State

Categories

Sub Categories

Click Here to Find Current Projects

List of Mining - Support Facilities Projects


RAVENSTHORPE NICKEL PROJECT - LABORATORY
Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project at 50 Km North of, Hopetoun, WA 6348 for New. Laboratory Click for more details...

TELFER GOLD OPERATIONS
Site operations via, Telfer, WA 6762 Has Telfer Gold Operations currently at Construction stage. Single level steel framed construction involving some cladding & an iron roof is envisaged. Tender incorporates site preparation, general civils, drainage & concrete pad. Work also includes some cranage & a tyre fitters area. Click for more details...

SOUTH BLACKWATER COAL MINE
Repairs & Maintenance Contract - Carpentry Plumbing & Minor Painting project at 43 km south, Blackwater, QLD 4717 In The Council Area Of Central Highlands Regional of Private. For company owned residential accommodation in Blackwater township and single persons accommodation at the mine site. Click for more details...

TARAWONGA COAL PROJECT - RESOURCE
Resource - Coal project at Maules Creek & Goonbri Rds, 15 km north east of, Boggabri, NSW 2382 In The Council Area Of Narrabri of Private. The expected mine life between 8 to 10 years, will yield close to 12 million tonnes of export quality low sulphur, low ash, high-energy semi-soft coking coal from the Forest View, Thuin and Nagero properties east of Boggabri (formerley named East Boggabri Coal Project). Click for more details...

AUSTAR COAL OPERATIONS EXPANSION
Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project In The Cessnock Council Area of Operating Mine - Extn - Stage 3 type. For longwall extraction from panels A1 & A2 using a new method of longwall mining known as longwall top caving. For the construction and operation of some additional surface infrastructure including a larger capacity ventilation fan, downcast shaft, substation, nitrogen injection plant, tube bundle shed, and diesel storage and dispatch system, and for the upgrading of some existing surface infrastructure including the water treatment plant, and the water reticulation and pumping system. Click for more details...

BENGALLA COAL OPERATIONS EXPANSION PHASE 1
Mining - Support Facilities (Industrial buildings) New project at 4 km west of, Muswellbrook, NSW 2333. This type is Operating Mine - Expansion - Phase 1 with Private ownership. Expansion of open cut operations with Phase 1 to increase Run-of-Mine (RoM) coal to 9.3Mtpa for 7.5Mtpa approx product coal. To include upgrade of the existing 8.7million tonnes per annum (Mtpa) capacity coal washery to 2 stage washing. Purchase of additional mining equipment. Upgrades of associated mine infrastructure including a heavy vehicle workshop, bathhouse & wash bay. Click for more details...

MOUNT MOSS PROJECT - MAGNETITE/COPPER/ZINC RESOURCE
Resource - Magnetite/Copper/Zinc project at Ewan Road via, Greenvale, QLD 4816 In The Council Area Of Charters Towers Regional of Private. Resource estimate is 3.5 Mt of magnetite ore and 600,000 tonnes of copper oxide ore. The operation comprises of open cut mining of magnetite, copper and zinc in one to three pits. Processing facility for the crushing and magnetic separation/enrichment of magnetite, stockpile area and loadout facilities and vat leaching processing facility for the production of copper concentrate. Other infrastructure included the upgrade of a 30 km haul road, waste rock dumps, ore stockpiles and the upgrade of an accommodation camp for 60 persons. Click for more details...

RAVENSTHORPE NICKEL PROJECT - BANDALUP HILL - INFRASTRUCTURE
Infrastructure project at 50km north of, Hopetoun, WA 6348 in the Mining - Support Facilities (Industrial buildings). A combination of multi user regional infrastructure and project infrastructure. The multi user infrastructure includes upgrade of local roads, new shire airstrip, emergency services, sewered land, housing, power and water. Project infrastructure includes site buildings, communication, plant roads, construction camp and port facilities at Esperance. Click for more details...

CHALLENGER GOLD OPERATIONS
Private ownership Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Roxby Downs Council Area for New development. The first gold bar at the Challenger Gold project was poured on 12 October during the commissioning process with the first shipment of gold bullion, expected to total 750 ounces, scheduled for 24 October. Ramp-up to full production levels is expected by the end of October. The initial open pit will recover 105,000 ounces of gold over a 20 month operating period from the start-up in October 2002 with head grades expected to average 5.9 g/t. Click for more details...

CRACOW GOLD PROJECT - KLONDYKE/ROYAL SHOOT/CROWN/ROSES PRIDE
Surface Works New project In The Banana Shire Council Area. Includes excavation of box cut. Click for more details...

MINDARIE MINERAL SANDS PROJECT - PROCESSING FACILITY
Processing Facilities/Infrastructure project at Via, Karoonda, SA 5307 In The Council Area Of Karoonda of Private. To construct a processing plant comprising a product separation plant (Dry) and HMC separation plant (Wet) and a warehouse to store equipment and product. Click for more details...

BHP BILLITON IRON ORE OPS - ASSET DEVELOPMENT PROJECTS - ACCOMMODATION
Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The East Pilbara Council Area of Private ownership. Part of a proposed additional expansion to145Mtpa. The feasibility study is being undertaken by MPDJV (Mine & Port Joint Venture). Click for more details...

KOOLYANOBBING IRON ORE OPERATIONS - EXPANSION - SHED
Private ownership Mining - Support Facilities (Industrial buildings) project In The Esperance Council Area for New development. Includes an additional 300,000 tonne capacity shed at the Port of Esperance. Click for more details...

BHP BILLITON IRON ORE - NEWMAN ACCOMMODATION VILLAGE
Mining - Support Facilities (Sporting facilities, Gymnasiums, etc.) project In The East Pilbara Council Area of Accommodation Village - 1000 Person type. A 1000 person accommodation village north of Les Tutt Drive, which is to be closed. Camp to have expected three year duration. Click for more details...

MOUNT ETNA MINE - PURCHASE & REMOVAL OF WORKSHOP BUILDING & FENCING
Workshop Building & Fencing - Purchase & Removal project at The Caves, 20 km north of, Rockhampton, QLD 4700 In The Council Area Of Rockhampton Regional of Private. Purchase and removal of Workshop Building and 2m Manproof Fencing to Workshop Perimeter. Click for more details...

TOM PRICE MINE CONSTRUCTION CAMP EXPANSION
A project in the WA Within Ashburton. 120 persons construction camp is under construction. Click for more details...

ENSHAM CENTRAL EXPANSION PROJECT - DRAGLINE ASSEMBLY WORKSHOP
Mining - Support Facilities (Canteens, Messes, Crib room) project at (Lot 34 RP 864576) Duckponds Road, Emerald, QLD 4720 of Dragline Assembly Workshop type of New development. Construction comprises an assembly workshop (450 sqm), abultion block, crib room, office, 8 metre wide sealed road and 2 buses & 15 vehicle parking spaces. Click for more details...

WILLOUGHBY PARK AMENITIES
Mining - Support Facilities (Canteens, Messes, Crib room) project at Warrane Road, Willoughby, NSW 2068 of Canteen/Changeroom - Altns type of Renovations, Refurbishments etc. development. Internal alterations to the Clive A Reid pavilion comprising of a new public toilet suitable for disabled persons, ramp along the rear, a shower recess and toilet cubicle. Additional planting to provide a visual buffer between the building and the residential properties. Click for more details...

EMILY ANN WORKERS CAMP EXPANSION
Currently at the Planning stage In Dundas is a project estimated to be $ 13000000. This project Proposal comprises an expansion of the existing 240 person accommodation village by 100 rooms, the existing sewerage evaporation pond and the domestic tip. Click for more details...

COPPABELLA ACCOMMODATION CENTRE
Mining - Support Facilities (Canteens, Messes, Crib room) project In The Isaac Regional Council Area of Mining Camp type. Proposed 558 Units (1200 rooms) accommodation centre to be constructed. Associated infrastructure includes kitchen, dining room, administration rooms, training rooms and car parking. Click for more details...

CENTRAL NORSEMAN GOLD OPERATIONS - RESOURCE
Resource -Gold project at 30 Km North of, Norseman, WA 6443 In The Council Area Of Dundas of Private. Norseman gold operation comprises two underground mines, Harlequin, Bullen, various open pits and the Phoenix mill treatment plant. The Davyhurst gold operation has been sold to Monarch Resources. Mining is to continue at all operations and various infrastructure projects will be undertaken. At Harlequin the mine ventilation system and the surface workshop will be upgraded in preparation for long term mining at the Harlequin decline. The Phoenix mill treatment plant will undergo maintenance of the crusher, ball and SAG mill and the installation of new ore feeders. A new tailings storage facility designed to provide 10 years storage will be developed. A major upgrade to the power distribution network will be undertaken. Lastly the single person quarters at Norseman will be upgraded and refurbished. Click for more details...

