List of Mining - Subcontracts Projects


AUGUSTA/COSTERFIELD PROCESSING FACILITY
Currently at the Construction stage In Greater Bendigo is a project estimated to be $ 10000000. This project Development comprises the modification and and refurbishment of the existing Costerfield CIL plant and the construction of a new crushing/processing plant. Work comprises earthworks; contract project management, layout and design drafting for various sections of the plant; sourcing, inspecting and acquiring various items of second hand equipment; design of main and distribution switchboards, current limiting device and main switch for installation adjacent to transformer substation reserve; refurbishment of float cells, Knelson concentrators and process circuit pumps. Click for more details...

MOURA COAL OPERATIONS
New project of Mining - Subcontracts (Electrical installation) project at Dawson Highway, Moura, QLD 4718. Moura Coal Mining is located 1hr 40m inland from Gladstone and Rockhampton. Moura has a township of some 2,200 people. The mine currently produces 5.5mt of clean coal per annum with an increase targeted. All services are currently contractor provided. Click for more details...

NIMARY - GOLD
Mine - Treatment Plant - Relocation Addition project In The Wiluna Council Area. Second hand Labouchere plant purchased from Dominion Mining. Contract to involve dismantling the carbon-in-pulp plant & transporting it from site 180 km north of Meekatharra to new mine 40 km northeast of Wiluna. Plant to then be reassembled & some modifications to be undertaken prior to recommissioning. The 500,000tpa carbon-in-pulp/carbon-in-leach plant to be expanded to 650,000tpa. Additional requirements include tankage, structural steel, mechanical & piping works. Refurbishment of existing facilities & installation of new equipment also included in this tender. Work scheduled for completion 31 October 1995. Click for more details...

LEINSTER - NICKEL/GOLD
Mine - Electrical Package - Accommodation Village project at Site operations via, Leinster, WA 6437 In The Council Area Of Leonora of Private. Electrical services required for 186 new rooms in this self-contained complex. Work expected to include general power distribution, lighting, switchgear & associated equipment. Click for more details...

GRIFFIN OIL & GAS OPERATIONS - GRIFFIN VENTURE
Mining - Subcontracts (Electrical installation) project In The Fremantle Council Area of Floating Production Vessel - Electrical & Instrumentation (Maintenance) type. Main component of contract is to provide instrumentation services for process area refit. Upgrade of some electricals & lighting also anticipated. Click for more details...

QUARRY OPERATIONS
Private ownership Mining - Subcontracts (Mechanical installation) project In The Gosnells Council Area for Addition development. Structural steelwork required for new screening facility. Construction of 2 hoppers to be included in tender. Click for more details...

YANDI - IRON ORE
Mining - Subcontracts (Mechanical installation) project for Addition development. Supply only contract to provide approximately 250t of steel for the new stacker & a similar amount of steelwork for the new feed conveyor. Pricing exercise & design work completed. Click for more details...

EWINGTON 2 COAL OPERATIONS
Mining - Subcontracts (Mechanical installation) project for Addition development. Fabrication & installation of one run-of-mine (ROM) hopper. Contract to mainly involve steelwork. Work to commence early April 1996 on this contract with an estimated 10 week duration. Click for more details...

EWINGTON 2 COAL OPERATIONS
Currently at the Construction stage In Collie is a project estimated to be $ 1000000. This project Installation of 8 conveyors of various sizes required. Associated components have been ordered. Click for more details...

YABULU NICKEL REFINERY EXTENSION - MHP RECEIVAL/TREATMENT FACILITIES CONTRACT
New project of Mining - Subcontracts (Mechanical installation) project at Refinery site at, Yabulu, QLD 4818. Contract package 4 involves a MHP leach area, ammonical solvent extraction area and a stripping stills and gas absorption area. This package involves construction on top of concrete, structural, mechanical, piping, electrical, instrumentation and controls for what are generally hydrometallurgical facilities. The contract involves both greenfield and brownfield work. The MHP Receival & Treatment Facilities include container storage and unloading and primary and secondary leaching facilities. The intermediate product (MHP) from Ravensthorpe will be received at Yabulu where it will be stockpiled in a weatherproof environment prior to feeding into a two stage leaching process. New material handling equipment will be constructed to process the additional MHP. Extension of the existing utilities plant will be required to provide additional power, steam and process gases. This includes a package plant for nitrogen generation by the pressure swing absorption process. Anhydrous ammonia will be imported to supplement ammonia currently produced on site. Click for more details...

