List of Mining - Primary And Secondary Processing Projects in WA


WORSLEY ALUMINA REFINERY CAPITAL DEVELOPMENT PROJECT
Mill Capacity Upgrade project at Near, Collie, WA 6225 In The Council Area Of Collie of Private. Expansion from 3.2 to 3.5 mtpa. Click for more details...

WESTONIA GOLD PROJECT - PROCESSING FACILITY - RELOCATION/RECOMMISSION
Currently at the Planning stage In Westonia is a project estimated to be $ 41000000. This project Disassembly, relocation, re-erection and commissioning of a 2.2 Mtpa plant. The plant is currently located at Big Bell and is proposed to be moved to the mine site. The mill is expected to produce over 75,000-80,000 ounces of gold per year. Click for more details...

WEST ANGELAS IRON ORE OPERATIONS
Private ownership Mining - Primary And Secondary Processing (Minerals Processing) project In The East Pilbara Council Area for New development. Minor modifications to the processing facility to enable expansion of capacity from 20 million tonnes per year to 25 million tonnes per year. Click for more details...

MEEKATHARRA GOLD OPERATIONS - BLUEBIRD PLANT
Currently at the Planning stage In Meekatharra is a project estimated to be $ 1000000. This project Modifications will include changing the circuit, incorporating some parts (already on hand) not currently in use. To accommodate the harder ore, rates will be adjusted from 3mtpa to 1 -1.5mtpa. Click for more details...

FORTNUM GOLD PROJECT - PLANT RECOMMISSIONING
Mining - Primary And Secondary Processing (Minerals Processing) project In The Meekatharra Council Area of Processing Plant - Recommissioning type. 1 million tonnes per annum gold treatment plant. Findings of the pre-feasibility study include treatment plant recommissioning cost of approximately $1.6 million for a production rate of 60,000 to 70,000 ounces. Click for more details...

SALLY MALAY NICKEL PROJECT
A project in the WA Within Wyndham-E Kimberley. Stage two optimisation. Previous test work has shown that fine grinding is an option to increase recoveries. This will be studied once plant (to be constructed shortly) is in full production Click for more details...

HISMELT EXPANSION PROJECT
Earthworks/Civil Works New project In The Kwinana Council Area. Roadworks, drainage. Click for more details...

MURRIN MURRIN NICKEL/COBALT OPERATIONS
Processing Facility - Rectification project at 60 km east of, Leonora, WA 6438 In The Council Area Of Leonora of Private. It is expected that higher daily production rates will be possible once the two new Geho pumps are fully commissioned in May and June 2004 respectively. The new Geho pumps will significantly increase throughput rates and increase nickel and cobalt production. Click for more details...

INDEE GOLD PROJECT - HEAP LEACH PLANT
Mining - Primary And Secondary Processing (Piping) project In The Port Hedland Council Area of Private ownership. The processing facility will initially treat oxide ores via carbon-in-leach technology. A two stage crushing and screening plant has been acquired. It comprises a feed hopper with vibrating screen and roller crusher, conveyors, 60 metre multi stage, heap leach conveying and stacking system, control room and CAT 320 kva generator. Heap leach pads, channel liners and pond liners are also to be supplied. Click for more details...

PREMIER COAL OPERATIONS - COAL CHAR PILOT PLANT
Mining - Primary And Secondary Processing (Coal Processing) project at Premier mine site 15 km east of, Collie, WA 6225 of Equipment - Supply/Install type of New development. Likely to be one package, supply/install. Click for more details...

WHIM CREEK COPPER PROJECT - MONS CUPRI
Renovations, Refurbishments etc. project of Mining - Primary And Secondary Processing (Minerals Processing) project at North West Hwy via, Whim Creek, WA 6718. The Whim Creek project is located between Karratha and Port Hedland in the Pilbara region of Western Australia. It conists of two deposits, Whim Creek and Mons Cupri approx 6 km apart. Both are mineable by conventional open cut methods. The feasibility study indicated a mine life of at least four years yielding a total of 51,000 tonnes of copper cathode. Click for more details...

JAGUAR BASE METALS PROJECT - SITE PREPARATION WORKS/BOX CUT MINING CONTRACT
A project in the WA Within Leonora. Development comprises the movement of 1 million cubic metres of material over five months. Work will involve site clearing, mining the box cut, construction of haul roads, initial processing plant earthworks, and tailings dams construction. Click for more details...

MURRIN MURRIN NICKEL OPERATIONS - ACID PLANT SHUTDOWN
Mining - Primary And Secondary Processing (Minerals Processing) project at 50 km east of, Leonora, WA 6438 for New. 21 day shutdown planned. Click for more details...

RAVENSTHORPE NICKEL PROJECT - VIBRATING SCREENS & GRIZZLY
New project of Mining - Primary And Secondary Processing (Minerals Processing) project at Via, Ravensthorpe, WA 6346. 314778-1M-P024 Vibrating Screens. 314978-IM-P205 Vibrating Grizzly. Click for more details...

BHP BILLITON IRON ORE RAPID GROWTH PROJECT 2 - OREBODY 25 PLANT MODIFICATIONS
Orebody 25 Plant - Modifications project at Via, Newman, WA 6753 in the Mining - Primary And Secondary Processing (Minerals Processing). Modifications at Orebody 25 will produce additional brockman lump and fines products. Click for more details...

PARDOO IRON ORE PROJECT
Pardoo Iron Ore Project is currently at the Construction stage, valued at about $ 8300000 it is The project is based on an identified iron ore (hematite) resource of approximately 7.4Mt. The project proposes an ore production rate of 1.5 Mtpa, resulting in a mining life of 5 - 6 years. The project involves the open cut mining of eight small pits in five deposits to obtain direct-shipping quality iron ore. The ore will be crushed, screened and stockpiled on site prior to being loaded into rail trains for road haulage to the appropriate berth at Port Hedland. Ore will be stockpiled at the port until it is loaded onto ships for export to overseas customers. The major components of the Pardoo DSO Project are: minesite establishment, mining operations, product transport and export and decommissioning and closure. The minesite access road and temporary construction yard and administration area will be the first infrastructure constructed. The mining operations centre (MOC) will be located in the northern portion of the minesite and contains the following infrastructure: administration area including Atlas facilities, mining contractor's facilities, crushing and screening contractor's facilities, haulage contractors facilities, sewerage treatment and waste water storage, potable water storage, common parking area. The MOC will also contain a fuel storage and refuelling area, power station (diesel), crushing and screening plant, ROM ore pad and product stockpiling area, parking areas and portions of the access road and haul road, and combined contractor's laydown area. Haul roads will be constructed between the pits, waste rock dumps, stockpiles and ROM pad stockpile. Minor access roads will provide access to waste rock dumps and inspection points, dewatering equipment, water management structures, environmental discharge locations and other minesite management areas. The proposed mining operation will be a multiple, open pit mining operation, using conventional drill and blast and load and haul methods. Ore from the pits will be hauled directly to the ROM pad or temporarily stockpiled adjacent to the pits. The crushing and screening plant will provide primary and secondary crushing and screening. Click for more details...

RAVENSTHORPE NICKEL PROJECT - AIR VALVES
Ravensthorpe Nickel Project - Air Valves is currently at the Construction stage, valued at about $ 100000 it is Air valves for seawater pipeline. Click for more details...

RAVENSTHORPE NICKEL PROJECT - GRP PIPE SPOOLS PIECES
Ravensthorpe Nickel Project - Grp Pipe Spools Pieces is currently at the Construction stage, valued at about $ 100000 it is GRP pipe spools pieces. Click for more details...

WAROONA MINERAL SANDS PROJECT - RESOURCE
Mining - Primary And Secondary Processing (Other processing including salt, sand etc) project for New development. Current mineable reserve is approx 8.4 million tonnes with an average grade of 10.2% heavy mineral. The mine will process 2,600,000 tonnes of ore per annum. Major work will comprise stripping of the overburden, upgrading and relocation of a wet concentrator plant and nfrastructure. Development will comprise topsoil stripping, overburden removal, installation of drainage and noise bunds, hauls roads, offices, workshops, construction of a clean water dam and associated infrastructure. Associated infrastructure will include in pit hoppers, conveyors, wet screening plant comprising a double deck screen and scrubber, pumps and pipes. A concentrator will be transferred from Capel and it will have the capacity to produce 250 tonnes per hour of HMC ore. The ore when processed will be transported to the North Capel seperation plant. Click for more details...

MURRIN MURRIN NICKEL OPERATIONS - PROCESSING FACILITY SHUTDOWN
Mining - Primary And Secondary Processing (Minerals Processing) New project at 50 km east of, Leonora, WA 6438. This type is Processing Facility Shutdown with Private ownership. This is to be a Statutory shutdown. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - STRUCTURAL/MECHANICAL/PIPING
Structural/Mechanical/Piping New project In The East Pilbara Council Area. Work comprises structural, mechanical and piping work associated with the expansion of Mining Area C iron ore processing facilities. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C/RAIL - EARTHWORKS/DRAINAGE
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The East Pilbara Council Area of Private ownership. Formation Earthworks and Drainage at Weeli, Poonda, Yeerabiddy and Area C . Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT/AREA C - RR CUBICLES/NE RESISTORS
Mining - Primary And Secondary Processing (Computerised systems for processing equipment) project at Near, Newman, WA 6753 for New. Rotor Resistance Cubicles and Neutral Earthing Resistors. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - MOTOR OPERATED VALVES
Mining - Primary And Secondary Processing (Minerals Processing) project In The Collie Council Area of Private ownership. For the supply of motor operated valves. Click for more details...

ST IVES GOLD OPERATIONS - HEAP LEACH FACILITY STAGE 3 EXPANSION
Currently at the Construction stage In Coolgardie is a project estimated to be $ 8589000. This project Work comprises clearing the site, earthworks, pipeworks, Geomembrane and geofabrics liners for the heap leach facility. Click for more details...

BODDINGTON GOLD MINE EXPANSION - CONSTRUCTION/ACCOMMODATION CAMP
Mining - Primary And Secondary Processing (Piping) project for New development. A 1250 person construction camp and associated civil works to be constructed. Facilities will include a permanent dry and wet mess and recreation facilities. The initial 200 person fly camp has been constructed. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - MECHANICAL/CIVIL/STRUCTURAL & ELECTRICAL
Private ownership Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The City Of Greater Geraldton Council Area for New development. Provision & Management of Minor Mechanical/Civil/Structural & Electrical works to Brownfield & Greenfield. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - FINUCANE ISLAND PORT UPGRADE
Mining - Primary And Secondary Processing (Civil works at processing facilities) project at Eastern Yard, Finucane Island, Finucane Island, WA 6721 for New. Development will comprise the development of new stockpiles and associated infrastructure in the Eastern Yard. The Car Dumper will be upgraded at Nelson Point. New infrastructure includes a stacker with a berm including rails and supports, stacker feed conveyor, transfer station conveyor, transfer station, water service pipelines and hydrants, dust suppression water cannons for stockpiles. Building infrastructure include administration offices, workshop offices, workshops, warehouse and a car park in a single facility at the Northern End of Finucane Island. Demolition work includes the existing office and workshops to make way for the new stockpiles row and the partial demolition of conveyors used at the Nelson Point Plant No 1 and Plant No 2. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - TRAIN LOAD OUT
Iron Ore Rapid Growth 4 Project - Train Load Out is currently at the Planning stage, valued at about $ 100000000 it is The new TLO facility will match the existing train load-out plant for through train capacity at 58Mtpa. The new TLO will comprise a new section of rail passing through a single tunnel that has two loading vaults. Each vault is located under a discrete stockpile, each with a minimum 25,000 live capacity. These stockpiles will be product specific, one for lump and one for fines, to eliminate product cross-contamination. Each stockpile will be built and maintained by a fixed stacker conveyor, fed from the diverter transfer station at the head of the stockyard reclaim conveyor (the transfer station and stacker conveyors are part of work pack 4N0). The conveyors will discharge from fixed cantilever booms. Dust suppression sprays will be mounted at the head of each conveyor discharge. The spray system will be complete with break tank and pumps for the high pressure for the spray canon. The TLO will have dedicated dust extraction/collection and ventilation systems for each of the vaults. Each of the dust systems will comprise dust hoods, ducting, wet scrubbers, extraction fans, seal tank, circulation pumps, sump tanks, pumps and associated pipe work. The complete tunnel with the vaults will have a vault ventilation system complete with fans, ducting, discharge registers and intake silencers. The stockpiles and stacker conveyors will have dust suppression sprays. Process water will be supplied for dust suppression and dust extraction scrubbers. The dust suppression spray system comprises piping, water cannon and controls. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - IRON ORE SAMPLER
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. Iron Ore Sampler Click for more details...

KWINANA TITANIUM DIOXIDE PIGMENT PLANT - PIPING CONTRACT
Mason Rd, Kwinana, WA 6966 Has Kwinana Titanium Dioxide Pigment Plant - Piping Contract currently at Planning stage. For the provision of piping services & associated works. Click for more details...

MOUNT WELD RARE EARTHS PROJECT - CONCENTRATOR PLANT
Mount Weld Rare Earths Project - Concentrator Plant is currently at the Construction stage, valued at about $ 70000000 it is For the development of a concentration plant. Click for more details...

BHP BILLITON RAPID GROWTH 5 IRON ORE PROJECT - STOCKYARD TRAIN LOAD OUT FACILITIES & ORE HANDLING PLANT
Private ownership Mining - Primary And Secondary Processing (Minerals Processing) project In The East Pilbara Council Area for New development. The contract includes structural, mechanical and piping works for the supply, pre-assembly and installation of the stockyard and train load out facilities and modifications to the existing Ore Handling Plant 2 (OHP2). Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - SS PIPES FOR PUMP TUBES
Mining - Primary And Secondary Processing (Tankage, Silos) project for New development. For the provision of stainless steel pipes for pump tubes. Click for more details...

MOUNT WELD RARE EARTHS OPERATIONS PLANT EXPANSION
Mining - Primary And Secondary Processing (Minerals Processing) project at near, Laverton, WA 6440 for New. Increase of initial 11,000 tonnes per annum (tpa) capacity to 22,000tpa through plant expansion from 120,000tpa to 240,000tpa throughput. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE TANKS - ELECTRICAL CABLE GLANDS
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area of Electrical Cable Glands type. For the provision of M20 electrical cable glands. Click for more details...

CHRISTMAS CREEK IRON ORE PROJECT - PROCESSING FACILITY 2
Processing Facility project at Via, Tom Price, WA 6751 In The Council Area Of Ashburton of Private. For the design, installation and operation of a 25 million tonne per annum crushing and processing circuit. To include establishment of a remote primary crushing hub, a 7km overland feed conveyor to transfer product from the primary hub to a separate coarse ore stockpile, a scrubbing and wet screening circuit, duplication of the existing CSI/Christmas Creek 1 upgraded 25Mtpa crushing and screening plant and incorporation of a jigging circuit to beneficiate product from the two plants. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - GRATING & CAST IN ANGLE SUPPLY
Mining - Primary And Secondary Processing (Piping) project for New development. For the supply of grating & cast in angle. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - CONSTRUCTION OF IN-SITU CONCRETE
Currently at the Construction stage In Ashburton is a project estimated to be $ 1500000. This project For the construction of in-situ concrete. Click for more details...

ROY HILL IRON ORE PROJECT - FUEL MANAGEMENT SYSTEM FOR MOBILE EQUIPMENT
Mining - Primary And Secondary Processing (Computerised systems for processing equipment) project at 110km North of, Newman, WA 6753 of Fuel Management System For Mobile Equipment type of New development. For the provision of a fuel management system for mobile equipment. Click for more details...

GREATER GORGON GAS PROJECT - CARBON DIOXIDE INJECTION PIPELINE & WELL SITE - PRECOMMISSIONING SERVICE
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Carbon Dioxide Injection Pipeline & Well Site - Precommissioning Service currently at Construction stage. For the provision of precommissioning service. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - ELECTRICAL POWER CABLE (MR-16120)
New project of Mining - Primary And Secondary Processing (Tankage, Silos) project at On, Barrow Island, WA 6712. For the provision of electrical power cable. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - SS CABLE LABLES & FERRULES (MR-17100)
Mining - Primary And Secondary Processing (Tankage, Silos) project at On, Barrow Island, WA 6712 for New. For the provision of SS cable lables & ferrules heat shrinkable tubes. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT CIVIL WORKS
A project in the WA Within City Of Karratha. Contract to include the CLB 353 stockyard. Conveyor link & rail formation earthworks. Relocation of water pipelines. Excavation, crushing & screening to produce 1 million tonnes (Mt) of pavement material for the construction of 5km of sealed roads. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - SLAB HEATING SYSTEM
Mining - Primary And Secondary Processing (Tankage, Silos) project In The Ashburton Council Area of Private ownership. For the provision of a slab heating system. Click for more details...

NIMBUS VHMS PROJECT - LEACH TANK CIRCUIT WORKS CONTRACT
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. For the provision of contract works. Click for more details...

NORTH WEST SHELF OIL REDEVELOPMENT PROGRAM - MASTER SERVICES CONTRACT
Mining - Primary And Secondary Processing (Insulation) project at Approx 135km Northwest of, Karratha, WA 6714 of Master Services Contract - Multi Discipline type of New development. For the provision of master services including electrical & instrumentation, mechanical, inspection, cladding/insulation, blasting & painting, scaffolding, rope access & web decking & other Perth based support services. Contract to include 2 x 1 year extension options. Click for more details...

SILVERGRASS IRON ORE EXPANSION PROJECT (SGE) - PRIMARY CRUSHER
A project in the WA Within Ashburton. For the provision of engineering, procurement & construction of a new primary crusher, 9km of overland conveyor & associated 33kV power line. Click for more details...

AUSTRALIAN MINES PROCESSING PLANT PERTH
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. Construction of a demonstration size high pressure acid leach & solvent extraction plant to produce offtake samples of cobalt sulphate, nickel sulphate & scandium oxide. Click for more details...