List of Mining - Primary And Secondary Processing Projects in WA


FORRESTANIA NICKEL PROJECT - T ZERO/T1/T4/FLYING FOX - RESOURCE
Mining - Primary And Secondary Processing (Minerals Processing) project In The Yilgarn Council Area of Private ownership. T Zero South indicated resource estimate is 36,500 tonnes @ 3.6% Ni for 1300 tonnes of Ni metal. Click for more details...

WESTONIA GOLD PROJECT - PROCESSING FACILITY - RELOCATION/RECOMMISSION
Currently at the Planning stage In Westonia is a project estimated to be $ 41000000. This project Disassembly, relocation, re-erection and commissioning of a 2.2 Mtpa plant. The plant is currently located at Big Bell and is proposed to be moved to the mine site. The mill is expected to produce over 75,000-80,000 ounces of gold per year. Click for more details...

BROCKMAN NO 2 IRON ORE OPERATIONS
55 km north west of, Tom Price, WA 6751 Has Brockman No 2 Iron Ore Operations currently at Early Planning stage. Internal refurbishment of plant. Click for more details...

TUTUNUP MINERAL SANDS PROJECT
Approximately 14 km south of, Capel, WA 6271 Has Tutunup Mineral Sands Project currently at Construction stage. The haulage contract is for removal of the Wet Processing Plant from Sandalwood to Tutunup, expected to commence in September 2003. Click for more details...

YANDICOOGINA IRON ORE OPERATIONS
A project in the WA Within East Pilbara. Expansion to 36 million tpa .Some conveyor work involved. Flow modifications. A current project to increase output to 24 million tonnes per annum is nearing completion. Click for more details...

PLUTONIC GOLD OPERATIONS - RESOURCE
Operating Mine project at 180 km North east of, Meekatharra, WA 6642 In The Council Area Of Meekatharra of Private. The Plutonic gold operation comprises both open pit and underground operations. There is also a CIL plant which operates sulphide and oxide circuits on site for the processing of ore. The mine can produce between 1.3 Mtpa to 1.8 Mtpa. In 2005, 251,000 ounces of gold were produced. Ore reserves are 14 Mt @ 5.2 gpt Au. Development work proposed includes increased mining at the Freshwater mine, in pit Tailing storage facilities at the Callp and Pirana pits. Work at the Freshwater mine is entitled the Trout Mining Project. Click for more details...

HITEC ELECTROLYTIC MANGANESE DIOXIDE PROJECT (EMD) - PROCESSING PLANT
Mining - Primary And Secondary Processing (Minerals Processing) project at Cawse 55 km north west of, Kalgoorlie, WA 6430 of Processing Plant - First Stage (Emd) type of New development. EMD plant of up to 23,000 tpa. Click for more details...

OREBODY 18 IRON ORE PROJECT - RESOURCE
A project in the WA Within East Pilbara. Orebody 18 is a satellite to the Mt Whaleback mine. The total mineable reserve of Brockman hematite is estimated at 116 Mt. Click for more details...

RADIO HILL NICKEL OPERATIONS
Mining - Primary And Secondary Processing (Minerals Processing) project at South of, Karratha, WA 6714 of Nickel/Copper Sulphide Process Plant & Associated Infrastructure type of New development. To include relocation and refurbishment of secondhand ball mill. Click for more details...

GASCOYNE PROJECT - ARTHUR RIVER/BERYL HILL
New project of Mining - Primary And Secondary Processing (Minerals Processing) project at via, Gascoyne Junction, WA 6705. A 50 tonne per hour jig plant to assess production potential for columbite and alluvial tantalite. Click for more details...

RAVENSTHORPE NICKEL PROJECT - TREATMENT PLANT PACKAGES
A project in the WA Within Ravensthorpe. Processing includes a combination of pressure acid leach (PAL), atmospheric leach (AL) and Enhanced Pressure Acid Leach (EPAL). The EPAL process entails separate mining, stockpiling and beneficiation of Ilmonite ( high iron, low magnesium and calcium, upper levels) ore. The ilmonite is treated by PAL, whilst the saprolite is treated by AL using the PAL discharge and additional acid. This allows recovery of an additional 15,000 tpa of nickel. The process downstream of the leaching circuit uses the Cawse flowsheet with partial neutralisation, followed by separation of the barrren tailings from the nickel bearing solution, further impurity removal and preciptiation of MHP. This intermediate product is then transported to the QNI Yabulu refinery. Click for more details...

MAGELLAN LEAD CARBONATE PROJECT - PROCESSING FACILITY UPGRADE
Magellan Lead Carbonate Project - Processing Facility Upgrade is currently at the Construction stage, valued at about $ 5000000 it is A refurbished 700 kilowatt ball mill has been secured as well as a refurbished concentrate thickner to increase processing capacity at the existing processing facility. Click for more details...

BHP BILLITON IRON ORE OPS - ASSET DEVELOPMENT PROJECTS - CRUSHING/SCREENING
Mining - Primary And Secondary Processing (Minerals Processing) project at Via, Newman, WA 6753 of Crushing & Screening Plants type of New development. Additional expansion from 110Mtpa to 145Mtpa. Part of a proposed additional expansion to meet increased demand, involving engineering works and capital investment of 2-3 billion $AU over the next five years. The feasibility study is being undertaken by MPDJV (Mine & Port Joint Venture). Click for more details...

BHP BILLITON IRON ORE OPERATIONS - ASSET DEVELOPMENT PROJECTS
Bhp Billiton Iron Ore Operations - Asset Development Projects is currently at the Early Planning stage, valued at about $ 20000000 it is Part of a proposed additional expansion to meet increased demand, involving engineering works and capital investment of 2-3 billion $AU over the next five years. The feasibility study is being undertaken by MPDJV (Mine & Port Joint Venture). Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT
Consultancies For Feasibility Study project at Via, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Feasibility work includes rail and rolling stock design, rail signals and communications design, marine studies, offshore and onshore geotechnical investigations and port stockyard design. Click for more details...

HISMELT - FREMANTLE PORT STOCKPILE
New project of Mining - Primary And Secondary Processing (Computerised systems for processing equipment) project at Lot Pt3 Leath Rd, Naval Base, WA 6165. Includes CitectScada HMI, Control Logix PLC and a DeviseNet Field Bus. Click for more details...

KOOLAN ISLAND IRON ORE PROJECT - WORKSHOP/FUEL SUPPLY/OFFICES
Mining - Primary And Secondary Processing (Minerals Processing) project at On, Koolan Island, WA 6733 for New. The contractor will be required to establish appropriate facilities on site, including workshops, administation offices,laboratory, three fuel storage facilities, explosive magazine, washdown bay and hardstand area. Click for more details...

EMILY ANN INFRASTRUCTURE EXPANSION
Infrastructure Expansion project at 140 kM West of, Norseman, WA 6443 In The Council Area Of Dundas of Private. Expansion of existing infrastructure at Maggie Hays comprises upgrading the processing plant from 0.5 mtpa of ore to 1.5 mtpa. Downstream facilities of flotation, concrete handling, tails disposal, reagent mixing and process water systems would also be expanded. Other facilities such as the laydown area, both explosive magazines and mixing facility, the ROM pad, waste rock dump, fuel storage (2 x 55,000 litre tanks) will be expanded. Expansion of existing workshop buildings and administration areas will be done as a needs basis. The power plant will Increase from 7 MW to 10 MW and the construction of a new 4 MW plant at the Maggie Hays mine site. Two new process water ponds and a merging lane at the corner of Hyden Norseman Road and the Maggie Hays access road. Click for more details...

MAGELLAN LEAD CARBONATE PROJECT - GAS PIPELINE
Mining - Primary And Secondary Processing (Piping) project at Goldfields Gas Transit pipeline to proposed Refinery near, Wiluna, WA 6646 for New. The gas pipeline is proposed to run from the proposed refinery to the main Goldfields Gas transit pipeline. Goldfields gas pipeline is 35 km from the minesite where the refinery is to be located nearby. Click for more details...

JAGUAR BASE METAL PROJECT - PROCESSING PLANT/STRUCTURAL CONTRACT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Leonora Council Area of Structural Works Contract type. A centrally located processing facility to be located on the granted Teutonic Bore mining lease, 4 km to the north of the Jaguar deposit. A 350,000 tpa plant to treat ore by crushing, grinding and flotation. Copper and zinc concentrate production is expected to commence in July 2007, increasing to 10,000 tonnes of copper, 34,000 tonnes if zinc and 1 million ounces of silver in concentrate per annum over a six year period. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C/PORT - ELECTRICAL/CONTROLS
Near, Newman, WA 6753 Has Iron Ore Rapid Growth 3 Project - Area C/Port - Electrical/Controls currently at Construction stage. Area C Electrical and Controls. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C/PORT - NETWORK EQUIPMENT
Mining - Primary And Secondary Processing (Computerised systems for processing equipment) project at Near, Newman, WA 6753 for New. NETWORK EQUIPMENT Click for more details...

LAVERTON GOLD PROJECT TREATMENT PLANT EPCM CONTRACT
Laverton Gold Project Treatment Plant Epcm Contract is currently at the Construction stage, valued at about $ 1000000 it is Upgrade of a treatment plant to process 1.5 Mtpa. Infrastructure proposed is a second ball mill, additional tankage, a gravity circuit and in pit tailings disposal. Also feed chutes, mill discharge pumps, tails pumps and the elution circuit. The first gold pour occurred on 19th March 2007. Crushing and milling of Sickle Ore commenced on 22 March. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - 415 V MOTOR CONTROL CENTRES & LOAD CENTRES
Mining - Primary And Secondary Processing (Minerals Processing) project at 15 Km South east of, Collie, WA 6225 of 415 V Motor Control Centres/Load Centres - Supply type of New development. 415 V Motor Control Centres (MCC) and Load Centres. Click for more details...

LAWLERS NICKEL OPERATIONS INTEGRATION
Processing Plant - Closure project at Near, Leinster, WA 6437 in the Mining - Primary And Secondary Processing (Minerals Processing). Lawler operations being integrated with new owner Gold Fields' existing Agnew operations. To include closure of the Lawler processing plant. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - NEWMAN HUB
Newman Hub project at Newman Hub, Newman, WA 6753 in the Mining - Primary And Secondary Processing (Minerals Processing). The RGP4 modifications include the final tie-ins that convert the existing Newman Operations from a production plant producing secondary crushed ore (with a nominal top size of -100mm) to a plant producing shipping quality lump and fines products. The main features of the new tie-in, starting at TS2 are: A new transfer tower, 41SE010, built immediately to the NE of the existing TS2, in line with conveyor M110. This tower is structurally linked to TS2. The tail end of the existing conveyor M110 is removed and replace by a new conveyor. 41CV010, which runs in the opposite direction and discharges ore to a new transfer conveyor, 41CV020, the tail of which is in the new transfer tower 41SE010. Connecting to the existing Newman High Grade (NHG) discharge in TS2 (ore from #2 Plant and Bene Plant product). Construction of a new single rotary cell train car dumping facility, a new crushing and screening plant to include scalping with middlings recirculation to produce sized lump and fines product. Construction of a new blending stockyard 5 x 210kt lump and fines, live and dead including stacking and reclaim machines, to produce a direct-shippable blended lump and fines product. Construction of sampling facilities for reconciliation of production from the various ore sources (NHB and SOB sites) and as-stacked blend control on the stockpiles. Construction of a new drive through train loading (TLO) facility with separate lump and fines sections. Modifications and additional track at the entrance of Newman Hub rail loop and new loco services facility near the existing Hub workshops. Modifications and additional tracks and realingments in the vicinity of the existing OB29 train loading facility for connections to new car dumper and train loading facility. These works include the additional SOBs train by pass line. Deconstruction of PB29 conveyors M301, M309, M311 transfer station TS3, part deconstruction M308 and the removal of the entire OB29 train Load-out facility. The deconstruction works also include removal of sections of existing rail line made redundant by the Newman Hub works. Decommissioning of the existing train load-out stackers No 1 & 2, stacker conveyors M110 and M6 and the existing train loading tunnels (demolition not included in the RGP4 scope). Modifications and additions to the existing water supply and reticulation system. Design Capacity is 31Mtpa. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - TRAIN LOAD OUT
Iron Ore Rapid Growth 4 Project - Train Load Out is currently at the Planning stage, valued at about $ 100000000 it is The new TLO facility will match the existing train load-out plant for through train capacity at 58Mtpa. The new TLO will comprise a new section of rail passing through a single tunnel that has two loading vaults. Each vault is located under a discrete stockpile, each with a minimum 25,000 live capacity. These stockpiles will be product specific, one for lump and one for fines, to eliminate product cross-contamination. Each stockpile will be built and maintained by a fixed stacker conveyor, fed from the diverter transfer station at the head of the stockyard reclaim conveyor (the transfer station and stacker conveyors are part of work pack 4N0). The conveyors will discharge from fixed cantilever booms. Dust suppression sprays will be mounted at the head of each conveyor discharge. The spray system will be complete with break tank and pumps for the high pressure for the spray canon. The TLO will have dedicated dust extraction/collection and ventilation systems for each of the vaults. Each of the dust systems will comprise dust hoods, ducting, wet scrubbers, extraction fans, seal tank, circulation pumps, sump tanks, pumps and associated pipe work. The complete tunnel with the vaults will have a vault ventilation system complete with fans, ducting, discharge registers and intake silencers. The stockpiles and stacker conveyors will have dust suppression sprays. Process water will be supplied for dust suppression and dust extraction scrubbers. The dust suppression spray system comprises piping, water cannon and controls. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - MANPOWER & LABOUR
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - Manpower & Labour currently at Construction stage. For the provision of manpower & labour. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - CS PLATES TO A36 & AS3678 250
Mining - Primary And Secondary Processing (Tankage, Silos) project for New development. For the provision of 250 CS plates MTO to A36 & AS3678. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - ROOF COLUMN JACKING LUGS
New project of Mining - Primary And Secondary Processing (Tankage, Silos) project at On, Barrow Island, WA 6712. For the provision of roof column jacking lugs. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - ANNULAR STANDS
Private ownership Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area for New development. For the detail, supply, fabrication, testing & prime of Annular Stands. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - MATERIALS FOR INSTRUMENT MOUNTING & SUPPORTS (REV 1)
New project of Mining - Primary And Secondary Processing (Tankage, Silos) project at On, Barrow Island, WA 6712. For the provision of materials for instrument mounting supports. Click for more details...

CHRISTMAS CREEK IRON ORE PROJECT - PROCESSING FACILITY 2
Processing Facility project at Via, Tom Price, WA 6751 In The Council Area Of Ashburton of Private. For the design, installation and operation of a 25 million tonne per annum crushing and processing circuit. To include establishment of a remote primary crushing hub, a 7km overland feed conveyor to transfer product from the primary hub to a separate coarse ore stockpile, a scrubbing and wet screening circuit, duplication of the existing CSI/Christmas Creek 1 upgraded 25Mtpa crushing and screening plant and incorporation of a jigging circuit to beneficiate product from the two plants. Click for more details...

WA-26-L & WA-191-P JOINT VENTURE FLETCHER-FINUCANE OIL DEVELOPMENT - SURF WELL CONNECTION CONTRACT
Subsea/Umbilicals/Risers/Flowlines project at North West Shelf 150km north of DAMPIER, ., WA 6999 In The Council Area Of Offshore of Private. A contract including 55km of flexible flowlines & more than 60km of umbilicals. Associated structures to connect wells to the existing Exeter-Mutineer facilities. Pre-commissioning activities & associated services. Click for more details...

NULLAGINE GOLD PROJECT - MOBILE PLANT & EQUIPMENT HIRE
Nullagine Gold Project - Mobile Plant & Equipment Hire is currently at the Construction stage, valued at about $ 40000000 it is For the provision of mobile plant and equipment. Click for more details...

LAMBOO/NICOLSONS GOLD JOINT VENTURE PROJECT - MILL REFURBISHMENT & UPGRADE
Mill - Refurbishment/Upgrade project at NW of Great Northern Hwy & from 40km W/SW of, Halls Creek, WA 6770 in the Mining - Primary And Secondary Processing (Tankage, Silos). Replacement of the retaining wall on the ROM pad. Replacement of the cone crusher. Modification to the single deck screen & installation of new second deck. New feeder belt & modified feed arrangement for the fine ore bin. New cyanide bagging system & dosing pump. Installation of new leach tankage for the 200 000 tpa upgrade. Modification of tank agitators & gearboxes to suit the upgraded leach circuit. New decant water return system. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - CABLE GLANDS - (MR-16153 & MR_17283)
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - Cable Glands - (Mr-16153 & Mr_17283) currently at Construction stage. For the provision of CMP or equivalent cable glands (complete with heavy duty nickel plated brass lock nuts & fibre weather washer). Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - MANUAL VALVES - (MR-15130)
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area of Manual Valves type. For the provision of manual valves. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - SHELL MANHOLE DETAILS
Mining - Primary And Secondary Processing (Tankage, Silos) project at On, Barrow Island, WA 6712 for New. For the provision of shell manhole details. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - SHELL SECTION
Mining - Primary And Secondary Processing (Tankage, Silos) New project at On, Barrow Island, WA 6712. This type is Shell Section with Private ownership. For the provision of shell section. Click for more details...

GREATER GORGON GAS PROJECT - CARBON DIOXIDE INJECTION PIPELINE & WELL SITE - SUPPLY OF HIRE VEHICLES
Supply Of Hire Vehicles New project In The Ashburton Council Area. For the supply of hire vehicles (4 x 4 light vehicles). Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - COMPRESSOR HIRE
Currently at the Construction stage In Ashburton is a project estimated to be $ 100000. This project For the provision of compressor hire. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT CIVIL WORKS
A project in the WA Within City Of Karratha. Contract to include the CLB 353 stockyard. Conveyor link & rail formation earthworks. Relocation of water pipelines. Excavation, crushing & screening to produce 1 million tonnes (Mt) of pavement material for the construction of 5km of sealed roads. Click for more details...

COCKATOO ISLAND IRON ORE OPERATIONS STAGE 3 MINING CONTRACT
Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project for New development. A contract for open cut mining of remnant material from stage 3 operations & ship loading of direct shipping ore (DSO) at a rate of up to 1 million tonnes per annum (Mtpa). To cover all operational mining & civil infrastructure services including drill & blast, loading, haulage & processing of ore for direct shipping. To also include commissioning of a new crushing & screening facility. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - CELLULAR GLASS
Currently at the Construction stage In Ashburton is a project estimated to be $ 500000. This project For the provision of cellular glass. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - CS RFWN FLANGES
Cs Rfwn Flanges project at On, Barrow Island, WA 6712 In The Council Area Of Ashburton of Private. For the provision of 300 CS RFWN flanges (1000 mm diameter, A105, Series A). Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - BRINE OUTFALL PIPING FOR HEAVY LIFT FACILITY
Private ownership Mining - Primary And Secondary Processing (Piping) project In The Ashburton Council Area for New development. For the supply & fabrication of brine outfall piping for heavy lift facility. To include: pipe works, pipe supports, & emergency escape access platform & ladders. Click for more details...

NOVA NICKEL PROJECT - PROCESSING & PASTE PLANT
New project of Mining - Primary And Secondary Processing (Crushing, Screening, Quarrying) project at 30km north of Eyre Hwy 120km E/NE of, Norseman, WA 6443. For the provision of a processing plant including crushing, grinding, flotation & dewatering & paste plant. Click for more details...

PILGANGOORA LITHIUM PROJECT - PROCESS PLANT SUPPORT FACILITIES
Process Plant Support Facilities project at 120km South of, Port Hedland, WA 6721 in the Mining - Primary And Secondary Processing (Minerals Processing). For the provision of processing plant support facilities. Click for more details...