KALGOORLIE NICKEL SMELTER
Mining - Subcontracts (Mechanical installation) project for Addition development. Work expected to involve a 2.4m diameter stainless steel duct & associated services. This new plant is designed to reduce sulphur dioxide emissions. Click for more details...

PLUTONIC GOLD MINE
Currently at the Construction stage In Meekatharra is a project estimated to be $ 20000000. This project This 20 megawatt gas-fired power station is a complete turnkey contract. Project will involve a 20 km spur line, gas metering & construction of a new power station. Associated civils & electrical services are included in contract. Click for more details...

BARNEY POINT COAL TERMINAL UPGRADING - STAGE 2
Mining - Subcontracts (Mechanical installation) project In The Gladstone Regional Council Area of Private ownership. To include both mechanical and electrical installation. Click for more details...

NEW BENDIGO GOLD PROJECT - KANGAROO FLAT MINE - RESOURCE
Mining - Subcontracts (Electrical installation) New project at via, Bendigo, VIC 3550. This type is Operating Mine with Private ownership. The plant is currently treating low-grade ore which was stockpiled during mining operations in 2006/2007. The first ore parcel from Gill reef is planned to be processed in late June, with trial gold production ramping up during the September 2008 quarter. Click for more details...

GRANNY SMITH GOLD OPERATIONS
Structural/Mechanical Package - Tailings Retreatment project at 20 km southeast of, Laverton, WA 6440 In The Council Area Of Laverton of Private. Supply & erect pumps, pipework, structural & mechanical packages for new retreatment facility. Tender expected to include mill installation & associated electrical services. Overall project to process carbon-in-pulp tailings through a retreatment circuit consisting of a cyclone desliming circuit. Slime overflow to go to tailings, whilst the underflow will go over a series of gravity concentrators. Resulting concentrate to then be leached (4 hours). Plant throughput of about 550tph of ore to produce 12t-15t of finer product is envisaged. Click for more details...

MILLMERRAN POWER STATION
Private ownership Mining - Subcontracts (Electrical installation) project In The Toowoomba Regional Council Area for New development. Above ground mine infrastructure to include electrical, mechanical, sewerage & water treatment systems, storage & amenities. Contract period 14 weeks approx. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION
A project in the NT Within East Arnhem Shire. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of separate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

KOGAN CREEK POWER PROJECT - ELECTRICAL INSTALLATION/WORKSHOP
South of, Brigalow, QLD 4412 Has Kogan Creek Power Project - Electrical Installation/Workshop currently at Construction stage. Erection of 1 Siemens Steam Turbine, 1 Siemens Generator THDF 125/67, Condenser, Tanks, Pumps, Compressors, Assembly of Workshop and Store, Electrical and I & C installation Click for more details...

KOGAN CREEK POWER STATION - SEALING AIR FAN MOTOR
Mining - Subcontracts (Air-conditioning installation) project In The Western Downs Regional Council Area of Sealing Air Fan Motor - Supply type. HITO410 Sealing Air Fan Motor of 110kw capacity. Click for more details...

RAVENSTHORPE NICKEL PROJECT - LIMESTONE BALL MILL
Ravensthorpe Nickel Project - Limestone Ball Mill is currently at the Construction stage, valued at about $ 10000000 it is Limestone Ball Mill Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - STRUCTURAL/MECHANICAL
Mining - Subcontracts (Mechanical installation) project for New development. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

BHP PORT HEADLANDS EXPANSION - RAPID GROWTH 2 - STRUCTURAL/MECHANICAL CONTRACT
Currently at the Planning stage In Port Hedland is a project estimated to be $ 65000000. This project Structural and mechanical work to be carried out at the existing Finucane Island and Nelson Point facilities. Click for more details...

RAVENSTHORPE NICKEL PROJECT - MECHANICAL INSTALLATION OF WATER SYSTEMS
Mining - Subcontracts (Mechanical installation) project at 50 Km North of, Hopetoun, WA 6348 of Mechanical/Piping Installation Of Water Systems type of New development. Mechanical and piping installation of water systems. Click for more details...

RAVENSTHORPE NICKEL PROJECT - ELECTRICAL INSTALLATION OF WATER SYSTEM
Mining - Subcontracts (Electrical installation) project for New development. Electrical and instrumentation installation of water systems. Click for more details...

LIDDELL POWER STATION - BOILER MAINTENANCE CONTRACT
Liddell Power Station - Boiler Maintenance Contract is currently at the Construction stage, valued at about $ 200000 it is Work comprises the emergency repair of the four 500 MW boilers. Click for more details...

SARAJI COAL MINE THICKNER PLANT CONVERSION
Mining - Subcontracts (Electrical installation) project In The Isaac Regional Council Area of Private ownership. A 35m thickner plant was installed in 2004 and will be upgraded to improve efficiency of tailings disposal. Work comprises the design, removal of existing equipment, civil construction, installation of the high rate thickner. Associated works involve piping, pumps, structural and mechanical works. Electrical installation and recommissioning are also part of the work. Click for more details...

MONTO MINERALS INDUSTRIAL MINERALS PROJECT - FELDSPAR WASH PLANT
Feldspar Wash Plant New project In The North Burnett Regional Council Area. Development comprises the construction of a treatment facility that will comprise a hot acid leach plant and associated equipment. The ore will be shipped from the mine to the feldspar plant at Dakiel Railroad Station where it will be loaded and sent to Gladstone and then be shipped to Brisbane. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - STOCKYARD MACHINES
Mining - Subcontracts (Mechanical installation) project In The East Pilbara Council Area of Stockyard Machines - Upgrade type. Area C Upgrade of Stockyard Machines. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C/RAIL - COMMUNICATIONS
Private ownership Mining - Subcontracts (Electrical installation) project In The East Pilbara Council Area for New development. Communications at Weeli, Poonda, Yeerabiddy and Area C Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT - ELECTRICAL
Finucane Island/Nelson Point Electrical New project In The Port Hedland Council Area. Finucane Island and Nelson Point Electrical. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - SITE WIDE POWER SYSTEMS UPGRADE
Private ownership Mining - Subcontracts (Electrical installation) project In The Mackay Regional Council Area for New development. Site wide power systems upgrade. Most of the work will be electrical installation. Click for more details...

LIDDELL POWER STATION - INSULATION/CLADDING REPAIRS/ASBESTOS REMOVAL/REINSULATION
Insulation/Cladding Repairs/Asbestos Removal/Reinsulation project at At, Liddell, NSW 2333 in the Mining - Subcontracts (Mechanical installation). This Specification covers the removal, handling and disposal of asbestos and non-asbestos materials. The supply and installation of replacement non-asbestos thermal insulation and cladding. The removal, reinstallation and refurbishment of damaged insulation and cladding. The installation of temporary staging/rigging access platforms as nominated by the Contract Manager. The Contract shall be for a period of two years from the date of the awarding of the Contract by the Principal (Portion 1), with a Macquarie Generation Option to extend the Contract for a further two year period (Portion 2, Option 1). Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - FENDERS
Mining - Subcontracts (Mechanical installation) project for New development. Supply of Fenders. Fentek ship fenders with frontal frames. Click for more details...

KESTREL COAL UNDERGROUND EXTENSION PROJECT - COAL HANDLING & PREPARATION PLANT UPGRADE
Mining - Subcontracts (Mechanical installation) project for Addition development. Upgrade to existing coal wash plant to increase production from 1000t/h to 1400t/h. Click for more details...

CHINCHILLA COAL SEAM GAS & UNDERGROUND COAL GASIFICATION PROJECT - STAGE 2 - MECHANICAL FOR LABORATORY
Mining - Subcontracts (Mechanical installation) project In The Western Downs Regional Council Area of Mechanical - For Laboratory type. For the larger mine site laboratory. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - ELECTRICAL FOR PRECONCENTRATOR PLANT
Currently at the Planning stage In Mildura is a project estimated to be $ 1200000. This project For the provision of electrical works for the preconcentrator plant. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - PF CORRECTION EQUIPMENT
Mining - Subcontracts (Electrical installation) project In The Mildura Council Area of Pf Correction Equipment type. For the provision of power factor correction equipment. Click for more details...

BHP BILLITON RAPID GROWTH 5 IRON ORE PROJECT - STOCKYARD TRAIN LOAD OUT FACILITIES & ORE HANDLING PLANT
Private ownership Mining - Subcontracts (Mechanical installation) project In The East Pilbara Council Area for New development. The contract includes structural, mechanical and piping works for the supply, pre-assembly and installation of the stockyard and train load out facilities and modifications to the existing Ore Handling Plant 2 (OHP2). Click for more details...

ARGYLE DIAMOND OPERATIONS UNDERGROUND EXPANSION - CRUSHERS, CONVEYORS & DEWATERING
Mining - Subcontracts (Piping & Hydraulic) New project at 110km south-southwest of, Kununurra, WA 6743. This type is Crushers/Conveyors/Dewatering Pump Stations with Private ownership. Supply of 2 underground crushers. 1.2km of conveyors. Dewatering pump stations. Associated piping, electrical, instrumentation & control equipment. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - CAR DUMPER SMP
Cape Lambert Port B (Clb) Development Stage 1 - Car Dumper Smp is currently at the Construction stage, valued at about $ 10000000 it is Structural, mechanical & piping for the screen house & car dumper. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE - OSBL ELECTRICAL & INSTRUMENTATION INSTALLATION
Vicinity of, Onslow, WA 6710 Has Wheatstone Development Project - Onshore - Osbl Electrical & Instrumentation Installation currently at Construction stage. For the provision of OSBL electrical and instrumentation instllation. Click for more details...

PILBARA IRON ORE EXPANSION - SMP FRAMEWORK AGREEMENT
Mining - Subcontracts (Electrical installation) project at via, Karratha, WA 6714 for New. Preferred structural, mechanical & piping (SMP) contractor status for 5 years in the program to expand capacity to 353 million tonnes per annum (Mtpa). To include early contractor involvement. Click for more details...

ERNEST HENRY COPPER-GOLD OPERATIONS - UNDERGROUND EXPANSION (SHUG) SMP CONTRACTOR PANEL
New project of Mining - Subcontracts (Piping & Hydraulic) project at East of, Cloncurry, QLD 4824. Registered contractors experienced in structural, mechanical & pipe installation in hard rock underground mines to be invited over the coming months to tender for parcels of work between 6-9 months duration & up to $5 million in value. Click for more details...

DIAMANTINA CCGT POWER STATION - ELECTRICAL & INSTRUMENTATION
A project in the QLD Within Mt Isa City. A contract involving installation, commissioning, service & maintenance of electrical instrumentation along with heating,ventilation & air conditioning (HVAC), fire protection & occupant warning systems works. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT PHASE B - SMP CONTRACT
Structural/Mechanical/Piping - For Balance Of Plant New project In The City Of Karratha Council Area. Structural, mechanical & piping services for conveyors & transfer stations associated with a screenhouse & a pair of car dumpers. Click for more details...

MARANDOO IRON OPERATIONS PHASE 2 SMP CONTRACT
Structural/Mechanical/Piping Contract New project In The Ashburton Council Area. Structural, mechanical & piping contract as part of a project to increase Rio Tinto's Pilbara operational capacity to 353 million tonnes per annum (Mtpa). Click for more details...

BHP BILLITON MOOKA CAR REPAIR WORKSHOP
Bhp Billiton Mooka Car Repair Workshop is currently at the Construction stage, valued at about $ 30000000 it is Contract for the construction of a maintenance workshop & warehouse. To include process equipment installation as well as rail & infrastructure components including roads, track, signalling & communications electrical engineering. Water supply. Click for more details...

MINING AREA C (MAC) FUEL FACILITIES EXPANSION
Concreting/Piping/Electrical project at off the Great Northern Hwy via, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Expansion of existing fuel dispensing facilities including for low voltage & power house. Click for more details...

BHP BILLITON NICKEL WEST MECHANICAL & ELECTRICAL SERVICES
Mining - Subcontracts (Electrical installation) project at Various mines, ., WA 6999 for New. For the provision of a three year maintenance services to cover both mechanical & electrical services across all of BHP Billiton Nickel West's operations in Western Australia. Click for more details...

NORTH WEST SHELF OIL REDEVELOPMENT PROGRAM - MASTER SERVICES CONTRACT
Mining - Subcontracts (Painting) project at Approx 135km Northwest of, Karratha, WA 6714 of Master Services Contract - Multi Discipline type of New development. For the provision of master services including electrical & instrumentation, mechanical, inspection, cladding/insulation, blasting & painting, scaffolding, rope access & web decking & other Perth based support services. Contract to include 2 x 1 year extension options. Click for more details...