State

Categories

Sub Categories

Click Here to Find Current Projects

List of Mining - Support Facilities Projects


HOXTON PARK RD INDUSTRIAL WORKSHOP
New project of Mining - Support Facilities (Industrial buildings) project at 376 (Lot 7) Hoxton Park Rd (DP1036695), Prestons, NSW 2170. (Lot 7; DP1036695) Construction of 644sqm workshop and 70sqm office Click for more details...

ALCAN GOVE BAUXITE OPERATIONS -EXPANSION - ACCOMMODATION
Mining - Support Facilities (Accommodation - units, housing, group accom.) New project at At, Nhulunbuy, NT 0880. This type is Houses/ Accomodation Units with Private ownership. Housing for the additional workforce are likely to be provision of permanent family style housing for 30 workers approx, while remaining workers would work on a fly-in fly-out basis and be accommodated in single person units. New units and houses would be provided in Nhulunbuy. Town support structure should not require expansion. Services of water, power, communications and sewerage will be required for all installed facilities and some upgrades would need to be implemented. Click for more details...

COAL & ALLIED OPERATIONS
Airconditioner Maintenance For Mobile And Fixed Plant project at Various sites Hunter Valley via, Lemington, NSW 2330 in the Mining - Support Facilities (Administration facilities). Includes professional services for the safe and effective maintenance of air conditioners installed to mobile or fixed plant at the above locations. All works will comply to Coal and Allied safety and standards. The work required will involve planned maintenance, servicing and breakdown repairs. Coal & Allied operates open cut coal mines and coal preparation plants in the Hunter Valley, New South Wales, these being Mount thorley Operations, Hunter Valley Operations ( Howick Hunter Valley and lemington), Warkworth and Bengalla mines. Click for more details...

HIGGINSVILLE GOLD PROJECT - RESOURCE
Mining - Support Facilities (Accommodation - units, housing, group accom.) New project at Between St Ives and, Norseman, WA 6443. This type is Resource - Gold with Private ownership. The developer is planning to construct a 1 Mtpa treatment plant in 2007 to be completed by 2008. The project includes 36 tenement including the Trident deposit. Resource estimate from the project is 8.7 Mt @ 4.0 g/t Au for 1.1 million ounces of gold. Resource estimate for Trident are 4.3 million tonnes at 6.2 g/t gold for 855,000 ounces and the Athena lodes is 960,000 tonnes @ 11.1 g/t Au for 343,000 ounces. Click for more details...

COYOTE GOLD PROJECT - RESOURCE
Private ownership Mining - Support Facilities (Industrial buildings) project In The Halls Creek Council Area for New development. Production rate is expected to be at least 60,000 tonnes per annum. The preferred development plan is based upon a three stage open pit at Coyote to be mined over a year followed by decline development off the base of the pit. Preferred mining method is high grade narrow vein techniques. Infrastructure proposed for the development will be waste rock dumps, tailings storage facility, gold treatment plant, mining contractors area, workshops and stores, office complex, airstrip, accommodation village, haul roads and access roads. Recent resource estimates are 4 metres at 70 g/t Au. The Coyote gold project includes Coyote and the jv Kookaburra and Sandpiper deposits at Larraganni. Click for more details...

MOUNT MOSS PROJECT - MAGNETITE/COPPER/ZINC RESOURCE
Resource - Magnetite/Copper/Zinc project at Ewan Road via, Greenvale, QLD 4816 In The Council Area Of Charters Towers Regional of Private. Resource estimate is 3.5 Mt of magnetite ore and 600,000 tonnes of copper oxide ore. The operation comprises of open cut mining of magnetite, copper and zinc in one to three pits. Processing facility for the crushing and magnetic separation/enrichment of magnetite, stockpile area and loadout facilities and vat leaching processing facility for the production of copper concentrate. Other infrastructure included the upgrade of a 30 km haul road, waste rock dumps, ore stockpiles and the upgrade of an accommodation camp for 60 persons. Click for more details...