HOPE DOWNS EXPLORATION CAMP
Hope Downs Exploration Camp is currently at the Construction stage, valued at about $ 4000000 it is Development comprises the construction of 148 person exploration camp in 37 accommodation blocks. Associated infrastructure includes kitchen, laundry,sport facilities, workshop, power generation facilities will also be constructed. A waste water treatment plant will be constructed to service the camp. Click for more details...

KING ISLAND SCHEELITE MINE REDEVELOPMENT PROJECT STAGE 1 - BUILDING CONTRACTORS COMPOUND
Private ownership Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The King Island Council Area for New development. For the provision of accommodation buildings, bath houses & crib rooms etc for Building Contractors Compound. Click for more details...

BONAPARTE GAS PIPELINE
J/V - Private & Govt ownership Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Coomalie Community Council Area for New development. To construct a gas pipeline from the Blacktip Gas Plant near Wadeye (Port Keats) to meet the existing Amadeus to Darwin Gas Pipeline on Ban Ban Springs Station in the Northern Territory. The pipeline will follow a route of approximately 275km and will initially be capable of delivering 30 petajoules per year. Click for more details...

BUNGAROO IRON ORE PROJECT - RESOURCE
Private ownership Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Ashburton Council Area for New development. Development comprises trial mining of the Bungaroo deposit for three years starting in third quarter 2007. Resource estimate is 15 Mt of Fe ore. Infrastructure proposed for the site include a crushing and screening plant, new haul road, dewatering pipeline, diesel generators for power supply, fuel storage area, refuelling areas, waste water treatment facilities, communication infrastructure and laydown area. A construction camp is also under consideration. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - ORE PREPERATION PLANT
Mining - Support Facilities (Administration facilities) project at Cloud Break Mine Site, Pilbara area via, Newman, WA 6753 for New. Ore Preparation Plant (OPP) is to comprise a crushing and screening operations. The facilities include a screen house, crushers, stockpiles and trainloader. The operation will process ore transported by a conveyor firstly to a portable crusher and sizer located at the operating face of the Cloud Break mine. When the ROM ore has been crushed and sized it will be transported via a conveyor to the screener and crusher. Ore will be sorted into super value fines, high grade fines, high grade lump and lower grade ore. The first three types of ore will be conveyed to the train loading station and shipped to Port Hedland. The low grade will be stockpiled for the future when the Christmas Creek Beneficiation Plant is constructed. Operating facilities at the plant will comprise a Sample Tester, Plant/Workshop store, Communication Tower, High Voltage Switchyard, Sewage Treatment Plant, Potable Water Plant including a Water Tank, Temporary Diesel Power Station, Control Room, Workshops, Laboratories, Amenities area, OPP Administration area including a Store, Laboratory, Emergency Response Centre and Administration building, Mining administration area, Car Parks, two Fuel Farms and a Vehicle Washdown Facility including a washdown slab and an oil separator and automated facilities. A desliming plant will also be constructed. Future expansion of the OPP will include a Desand Plant and associated infrastructure. The developer is currently designing the Desanding plant. Click for more details...

ENSHAM CENTRAL UNDERGROUND COAL PROJECT
New project of Mining - Support Facilities (Administration facilities) project at 40 km north east of, Emerald, QLD 4720. A project to extend Ensham's Life-Of-Mine by 20-30 years by expanding into underground mining. Operations at around 7.6 million tonnes per annum (Mt/y) expected initially to be bord & pillar. New surface facilities likely to include access roads, workshop & vehicle servicing facilities, administration building, accommodation camp, washplant, tailings dams, conveyors, coal stockpile areas, coal handling & preparation facilities, ventilation shafts & access boreholes. A new conveyor to connect the underground product coal stockpile to the existing conveyor serving the train loading bin. Click for more details...

ROCGLEN COAL PROJECT - ADMINISTRATION BUILDINGS
Rocglen Coal Project - Administration Buildings is currently at the Construction stage, valued at about $ 1000000 it is For the provision of administration buildings. Click for more details...

ROCGLEN COAL PROJECT - BATHHOUSES & ABLUTIONS BUILDINGS
Currently at the Construction stage In Gunnedah is a project estimated to be $ 2000000. This project For the provision of bathhouses & ablutions buildings. Click for more details...

ROCGLEN COAL PROJECT - WORKSHOP
Mining - Support Facilities (Industrial buildings) project for New development. For the provision of a workshop. Click for more details...

ABYDOS IRON ORE PROJECT
Operating Mine - Iron Ore project at 85km West of, Marble Bar, WA 6760 in the Mining - Support Facilities (Industrial buildings). Upgraded resource estimate of 22.2Mt @ 56.7% Fe. Project will consist of two open pits which will be mined using conventional drill and blast, load and haul techniques. Pit dewatering will not be required. Ore processing and transport. Additional infrastructure will include the administration area, haul road, Abydos Link road, access tracks, explosives magazines, water bores and associated reticulation and borrow pits. Re-fuelling and fuel storage areas, workshops, washdown areas and laydown areas will be located within the administration area and the ROM area. All personnel and staff will be housed at the Abydos accommodation village. Click for more details...

CHINCHILLA COAL SEAM GAS & UNDERGROUND COAL GASIFICATION PROJECT - STAGE 2 - CRIB ROOM FOR LABORATORY
Mining - Support Facilities (Canteens, Messes, Crib room) project at Capowie, 16 Mile Hall Rd, Hopeland via, Chinchilla, QLD 4413 of Crib Room - For Laboratory type of New development. For the larger mine site laboratory. Click for more details...

PATRICIA-BALEEN GAS PLANT UPGRADE
Mining - Support Facilities (Industrial buildings) project for New development. For the upgrade to the existing Patricia-Baleen Gas Plant. The works include: installation of a condensate separation and stabilisation system, installation of condensate storage tanks and truck load-out facility, installation of hydrocarbon dew point control facilities for the gas, reconfiguration of the existing compressors to increase compression capacity, upgrade to the sales gas dehydration system to accommodate higher gas rates and minimise glycol carryover, installation of monoethylene glycol (MEG) storage and injection facilities to prevent hydrate formation in the offshore pipeline and selected plant process locations, and associated MEG regeneration facilities. Installation of a corrosion inhibitor injection system for the offshore pipeline, installation of a hot oil heater and hot oil circulation system to provide process heat to the processing facilities, installation of a n"off-gas" compressor to recycle gas vented from the condensate stabilisation system to eliminate operations flaring. Installation of new flare systems and removal of existing flare system, modifications to the drainage system, including a new API Separator and extension of the storm water system. Installation of a water vaporiser to dispose of excess produced water that cannot be reused or naturally evaporates. Modifications to various plant utilities, namely, the fuel gas system, odourisation system, compressed air system and plant process control system. Upgrade of the fire and gas protection facilities including installation of fixed firewater pumps and foam systems. Exte4nsion of office facilities and installation of a laboratory, and the construction of a new workshop/warehouse facility. Click for more details...

PILBARA IRON ORE PROJECT - CHRISTMAS CREEK - CAMP
Mining - Support Facilities (Canteens, Messes, Crib room) project for New development. The scope of works includes the installations, fit out and commissioning of three-room accommodation modules. Other on site facilities will include a recreation area, football oval, pool, wet mess and kitchen. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT
Mining - Support Facilities (Accommodation - units, housing, group accom.) project for New development. QCLNG is a project to develop coal seam gas (CSG) fields in the Surat & Bowen Basins, pipe gas to a processing plant to be built on Curtis Island & then export product liquefied natural gas (LNG) by ship. Phase 1 to be constructed to include 2 LNG processing trains with a combined capacity of up to 8.5million tonnes per annum (Mtpa) along with associated gas wells, field facilities & pipelines. Some 820 operational personnel & over 5000 construction personnel expected. Workers accommodation to be required in the Gladstone region (250 approx dwellings) & Western Downs area (280 approx dwellings). Click for more details...

RAVENSWORTH COAL OPERATIONS EXPANSION - RAVENSWORTH NORTH PROJECT
Operating Mine/S - Expansion project at Lemington Rd, Singleton, NSW 2330 in the Mining - Support Facilities (Industrial buildings). A project to create a mining complex incorporating neighbouring open cut & underground operations at Ravensworth West, Narama and Cumnock No 1 Colliery & the surface facilities associated with Ravensworth Underground Mine (RUM) for mining up to 16million tonnes per annum (Mtpa) of Run-Of-Mine (ROM) coal over an expected Life-of-mine (LOM) of 29 years. Establishment south of Davis Creek & west of Bayswater Creek of the new Ravensworth North Pit. Open cut operations to continue to involve prestripping, drill & blast overburden removal, coal extraction through blasting or bulldozer, transportation of the ROM coal by truck to stockpiles & then by conveyor to a local power station (Macquarie Generation) or the Ravensworth Coal Terminal (RCT). Expansion of the product coal capacity of the existing northerly Ravensworth Coal Handling & Preparation Plant (RCHPP) & RCT loadout facility to 20Mtpa. A new Raw Coal stockpile with associated conveyor & access bridge over the New England Highway to the RCT. At this coal terminal a new product coal stockpile as well as a water dam. A new rejects bin at the existing centrally located ROM pad along with new conveyor to link to the existing rejects conveyor. Establishment of new workshop & office facilities north of Davis Creek. Realignment of an existing 330kV transmission line & ancillary services. Construction of a mine access road along with realignment of Lemington Road involving a New England Highway intersection upgrade. A new explosives facility. Diversion of Emu Creek. A new main storage dam in the south of the project area with associated drains & pipelines. Expanded out of pit emplacement areas. New Cumnock 3 tailings dam to the south of the existing dams. Construction of temporary employee, maintenance & equipment storage facilities at the Narama operations. Click for more details...

PECULIAR KNOB IRON ORE PROJECT - TRANSHIPMENT STORAGE PORT FACILITY
At Berth 7, Port Pirie, SA 5540 Has Peculiar Knob Iron Ore Project - Transhipment Storage Port Facility currently at Construction stage. Contract for the design, procurement, construction & commissioning of an ore receival, storage & out-load facility at Port Pirie. To include train unloading, enclosed stockpiling in a storage shed (10,500 sqm), reclaiming/shiploading overland conveyors. Associated infrastructure/siteworks. Click for more details...

INTEGRA COAL OPERATIONS - OPEN CUT EXTENSION PROJECT
Currently at the Construction stage In Singleton is a project estimated to be $ 10000000. This project Extension further south of the existing South Pit (247ha). Trucks & shovel/excavators to access 30million tonnes (Mt) of Run-of-Mine (RoM) coal at a rate of 2.3-4.2Mtpa to give a Life-of-Mine (LoM) of 9 years. Associated infrastructure to include relocation of power lines & telecommunications in the proposed open cut area. Construction of temporary haul roads & surface water management structures. Installation of tansportable site office, crib room & bathhouse. Installation of a transportable, above ground equipment refuelling station. Click for more details...

GLNG WALLUMBILLA GAS TREATMENT FACILITY (WGTF)
New project of Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project at Walumbilla South Rd Iona Bardlomey Rd (Lot 33 SP 212840) 12km south of, Wallumbilla, QLD 4428. Staged development adjacent the existing Santos compressor (WCS) & metering (WMS) stations of a gas treatment facility of 2 trains each with a capacity of 250TJ/day. Each train to consist of gas compression, natural gas liquid removal & cryogenic gas treatment units & a gas turbine power generator using non-methane gas liquids & distributing power through alternators. Ancillary infrastructure to include condensate storage, hot oil system, air compression system, nitrogen generation plant, fire water system, flare & vent system, oily water system along with potable & service water system. Plant control room & workforce amenities. Click for more details...

PORT HEDLAND BHP BILLITON NON-PROCESS INFRASTRUCTURE (PORT NPI) PHASE 1
Mining - Support Facilities (Industrial buildings) project In The Port Hedland Council Area of Lubrication Facility/Office, Administration & Stores Buildings - Altn & Addns type. A Port Hedland Inner Harbour project to increase throughput by upgrading existing & construction of new support facilities. Construction of a new lube facility including lube storage & dispensing unit & storage area; a workshop with washdown pad, office & workstations along with an amenities block, traffic management, oily water separation system & bulk diesel storage. Upgrade after removal of some portable buildings of the belt store including new storage/laydown area, high bay belt workshop, portable offices & amenities block, a cool, dry storage facility, light vehicle car park & truck loading yard. Expansion of the existing administration building including offices, conference rooms, open plan work areas, amenities, crib room, tool lockers, secure & public car parking & relocation of the barbecue area. Refurbishment & internal refit of existing crib rooms & amenities at the Nelson Point Crushing Offices as well as the Emergency Services Office. Click for more details...

