State

Categories

Sub Categories

Click Here to Find Current Projects

List of Mining - Subcontracts⊂category= Projects in ®ion= in region


AUGUSTA/COSTERFIELD PROCESSING FACILITY
Currently at the Construction stage In Greater Bendigo is a project estimated to be $ 10000000. This project Development comprises the modification and and refurbishment of the existing Costerfield CIL plant and the construction of a new crushing/processing plant. Work comprises earthworks; contract project management, layout and design drafting for various sections of the plant; sourcing, inspecting and acquiring various items of second hand equipment; design of main and distribution switchboards, current limiting device and main switch for installation adjacent to transformer substation reserve; refurbishment of float cells, Knelson concentrators and process circuit pumps. Click for more details...

HISMELT EXPANSION PROJECT
Mechanical Installation - Package 2 New project In The Kwinana Council Area. One of three packages. Fabrication and installation. Click for more details...

BLACK SWAN DISSEMINATED TWO PROJECT - PLANT UPGRADE
53 km north east of, Kalgoorlie, WA 6430 Has Black Swan Disseminated Two Project - Plant Upgrade currently at Construction stage. Expansion in production capacity of the processing plant from 600,000 tpa to 2,150,000 tpa. Production of 13,000 tonnes of payable nickel per annum is to be produced. This will require two new grinding mills, which have already been sourced second hand. Project to include upgrade of grinding circuit, new tank cells, relocation of control room. Click for more details...

EASTERN GOLDFIELDS - NICKEL/GOLD
Mining - Subcontracts (Electrical installation) project In The Kalgoorlie-Boulder Council Area of Mines - Gas-Fired Power Stations (4) type. 4 x 40 megawatt power stations to be built to supply electricity to the Company's Mt Keith, Leinster & Kambalda nickel operations. In addition, a new power station is to be installed at the Kalgoorlie nickel smelter. Proposals will utilise gas from the Pilbara-Goldfields pipeline which is due to deliver gas July/August 1996. 200mm diameter spur lines will be constructed to the gas pipeline & a transmission line will connect Mt Keith & Leinster sites. Waste heat from the turbines is to be used at the nickel processing plants. Lateral line of 7.6 km with a 500m easement is planned for Mt Keith. Click for more details...

NELSON POINT - IRON ORE
Nelson Point - Iron Ore is currently at the Construction stage, valued at about $ 250000 it is Works for the automation of dumper No: 1 to include programme logic controls, lighting, ladder racks, cable, limit switches & positioners. Additional definition to be attached to the scope of works. Click for more details...

NELSON POINT - IRON ORE
Mining - Subcontracts (Mechanical installation) project at Port facilities via, Port Hedland, WA 6721 of Operations - Bogie Changeout type of Renovations, Refurbishments etc. development. Contract to involve refurbishment & replacement of bogies (8 sets) on car dumper number one. Click for more details...

JUNDEE - GOLD
Mine - Electrical Package - Borefield Installation New project In The Wiluna Council Area. Tender to involve generators, telemetry, switchboards & reticulation for new borefield development. Click for more details...

QUARRY OPERATIONS
Private ownership Mining - Subcontracts (Mechanical installation) project In The Gosnells Council Area for Addition development. Structural steelwork required for new screening facility. Construction of 2 hoppers to be included in tender. Click for more details...

EWINGTON 2 COAL OPERATIONS
Currently at the Construction stage In Collie is a project estimated to be $ 1000000. This project Installation of 8 conveyors of various sizes required. Associated components have been ordered. Click for more details...

WOODCUTTERS BASE METALS MINE
Mining - Subcontracts (Mechanical installation) project at 80 km south of, Darwin, NT 0800 for Addition. Contract for supply & installation of grisleys, 2 x plate feeders & one conveyor system. This tender is to include all associated electricals such as general power distribution & lighting. Click for more details...

YABULU NICKEL REFINERY EXTENSION - MHP RECEIVAL/TREATMENT FACILITIES CONTRACT
New project of Mining - Subcontracts (Electrical installation) project at Refinery site at, Yabulu, QLD 4818. Contract package 4 involves a MHP leach area, ammonical solvent extraction area and a stripping stills and gas absorption area. This package involves construction on top of concrete, structural, mechanical, piping, electrical, instrumentation and controls for what are generally hydrometallurgical facilities. The contract involves both greenfield and brownfield work. The MHP Receival & Treatment Facilities include container storage and unloading and primary and secondary leaching facilities. The intermediate product (MHP) from Ravensthorpe will be received at Yabulu where it will be stockpiled in a weatherproof environment prior to feeding into a two stage leaching process. New material handling equipment will be constructed to process the additional MHP. Extension of the existing utilities plant will be required to provide additional power, steam and process gases. This includes a package plant for nitrogen generation by the pressure swing absorption process. Anhydrous ammonia will be imported to supplement ammonia currently produced on site. Click for more details...

KALGOORLIE NICKEL SMELTER
Mining - Subcontracts (Mechanical installation) project for Addition development. Work expected to involve a 2.4m diameter stainless steel duct & associated services. This new plant is designed to reduce sulphur dioxide emissions. Click for more details...

PLUTONIC GOLD MINE
Currently at the Construction stage In Meekatharra is a project estimated to be $ 20000000. This project This 20 megawatt gas-fired power station is a complete turnkey contract. Project will involve a 20 km spur line, gas metering & construction of a new power station. Associated civils & electrical services are included in contract. Click for more details...

BARNEY POINT COAL TERMINAL UPGRADING - STAGE 2
Mining - Subcontracts (Electrical installation) project In The Gladstone Regional Council Area of Private ownership. To include both mechanical and electrical installation. Click for more details...

NELSON POINT ORE HANDLING FACILITY - PACE
Structural/Mechanical Works For Finance Island Tunnel New project In The Port Hedland Council Area. Supply and installation of structural and mechanical works for Finance Island tunnel, shiploading routes and lump rescreening plant. Click for more details...

MONTO MINERALS INDUSTRIAL MINERALS PROJECT - WET SEPERATION PLANT
Mining - Subcontracts (Mechanical installation) project for New development. Wet Seperation Plant that will constructed next to the existing pilot plant. The plant will use non chemical seperation using gravity and magnetics. Plant is expected to process 142,000 tonnes in 2007 and 232,000 tonnes in 2008. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION
A project in the NT Within East Arnhem Shire. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of separate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

RAVENSWOOD GOLD OPERATIONS - SARSFIELD
Mining - Subcontracts (Electrical installation) project at via, Ravenswood, QLD 4816 for New. The crushing circuit from the now-closed Kidston gold mine is being relocated to Sarsfield. Click for more details...

BHP BILLITON IRON ORE OPS - ASSET DEVELOPMENT PROJECTS - STEEL FABRICATION
New project of Mining - Subcontracts (Mechanical installation) project at Various sites via, Newman, WA 6753. BHP Billiton has increased iron ore production with work culminating in a production capacity of 110 Mtpa to be completed by late 2004. The company is now investigating ways of increasing production over the next five years to meet a projected increased in demand, especially from China. A complete process redesign will be involved with higher throughput levels and environmental and social benefits. Additional expansions of capacity to 145Mtpa are currently the subject of a feasibility study due for completion late 2004 approx. Click for more details...

RAVENSTHORPE NICKEL PROJECT - ELECTRICAL INSTALLATION OF WATER SYSTEM
Mining - Subcontracts (Electrical installation) project for New development. Electrical and instrumentation installation of water systems. Click for more details...

LIDDELL POWER STATION - CONVEYOR BELTS
Currently at the Construction stage In Muswellbrook is a project estimated to be $ 400000. This project Development comprises the replacement of conveyor belts at Liddell Power Station, as and when directed by the Principal for a two (2) year period from the date of the awarding of Macquarie Generation's Contract. The work includes the removal, overhaul and installation of each conveyor's head and tail end belt cleaning systems. Tenderers are to demonstrate in their tender a working knowledge of the requirements of the Specification gained through experience with and knowledge of the plant described or similar plant. Click for more details...

MONTO MINERALS INDUSTRIAL MINERALS PROJECT - FELDSPAR WASH PLANT
Feldspar Wash Plant New project In The North Burnett Regional Council Area. Development comprises the construction of a treatment facility that will comprise a hot acid leach plant and associated equipment. The ore will be shipped from the mine to the feldspar plant at Dakiel Railroad Station where it will be loaded and sent to Gladstone and then be shipped to Brisbane. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - STRUCTURAL/MECHANICAL/PIPING
Structural/Mechanical/Piping New project In The East Pilbara Council Area. Work comprises structural, mechanical and piping work associated with the expansion of Mining Area C iron ore processing facilities. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C/PORT - ELECTRICAL/CONTROLS
Near, Newman, WA 6753 Has Iron Ore Rapid Growth 3 Project - Area C/Port - Electrical/Controls currently at Construction stage. Area C Electrical and Controls. Click for more details...

DAVYHURST GOLD PROJECT - GOLD MILL REFURBISHMENT
Mining - Subcontracts (Electrical installation) New project at 80 Km North west of, Kalgoorlie, WA 6430. This type is Gold Mill Refurbishment with Private ownership. The 1.2 Mtpa mill was purchased from Croseus mining and remains in good condition. Work on the tanks and concrete pillars will be the focus of the work. Click for more details...

BATCHELOR SUBSTATION PROJECT - ELECTRICAL PACKAGE
New project of Mining - Subcontracts (Electrical installation) project at Batchelor Road, Batchelor, NT 0845. Electrical works for the Batchelor 132/22 KV Substation. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - MOUNT WHALEBACK ELECTRICAL WORK PACKAGE 4N15
Mining - Subcontracts (Electrical installation) project at Newman Hub, Newman, WA 6753 of Electrical Work type of New development. Removal of existing 66kv & 11 kv overhead power-line. Construction of a 66 kv substation buried 66 kv cable, to supply the substation and re-establish the 66 kv and 11kv loop. 6.6kv ring will be established to link each of the switch rooms. Large motors will be 6.6 kv. Click for more details...

LAKE VERMONT COAL PROJECT - STRUCTURAL STEEL FOR COAL PREPARATION PLANT
Mining - Subcontracts (Mechanical installation) New project at Approx 15 km north east of, Dysart, QLD 4745. This type is Structural Steel - For Coal Preparation Plant with Private ownership. For a 4 Mtpa plant. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - ELECTRICAL BULK MATERIALS
Worsley Alumina Efficiency/Growth Project - Electrical Bulk Materials is currently at the Tenders & Building stage, valued at about $ 500000 it is For the supply of electrical bulk materials. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - ORIFICE PLATES & ASSEMBLEYS
Orifice Plates/Assemblies - Supply Of project at 15km Southeast of, Collie, WA 6225 in the Mining - Subcontracts (Electrical installation). For the supply of orifice places and assembleys. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - ELECTRICAL FOR WET CONCENTRATOR
A project in the VIC Within Mildura. For the provision of electrical works for the wet concentrator. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - ELECTRICAL FOR WHIMS BUILDING
Electrical - For Whims Building New project In The Mildura Council Area. For the provision of electrical works & instrumentation for the wet high intensity magnetic separators building. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - EXPORT SHIPPING FACILITIES
Mining - Subcontracts (Electrical installation) project for New development. Design & construction of a 168m long jetty, loading platform & berth for vessels with capacities from 125,000cu m (285m long) up to 220,000cu m (315m long) exporting liquefied natural gas (LNG) & 20,000-80,000cu m capacity for exporting liquid petroleum gas (LPG). Contract to include the procurement, fabrication, construciton & commissioning of the structural, mechanical & electrical components of the combined Marine Facilities. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - SHOP PAINTING OF BOTTOM PLATES
Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - Shop Painting Of Bottom Plates is currently at the Construction stage, valued at about $ 2500000 it is For the coating of Condensate Tanks bottom plates underside with epoxy coating 400 microns DFT. Total area to be coasted is approximately 10000 m2. Click for more details...

MORANBAH REGION EXPANSION PROJECT - SMP PACKAGES
A project in the QLD Within Isaac Regional. Structural, mechanical & piping (SMP) services for materials handling (CX002/X004) & coal preparation plant (CPP) (CX003/X005). Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - CAR DUMPER SMP
Cape Lambert Port B (Clb) Development Stage 1 - Car Dumper Smp is currently at the Construction stage, valued at about $ 10000000 it is Structural, mechanical & piping for the screen house & car dumper. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - GRATING & CAST IN ANGLE SUPPLY
Mining - Subcontracts (Electrical installation) project for New development. For the supply of grating & cast in angle. Click for more details...

ROCKLANDS GROUP JOINT VENTURE COPPER PROJECT - PROCESSING PLANT INSTALLATION
Structural/Mechanical/Piping Installation New project In The Cloncurry Shire Council Area. Installation of a fully computerised & automated 3 million tonne per annum (Mtpa) processing plant for copper/gold, cobaltic-pyrite, native copper & magnetite concentrate production. Click for more details...

ERNEST HENRY COPPER-GOLD OPERATIONS - UNDERGROUND EXPANSION (SHUG) SMP CONTRACTOR PANEL
New project of Mining - Subcontracts (Mechanical installation) project at East of, Cloncurry, QLD 4824. Registered contractors experienced in structural, mechanical & pipe installation in hard rock underground mines to be invited over the coming months to tender for parcels of work between 6-9 months duration & up to $5 million in value. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - LIGHTNING PROTECTION
Mining - Subcontracts (Electrical installation) project In The Ashburton Council Area of Lightning Protection type. For the provision of lightning protection. Click for more details...

LEICHHARDT CCGT POWER STATION
Private ownership Mining - Subcontracts (Structural) project In The Mt Isa City Council Area for New development. EPC turnkey contract including engineering, procurement & construction of a 80MW combined cycle gas turbine (CCGT) power station to act as back up to the 240MW Diamantina Power Station currently under construction. To include design & procurement of the dual fuel Rolls Royce Trent 60 WLE gas turbine generator & associated electrical & mechanical equipment, footings, structural & drainage work, assembly & installation of the main generation unit & balance of plant. Associated cabling & switchgear, telecommunications, instrument control & switchyard connections. Commissioning & operational handover. Click for more details...

WALLUMBILLA GAS HUB COMPRESSORS UPGRADE
Compressors project at via, Wallumbilla, QLD 4428 In The Council Area Of Maranoa Regional of Private. Upgrade at the Walumbilla gas hub which connects to APA's Roma-Brisbane & South West Queensland Pipelines. Installation of 3 new compressors & associated services. Click for more details...

ICHTHYS MAIN CIVIL WORKS (CVL3) - GRE/GRVE PIPING INSTALLATION
Mining - Subcontracts (Piping & Hydraulic) project for New development. Contract for installation & spooling of 16km of DN 150mm-900mm glass reinforced vinyl ester (GRVE) & DN 1050mm-1800mm glass-fibre reinforced epoxy (GRE) pipes. Contract to also include lamination of rubber ring jointing at the Ichthys Onshore LNG facilities project. Click for more details...

BHP BILLITON MOOKA CAR REPAIR WORKSHOP
Bhp Billiton Mooka Car Repair Workshop is currently at the Construction stage, valued at about $ 30000000 it is Contract for the construction of a maintenance workshop & warehouse. To include process equipment installation as well as rail & infrastructure components including roads, track, signalling & communications electrical engineering. Water supply. Click for more details...

MINING AREA C (MAC) FUEL FACILITIES EXPANSION
Concreting/Piping/Electrical project at off the Great Northern Hwy via, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Expansion of existing fuel dispensing facilities including for low voltage & power house. Click for more details...

BHP BILLITON PORT HEDLAND INNER HARBOUR SHIPLOADERS - DEMOLITION WORKS & CONVEYORS UPGRADE
Dismantling Shiploaders/Conveyors Upgrade project at Nelson Point, Port Hedland, WA 6721 in the Mining - Subcontracts (Dismantling, Demolition). Upgrade of a 2 conveyors followed by dismantling of a pair of decommissioned shiploaders. Click for more details...

QCLNG OPERATIONS - WELL SITE CONTROLS INSTRUMENTATION & AUTOMATION
A project in the QLD Within Various. For the provision of well site controls, instrumentation & automation services. Click for more details...

ROY HILL IRON ORE PROJECT - GENERAL - MISCELLANEOUS SITE SERVICES
A project in the WA Within Various. For the provision of miscellaneous site services. Click for more details...

ICHTHYS LNG PLANT - ONSHORE MECHANICAL WORKS - MEC 2 - SUPPLY & INSTALLATION OF GROUT
Grout - Supply & Installation New project In The Darwin City Council Area. For the supply & installation of grout. Click for more details...

BHP BILLITON NICKEL WEST MECHANICAL & ELECTRICAL SERVICES
Mining - Subcontracts (Electrical installation) project at Various mines, ., WA 6999 for New. For the provision of a three year maintenance services to cover both mechanical & electrical services across all of BHP Billiton Nickel West's operations in Western Australia. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect