List of Mining - Support Facilities Projects


GOONYELLA/RIVERSIDE COAL OPERATION
Goonyella Mine via, Moranbah, QLD 4744 Has Goonyella/Riverside Coal Operation currently at Planning stage. Standing structures include warehouse, service bay tank farm, tyre bay, carpenter shop, 2 x workshops. Click for more details...

COAL & ALLIED OPERATIONS
Airconditioner Maintenance For Mobile And Fixed Plant project at Various sites Hunter Valley via, Lemington, NSW 2330 in the Mining - Support Facilities (Administration facilities). Includes professional services for the safe and effective maintenance of air conditioners installed to mobile or fixed plant at the above locations. All works will comply to Coal and Allied safety and standards. The work required will involve planned maintenance, servicing and breakdown repairs. Coal & Allied operates open cut coal mines and coal preparation plants in the Hunter Valley, New South Wales, these being Mount thorley Operations, Hunter Valley Operations ( Howick Hunter Valley and lemington), Warkworth and Bengalla mines. Click for more details...

LUDLOW MINERAL SANDS PROJECT - ON SITE BUILDINGS RELOCATION
Mining - Support Facilities (Accommodation - units, housing, group accom.) New project at 34 km south of, Bunbury, WA 6230. This type is On Site Buildings - Relocation (From Yarloop & Sandalwood) with Private ownership. On site buildings include: office/cribb room; plant buildings. Click for more details...

BAUHINIA REGIONAL RAIL PROJECT - ROLLESTON COAL PROJECT
A project in the QLD Within Central Highlands Regional. Queensland Rail will construct, own and operate a new 110 km spur to expand their existing rail network in the Blackwater system. The new spur will connect to the existing system near Kinrola. The Rolleston mine will be charged a fee under a 20 year contract to access the line. Click for more details...

LEINSTER - NICKEL/GOLD
Site operations via, Leinster, WA 6437 Has Leinster - Nickel/Gold currently at Construction stage. Contract to involve site works, provision of services & construction of a transportable (or insitu) 186-room self contained village. Concrete verandah floors, earthworks, roadworks & drainage included in tender. Services include termite treatment, plumbing, LPG connections & electrical requirements. Click for more details...

SUNRISE DAM GOLD OPERATIONS
Currently at the Construction stage In Laverton is a project estimated to be $ 1500000. This project Contract includes accommodation village for about 150 personnel, offices and ablution areas. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - RAIL INFRASTRUCTURE
Rail Infrastructure New project In The Port Hedland Council Area. Feasibility study has recommended a a 255 km railway line from Cloud Break to Port Headland port facility. A mine load out facility will be located at Cloud Break. There will be four train sets each comprising two locomotives and two hundred wagons. Supporting infrastructure will include sidings, passing bays and loading loops, train loader, temporary construction facilities, temporary track camps, administration offices and warehouses, trip servicing facilities, service and repair workshop, rail maintenance track, rail loops and marshalling yards, maintenance facilities, substations and communication systems. The proposed line does deviate where there are environmental, heritage and engineering constraints. Stage A PER covers the Port and North to South rail line. The Stage B PER covers the East to West rail spur. Click for more details...

CHARTERS TOWERS GOLD OPERATIONS
Mining - Support Facilities (Canteens, Messes, Crib room) project for New development. Includes pipes, crib rooms, escape rooms, ladder ways. Detailed mine plans have been completed for Warrior East and Sunburst laying out access, exploration and production drives, escapeways, drainage and ventilation connections. Click for more details...

MOUNT IDA PROJECT - GOLD RESOURCE
Mining - Support Facilities (Administration facilities) project at Via, Menzies, WA 6436 of Resource - Gold type of New development. Resource estimate for the Baldock, Meteor, Whinnen and Timoni ore bodies is 143,000 tonnes @ 24 g/t for 110,650 ounces of Au. Associated infrastructure includes camp, offices, refurbished shaft and mining equipment. Click for more details...

SALLY MALAY NICKEL PROJECT
Mining - Support Facilities (Accommodation - units, housing, group accom.) New project at 160 km southwest of, Kununurra, WA 6743. This type is Accommodation Village with Private ownership. 120 person village. Click for more details...

RAVENSTHORPE NICKEL PROJECT - BANDALUP HILL - INFRASTRUCTURE
Infrastructure project at 50km north of, Hopetoun, WA 6348 in the Mining - Support Facilities (Industrial buildings). A combination of multi user regional infrastructure and project infrastructure. The multi user infrastructure includes upgrade of local roads, new shire airstrip, emergency services, sewered land, housing, power and water. Project infrastructure includes site buildings, communication, plant roads, construction camp and port facilities at Esperance. Click for more details...

DEPARTMENT ENVIRONMENT & HERITAGE
Facilities Plan Consultancy For Accomodation Solutions In The Various Council Area. Facilities plan survey to decide on right accommodation, cost efficient for long term future. Click for more details...

CRACOW GOLD PROJECT - KLONDYKE/ROYAL SHOOT/CROWN/ROSES PRIDE
Surface Works New project In The Banana Shire Council Area. Includes excavation of box cut. Click for more details...

WILLOUGHBY PARK AMENITIES
Mining - Support Facilities (Canteens, Messes, Crib room) project at Warrane Road, Willoughby, NSW 2068 of Canteen/Changeroom - Altns type of Renovations, Refurbishments etc. development. Internal alterations to the Clive A Reid pavilion comprising of a new public toilet suitable for disabled persons, ramp along the rear, a shower recess and toilet cubicle. Additional planting to provide a visual buffer between the building and the residential properties. Click for more details...

IRON ORE RAPID GROWTH PROJECT 3 - PORT INFRASTRUCTURE
At, Finucane Island, WA 6721 Has Iron Ore Rapid Growth Project 3 - Port Infrastructure currently at Construction stage. Development comprises construction a new single stockyard row in area S, the Eastern Yard including a new stacker and new reclaimer. Constructing a new dedicated Return Screened Fines stockpile adjacent to Car Dumper 4 including new stacker and new reclaimer. Joining the existing Berths C & D together to allow existing shiploaders SLO3 and SLO4 to access either berth. Modifications to the long travel of shiploaders SLO3 and SLO4 so they can travel and shipload on Berth C and D. Upgrading and rebuilding the existing Berth C to accommodate shiploader SLO4 and 250,000 DWT vessels, modify the exisitng control system to suit the new operating regime, improve dust control measures, upgrade electrical infrastructure to suit the proposed development, upgrade the exisiting general infrastructure including upgrading a warhouse building , upgrading roads and constructing a new water recovery plant. The existing existing environmental berm will be extend to provide a visual buffer to the town of Port Hedland on the other side of the harbour from the new eastern stockyard. Construction of temporary lay down areas and buildings for the contractors and temporary construction offices for BHP and EPCM staff. Borrow pits will be developed for the taking of material for construction purposes. A new 66 Kv power line will also be constructed and installed. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - ANFO STORAGE FACILITY
Great Northern Highway, Newman, WA 6753 Has Iron Ore Rapid Growth 3 Project - Area C - Anfo Storage Facility currently at Construction stage. Ammonium Nitrate and Fuel Oil facility. The building will be built into the side of a hill and will be 3 levels and 27.1 metres high. The middle level will be 49.2 metres long and 26.2 metres wide. Click for more details...

COBURN MINERAL SANDS PROJECT - ACCOMMODATION CAMP CATERING
Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Shark Bay Council Area of Accommodation Camp Catering type. Catering for accommodation camp. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - RAIL WORKERS CAMP
Mining - Support Facilities (Accommodation - units, housing, group accom.) project at 15 Km North of Wodgina via, Newman, WA 6753 of Accommodation Camp type of New development. A 280 person accommodation camp to be constructed for rail workers. The camp will comprise 70 accommodation units containing 4 rooms with their own ensuite. Other buildings will be a camp management/office building, dry mess, a wet mess with covered beer garden, a recreation complex, 3 laundry buildings, fully equiped gymnasium, a first aid post with ambulance shelter and other ancillary buildings. A sports court, BBQ area and swimming pool with associated toliets and change rooms will be constructed. Click for more details...

COPPABELLA ACCOMMODATION CENTRE - CENTRAL FACILITIES BUILDING - STAGE 1
Coppabella Accommodation Centre - Central Facilities Building - Stage 1 is currently at the Construction stage, valued at about $ 5000000 it is To include bar, recreation facilities, meeting rooms & swimming pool. Concrete slab, structural steel frame, external cladding & metal roof. Loading dock. Click for more details...

PROMINENT HILL GOLD/COPPER PROJECT - ACCOMMODATION VILLAGE
Prominent Hill Gold/Copper Project - Accommodation Village is currently at the Construction stage, valued at about $ 9000000 it is A 400 unit permanent village will comprise of air-conditioned single room semi-detachable accommodation units with ensuites. Other facilities include, a kitchen, storage, messing facilities, a wet mess, meeting room, internet cafe, gymnasium and swimming pool. Click for more details...

BROKEN HILL SEPARATION PLANT UPGRADE
Currently at the Planning stage In Broken Hill is a project estimated to be $ 36000000. This project The upgrade of the separation plant is proposed to take into account the development of the nearby Snapper project. Upgrades will be undertaken for the plant itself and associated infrastructure. The plant upgrades planned are the additions of a rutile circuit and a zircon circuit. An option to locate a Wet High Intensity Magnetic Separator circuit from the mine site is also proposed. These addition will production to increase from 576,000 tpa to 650,000 tpa. The rutile, ilmenite and zircon circuit feed and rejects stockpiles will all be expanded. The non-magnetic concentrate heavy mineral concentrate receival area will also be expanded. The capacity of the two coal container storages will be expanded from 1000 tonnes to 1500 tonnes. Click for more details...

QSN LINK GAS PIPELINE
Private ownership Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Not Yet Determined Council Area for New development. The QSN Link pipeline will extend south-west from the Ballera Gas facility in Queensland. It will pass approximately 7km to the south of Innamincka in South Australia and terminate at the Moomba plant. The pipeline will be some 180km in length, with approximately 90km in Queensland and 91.5km in South Australia. The pipeline will be typical of a modern, small to medium diameter gas transmission pipeline. Final design parameters are yet to be determined, but it is likely to involve the following infrastructure: a buried, high pressure, steel, natural gas pipeline, with a diameter in the order of 400mm, an inlet station at Ballera, above ground facilities at intervals along the pipeline include a mid-line mainline valve, cathodic protection systems and marker signs and an outlet delivery station at Moomba. The construction workforce will be accommodated in temporary camps and at local accommodation. two preliminary campsite locations have been selected which will accommodate a single camp that will be mobilised from one location to the other during the construction phase of the project. construction depots will be used primarily for equipment storage and will typically be co-located with the construction camps. Facilities and equipment stored at the construction depots may include: site office and administration centre, construction vehicles, diesel fuel and lubricants, vehicle maintenance equipment, sand bags, sediment fencing, star droppers and wooden stakes and pipe wrapping and joint coating materials. When the utility is no longer required, the pipeline will be decommissioned in accordance with the regulatory requirements and accepted environmental best practices at the time. currently decommissioning procedures require the removal of all above ground infrastructure and the restoration of associated disturbed areas. Click for more details...

ROCGLEN COAL PROJECT - WORKSHOP
Mining - Support Facilities (Industrial buildings) project for New development. For the provision of a workshop. Click for more details...

DRAYTON COAL OPERATIONS EXTENSION PROJECT
Mining - Support Facilities (Industrial buildings) project for New development. Mining of an additional resource of 30 million tonnes from the Greta Coal Measures (targeting the Rowan formation) at a rate of up to 8 Mtpa to extend the mine life to 2017. The extension of mining will predominantly progress to the South of current operations; however, additional areas within the North and East of the project area are also proposed to be mined. The project will require some additional items of equipment to accommodate an increased rate of production such as: 1 x excavator, 3 x track dozers, 5 x 280 tonne rear dump trucks, 1 x additional drill, grader and watercart, plus other minor ancillary equipment. The existing Coal Handling Plant (CHP) & associated stockpile reclamation system will be upgraded in order to align the facilities with the proposed increase in annual production. A new 80 000 tonnes product coal stockpile & a 40 000 tonne domestic product coal stockpile are proposed to further assist production efficiencies. Minor changes to Drayton's water management system are also proposed to maximise water management & use at the mine. Drayton will continue to utilise dragline, excavators, loaders and a fleet of trucks to both uncover the coal & transport it to on-site processing and load-out facilities. Blasting will continue to be required to assist with overburden & coal extraction. Drayton will continue to utilise existing infrastructure such as administration offices, workshops, parking facilities, conveyors, coal handling facilities and coal stockpiles. Click for more details...

RIDGEWAY DEEPS UNDERGROUND GOLD MINE EXTENSION PROJECT - MECHANICAL FABRICATION FOR SURFACE FACILITIES & INFRASTRUCTURE
Mining - Support Facilities (Canteens, Messes, Crib room) project In The Orange Council Area of Private ownership. For mechanical fabrication for the surface facilities & infrastructure. Click for more details...

SINO IRON ORE PROJECT - ACCOMMODATION VILLAGE
Mining - Support Facilities (Sporting facilities, Gymnasiums, etc.) project for New development. For the construction of a 600 man accommodation village facility. The facility comprises accommodation units, staff canteens, a tavern, gymnasium and associated facilities. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT
Mining - Support Facilities (Accommodation - units, housing, group accom.) project for New development. QCLNG is a project to develop coal seam gas (CSG) fields in the Surat & Bowen Basins, pipe gas to a processing plant to be built on Curtis Island & then export product liquefied natural gas (LNG) by ship. Phase 1 to be constructed to include 2 LNG processing trains with a combined capacity of up to 8.5million tonnes per annum (Mtpa) along with associated gas wells, field facilities & pipelines. Some 820 operational personnel & over 5000 construction personnel expected. Workers accommodation to be required in the Gladstone region (250 approx dwellings) & Western Downs area (280 approx dwellings). Click for more details...

JEEBROPILLY COAL TO LIQUIDS PLANT
Private ownership Mining - Support Facilities (Administration facilities) project In The Ipswich City Council Area for New development. Construction of a proof of concept coal to liquids (CTL) plant at the existing Jeebropilly Coal Mine site. Click for more details...

HOPE DOWNS 4 JOINT VENTURE IRON ORE PROJECT - ACCOMMODATION VILLAGE
Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The East Pilbara Council Area of Private ownership. Provision of an accommodation village for 920 people. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1/PHASE A
Civils/Piping Works/Offices/Roads/Accommodation - Stage 1/Phase A New project In The City Of Karratha Council Area. As part of a plan to increase Rio Tinto's overall Pilbara operational capacity to 330million tonnes per annum (Mtpa), a project to increase the Cape Lambert Port iron ore handling, processing & ship loading capacity through construction in 2 stages (phases A 7 B) of new stockyard & port facilities of up to 100Mtpa capacity to the west of the existing 80Mtpa Port A operations. Construction of a 920m long jetty & a 2-berth wharf along with new shiploading facilities. Associated piping works expected to include relocation of the natural gas pipeline feeding the Cape Lambert power station, the Cape Lambert landfill site & a transmission line. Construction facilities expected to inlcude laydown & storage areas adjacent the stockpile area, construction contractor offices, minor roads & accommodation. Click for more details...

TOM PRICE SINGLE DETACHED HOUSES
A project in the WA Within Ashburton. Works to include construction of 4 x 3 single detached houses on Lot 481 Coolibah Street, Lot 744 Mungarra Street, Lot 239 Kurrajong Street & Lot 97 Oleander Street. Click for more details...

ROLLESTON ACCOMMODATION VILLAGE EXPANSION
Mining - Support Facilities (Accommodation - units, housing, group accom.) project at via Dawson Hwy 10km northwest of, Rolleston, QLD 4702 of Bedrooms/Dining Hall/Parking/Water Treatment/Dam Relocation type of New development. Doubling of the existing 350 person accommodation village with another 200 rooms in stage 1 & 150 rooms in stage 2. New mess hall. Upgrades to the existing sewerage & water treatment facilities. Expansion of car parks. Relocation of existing silt retention dam. Click for more details...

DOYLES CREEK COAL PROJECT - MINE SAFETY & TRAINING SCHOOL
Mining - Support Facilities (Administration facilities) project In The Singleton Council Area of Training School type. Establishment of a stand alone mine safety & training school for around 30 staff & 100 students a year. Construction of dedicated surface infrastructure to include a training room, on site accommodation modules for 8 visiting students & a large building to simulate underground mining conditions. Subsequent development to include a separate portal to the West Borehole Seam plus a network of first workings with 20m centre pillars at a rate of 400m a year (8,000 tpa) for more than 21 years. Click for more details...

LAMBOO/NICOLSONS GOLD PROJECT - ACCOMMODATION VILLAGE UPGRADE
Accommodation Village New project In The Halls Creek Council Area. Already existing 8 accommodation units with 31 ensuited rooms & 2 laundry buildings requiring some refurbishment. Potential purchase of additional new accommodation units, kitchen, mess & the installation of services including power & sewerage. Click for more details...

MORANBAH GAS FIELD DEVELOPMENT
Mining - Support Facilities (Accommodation - units, housing, group accom.) New project at Between COPPABELLA &, Moranbah, QLD 4744. This type is Operating Gas Field - Expansion with Private ownership. A project to develop the existing Moranbah gas field which comprises over 500 production wells & mostly buried gas/water flowlines with compressors leading to water facilities (15 dams, a water treatment facility under construction) & the Moranbah Gas Processing Facility (PL191). Further development to include drilling of 5 exploration wells & 6 appraisal wells with associated water handling systems including flowlines & 5 small (10ML) aggregation dams to store well head water. Drilling also of over 100 fenced, steel & concrete cased production wells each comprising a wellhead, electric drive rotating screw pump, wellhead gas/water separator & control valve as well as monitoring, metering & communications equipment. Typically the wells will be chevron style with surface-to-in-seam horizontal/lateral wells requiring up to 3 pads each but some will be multi-branch lateral wells linked from 2 separate pads. Gathering lines to be buried 53-500mm diameter high density polyethylene (HDPE) pipe. Associated infrastructure to include access tracks, overhead powerlines (for wellhead & compressor facilities), borrow pits, quarries & storage areas. Construction also of up to 4 large (400-600ML) dams for treated water, up to 3 brine storages & groundwater monitoring bores. Any accommodation camps to be developed over the project to include canteen facilities, communications, vehicle maintenance & parking areas, fuel handling & storage areas sewerage treatment. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - ACCOMMODATION SUPPLY
Australia Pacific Lng (Aplng) Project - Accommodation Supply is currently at the Construction stage, valued at about $ 6000000 it is Provision of 200 ensuited rooms across the Surat Basin. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE - OPERATIONS CENTRE
Operations Centre project at Blaydin Point, Darwin, NT 0800 In The Council Area Of Darwin City of Private. For the construction of an operations complex area including operations office, central control building and fire station, training and canteen facility, warehouses, workshops laboratory, guardhouse and associated infrastructure. Click for more details...

THE MAC ACCOMMODATION CENTRE BOGGABRI STAGE 1
Mining - Support Facilities (Accommodation - units, housing, group accom.) New project at 262 Carloola Rd, Boggabri, NSW 2382. This type is Accommodation Modules/Administration/Kitchen/Dining/Laundry/Civils/Reservoir with Private ownership. Construction of stage 1 of an accommodation village to provide 328 rooms & laundry facilities in prefabricated modules. Construction also of an office/administration building & a kitchen/dining building with concrete floors & metal walls & roofs. Civil works package expected to include bulk earthworks, roadworks, stormwater & construction of an 8ML reservoir. Click for more details...

DEFLECTOR COPPER GOLD PROJECT - ACCOMMODATION CAMP - EXPANSION
New project of Mining - Support Facilities (Accommodation - units, housing, group accom.) project at Via Geraldton Mt Magnet Rd 60km SE of, Mullewa, WA 6630. Planned expansion of an onsite accommodation camp. Access road. Click for more details...

ROY HILL IRON ORE PROJECT - NON-PROCESSING INFRASTRUCTURE
Mining - Support Facilities (Administration facilities) project for New development. For the development of heavy and light vehicle workshops, a washdown facility, a boilermaker workshop, tyre change facility, lube farm administration buildings and a gatehouse. Click for more details...

ICHTHYS GAS PROJECT - ONSHORE - SITE FACILITIES BLD1 - CEILINGS PARTITIONS & LININGS SUBCONTRACT
Ceilings/Partitions/Linings - Supply & Install New project In The Darwin City Council Area. Supply, delivery & installation of all new ceilings, partitions & linings to buildings in the gatehouse, operations & warehouse/workshop zones. Click for more details...

EUROMBAH SUBSTATION WORKERS ACCOMMADATION
Temporary Workers Accommadation New project In The Banana Shire Council Area. Temporary workers accommodation on the furure Eurombah Substation site. Power generation room, water storage & pump room, theatre & gymnasium, laundry & sick room, food storage & cold room, food preparation room, kitchen & dining room. 4 person accommodation demountable modular units. Click for more details...

ROY HILL IRON ORE PROJECT - PKG 3 - PORT LANDSIDE - EPC CONTRACT
Epc Contract project at Boodarie Industrials Estate, Southwest of, Port Hedland, WA 6721 In The Council Area Of Port Hedland of Private. For the provision of EPC services consisting of all SMPE&I for installation of the Train unloading systems, multiple conveyor systems including transfer stations & rescreening buildings, installation of stockyard Stackers & Reclaimers and all other services required. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - ACCOMMODATION VILLAGE (DESIGN & CONSTRUCTION)
New project of Mining - Support Facilities (Industrial buildings) project at 40km SW of, Weipa, QLD 4874. For the design & construction of an Accommodation Village (comprising approximately 1,200 accommodation rooms) & temporary on-site construction facilities at different locations external to the construction camp. Accommodation rooms will be supplied by Rio Tinto. The accommodation village & the temporary on-site construction facilities includes but is not limited to: Four (4) bed unsuited accommodation modules. People with Disabilities (PWD) two (2) bed unsuited accommodation modules. Maintenance & storage facilities. Office & administration facilities. Communications/data/television signal facility. Close Circuit Television (CCTV) monitoring facilities. Ablutions modules. Kitchen, dining & crib facilities. Entertainment facilities. Gymnasiums. Sporting facilities. Training/education centre. Laundry modules. Commercial laundry facility. First aid facility Power generation units & distribution panels with reticulation network. Area & general lighting requirements. Potable water treatment, storage & distribution networks. Waste water treatment systems & collection networks. Click for more details...

PILGANGOORA LITHIUM-TANTALUM PROJECT - ACCOMMODATION
Accommodation Village - Relocation project at 120km South of, Port Hedland, WA 6721 in the Mining - Support Facilities (Accommodation - units, housing, group accom.). For the provision of the relocation of the Roy Hill Rail Camp 3. The camp will be relocated in 2 stages. Click for more details...

PILGANGOORA LITHIUM-TANTALUM PROJECT - MINE WORKSHOP & OFFICES
Mining - Support Facilities (Industrial buildings) project for New development. For the provision of a mine workshop & offices. Click for more details...

NORTHERN GAS PIPELINE - MOTOR CONTROL CENTRES
Mining - Support Facilities (Industrial buildings) New project at Tennant Creek to Mount Isa, ., NT 8999. This type is Motor Control Centres with Private ownership. For the provision of 2 motor control centres. Click for more details...

PILGANGOORA LITHIUM TANTALUM PROJECT - EPC CONTRACT
Mining - Support Facilities (Industrial buildings) project for New development. For the provision of engineering, procurements & construction for the Pilgangoora Lithium-Tantalum Project. Click for more details...

WOODVIEW QUARRY
Mining - Support Facilities (Industrial buildings) project for New development. Proposed crushing aggregates & flood blend to include transporting & loading of feed rock into a primary crusher, crushing of feed rock through necessary crushers, screening of rock to meet specifications, re-crushing & re-screening of oversize rock to meet specifications, stockpiling of materials in uniform windrows to suit stockpile area, testing of MB20 & DGS40 to NSW Roads & Maritime Services specifications for quality & Council requirements for the number of tests required & testing of Flood Blend, 20mm Aggregate, Gabion Rock & -70mm to Council requirements. Click for more details...