BALLERA GAS CENTRE - SOUTH WEST QUEENSLAND GAS PROJECT
Mining - Support Facilities (Industrial buildings) project at Ballera, ., QLD 4999 of Electrical Installation For Operations Village/Workshops & Admin. Facilities type of Subcontract development. Includes workshop, offices for permanent camp Click for more details...

RAVENSWOOD GOLD OPERATIONS - MOUNT WRIGHT - GOLD RESOURCE
Mining - Support Facilities (Industrial buildings) project for New development. Design work and equipment procurement is to commence shortly with major site works scheduled to start July 2006. The project is expect to cost $77 million with $28.8 million for underground facilities and equipment, $21.7 million for surface facilities and equipment and $26.4 million for capitalised mine development. During the first two years $42 million will be spent on development. Production cost is expected to be $34 per tonne of ore processed. The project will develop in two stages with phase one involving decline development and exploration access for the drill program, while providing a platform for production from the upper levels of the resource. Phase two will extract the remaining resources identified in phase one. The feasibility study completed a comprehensive metallurgical test work, processing strategy using the existing plant, options study on different mining methods, environmental issues connected to tailing storage have been addressed. Underground mining is the method of mining. The Mount Wright prospect is located 10 km northwest of the Sarsfield open pit and is proposed to be developed as a decline accessed underground mine. Mining is to be by open stoping with 50 metre sub-levels at an extraction rate of 1 million tonnes per annum. An extensive underground DC drilling program will be undertaken in conjunction with mine development to upgrade the resource status. Inferred and indicated resource estimate is 1,054,722 ounces of gold. An eight year production life to 2015 and production rate of 1 MTPA. Click for more details...

COWAL GOLD PROJECT
Site Office project at North west of, West Wyalong, NSW 2671 In The Council Area Of Bland of Private. Includes the construction/supply of buildings and services required to establish a site office at the Cowal Gold Project. Capabilities required include-supply/fabrication of steel industrial shed, construction management, transportable office accommodation, fencing, electrical, concrete works, sewerage plant and plumbing. Click for more details...

KOGAN CREEK POWER PROJECT - ELECTRICAL INSTALLATION/WORKSHOP
South of, Brigalow, QLD 4412 Has Kogan Creek Power Project - Electrical Installation/Workshop currently at Construction stage. Erection of 1 Siemens Steam Turbine, 1 Siemens Generator THDF 125/67, Condenser, Tanks, Pumps, Compressors, Assembly of Workshop and Store, Electrical and I & C installation Click for more details...

DEFLECTOR COPPER GOLD PROJECT - ACCOMMODATION VILLAGE
Mining - Support Facilities (Administration facilities) project at 150km SW of, Mount Magnet, WA 6638 for New. For the provision of an accommodation village including medical services & administrative management of the mine site & village. Click for more details...

RAVENSTHORPE NICKEL PROJECT - PERMANENT VILLAGE BUILDINGS
Permanent Village Buildings New project In The Ravensthorpe Council Area. Development comprises 36 x 1 storey houses of three and four bedrooms, two bathrooms and air conditioning. Click for more details...

COPPABELLA ACCOMMODATION CENTRE
Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Isaac Regional Council Area of Mining Camp type. Proposed 558 Units (1200 rooms) accommodation centre to be constructed. Associated infrastructure includes kitchen, dining room, administration rooms, training rooms and car parking. Click for more details...

CENTRAL NORSEMAN GOLD OPERATIONS - RESOURCE
Resource -Gold project at 30 Km North of, Norseman, WA 6443 In The Council Area Of Dundas of Private. Norseman gold operation comprises two underground mines, Harlequin, Bullen, various open pits and the Phoenix mill treatment plant. The Davyhurst gold operation has been sold to Monarch Resources. Mining is to continue at all operations and various infrastructure projects will be undertaken. At Harlequin the mine ventilation system and the surface workshop will be upgraded in preparation for long term mining at the Harlequin decline. The Phoenix mill treatment plant will undergo maintenance of the crusher, ball and SAG mill and the installation of new ore feeders. A new tailings storage facility designed to provide 10 years storage will be developed. A major upgrade to the power distribution network will be undertaken. Lastly the single person quarters at Norseman will be upgraded and refurbished. Click for more details...

