pipeline/Roadworks/Processing Plant project at ., Boyne Island, QLD 4680 in the Mining - Primary And Secondary Processing (Civil works at processing facilities). Containment walls, processing plant, roads & pipes. Click for more details...

AURUKUN BAUXITE PROJECT - EAST COAST REFINERY
Alumina Refinery New project In The Whitsunday Regional Council Area. The project is to be undertaken in two stages. Stage 1 is for a 2.3 million tonnes of alumina per annum (mtpa) refinery, with eventual expansion in Stage 2 to refining 3.5 mtpa of alumina. The general refinery and associated infrastructure includes: gas fired cogeneration plant for the generation of power and process steam, including export of power to the electricity grid, or coal fired boilers for the production of process steam with the import of power for hte refinery from the electricity grid. Coal handling and ash disposal facilities including rail access for coal delivery (if the coal fired steam raising plant option is selected). Seawater intake to be used for the neutralisation of the refinery residue and for cooling of the power station. Residue neutralisation using seawater. Ocean discharge of the neutralising seawater, which will have elevated temperature and pH of around 9. Water management ponds including for stormwater, process water and cooling water. Bauxite residue storage facilities to be located within the SDA, residue slurry pipelines from the refinery to the RSF and associated service roads. Shipping of bauxite from the mine via the Torres Strait to the the refinery. An access road for transportation of Pre-Assembled Modules (PAMs) from a dedicated unloading facility on the coast to the refinery. A dredged approach channel to PAMs unloading facility and off-site infrastructure including construction camp and villages. Click for more details...

WOLFRAM CAMP PROJECT - PROCESSING PLANT
15 Km North west of, Dimbulah, QLD 4872 Has Wolfram Camp Project - Processing Plant currently at Construction stage. Construction of a 150,000 tpa treatment plant. The developer has sourced a suitable second hand ball mill and is inspecting a second hand front end crushing and screening facility. Click for more details...

JUMNA TIN PROJECT - RESOURCE & PROCESSING FACILITY
Mining - Primary And Secondary Processing (Minerals Processing) project at Approx 20 km west of, Herberton, QLD 4872 of Resource/Processing Facility - Tin type of New development. This will now be a stand alone tin processing facility. Click for more details...

YARWUN ALUMINA REFINERY EXPANSION
Mining - Primary And Secondary Processing (Minerals Processing) project In The Gladstone Regional Council Area of Private ownership. Expansion of the existing refinery to increase its capacity by 2million tonnes per annum (Mtpa) to 3.4Mtpa. Includes construction of a 160MW, gas-fired cogeneration plant to improve energy efficiency while reducing greenhouse gas emissions. About half the electricity generated by the plant will be used to power the existing & new refinery facilities with the remainder exported to the national electricity grid. By mid 2010 the cogeneration plant had been handed over & the wharf extension & major tank builds had been completed. Click for more details...

HANDLEBAR HILL ZINC & LEAD PROJECT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Mt Isa City Council Area of Private ownership. Recent drilling, metallurgical testing and design has confirmed a 3.4 million tonne open pit reserve in an area south of the George Fisher underground mine. Ore will be mined at a rate of up to 1.75 million tonnes per annum, crushed at George Fisher and trucked to the Mount Isa zinc-lead concetrator from mid 2008. The concentrator is currently being expanded from 6.5mtpa to 8mtpa. The open cut mine has an expected life time of two and a half years with the potential for underground mining operations into the future. Click for more details...

MOUNT GARNET TIN & IRON PROJECT
Private ownership Mining - Primary And Secondary Processing (Minerals Processing) project In The Tablelands Regional Council Area for New development. A project covering the Gillian, Pinnacles & Windermere localities on the historic Herberton tin field. A tin resource estimate of 7.3million tonnes (Mt) with iron estimates of 3Mt @ 30.8% at Gillian, 1.87Mt at Pinnacles (Wafer) & 400,000t at Deadmans Gully (Windermere). A fluorite estimate also for Pinnacles (Hartog, Llashram, Sniska, Wafer) of 0.96Mt @ 15%. A scoping study envisaged 7.5years life-of-mine (LoM) for operations in the project area at a rate of 700,000tpa producing 236,600tpa of magnetite concentrate grading 65%. Click for more details...

CARBOROUGH DOWNS COAL MINE EXPANSION PROJECT - ELECTRICAL INSTRUMENTATION FOR CHPP
15 km east of, Moranbah, QLD 4744 Has Carborough Downs Coal Mine Expansion Project - Electrical Instrumentation For Chpp currently at Tenders & Building stage. For the provision of electrical instrumentation for the new 5Mpta CHPP. Click for more details...

CARBOROUGH DOWNS COAL MINE EXPANSION PROJECT - SPIRALS FOR CHPP
Mining - Primary And Secondary Processing (Coal Processing) project at 15 km east of, Moranbah, QLD 4744 for New. For the provision of spirals for the new 5Mpta CHPP. Click for more details...

DAUNIA COAL PROJECT - COAL HANDLING PREPARATION PLANT
Approximately 25km Southeast of, Moranbah, QLD 4744 Has Daunia Coal Project - Coal Handling Preparation Plant currently at Construction stage. The contract involves detailed design and procurement of a CHPP, with all key components scheduled for delivery during calendar 2009. Click for more details...

TALINGA DEVELOPMENT PROJECT STAGE 1 - CIVIL WORKS
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Western Downs Regional Council Area of Private ownership. Stage 1 - Civil Works involves earthmoving, hydraulic & civil works up to the completion of the slab & sub-structure. The pipe-laying & superstructure of the facility will be further stages with the pipework to be completed by a specialist company. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - SOCIAL IMPACT CONSULTANTS PANEL
Mining - Primary And Secondary Processing (Coal Processing) New project at Between Bowen Basin &, Curtis Island, QLD 4680. This type is Consultants Panel - Social Impact Management Plan with Private ownership. QCLNG is a project to develop coal seam gas wells in the Surat & Bowen Basins, pipe gas to a processing plant to be built on Curtis Island & then export product LNG by ship. A panel of providers is being sought to undertake contracted social performance services in the course of compiling a Social Impact Management Plan for the project. Click for more details...

GROSVENOR COAL PROJECT - ROM STOCKPILE CIVIL WORKS
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 10000000. This project Civil works for the run-of-mine (ROM) stockpile & crushing area. Click for more details...

GROSVENOR COAL PROJECT - BULK EARTHWORKS PACKAGE
Mining - Primary And Secondary Processing (Civil works at processing facilities) project at via, Moranbah, QLD 4744 of Bulk Earthworks type of New development. Bulk earthworks for coal operations areas to include drift cut & cover and shotcrete soil stabilisation. Click for more details...

APLNG LNG PLANT - COATING CONSULTANCY
Mining - Primary And Secondary Processing (Piping) project for New development. For the provision of consultancy services on coatings. Click for more details...

EAGLE DOWNS JOINT VENTURE COAL PROJECT - CHPP
20km Southeast of, Moranbah, QLD 4744 Has Eagle Downs Joint Venture Coal Project - Chpp currently at Construction stage. For the provision of coal handling & preparation plant for the Eagle Downs Joint Venture Coal Project. Click for more details...