DUGALD RIVER BASE METAL PROJECT - PERMANENT ACCOMMODATION VILLAGE
Accommodation Modules/Ancillary Buildings/Services project at Off the Burke Developmental Rd 85km NE of, Mount Isa, QLD 4825 In The Council Area Of Mt Isa City of Private. Construction of a 500 bed permanent accommodation village for the 25 year life-of-mine. Single storey modules with 3 bedrooms each. Associated kitchen, dining, laundry, recreation facilities. Parking. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - GAS FIELD DEVELOPMENT - GAS PROCESSING PLANTS
Private ownership Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project In The Various Council Area for New development. A contract for the construction of 7 gas processing plants at Condabri, Orana (east of Talinga), Reedy Creek, Combabula & Eurombah Creek. Associated integrated operations centres, warehouses, workshops & internal roadways. Click for more details...

EDGEWORTH ST CESSNOCK MIXED DEVELOPMENT
A project in the NSW Within Cessnock. Demolition of existing building. Construction of a new single storey mixed clad community centre, to include open foyer & reception area leading to a covered outdoor area. Gym, pool, plant room, 4 storage rooms, 2 training rooms separated by foldable partition, 4 individual water closets/change rooms & 1 assisted. Six consulting/meeting rooms, office, male, female & disabled toilets. Lunch room & kitchen, dining area & maintenance shed & bin storage area. Wall, masonry, rendered masonry, fibre cement sheeting, glass. Roof, metal sheeting & trims, painted steelwork columns & exposed structure. Disability housing to include, 34 dwelings including (6 x 2 bedroom SAIF dwellings, 8 x 3 bedroom dwellings, 4 x 2 bedroom dwellings & 16 x 1 bedroom dwellings. Seventeen separate buildings will contain the units & will be a mixture of 1 & 2 storeys in height. Walls, masonry, fibre cement sheeting, weatherboard & metal roof sheeting. Overall parking for 57 parking spaces. Extensive landscaping Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - RAIL NON PROCESS - MODULAR BUILDING
Mining - Support Facilities (Administration facilities) project In The East Pilbara Council Area of Modular Buildings type. For the supply & installation of modular buildings. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - NORTH WEST OPERATIONS SHORE BASE & STAGING FACILITIES
Mining - Support Facilities (Administration facilities) project In The Ashburton Council Area of Private ownership. For the provision of North West Operations Shore Base Facility & North West Operations Staging Facility. Click for more details...

BAUXITE HILLS BAUXITE DSO PROJECT - ACCOMMODATION CAMP
A project in the QLD Within Mapoon Shire. Accommodation camp/village for the Bauxite Hills DSO Project. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE & INFRASTRUCTURE - PINDAN - DETAILED EARTHWORKS & CONCRETE WORKS
Wheatstone Development Project - Onshore & Infrastructure - Pindan - Detailed Earthworks & Concrete Works is currently at the Construction stage, valued at about $ 1000000 it is For the provision of detailed earthworks & concrete works to 50 modular house lots. Estimated 2500m3 of earthworks & 1900m3 of concrete over a 40 week period. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - ACCOMMODATION VILLAGE (DESIGN & CONSTRUCTION)
New project of Mining - Support Facilities (Sporting facilities, Gymnasiums, etc.) project at 40km SW of, Weipa, QLD 4874. For the design & construction of an Accommodation Village (comprising approximately 1,200 accommodation rooms) & temporary on-site construction facilities at different locations external to the construction camp. Accommodation rooms will be supplied by Rio Tinto. The accommodation village & the temporary on-site construction facilities includes but is not limited to: Four (4) bed unsuited accommodation modules. People with Disabilities (PWD) two (2) bed unsuited accommodation modules. Maintenance & storage facilities. Office & administration facilities. Communications/data/television signal facility. Close Circuit Television (CCTV) monitoring facilities. Ablutions modules. Kitchen, dining & crib facilities. Entertainment facilities. Gymnasiums. Sporting facilities. Training/education centre. Laundry modules. Commercial laundry facility. First aid facility Power generation units & distribution panels with reticulation network. Area & general lighting requirements. Potable water treatment, storage & distribution networks. Waste water treatment systems & collection networks. Click for more details...

PILGANGOORA LITHIUM-TANTALUM PROJECT - ACCOMMODATION
Accommodation Village - Relocation project at 120km South of, Port Hedland, WA 6721 in the Mining - Support Facilities (Accommodation - units, housing, group accom.). For the provision of the relocation of the Roy Hill Rail Camp 3. The camp will be relocated in 2 stages. Click for more details...

PILGANGOORA LITHIUM-TANTALUM PROJECT - MINE WORKSHOP & OFFICES
Mining - Support Facilities (Administration facilities) project for New development. For the provision of a mine workshop & offices. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect