AUGUSTA/COSTERFIELD PROCESSING FACILITY
Currently at the Construction stage In Greater Bendigo is a project estimated to be $ 10000000. This project Development comprises the modification and and refurbishment of the existing Costerfield CIL plant and the construction of a new crushing/processing plant. Work comprises earthworks; contract project management, layout and design drafting for various sections of the plant; sourcing, inspecting and acquiring various items of second hand equipment; design of main and distribution switchboards, current limiting device and main switch for installation adjacent to transformer substation reserve; refurbishment of float cells, Knelson concentrators and process circuit pumps. Click for more details...

GRANTS PATCH - GOLD
Mine - Treatment Plant - Relocation Renovations, Refurbishments etc. project In The Katanning Council Area. Recent purchase included a 250,000tpa carbon-in-pulp plant. Facility to be moved to Company's proposed mine 36 km east Katanning. Small Victorian company (undisclosed) to carry out plant dismantling, re-assembly & modifications. Remainder of works expected to utilise inhouse resources or subcontractors on an ad hoc basis. Click for more details...

NELSON POINT - IRON ORE
Nelson Point - Iron Ore is currently at the Construction stage, valued at about $ 250000 it is Works for the automation of dumper No: 1 to include programme logic controls, lighting, ladder racks, cable, limit switches & positioners. Additional definition to be attached to the scope of works. Click for more details...

YANDI - IRON ORE
Addition project of Mining - Subcontracts (Mechanical installation) project at 90 km northwest of, Newman, WA 6753. Stacker, conveyors, structural steelwork & associated services required for new mine expansion. Overall project development still subject to obtaining necessary approvals. Click for more details...

GRIFFIN OIL & GAS OPERATIONS - GRIFFIN VENTURE
Mining - Subcontracts (Electrical installation) project In The Fremantle Council Area of Floating Production Vessel - Electrical & Instrumentation (Maintenance) type. Main component of contract is to provide instrumentation services for process area refit. Upgrade of some electricals & lighting also anticipated. Click for more details...

BIG BELL GOLD OPERATIONS
30 km northwest of, Cue, WA 6640 Has Big Bell Gold Operations currently at Construction stage. Contract to provide services for the 300m deep shaft. Work includes access ways, piping & electrical requirements & all associated design & fabrication work. Click for more details...

EWINGTON 2 COAL OPERATIONS
Mining - Subcontracts (Mechanical installation) project for Addition development. Fabrication & installation of one run-of-mine (ROM) hopper. Contract to mainly involve steelwork. Work to commence early April 1996 on this contract with an estimated 10 week duration. Click for more details...

EWINGTON 2 COAL OPERATIONS
Currently at the Construction stage In Collie is a project estimated to be $ 1000000. This project Installation of 8 conveyors of various sizes required. Associated components have been ordered. Click for more details...

YABULU NICKEL REFINERY EXTENSION - MHP RECEIVAL/TREATMENT FACILITIES CONTRACT
New project of Mining - Subcontracts (Electrical installation) project at Refinery site at, Yabulu, QLD 4818. Contract package 4 involves a MHP leach area, ammonical solvent extraction area and a stripping stills and gas absorption area. This package involves construction on top of concrete, structural, mechanical, piping, electrical, instrumentation and controls for what are generally hydrometallurgical facilities. The contract involves both greenfield and brownfield work. The MHP Receival & Treatment Facilities include container storage and unloading and primary and secondary leaching facilities. The intermediate product (MHP) from Ravensthorpe will be received at Yabulu where it will be stockpiled in a weatherproof environment prior to feeding into a two stage leaching process. New material handling equipment will be constructed to process the additional MHP. Extension of the existing utilities plant will be required to provide additional power, steam and process gases. This includes a package plant for nitrogen generation by the pressure swing absorption process. Anhydrous ammonia will be imported to supplement ammonia currently produced on site. Click for more details...

KANOWNA BELLE GOLD OPERATIONS
Addition project of Mining - Subcontracts (Electrical installation) project at 16 km northeast of, Kalgoorlie, WA 6430. Stage 3A is to involve a portal development & a decline from below the open pit floor (approximately 220m from surface). Mining to a depth of 360m will involve vertical haulage shaft & long-hole open stoping mining methods. The resource below 200m has been divided into two main categories. From 200m to 360m a total of 3.6mt grading 7.2gpt gold is estimated. Between 360m and 800m an inferred resource of 3.85mt at 5.5gpt gold has been estimated. Ore production is due to start in 1998 for a mine life of approximately 16 years at a rate of 1mtpa-1.25mtpa. Drilling to test mineralisation from 650m to 1,000m demonstrated encouraging widths and grades with best results including 27.5m (from 1,008m) grading 10.1gpt gold. Mining & haulage expected to utilise inhouse resources. Ore will be processed through the Joint Venture's refractory plant at Kanowna Belle. The decline is expected to extend to 760m to allow additional exploration & ore definition work to be conducted. This contract will include diamond drilling (28,000m), raise boring (1,400m) & decline (9,000m). Associated electricals to also form part of this tender. Click for more details...

BARNEY POINT COAL TERMINAL UPGRADING - STAGE 2
Mining - Subcontracts (Electrical installation) project In The Gladstone Regional Council Area of Private ownership. To include both mechanical and electrical installation. Click for more details...

BARNEY POINT COAL TERMINAL UPGRADING - STAGE 2
Mining - Subcontracts (Mechanical installation) project In The Gladstone Regional Council Area of Private ownership. To include both mechanical and electrical installation. Click for more details...

PREMIER COAL OPERATIONS - COAL CHAR PILOT PLANT
Mining - Subcontracts (Mechanical installation) project at Premier mine site 15 km east of, Collie, WA 6225 of Equipment - Supply/Install type of New development. Likely to be one package, supply/install. Click for more details...

CHEDDAR ST NURSING HOME
Currently at the Construction stage In Kogarah is a project estimated to be $ 900000. This project Demolition of existing dwellings at 16 & 18 Cheddar St. Construction of a new office building. Click for more details...

MONTO MINERALS INDUSTRIAL MINERALS PROJECT - WET SEPERATION PLANT
Mining - Subcontracts (Electrical installation) project for New development. Wet Seperation Plant that will constructed next to the existing pilot plant. The plant will use non chemical seperation using gravity and magnetics. Plant is expected to process 142,000 tonnes in 2007 and 232,000 tonnes in 2008. Click for more details...

MILLMERRAN POWER STATION
Private ownership Mining - Subcontracts (Electrical installation) project In The Toowoomba Regional Council Area for New development. Above ground mine infrastructure to include electrical, mechanical, sewerage & water treatment systems, storage & amenities. Contract period 14 weeks approx. Click for more details...

KOGAN CREEK POWER STATION - FAN - SUPPLY
Mining - Subcontracts (Air-conditioning installation) project at Via, Brigalow, QLD 4412 for New. Sealing Air Fan Capacity: 600m3/min., Head: 6.67kPa, Quantity: 2 sets. Click for more details...

KOGAN CREEK POWER STATION - FAN - SUPPLY
Mining - Subcontracts (Mechanical installation) project at Via, Brigalow, QLD 4412 for New. Sealing Air Fan Capacity: 600m3/min., Head: 6.67kPa, Quantity: 2 sets. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - ELECTRICAL/INSTRUMENTATION
Mining - Subcontracts (Electrical installation) New project at Gove Peninsula North West Arneham Land via, Gove, NT 0880. This type is Electrical/Instrumentation with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

RAVENSTHORPE NICKEL PROJECT - ELECTRICAL INSTALLATION OF WATER SYSTEM
Mining - Subcontracts (Electrical installation) project for New development. Electrical and instrumentation installation of water systems. Click for more details...

LIDDELL POWER STATION - BOILER MAINTENANCE CONTRACT
Liddell Power Station - Boiler Maintenance Contract is currently at the Construction stage, valued at about $ 200000 it is Work comprises the emergency repair of the four 500 MW boilers. Click for more details...

CURRAGH NORTH COAL PROJECT - ELECTRICAL PACKAGES FOR SHUTDOWN
Mining - Subcontracts (Electrical installation) project In The Central Highlands Regional Council Area of Private ownership. The shutdown is planned for October 2005. Click for more details...

NEWLANDS COAL OPERATIONS - SUPPLY OF STRUCTURAL STEEL PACKAGE NO2 FOR WASHPLANT
Mining - Subcontracts (Mechanical installation) project at 13 km west of, Glenden, QLD 4743 of Structural Steel Package (No2) - Supply For Washplant type of New development. Two Fine Coal buildings. Click for more details...

SARAJI COAL MINE THICKNER PLANT CONVERSION
Mining - Subcontracts (Electrical installation) project In The Isaac Regional Council Area of Private ownership. A 35m thickner plant was installed in 2004 and will be upgraded to improve efficiency of tailings disposal. Work comprises the design, removal of existing equipment, civil construction, installation of the high rate thickner. Associated works involve piping, pumps, structural and mechanical works. Electrical installation and recommissioning are also part of the work. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - STOCKYARD MACHINES
Mining - Subcontracts (Mechanical installation) project In The East Pilbara Council Area of Stockyard Machines - Upgrade type. Area C Upgrade of Stockyard Machines. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C/RAIL - COMMUNICATIONS
Private ownership Mining - Subcontracts (Electrical installation) project In The East Pilbara Council Area for New development. Communications at Weeli, Poonda, Yeerabiddy and Area C Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT - ELECTRICAL
Finucane Island/Nelson Point Electrical New project In The Port Hedland Council Area. Finucane Island and Nelson Point Electrical. Click for more details...

ALCOA REFINERIES PINJARRA RESIDUE PROJECT - ELECTRICAL INSTALL FOR CARBONATION PLANT
Private ownership Mining - Subcontracts (Electrical installation) project In The Murray Council Area for New development. For the provision of electrical installation services for the carbonation plant. Click for more details...

KESTREL COAL UNDERGROUND EXTENSION PROJECT - COAL HANDLING & PREPARATION PLANT UPGRADE
Mining - Subcontracts (Structural) project for Addition development. Upgrade to existing coal wash plant to increase production from 1000t/h to 1400t/h. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - NEWMAN HUB
Newman Hub project at Newman Hub, Newman, WA 6753 in the Mining - Subcontracts (Dismantling, Demolition). The RGP4 modifications include the final tie-ins that convert the existing Newman Operations from a production plant producing secondary crushed ore (with a nominal top size of -100mm) to a plant producing shipping quality lump and fines products. The main features of the new tie-in, starting at TS2 are: A new transfer tower, 41SE010, built immediately to the NE of the existing TS2, in line with conveyor M110. This tower is structurally linked to TS2. The tail end of the existing conveyor M110 is removed and replace by a new conveyor. 41CV010, which runs in the opposite direction and discharges ore to a new transfer conveyor, 41CV020, the tail of which is in the new transfer tower 41SE010. Connecting to the existing Newman High Grade (NHG) discharge in TS2 (ore from #2 Plant and Bene Plant product). Construction of a new single rotary cell train car dumping facility, a new crushing and screening plant to include scalping with middlings recirculation to produce sized lump and fines product. Construction of a new blending stockyard 5 x 210kt lump and fines, live and dead including stacking and reclaim machines, to produce a direct-shippable blended lump and fines product. Construction of sampling facilities for reconciliation of production from the various ore sources (NHB and SOB sites) and as-stacked blend control on the stockpiles. Construction of a new drive through train loading (TLO) facility with separate lump and fines sections. Modifications and additional track at the entrance of Newman Hub rail loop and new loco services facility near the existing Hub workshops. Modifications and additional tracks and realingments in the vicinity of the existing OB29 train loading facility for connections to new car dumper and train loading facility. These works include the additional SOBs train by pass line. Deconstruction of PB29 conveyors M301, M309, M311 transfer station TS3, part deconstruction M308 and the removal of the entire OB29 train Load-out facility. The deconstruction works also include removal of sections of existing rail line made redundant by the Newman Hub works. Decommissioning of the existing train load-out stackers No 1 & 2, stacker conveyors M110 and M6 and the existing train loading tunnels (demolition not included in the RGP4 scope). Modifications and additions to the existing water supply and reticulation system. Design Capacity is 31Mtpa. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - MOUNT WHALEBACK ELECTRICAL WORK PACKAGE 4N15
Mining - Subcontracts (Electrical installation) project at Newman Hub, Newman, WA 6753 of Electrical Work type of New development. Removal of existing 66kv & 11 kv overhead power-line. Construction of a 66 kv substation buried 66 kv cable, to supply the substation and re-establish the 66 kv and 11kv loop. 6.6kv ring will be established to link each of the switch rooms. Large motors will be 6.6 kv. Click for more details...

KING ISLAND SCHEELITE PROJECT - ELECTRICAL FOR PROCESSING FACILITY
Mining - Subcontracts (Electrical installation) New project at Near, Grassy, TAS 7256. This type is Electrical - For Processing Facility with Private ownership. For the provision of electrical installation for the processing facility. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - ORIFICE PLATES & ASSEMBLEYS
Orifice Plates/Assemblies - Supply Of project at 15km Southeast of, Collie, WA 6225 in the Mining - Subcontracts (Electrical installation). For the supply of orifice places and assembleys. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - PF CORRECTION EQUIPMENT
Mining - Subcontracts (Electrical installation) project In The Mildura Council Area of Pf Correction Equipment type. For the provision of power factor correction equipment. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - EXPORT SHIPPING FACILITIES
Mining - Subcontracts (Mechanical installation) project for New development. Design & construction of a 168m long jetty, loading platform & berth for vessels with capacities from 125,000cu m (285m long) up to 220,000cu m (315m long) exporting liquefied natural gas (LNG) & 20,000-80,000cu m capacity for exporting liquid petroleum gas (LPG). Contract to include the procurement, fabrication, construciton & commissioning of the structural, mechanical & electrical components of the combined Marine Facilities. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - EXPORT SHIPPING FACILITIES
Mining - Subcontracts (Structural) project for New development. Design & construction of a 168m long jetty, loading platform & berth for vessels with capacities from 125,000cu m (285m long) up to 220,000cu m (315m long) exporting liquefied natural gas (LNG) & 20,000-80,000cu m capacity for exporting liquid petroleum gas (LPG). Contract to include the procurement, fabrication, construciton & commissioning of the structural, mechanical & electrical components of the combined Marine Facilities. Click for more details...

MORANBAH REGION EXPANSION PROJECT - SMP PACKAGES
A project in the QLD Within Isaac Regional. Structural, mechanical & piping (SMP) services for materials handling (CX002/X004) & coal preparation plant (CPP) (CX003/X005). Click for more details...

ARGYLE DIAMOND OPERATIONS UNDERGROUND EXPANSION - CRUSHERS, CONVEYORS & DEWATERING
Mining - Subcontracts (Piping & Hydraulic) New project at 110km south-southwest of, Kununurra, WA 6743. This type is Crushers/Conveyors/Dewatering Pump Stations with Private ownership. Supply of 2 underground crushers. 1.2km of conveyors. Dewatering pump stations. Associated piping, electrical, instrumentation & control equipment. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - CAR DUMPER SMP
Cape Lambert Port B (Clb) Development Stage 1 - Car Dumper Smp is currently at the Construction stage, valued at about $ 10000000 it is Structural, mechanical & piping for the screen house & car dumper. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - MINOR PRECAST CONCRETE WORKS
A project in the WA Within Ashburton. For the provision & installation of minor precast concrete works (including concrete, steel reinforcing, embedded materials, & anchor bolts where necessary). Click for more details...

PILBARA IRON ORE EXPANSION - SMP FRAMEWORK AGREEMENT
Mining - Subcontracts (Piping & Hydraulic) project at via, Karratha, WA 6714 for New. Preferred structural, mechanical & piping (SMP) contractor status for 5 years in the program to expand capacity to 353 million tonnes per annum (Mtpa). To include early contractor involvement. Click for more details...

ERNEST HENRY COPPER-GOLD OPERATIONS - UNDERGROUND EXPANSION (SHUG) SMP CONTRACTOR PANEL
New project of Mining - Subcontracts (Structural) project at East of, Cloncurry, QLD 4824. Registered contractors experienced in structural, mechanical & pipe installation in hard rock underground mines to be invited over the coming months to tender for parcels of work between 6-9 months duration & up to $5 million in value. Click for more details...

GREATER GORGON GAS PROJECT - MECHANICAL ELECTRICAL & INSTRUMENTATION - CHEMICAL CLEANING SUBCONTRACT
Mining - Subcontracts (Mechanical installation) project at On, Barrow Island, WA 6712 for New. For the provision of the chemical cleaning subcontract. Click for more details...

MARANDOO IRON OPERATIONS PHASE 2 SMP CONTRACT
Structural/Mechanical/Piping Contract New project In The Ashburton Council Area. Structural, mechanical & piping contract as part of a project to increase Rio Tinto's Pilbara operational capacity to 353 million tonnes per annum (Mtpa). Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - 6 + 1 UPSTREAM PIPING SUPPLY
A project in the QLD Within Western Downs Regional. Supply of all piping for the Ruby central processing plant including fabrication, welding, NDT, hydro testing, painting & delivery to site. Associated mechanical, structural & piping services. Click for more details...

MINING AREA C (MAC) FUEL FACILITIES EXPANSION
Concreting/Piping/Electrical project at off the Great Northern Hwy via, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Expansion of existing fuel dispensing facilities including for low voltage & power house. Click for more details...

APLNG LNG PLANT - COATING CONSULTANCY
Mining - Subcontracts (Piping & Hydraulic) project for New development. For the provision of consultancy services on coatings. Click for more details...

QCLNG OPERATIONS - WELL SITE CONTROLS INSTRUMENTATION & AUTOMATION
A project in the QLD Within Various. For the provision of well site controls, instrumentation & automation services. Click for more details...

GREATER GORGON GAS PROJECT - MECHANICAL ELECTRICAL & INSTRUMENTATION - DESIGN OF TEMPORARY EQUIPMENT
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Mechanical Electrical & Instrumentation - Design Of Temporary Equipment currently at Tenders & Building stage. For the provision of services for the design & detailing (fabrication shop drawings) for miscellaneous non permanent structual equipment required during the construction phase. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE & INFRASTRUCTURE - PINDAN - HYDRAULIC WORKS
Mining - Subcontracts (Piping & Hydraulic) project for New development. For the installation of hydraulic services from verge to housing connection points on 50 modular houses. Click for more details...