INDEE GOLD PROJECT - ACCOMODATION/ADMINISTRATION/STORAGE FACILITY
80 Km South west of, Port Hedland, WA 6721 Has Indee Gold Project - Accomodation/Administration/Storage Facility currently at Tenders & Building stage. Construction comprises an accommodation building for 40 persons, ablution block, kitchen/mess facilities, administration building and an equipment storage facility. Click for more details...

HOPE DOWNS EXPLORATION CAMP
Hope Downs Exploration Camp is currently at the Construction stage, valued at about $ 4000000 it is Development comprises the construction of 148 person exploration camp in 37 accommodation blocks. Associated infrastructure includes kitchen, laundry,sport facilities, workshop, power generation facilities will also be constructed. A waste water treatment plant will be constructed to service the camp. Click for more details...

MOUNT BROCKMAN CONSTRUCTION CAMP EXPANSION
Construction Camp/Kitchen New project In The Ashburton Council Area. 150 person construction camp and new kitchen building. Click for more details...

COBURN MINERAL SANDS PROJECT - ACCOMMODATION CAMP/OFFICE CONTRACT
New project of Mining - Support Facilities (Administration facilities) project at South of, Hamelin Pool, WA 6532. For the construction of an accommodation camp and office. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - RAIL WORKERS CAMP
Mining - Support Facilities (Medical facilities) project at 15 Km North of Wodgina via, Newman, WA 6753 of Accommodation Camp type of New development. A 280 person accommodation camp to be constructed for rail workers. The camp will comprise 70 accommodation units containing 4 rooms with their own ensuite. Other buildings will be a camp management/office building, dry mess, a wet mess with covered beer garden, a recreation complex, 3 laundry buildings, fully equiped gymnasium, a first aid post with ambulance shelter and other ancillary buildings. A sports court, BBQ area and swimming pool with associated toliets and change rooms will be constructed. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - TRANSIENT WORKERS CAMP
Mining - Support Facilities (Bath houses, Amenities, Dressing rooms) project for New development. A 704 persons accommodation camp to be constructed. The camp will comprise 126 permanent accommodation units containing 4 rooms with their own ensuites and 66 temporary accommodation units containing 4 rooms with their own ensuites. Other buildings will be a dry mess, a wet mess with covered beer garden, maintenance sheds, laundry buildings, fully equipped gymnasium, a first aid post with ambulance shelter. A sports court, BBQ area and swimming pool with associated toilets and change rooms will be constructed. Other ancillary buildings will also be constructed. Click for more details...

RAVENSTHORPE NICKEL PROJECT - PERMENANT VILLAGE BUILDINGS
Private ownership Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Ravensthorpe Council Area for New development. Work comprises the manufacture, delivery and installation of 50 Park Homes. Click for more details...

BATCHELOR SUBSTATION - CIVIL/EARTHING WORKS
A project in the NT Within Darwin City. Work comprises civil and drainage works, earth grid and connection tails, fencing, installed certified and fully serviced crib room, new poles, nominated structures, and foundations for HV structures. All structures to include hold down bolts measured to ensure they will accommodate the future installation of electrical equipment that will be relocated from the Edith River substation. Click for more details...

BOGGABRI COAL OPERATIONS EXPANSION
Mining - Support Facilities (Industrial buildings) project at 17km northeast of, Boggabri, NSW 2382 of Operating Mine - Expansion - Stage 2 type of New development. Expansion of existing Boggarbri open cut coal operations. Upgrade of the coal handling & preparation plant (CHPP) to increase throughput from 1.5 million tonnes per annum (Mtpa) to 2.5Mtpa in 2011 & 4.3Mtpa in 2013. Installation of a new 132kV switchyard/sub-station/overhead power lines. Installation of modular buildings for offices & bathhouse extension. Construction of a light vehicle workshop, a heavy vehicle workshop with warehouse & a car park. 150 construciton jobs expected as well as 500 operational jobs. Click for more details...

BROKEN HILL SEPARATION PLANT UPGRADE
Currently at the Planning stage In Broken Hill is a project estimated to be $ 36000000. This project The upgrade of the separation plant is proposed to take into account the development of the nearby Snapper project. Upgrades will be undertaken for the plant itself and associated infrastructure. The plant upgrades planned are the additions of a rutile circuit and a zircon circuit. An option to locate a Wet High Intensity Magnetic Separator circuit from the mine site is also proposed. These addition will production to increase from 576,000 tpa to 650,000 tpa. The rutile, ilmenite and zircon circuit feed and rejects stockpiles will all be expanded. The non-magnetic concentrate heavy mineral concentrate receival area will also be expanded. The capacity of the two coal container storages will be expanded from 1000 tonnes to 1500 tonnes. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - NEWMAN HUB
Newman Hub project at Newman Hub, Newman, WA 6753 in the Mining - Support Facilities (Industrial buildings). The RGP4 modifications include the final tie-ins that convert the existing Newman Operations from a production plant producing secondary crushed ore (with a nominal top size of -100mm) to a plant producing shipping quality lump and fines products. The main features of the new tie-in, starting at TS2 are: A new transfer tower, 41SE010, built immediately to the NE of the existing TS2, in line with conveyor M110. This tower is structurally linked to TS2. The tail end of the existing conveyor M110 is removed and replace by a new conveyor. 41CV010, which runs in the opposite direction and discharges ore to a new transfer conveyor, 41CV020, the tail of which is in the new transfer tower 41SE010. Connecting to the existing Newman High Grade (NHG) discharge in TS2 (ore from #2 Plant and Bene Plant product). Construction of a new single rotary cell train car dumping facility, a new crushing and screening plant to include scalping with middlings recirculation to produce sized lump and fines product. Construction of a new blending stockyard 5 x 210kt lump and fines, live and dead including stacking and reclaim machines, to produce a direct-shippable blended lump and fines product. Construction of sampling facilities for reconciliation of production from the various ore sources (NHB and SOB sites) and as-stacked blend control on the stockpiles. Construction of a new drive through train loading (TLO) facility with separate lump and fines sections. Modifications and additional track at the entrance of Newman Hub rail loop and new loco services facility near the existing Hub workshops. Modifications and additional tracks and realingments in the vicinity of the existing OB29 train loading facility for connections to new car dumper and train loading facility. These works include the additional SOBs train by pass line. Deconstruction of PB29 conveyors M301, M309, M311 transfer station TS3, part deconstruction M308 and the removal of the entire OB29 train Load-out facility. The deconstruction works also include removal of sections of existing rail line made redundant by the Newman Hub works. Decommissioning of the existing train load-out stackers No 1 & 2, stacker conveyors M110 and M6 and the existing train loading tunnels (demolition not included in the RGP4 scope). Modifications and additions to the existing water supply and reticulation system. Design Capacity is 31Mtpa. Click for more details...

ADMIRAL BAY PROJECT - EXPLORATION CAMP
Mining - Support Facilities (Accommodation - units, housing, group accom.) project at 140km South of, Broome, WA 6725 of Exploration Camp type of New development. To construct a worker's camp to be used for the durationof the exploration project. The works camp is proposed to have 9 x 4 bedroom accommodation units for 36 works. A site office, laundry, kitchen/dining building and a recration building. Septic tanks and leach drains are also going to be installed. Click for more details...

ROCGLEN COAL PROJECT - CRIB ROOMS
Crib Rooms project at 25 km north of, Gunnedah, NSW 2380 in the Mining - Support Facilities (Canteens, Messes, Crib room). For the provision of crib rooms. Click for more details...

PATRICIA-BALEEN GAS PLANT UPGRADE
Mining - Support Facilities (Industrial buildings) project for New development. For the upgrade to the existing Patricia-Baleen Gas Plant. The works include: installation of a condensate separation and stabilisation system, installation of condensate storage tanks and truck load-out facility, installation of hydrocarbon dew point control facilities for the gas, reconfiguration of the existing compressors to increase compression capacity, upgrade to the sales gas dehydration system to accommodate higher gas rates and minimise glycol carryover, installation of monoethylene glycol (MEG) storage and injection facilities to prevent hydrate formation in the offshore pipeline and selected plant process locations, and associated MEG regeneration facilities. Installation of a corrosion inhibitor injection system for the offshore pipeline, installation of a hot oil heater and hot oil circulation system to provide process heat to the processing facilities, installation of a n"off-gas" compressor to recycle gas vented from the condensate stabilisation system to eliminate operations flaring. Installation of new flare systems and removal of existing flare system, modifications to the drainage system, including a new API Separator and extension of the storm water system. Installation of a water vaporiser to dispose of excess produced water that cannot be reused or naturally evaporates. Modifications to various plant utilities, namely, the fuel gas system, odourisation system, compressed air system and plant process control system. Upgrade of the fire and gas protection facilities including installation of fixed firewater pumps and foam systems. Exte4nsion of office facilities and installation of a laboratory, and the construction of a new workshop/warehouse facility. Click for more details...

ULAN COAL MINE CONTINUED OPERATIONS PROJECT - ULAN WEST UNDERGROUND
Private ownership Mining - Support Facilities (Administration facilities) project In The Mid Western Regional Council Area for New development. Extension of underground mining operations in a location west of the existing Ulan No 3 underground mine & north of the recently closed open cut pit. To operate for 21 years using the retreat longwall method with a panel width of up to 400m. Access to the Ulan West operations to be via a series of portals to be constructed within the vicinity of the existing open cut pit. New surface facilities to be constructed around the entrance to include ventilation, power & water management facilities & a small temporary coal stockpile. An access ramp will also accommodate an overland conveyor out of the mine. Ancillary facilities to include a steel framed, concrete walled bathhouse along with other demountable buildings for workshops & administration purposes. Some temporary structures may also be installed during construction. Click for more details...

TALINGA DEVELOPMENT PROJECT
Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Western Downs Regional Council Area of Resource - Coal Seam Gas type. The project involves transitioning the existing pilot trial of 12 wells to production of up to 90TJ/day of coal seam gas, which will contribute to the supply of gas to the Darling Downs Power Station. The development will involve installing coal seam gas wells at a spacing of between 750m and 1000m; associated gas and water gathering systems, a gas plant, a produced water treatment facility, evaporation ponds, offices, storage areas, workshops, camp and gravel pits. Based on current well production predictions, this equates to the installation of approximately 100 coal seam gas wells. This project will incorporate a water treatment facility to significantly reduce the evaporation pond surface area down to approximately 170ha. The water treatment facility will employ an integrated membrane system, including reverse osmosis, to achieve an 85% desalination recovery and create a freshwater resource. The freshwater will be discharged to the Condamine River catchment until higher level beneficial used, such as industrial, urban or agricultural use, can be implemented. Click for more details...

TALINGA DEVELOPMENT PROJECT
Mining - Support Facilities (Industrial buildings) project In The Western Downs Regional Council Area of Resource - Coal Seam Gas type. The project involves transitioning the existing pilot trial of 12 wells to production of up to 90TJ/day of coal seam gas, which will contribute to the supply of gas to the Darling Downs Power Station. The development will involve installing coal seam gas wells at a spacing of between 750m and 1000m; associated gas and water gathering systems, a gas plant, a produced water treatment facility, evaporation ponds, offices, storage areas, workshops, camp and gravel pits. Based on current well production predictions, this equates to the installation of approximately 100 coal seam gas wells. This project will incorporate a water treatment facility to significantly reduce the evaporation pond surface area down to approximately 170ha. The water treatment facility will employ an integrated membrane system, including reverse osmosis, to achieve an 85% desalination recovery and create a freshwater resource. The freshwater will be discharged to the Condamine River catchment until higher level beneficial used, such as industrial, urban or agricultural use, can be implemented. Click for more details...

BASSGAS OPERATIONS - YOLLA MID-LIFE ENHANCEMENT PROJECT STAGE 1
Tasmanian waters 147km off the Victorian coast, Bass Basin, TAS 7999 Has Bassgas Operations - Yolla Mid-Life Enhancement Project Stage 1 currently at Construction stage. A project to maximise gas recovery from the operating Yolla field which provides gas, condensate & LPG through the Lang Lang processing facility. Conversion of the currently unmanned 8000t, 50m x 50m x 120m high Yolla A platform by installation of living quarters along with safety related systems & equipment. Installation also of pumping & compression equipment. Click for more details...

MAULES CREEK COAL PROJECT - OFFICES & BATHHOUSE
Administration Offices/Bathhouse project at 20km NE of, Boggabri, NSW 2382 In The Council Area Of Narrabri of Private. For the provision of administration offices & bath house. Click for more details...

GLADSTONE LIQUEFIED NATURAL GAS (GLNG) PROJECT - COAL SEAM GAS FIELDS - ACCOMMODATION PACKAGES
Gladstone Liquefied Natural Gas (Glng) Project - Coal Seam Gas Fields - Accommodation Packages is currently at the Construction stage, valued at about $ 10000000 it is For the provision of accommodation camps. Click for more details...

BOWEN BASIN ACCOMMODATION VILLAGE PACKAGES
Currently at the Tenders & Building stage In Various is a project estimated to be $ 10000000. This project Packages for supplier & construction involvement in The Mac's Developed-Owned-Operated accommodation village projects in the Bowen Basin (non-mining sites). To include civil site & road works, accommodation village transportable buildings as well as on site construction of kitchen/dining rooms, taverns, administration & retail facilities. Click for more details...

MORANBAH VILLAGE STYLE ACCOMMODATION CONTRACT
Moranbah Village Style Accommodation Contract is currently at the Planning stage, valued at about $ 3000000 it is Provision in stages of 250-300 beds in new or existing village style accommodation to support the Moranbah Gas Project. Click for more details...

GROSVENOR COAL PROJECT - MINE INFRASTRUCTURE AREA (MIA)
Support Buildings New project In The Isaac Regional Council Area. Construction of 7 separate buildings to provide support infrastructure. To include workshops, training room, administration buildings, amenities buildings & truck wash area. Concrete slab, steel portal frame, lightweight cladding, metal roof. Click for more details...

STORMONT JOINT VENTURE GOLD PROJECT
Mining - Support Facilities (Industrial buildings) New project at off Cradle Mountain Rd west of, Moina, TAS 7306. This type is Resource - Gold with Private ownership. Mining of 80,000t approx of the Stormont skarn-style gold-silver-bismuth deposit to 50m deep using conventional methods (drill & blast, excavators, articulated trucks). Ore to be trucked from a run-of-mine (RoM) stockpile over 130km for processing at BCD's Beaconsfield carbon-in-leach (CIL)/Bacox plant. An on-site mobile crusher may be required in addition to a hydraulic rock-breaker. Associated temporary waste rock dump, office, crib room/amenities, workshop (open ended shed with laydown area) & diesel fuel/oil storage system. Rehabilitation at completion of campaign. Expected employment for 14 people plus truck haulers. Click for more details...

THE MAC ACCOMMODATION CENTRE BOGGABRI STAGE 1
Mining - Support Facilities (Canteens, Messes, Crib room) New project at 262 Carloola Rd, Boggabri, NSW 2382. This type is Accommodation Modules/Administration/Kitchen/Dining/Laundry/Civils/Reservoir with Private ownership. Construction of stage 1 of an accommodation village to provide 328 rooms & laundry facilities in prefabricated modules. Construction also of an office/administration building & a kitchen/dining building with concrete floors & metal walls & roofs. Civil works package expected to include bulk earthworks, roadworks, stormwater & construction of an 8ML reservoir. Click for more details...

DUGALD RIVER BASE METAL PROJECT - TEMPORARY ACCOMMODATION CAMP
A project in the QLD Within Mt Isa City. Construction of a 100 bed temporary worker's village. Click for more details...

ROY HILL IRON ORE PROJECT - NON-PROCESSING INFRASTRUCTURE
Mining - Support Facilities (Administration facilities) project for New development. For the development of heavy and light vehicle workshops, a washdown facility, a boilermaker workshop, tyre change facility, lube farm administration buildings and a gatehouse. Click for more details...

ROY HILL IRON ORE PROJECT - NON-PROCESSING INFRASTRUCTURE
Mining - Support Facilities (Industrial buildings) project for New development. For the development of heavy and light vehicle workshops, a washdown facility, a boilermaker workshop, tyre change facility, lube farm administration buildings and a gatehouse. Click for more details...

ICHTHYS GAS PROJECT - ONSHORE - SITE FACILITIES BLD1 - CEILINGS PARTITIONS & LININGS SUBCONTRACT
Ceilings/Partitions/Linings - Supply & Install New project In The Darwin City Council Area. Supply, delivery & installation of all new ceilings, partitions & linings to buildings in the gatehouse, operations & warehouse/workshop zones. Click for more details...

LIDDELL COAL OPERATIONS EXPANSION
Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project at Old New England Hwy, Ravensworth, NSW 2330 for New. A project for a 5 year life-of-mine (LoM) extension by expanding the existing South pit followed by expansion of the Entrance pit after which a new MIA pit to be developed involving relocation of the current mine infrastructure area. Construction of a new conveyor & transfer point to link to the existing overland conveyor to allow transfer of up to 1.5 million tonnes per annum (Mtpa) of coal to the Ravensworth coal handling & preparation plant (CHPP) now that the demolished Cumnock CHPP is no longer available to take excess run-of-mine (ROM) coal. A new 50,000t stockpile at the new conveyor & expansion of the existing ROM stockpile capacity to 200,000t as well as a new tailings emplacement area in the South Pit void. Associated infrastructure expected to include access & haul roads, surface water management systems, new dewatering bores for the Hazeldene, Entrance & South pit workings, an explosive reload facility, powerlines, pipelines & a water truck fill point. Click for more details...

BHP BILLITON MOOKA CAR REPAIR WORKSHOP
Bhp Billiton Mooka Car Repair Workshop is currently at the Construction stage, valued at about $ 30000000 it is Contract for the construction of a maintenance workshop & warehouse. To include process equipment installation as well as rail & infrastructure components including roads, track, signalling & communications electrical engineering. Water supply. Click for more details...

ROY HILL IRON ORE PROJECT - NON-PROCESS INFRASTRUCTURE - MINE SITE HV AREA
Currently at the Construction stage In East Pilbara is a project estimated to be $ 100000000. This project Construction of various non-process infrastructure buildings for the Roy Hill Iron Ore Mine, comprising three main works zones being Mine Services Area, a Gatehouse and Go-Line Facility and to include HV area. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE FACILITIES - TANK CALIBRATION
Tank Calibration Services New project In The Darwin City Council Area. Comprehensive post-build survey of the interior of tanks followed by preparation of detailed calibration charts. To include a propane refrigerant storage sphere & miscellaneous non-cryogenic storage tanks (eg condensate, hydrocarbon drain, solvent, water, diesel). Click for more details...

EUROMBAH SUBSTATION WORKERS ACCOMMADATION
Temporary Workers Accommadation New project In The Banana Shire Council Area. Temporary workers accommodation on the furure Eurombah Substation site. Power generation room, water storage & pump room, theatre & gymnasium, laundry & sick room, food storage & cold room, food preparation room, kitchen & dining room. 4 person accommodation demountable modular units. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - ACCOMMODATION VILLAGE (DESIGN & CONSTRUCTION)
New project of Mining - Support Facilities (Accommodation - units, housing, group accom.) project at 40km SW of, Weipa, QLD 4874. For the design & construction of an Accommodation Village (comprising approximately 1,200 accommodation rooms) & temporary on-site construction facilities at different locations external to the construction camp. Accommodation rooms will be supplied by Rio Tinto. The accommodation village & the temporary on-site construction facilities includes but is not limited to: Four (4) bed unsuited accommodation modules. People with Disabilities (PWD) two (2) bed unsuited accommodation modules. Maintenance & storage facilities. Office & administration facilities. Communications/data/television signal facility. Close Circuit Television (CCTV) monitoring facilities. Ablutions modules. Kitchen, dining & crib facilities. Entertainment facilities. Gymnasiums. Sporting facilities. Training/education centre. Laundry modules. Commercial laundry facility. First aid facility Power generation units & distribution panels with reticulation network. Area & general lighting requirements. Potable water treatment, storage & distribution networks. Waste water treatment systems & collection networks. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect