State

Categories

Sub Categories

Click Here to Find Current Projects

List of Mining - Subcontracts Projects


HISMELT EXPANSION PROJECT
Mechanical Installation - Package 2 New project In The Kwinana Council Area. One of three packages. Fabrication and installation. Click for more details...

WOODCUTTERS BASE METALS MINE
Mining - Subcontracts (Mechanical installation) project In The Darwin City Council Area of Private ownership. Overall proposal to include installation of underground loading station & shaft fitout. All electrical services to be carried out by contractor main work to involve 2 x plate feeders, conveyor & grisleys & general power distribution. Click for more details...

JUNDEE-NIMARY GOLD OPERATIONS
Approximately 40 km east southeast of, Wiluna, WA 6646 Has Jundee-Nimary Gold Operations currently at Construction stage. Contract to involve site clearance, general earthworks & associated services such as lighting. Design work completed. A gravel airstrip & apron area are required for new mine site. Click for more details...

QUARRY OPERATIONS
Mining - Subcontracts (Mechanical installation) project at Lot 467 & 453 Stephen St, Orange Grove, WA 6109 for Addition. Structural steelwork & piping required for this contract which mainly involves conveyors (8) & screens. Tender also includes associated earthworks, drainage, general site services & electrical requirements. Existing plant is to be demolished & will be replaced by a 22m high building constructed of concrete panels & colourbond sheeting. A conveyor belt extends from this complex to load-out bins to load vehicles similar to the current facilities. Work scheduled for completion during April 1996. Project has received EPA approval for grinding & milling works. Click for more details...

GRIFFIN OIL & GAS OPERATIONS - GRIFFIN VENTURE
Mining - Subcontracts (Electrical installation) project In The Fremantle Council Area of Floating Production Vessel - Electrical & Instrumentation (Maintenance) type. Main component of contract is to provide instrumentation services for process area refit. Upgrade of some electricals & lighting also anticipated. Click for more details...

BIG BELL GOLD OPERATIONS
30 km northwest of, Cue, WA 6640 Has Big Bell Gold Operations currently at Construction stage. Contract to provide services for the 300m deep shaft. Work includes access ways, piping & electrical requirements & all associated design & fabrication work. Click for more details...

WILUNA - GOLD
Mining - Subcontracts (Electrical installation) project In The Wiluna Council Area of Mine - Biox Plant - Upgrade/Biox Reactors type. Proposal reviewed feasibility of doubling the process capacity of the BIOX plant (to 700,000tpa). Anticipated works include mechanical/structural & electrical services. A construction phase of about 35 weeks is envisaged. The new reactors & associated infrastructure are designed to increase the biox circuit capacity to 35tpd (sulphur). Current throughput stands at 22tpd with design capacity for 26tpd. 2 new 470 cubic reactors expected to be installed. Additional envisaged works include a single 15m CCD thickener & an extra 10,000m/ph blower. Click for more details...

PARKESTON POWER STATION
Private ownership Mining - Subcontracts (Electrical installation) project In The Kalgoorlie-Boulder Council Area for New development. Project to include mechanical/structural, pipework & pumps. Tender also involves some tankage & fire protection services. Click for more details...

EWINGTON 2 COAL OPERATIONS
Crusher Fabrication project at For site 8 km east of, Collie, WA 6225 In The Council Area Of Collie of Private. Contract to mainly involve structural steelwork for supply & delivery of crusher facility for new coal mines. Delivery scheduled for March 1996. Click for more details...

FINUCANE ISLAND - IRON ORE
Operations - Dust Pip - Upgrade project at Site facilities via, Port Hedland, WA 6721 in the Mining - Subcontracts (Mechanical installation). Dust suppression required for crushing & screening plant area as part of current project improvement programme. Tender expected to include sprinklers plus associated equipment & electrical services. Work scheduled for completion 31 July 1996. Click for more details...

NELSON POINT/FINUCANE ISLAND - IRON ORE
Operations - Tunnel Conveyor - Mechanical/Structural Package project at Finucane Island to, Port Hedland, WA 6721 In The Council Area Of Port Hedland of Private. Contract to provide conveyor belt/system under the Pt Hedland harbour. Project designed to cart ore from Nelson Point to Finucane Island stockpiles. Conveyor expected to be 1.8m wide with capacity to move 4,000tph lump ore with full capacity of 10,000tph (ore) envisaged. This conveyor is to link up with the overland system during first half of 1997. Click for more details...

GREENBUSHES TANTALUM OPERATIONS
Mining - Subcontracts (Electrical installation) project In The Manjimup Council Area of Treatment Plant - Upgrade type. Secondary plant wet recovery circuit to be upgraded. Main components to involve mechanical, piping & electrical services. Click for more details...

WOODCUTTERS BASE METALS MINE
Mining - Subcontracts (Mechanical installation) project at 80 km south of, Darwin, NT 0800 for Addition. Contract for supply & installation of grisleys, 2 x plate feeders & one conveyor system. This tender is to include all associated electricals such as general power distribution & lighting. Click for more details...

YABULU NICKEL REFINERY EXTENSION - MHP RECEIVAL/TREATMENT FACILITIES CONTRACT
New project of Mining - Subcontracts (Mechanical installation) project at Refinery site at, Yabulu, QLD 4818. Contract package 4 involves a MHP leach area, ammonical solvent extraction area and a stripping stills and gas absorption area. This package involves construction on top of concrete, structural, mechanical, piping, electrical, instrumentation and controls for what are generally hydrometallurgical facilities. The contract involves both greenfield and brownfield work. The MHP Receival & Treatment Facilities include container storage and unloading and primary and secondary leaching facilities. The intermediate product (MHP) from Ravensthorpe will be received at Yabulu where it will be stockpiled in a weatherproof environment prior to feeding into a two stage leaching process. New material handling equipment will be constructed to process the additional MHP. Extension of the existing utilities plant will be required to provide additional power, steam and process gases. This includes a package plant for nitrogen generation by the pressure swing absorption process. Anhydrous ammonia will be imported to supplement ammonia currently produced on site. Click for more details...

JAGUAR BASE METALS PROJECT - PROCESSING PLANT/MECHANICAL WORKS CONTRACT
A project in the WA Within Leonora. A centrally located processing facility to be located on the granted Teutonic Bore mining lease, 4 km to the north of the Jaguar deposit. A 350,000 tpa plant to treat ore by crushing, grinding and flotation. Copper and zinc concentrate production is expected to commence in July 2007, increasing to 10,000 tonnes of copper, 34,000 tonnes if zinc and 1 million ounces of silver in concentrate per annum over a six year period. Click for more details...

KALGOORLIE NICKEL SMELTER
Mining - Subcontracts (Mechanical installation) project at 16 km southeast of, Kalgoorlie, WA 6430 for Addition. Structural/mechanical/piping works to be carried out on M1 & M2 areas for new 800,000tpa acid plant to be constructed near existing Kalgoorlie Nickel Smelter. Facility to use a 3-staged acid conversion process. Overall project scheduled for completion during latter half of 1996. Click for more details...

PARKESTON POWER STATION
Private ownership Mining - Subcontracts (Electrical installation) project In The Kalgoorlie-Boulder Council Area for New development. Contract to involve erection of two gas turbine generator sets. The new 75 megawatt power station is to utilise 2 x LM6000 aero engine derivative gas turbine units. First engine scheduled for operation in January 1996 with the second unit due mid 1996. Click for more details...

BARNEY POINT COAL TERMINAL UPGRADING - STAGE 2
Mining - Subcontracts (Mechanical installation) project In The Gladstone Regional Council Area of Private ownership. To include both mechanical and electrical installation. Click for more details...

PREMIER COAL OPERATIONS - COAL CHAR PILOT PLANT
Mining - Subcontracts (Mechanical installation) project at Premier mine site 15 km east of, Collie, WA 6225 of Equipment - Supply/Install type of New development. Likely to be one package, supply/install. Click for more details...

MILLMERRAN POWER STATION
Private ownership Mining - Subcontracts (Electrical installation) project In The Toowoomba Regional Council Area for New development. Above ground mine infrastructure to include electrical, mechanical, sewerage & water treatment systems, storage & amenities. Contract period 14 weeks approx. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION
A project in the NT Within East Arnhem Shire. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of separate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

KOGAN CREEK POWER PROJECT - MECHANICAL ERECTION CONTRACT
Mining - Subcontracts (Mechanical installation) project for New development. Mechanical erection of 1 Siemens Steam Turbine, 1 Siemens Generator THDF 125/67, Condenser, Tanks, Pumps, Compressors, Assembly of workshop and Store Click for more details...

KOGAN CREEK POWER PROJECT - ELECTRICAL INSTALLATION/WORKSHOP
South of, Brigalow, QLD 4412 Has Kogan Creek Power Project - Electrical Installation/Workshop currently at Construction stage. Erection of 1 Siemens Steam Turbine, 1 Siemens Generator THDF 125/67, Condenser, Tanks, Pumps, Compressors, Assembly of Workshop and Store, Electrical and I & C installation Click for more details...

RENISON BELL TIN OPERATIONS
Mining - Subcontracts (Electrical installation) project In The Burnie Council Area of Electrical Installation Packages - Various type. Various packages associated with mine and processing facilities refurbishments. Click for more details...

DARWIN EAST ARM WHARF - FIRE PROTECTION
Mining - Subcontracts (Electrical installation) New project at East Arm Wharf, Darwin, NT 0800. This type is Fire Protection-Design/Supply/Install/Commission Fire Fighting Equipment with Private ownership. Design, supply, install and commissioning of a fully operational wharf-based fire protection system for bulk liquid vessel loading and unloading operations. Click for more details...

CURRAGH NORTH COAL PROJECT - ELECTRICAL PACKAGES FOR SHUTDOWN
Mining - Subcontracts (Electrical installation) project In The Central Highlands Regional Council Area of Private ownership. The shutdown is planned for October 2005. Click for more details...

SARAJI COAL MINE THICKNER PLANT CONVERSION
Mining - Subcontracts (Electrical installation) project In The Isaac Regional Council Area of Private ownership. A 35m thickner plant was installed in 2004 and will be upgraded to improve efficiency of tailings disposal. Work comprises the design, removal of existing equipment, civil construction, installation of the high rate thickner. Associated works involve piping, pumps, structural and mechanical works. Electrical installation and recommissioning are also part of the work. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C/PORT - ELECTRICAL/CONTROLS
Near, Newman, WA 6753 Has Iron Ore Rapid Growth 3 Project - Area C/Port - Electrical/Controls currently at Construction stage. Area C Electrical and Controls. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - SITE WIDE POWER SYSTEMS UPGRADE
Private ownership Mining - Subcontracts (Electrical installation) project In The Mackay Regional Council Area for New development. Site wide power systems upgrade. Most of the work will be electrical installation. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - FENDERS
Mining - Subcontracts (Mechanical installation) project for New development. Supply of Fenders. Fentek ship fenders with frontal frames. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - VSD
New project of Mining - Subcontracts (Electrical installation) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530. Manufacture VSD's. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - MINOR CIVIL/MECHANICAL/STRUCTURAL WORKS
Private ownership Mining - Subcontracts (Mechanical installation) project In The Mackay Regional Council Area for New development. Work comprises the contractor to do minor civil, mechanical and structural works on site when needed. Click for more details...

BATCHELOR SUBSTATION PROJECT - ELECTRICAL PACKAGE
New project of Mining - Subcontracts (Electrical installation) project at Batchelor Road, Batchelor, NT 0845. Electrical works for the Batchelor 132/22 KV Substation. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - MOUNT WHALEBACK ELECTRICAL WORK PACKAGE 4N15
Mining - Subcontracts (Electrical installation) project at Newman Hub, Newman, WA 6753 of Electrical Work type of New development. Removal of existing 66kv & 11 kv overhead power-line. Construction of a 66 kv substation buried 66 kv cable, to supply the substation and re-establish the 66 kv and 11kv loop. 6.6kv ring will be established to link each of the switch rooms. Large motors will be 6.6 kv. Click for more details...

CHINCHILLA COAL SEAM GAS & UNDERGROUND COAL GASIFICATION PROJECT - STAGE 1 - STRUCTURAL STEEL FOR LABORATORY
Mining - Subcontracts (Mechanical installation) project In The Western Downs Regional Council Area of Private ownership. For the mine site laboratory. Click for more details...

RIDGEWAY DEEPS UNDERGROUND GOLD MINE EXTENSION PROJECT - MECHANICAL INSTALLATION FOR CONCENTRATOR UPGRADE
Mining - Subcontracts (Mechanical installation) project at 25 km south west of, Orange, NSW 2800 of Mechanical - Install For Concentrator Upgrade type of New development. Mechanical installation for the concentrator upgrade. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - STRUCTURAL STEEL & MECHANICAL FOR WHIMS BUILDING
New project of Mining - Subcontracts (Mechanical installation) project at 28 km east of, Ouyen, VIC 3490. For the provision of structural steel & mechanical works for the wet high intensity magnetic separator building. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - ELECTRICAL FOR WET CONCENTRATOR
A project in the VIC Within Mildura. For the provision of electrical works for the wet concentrator. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - EXPORT SHIPPING FACILITIES
Mining - Subcontracts (Structural) project for New development. Design & construction of a 168m long jetty, loading platform & berth for vessels with capacities from 125,000cu m (285m long) up to 220,000cu m (315m long) exporting liquefied natural gas (LNG) & 20,000-80,000cu m capacity for exporting liquid petroleum gas (LPG). Contract to include the procurement, fabrication, construciton & commissioning of the structural, mechanical & electrical components of the combined Marine Facilities. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - E & I CONTRACT
Electrical & Instrumentation project at Port Walcott 40km east of, Karratha, WA 6714 In The Council Area Of City Of Karratha of Private. Supply & installation of the electrical & instrumentation package. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - MANHOLE STEEL COVERS (GATIC)
Mining - Subcontracts (Electrical installation) project at Both on & off, Barrow Island, WA 6712 of Manhole Steel Covers type of New development. For the provision of various types, classes & sizes of steel manhole metal covers & frames. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE - OSBL ELECTRICAL & INSTRUMENTATION INSTALLATION
Vicinity of, Onslow, WA 6710 Has Wheatstone Development Project - Onshore - Osbl Electrical & Instrumentation Installation currently at Construction stage. For the provision of OSBL electrical and instrumentation instllation. Click for more details...

PILBARA ELECTRICAL INFRASTRUCTURE REPLACEMENT PROJECT
Mining - Subcontracts (Electrical installation) project at Tom Price, Paraburdoo & Channar Mines via, Dampier, WA 6713 for New. Major upgrades to electrical & control systems infrastructure at Rio Tinto Pilbara mines including Tom Price, Paraburdoo & Channar. Click for more details...

PILBARA IRON ORE EXPANSION - ELECTRICAL & INSTRUMENTATION FRAMEWORK AGREEMENT
Mining - Subcontracts (Electrical installation) project for New development. Preferred electrical & instrumentation (E & I) contractor status for 5 years in the program to expand capacity to 353 million tonnes per annum (Mtpa). To include early contractor involvement. Click for more details...

DIAMANTINA CCGT POWER STATION - ELECTRICAL & INSTRUMENTATION
A project in the QLD Within Mt Isa City. A contract involving installation, commissioning, service & maintenance of electrical instrumentation along with heating,ventilation & air conditioning (HVAC), fire protection & occupant warning systems works. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - 6 + 1 UPSTREAM PIPING SUPPLY
A project in the QLD Within Western Downs Regional. Supply of all piping for the Ruby central processing plant including fabrication, welding, NDT, hydro testing, painting & delivery to site. Associated mechanical, structural & piping services. Click for more details...

BHP BILLITON MOOKA CAR REPAIR WORKSHOP
Bhp Billiton Mooka Car Repair Workshop is currently at the Construction stage, valued at about $ 30000000 it is Contract for the construction of a maintenance workshop & warehouse. To include process equipment installation as well as rail & infrastructure components including roads, track, signalling & communications electrical engineering. Water supply. Click for more details...

HAY POINT COAL TERMINAL EXPANSION - HPX3 PROJECT - ONSHORE TERMINAL UPGRADE ELECTRICAL & MECHANICAL CONTRACT & EXTENSION
Electrical/Mechanical - Contract New & Extn project at Offshore & 1175, 1395 Hay Point Rd, Hay Point, QLD 4740 in the Mining - Subcontracts (Electrical installation). For the provision of new & extended electrical & mechanical work, onshore & offshore. Click for more details...

HAY POINT COAL TERMINAL EXPANSION - HPX3 PROJECT - ONSHORE TERMINAL UPGRADE ELECTRICAL & MECHANICAL CONTRACT & EXTENSION
Electrical/Mechanical - Contract New & Extn project at Offshore & 1175, 1395 Hay Point Rd, Hay Point, QLD 4740 in the Mining - Subcontracts (Mechanical installation). For the provision of new & extended electrical & mechanical work, onshore & offshore. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE & INFRASTRUCTURE - PINDAN - ELECTRICAL WORKS
Mining - Subcontracts (Electrical installation) Renovations, Refurbishments etc. project at Barrarda Estate, Onslow, WA 6710. This type is Electrical Works with Private ownership. For the installation of mains cables from street to house, connection of AC & HWS for 50 modular houses. Includes excavation & backfill. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect