List of Mining - Support Facilities Projects in NSW


HOXTON PARK RD INDUSTRIAL WORKSHOP
New project of Mining - Support Facilities (Industrial buildings) project at 376 (Lot 7) Hoxton Park Rd (DP1036695), Prestons, NSW 2170. (Lot 7; DP1036695) Construction of 644sqm workshop and 70sqm office Click for more details...

HUNTER VALLEY COAL OPERATIONS - HUNTER VALLEY/HOWICK/LEMINGTON
Office - Alterations & Additions project at Via, Singleton, NSW 2330 In The Council Area Of Singleton of Private. To extend available area. Click for more details...

TASMAN PROJECT - MOUNT SUGARLOAF - SURFACE BUILDINGS
Tasman Project - Mount Sugarloaf - Surface Buildings is currently at the Construction stage, valued at about $ 1000000 it is Administration, worker amenities and stores, workshop, bunded fuel area. Click for more details...

LIDDELL COAL COLLIERY - RESOURCE
Mine - Coal New project In The Singleton Council Area. Existing operation produces 4.5 Mtpa of Rom coal and the CHPP processes 700 tonnes per hour. A proposal has been approved to increase ROM coal production to 8 Mtpa. Associated development will comprise the construction of a new Coal Handling Plant, establishment of a new supplementary stockpile with capacity of 450,000 tonnes, alter the planned 1500 ML Dam 13B footprint, construct a bridge over the main Northern Railway to improve transport between existing coal pits, alter an access road to the CHPP, relocation of offices, workshop and storage area and an associated access road, and the construction of a desalination unit within the CHPP area for the treatment of mine water. Capital expenditure on the Washplant upgrade alone was approx $100 million. Click for more details...

COAL & ALLIED OPERATIONS
Airconditioner Maintenance For Mobile And Fixed Plant project at Various sites Hunter Valley via, Lemington, NSW 2330 in the Mining - Support Facilities (Administration facilities). Includes professional services for the safe and effective maintenance of air conditioners installed to mobile or fixed plant at the above locations. All works will comply to Coal and Allied safety and standards. The work required will involve planned maintenance, servicing and breakdown repairs. Coal & Allied operates open cut coal mines and coal preparation plants in the Hunter Valley, New South Wales, these being Mount thorley Operations, Hunter Valley Operations ( Howick Hunter Valley and lemington), Warkworth and Bengalla mines. Click for more details...

ULAN NO 2 COAL MINE
New project of Mining - Support Facilities (Administration facilities) project at off Cassilis Rd, Ulan, NSW 2850. Concrete slab, steel frame and metal clad walls and roof. Includes air conditioning to offices. Click for more details...

ULAN NO 2 COAL MINE
New project of Mining - Support Facilities (Industrial buildings) project at off Cassilis Rd, Ulan, NSW 2850. Concrete slab, steel frame and metal clad walls and roof. Includes air conditioning to offices. Click for more details...

TARAWONGA COAL PROJECT - RESOURCE
Resource - Coal project at Maules Creek & Goonbri Rds, 15 km north east of, Boggabri, NSW 2382 In The Council Area Of Narrabri of Private. The expected mine life between 8 to 10 years, will yield close to 12 million tonnes of export quality low sulphur, low ash, high-energy semi-soft coking coal from the Forest View, Thuin and Nagero properties east of Boggabri (formerley named East Boggabri Coal Project). Click for more details...

AUSTAR COAL OPERATIONS EXPANSION
Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project In The Cessnock Council Area of Operating Mine - Extn - Stage 3 type. For longwall extraction from panels A1 & A2 using a new method of longwall mining known as longwall top caving. For the construction and operation of some additional surface infrastructure including a larger capacity ventilation fan, downcast shaft, substation, nitrogen injection plant, tube bundle shed, and diesel storage and dispatch system, and for the upgrading of some existing surface infrastructure including the water treatment plant, and the water reticulation and pumping system. Click for more details...

VERGE
A project in the NSW Within Rockdale. Proposed construction of a mixed development . Ground floor commercial space of 428 sq m part of which is to be used as a cafe (126 sq m) . Second level is also commercial space (this is subject to another DA not yet lodged) Over levels 3 to 11 there are 80 units. The 59 units on levels 3 - 7 are single level level 8 there are 5 single level units and 5 maisonette units with internal access to level 11 There are also 2 single level units on level 11 that gain access from level 10. The units are as follws 32 x 1 bedroom 38 x 2 bedroom and 10 x 3 bedroom units Click for more details...

BENGALLA COAL OPERATIONS EXPANSION PHASE 1
Mining - Support Facilities (Bath houses, Amenities, Dressing rooms) New project at 4 km west of, Muswellbrook, NSW 2333. This type is Operating Mine - Expansion - Phase 1 with Private ownership. Expansion of open cut operations with Phase 1 to increase Run-of-Mine (RoM) coal to 9.3Mtpa for 7.5Mtpa approx product coal. To include upgrade of the existing 8.7million tonnes per annum (Mtpa) capacity coal washery to 2 stage washing. Purchase of additional mining equipment. Upgrades of associated mine infrastructure including a heavy vehicle workshop, bathhouse & wash bay. Click for more details...

BENGALLA COAL OPERATIONS EXPANSION PHASE 1
Mining - Support Facilities (Industrial buildings) New project at 4 km west of, Muswellbrook, NSW 2333. This type is Operating Mine - Expansion - Phase 1 with Private ownership. Expansion of open cut operations with Phase 1 to increase Run-of-Mine (RoM) coal to 9.3Mtpa for 7.5Mtpa approx product coal. To include upgrade of the existing 8.7million tonnes per annum (Mtpa) capacity coal washery to 2 stage washing. Purchase of additional mining equipment. Upgrades of associated mine infrastructure including a heavy vehicle workshop, bathhouse & wash bay. Click for more details...

BENGALLA COAL OPERATIONS
Mining - Support Facilities (Industrial buildings) project, Bengalla, NSW 2333 of Truck Wash Facilities type of New development. Includes light duty truck wash to 40 tonnes and heavy duty truck wash to 300 tonnes and 2 fully automatic tank filling stations for the 300 tonne Eucalypt vehicles/ Click for more details...

WYNYARD ON THE GREEN
Mining - Support Facilities (Retail facilities) project In The Sydney Council Area of Private ownership. The proposal is for the conservation and refurbishment of Railway House, the works include, conversion of the ground floor office area at the southern end of the building for retail purposes with a new York Street entrance and awning, relocation of the ground floor facade elements from the above opening to the northern most bay to replace elements removed in 1973, reconstruction of the original main entrance with new doors set back from the facade, conservation of the terracotta facade and bronze windows, installation of a sprinkler system, demolition of lavatories and duct behind the lift shafts for construction of new corridor, fire stair, duct lavatories. Demolition of the 1973 fire stairs in the north east corner of the building, conservation of and repairs to existing corridors, including terrazzo floors, tiled walls, polished joinery, figured glass and plaster ceilings. Refurbishment of office areas including the removal of existing partitions and office fitout. Refurbishment of the lift lobbies and lift car interiors, removal of modern light fittings and their replacement with more sympathetic fittings. Removal of the lift car and cables from the good lift and insertion of a new fire-rated door and removal of exposed air conditioning ducts and their replacement with new fan coil units under windows. Click for more details...

COORANBONG COLLIERY - LIFE EXTENSION PROJECT
New project of Mining - Support Facilities (Administration facilities) project at South west of, Morisset, NSW 2264. Infrastructure to include administration buildings, concrete works, surface workshop, paving, dams, compressor buildings. Click for more details...

COORANBONG COLLIERY - LIFE EXTENSION PROJECT
New project of Mining - Support Facilities (Bath houses, Amenities, Dressing rooms) project at South west of, Morisset, NSW 2264. Infrastructure to include administration buildings, concrete works, surface workshop, paving, dams, compressor buildings. Click for more details...

COORANBONG COLLIERY - LIFE EXTENSION PROJECT
New project of Mining - Support Facilities (Canteens, Messes, Crib room) project at South west of, Morisset, NSW 2264. Infrastructure to include administration buildings, concrete works, surface workshop, paving, dams, compressor buildings. Click for more details...

COORANBONG COLLIERY - LIFE EXTENSION PROJECT
New project of Mining - Support Facilities (Industrial buildings) project at South west of, Morisset, NSW 2264. Infrastructure to include administration buildings, concrete works, surface workshop, paving, dams, compressor buildings. Click for more details...

COORANBONG COLLIERY - LIFE EXTENSION PROJECT
New project of Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project at South west of, Morisset, NSW 2264. Infrastructure to include administration buildings, concrete works, surface workshop, paving, dams, compressor buildings. Click for more details...

UNIVERSITY OF SYDNEY FLAMMABLE GOODS STORE
Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project at 1 City Road, Camperdown, NSW 2050 of Flammable Goods Store type of New development. Proposal for the construction of a new building for the storage of dangerous & flammable goods (6000 litre) for the Faculty of Medicine. Proposed building approximately 52 sq m in area & will be of brick & blockwork construction with a metal deck roof & mechanical ventilation. Click for more details...

MOUNT ARTHUR NORTH COAL PROJECT
Administration Buildings/Bath House For Industrial Area project at 5 km south of, Muswellbrook, NSW 2333 In The Council Area Of Muswellbrook of Private. Architectural design work complete. Click for more details...

COWAL GOLD PROJECT
Site Office project at North west of, West Wyalong, NSW 2671 In The Council Area Of Bland of Private. Includes the construction/supply of buildings and services required to establish a site office at the Cowal Gold Project. Capabilities required include-supply/fabrication of steel industrial shed, construction management, transportable office accommodation, fencing, electrical, concrete works, sewerage plant and plumbing. Click for more details...

WILLOUGHBY PARK AMENITIES
Mining - Support Facilities (Canteens, Messes, Crib room) project at Warrane Road, Willoughby, NSW 2068 of Canteen/Changeroom - Altns type of Renovations, Refurbishments etc. development. Internal alterations to the Clive A Reid pavilion comprising of a new public toilet suitable for disabled persons, ramp along the rear, a shower recess and toilet cubicle. Additional planting to provide a visual buffer between the building and the residential properties. Click for more details...

BOGGABRI COAL OPERATIONS EXPANSION
Mining - Support Facilities (Bath houses, Amenities, Dressing rooms) project at 17km northeast of, Boggabri, NSW 2382 of Operating Mine - Expansion - Stage 2 type of New development. Expansion of existing Boggarbri open cut coal operations. Upgrade of the coal handling & preparation plant (CHPP) to increase throughput from 1.5 million tonnes per annum (Mtpa) to 2.5Mtpa in 2011 & 4.3Mtpa in 2013. Installation of a new 132kV switchyard/sub-station/overhead power lines. Installation of modular buildings for offices & bathhouse extension. Construction of a light vehicle workshop, a heavy vehicle workshop with warehouse & a car park. 150 construciton jobs expected as well as 500 operational jobs. Click for more details...

BOGGABRI COAL OPERATIONS EXPANSION
Mining - Support Facilities (Industrial buildings) project at 17km northeast of, Boggabri, NSW 2382 of Operating Mine - Expansion - Stage 2 type of New development. Expansion of existing Boggarbri open cut coal operations. Upgrade of the coal handling & preparation plant (CHPP) to increase throughput from 1.5 million tonnes per annum (Mtpa) to 2.5Mtpa in 2011 & 4.3Mtpa in 2013. Installation of a new 132kV switchyard/sub-station/overhead power lines. Installation of modular buildings for offices & bathhouse extension. Construction of a light vehicle workshop, a heavy vehicle workshop with warehouse & a car park. 150 construciton jobs expected as well as 500 operational jobs. Click for more details...

BROKEN HILL SEPARATION PLANT UPGRADE
Currently at the Planning stage In Broken Hill is a project estimated to be $ 36000000. This project The upgrade of the separation plant is proposed to take into account the development of the nearby Snapper project. Upgrades will be undertaken for the plant itself and associated infrastructure. The plant upgrades planned are the additions of a rutile circuit and a zircon circuit. An option to locate a Wet High Intensity Magnetic Separator circuit from the mine site is also proposed. These addition will production to increase from 576,000 tpa to 650,000 tpa. The rutile, ilmenite and zircon circuit feed and rejects stockpiles will all be expanded. The non-magnetic concentrate heavy mineral concentrate receival area will also be expanded. The capacity of the two coal container storages will be expanded from 1000 tonnes to 1500 tonnes. Click for more details...

ROCGLEN COAL PROJECT - ACCOMMODATION BUILDINGS
Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Gunnedah Council Area of Accommodation Buildings type. For the provision of accommodation buildings for approximately 57 persons. Click for more details...

ROCGLEN COAL PROJECT - BATHHOUSES & ABLUTIONS BUILDINGS
Currently at the Construction stage In Gunnedah is a project estimated to be $ 2000000. This project For the provision of bathhouses & ablutions buildings. Click for more details...

ROCGLEN COAL PROJECT - CRIB ROOMS
Crib Rooms project at 25 km north of, Gunnedah, NSW 2380 in the Mining - Support Facilities (Canteens, Messes, Crib room). For the provision of crib rooms. Click for more details...

ROCGLEN COAL PROJECT - WORKSHOP
Mining - Support Facilities (Industrial buildings) project for New development. For the provision of a workshop. Click for more details...

RIDGEWAY DEEPS UNDERGROUND GOLD MINE EXTENSION PROJECT - MECHANICAL FABRICATION FOR SURFACE FACILITIES & INFRASTRUCTURE
Mining - Support Facilities (Bath houses, Amenities, Dressing rooms) project In The Orange Council Area of Private ownership. For mechanical fabrication for the surface facilities & infrastructure. Click for more details...

RIDGEWAY DEEPS UNDERGROUND GOLD MINE EXTENSION PROJECT - MECHANICAL FABRICATION FOR SURFACE FACILITIES & INFRASTRUCTURE
Mining - Support Facilities (Canteens, Messes, Crib room) project In The Orange Council Area of Private ownership. For mechanical fabrication for the surface facilities & infrastructure. Click for more details...

ULAN COAL MINE CONTINUED OPERATIONS PROJECT - ULAN WEST UNDERGROUND
Private ownership Mining - Support Facilities (Administration facilities) project In The Mid Western Regional Council Area for New development. Extension of underground mining operations in a location west of the existing Ulan No 3 underground mine & north of the recently closed open cut pit. To operate for 21 years using the retreat longwall method with a panel width of up to 400m. Access to the Ulan West operations to be via a series of portals to be constructed within the vicinity of the existing open cut pit. New surface facilities to be constructed around the entrance to include ventilation, power & water management facilities & a small temporary coal stockpile. An access ramp will also accommodate an overland conveyor out of the mine. Ancillary facilities to include a steel framed, concrete walled bathhouse along with other demountable buildings for workshops & administration purposes. Some temporary structures may also be installed during construction. Click for more details...

RAVENSWORTH COAL OPERATIONS EXPANSION - RAVENSWORTH NORTH PROJECT
Operating Mine/S - Expansion project at Lemington Rd, Singleton, NSW 2330 in the Mining - Support Facilities (Industrial buildings). A project to create a mining complex incorporating neighbouring open cut & underground operations at Ravensworth West, Narama and Cumnock No 1 Colliery & the surface facilities associated with Ravensworth Underground Mine (RUM) for mining up to 16million tonnes per annum (Mtpa) of Run-Of-Mine (ROM) coal over an expected Life-of-mine (LOM) of 29 years. Establishment south of Davis Creek & west of Bayswater Creek of the new Ravensworth North Pit. Open cut operations to continue to involve prestripping, drill & blast overburden removal, coal extraction through blasting or bulldozer, transportation of the ROM coal by truck to stockpiles & then by conveyor to a local power station (Macquarie Generation) or the Ravensworth Coal Terminal (RCT). Expansion of the product coal capacity of the existing northerly Ravensworth Coal Handling & Preparation Plant (RCHPP) & RCT loadout facility to 20Mtpa. A new Raw Coal stockpile with associated conveyor & access bridge over the New England Highway to the RCT. At this coal terminal a new product coal stockpile as well as a water dam. A new rejects bin at the existing centrally located ROM pad along with new conveyor to link to the existing rejects conveyor. Establishment of new workshop & office facilities north of Davis Creek. Realignment of an existing 330kV transmission line & ancillary services. Construction of a mine access road along with realignment of Lemington Road involving a New England Highway intersection upgrade. A new explosives facility. Diversion of Emu Creek. A new main storage dam in the south of the project area with associated drains & pipelines. Expanded out of pit emplacement areas. New Cumnock 3 tailings dam to the south of the existing dams. Construction of temporary employee, maintenance & equipment storage facilities at the Narama operations. Click for more details...

INTEGRA COAL OPERATIONS - OPEN CUT EXTENSION PROJECT
Currently at the Construction stage In Singleton is a project estimated to be $ 10000000. This project Extension further south of the existing South Pit (247ha). Trucks & shovel/excavators to access 30million tonnes (Mt) of Run-of-Mine (RoM) coal at a rate of 2.3-4.2Mtpa to give a Life-of-Mine (LoM) of 9 years. Associated infrastructure to include relocation of power lines & telecommunications in the proposed open cut area. Construction of temporary haul roads & surface water management structures. Installation of tansportable site office, crib room & bathhouse. Installation of a transportable, above ground equipment refuelling station. Click for more details...

MOUNT ARTHUR COAL OPERATIONS EXPANSION RX1
Operating Mine - Expn - Rx1 New project In The Muswellbrook Council Area. Increase of run-of-mine (ROM) capacity by 4million tonnes per annum (Mtpa) to reach 24Mtpa approx. 300 new full time jobs expected. Click for more details...

MAULES CREEK COAL PROJECT - MINE INDUSTRIAL AREA
Maules Creek Coal Project - Mine Industrial Area is currently at the Construction stage, valued at about $ 75000000 it is Surface facilities at the Mine Infrastructure Area to include workshops, heavy & light vehicle refuelling & washing facilities as well as tyre jacking slabs. Click for more details...

MOUNT BOPPY GOLD MINE RECOMMENCEMENT
Mining - Support Facilities (Accommodation - units, housing, group accom.) New project at 46km East of, Cobar, NSW 2835. This type is Mine - Recommencement with Private ownership. Mount Boppy Mine recommencement. Ore to be delivered to the recently refurbished Manuka Silver Mine (formerly Wonawinta Silver Mine) Processing Plant for processing. Click for more details...

MAULES CREEK COAL PROJECT - OFFICES & BATHHOUSE
Administration Offices/Bathhouse project at 20km NE of, Boggabri, NSW 2382 In The Council Area Of Narrabri of Private. For the provision of administration offices & bath house. Click for more details...

PINE DALE COAL OPERATIONS STAGE 2 EXTENSION
Mining - Support Facilities (Industrial buildings) project In The Lithgow Council Area of Operating Mine - Extension type. A project to extend operations 10-15 years by incorporating 201ha in the Blackmans Flat area adjoining the now exhausted original Pine Dale mine & the recently approved 27ha Stage 1 Yarraboldy extension. Continued open cut operations accessing 14.2 million tonnes (Mt) at a rate of 2Mt product coal annually. Construction of a new mine industrial area to include a 600tph crushing & screening plant, 100,000t run-of-mine (ROM) stockpile, 200,000t product stockpiles & maintenance facilities. Construction or relocation of offices, amenities, workshop, water management infrastructure, electric power supply, explosives magazine & fuel storage area. Dewatering of existing pit prior to use for overburden & interburden emplacement. Reinstatement of the now derelict Wallerawang spur rail line & rail siding & construction of a rail load out facility. Internal access roads & private haul road crossing. An additional 60 employees expected at maximum production. Click for more details...

DOYLES CREEK COAL PROJECT - MINE SAFETY & TRAINING SCHOOL
Mining - Support Facilities (Administration facilities) project In The Singleton Council Area of Training School type. Establishment of a stand alone mine safety & training school for around 30 staff & 100 students a year. Construction of dedicated surface infrastructure to include a training room, on site accommodation modules for 8 visiting students & a large building to simulate underground mining conditions. Subsequent development to include a separate portal to the West Borehole Seam plus a network of first workings with 20m centre pillars at a rate of 400m a year (8,000 tpa) for more than 21 years. Click for more details...

DOYLES CREEK COAL PROJECT - MINE SAFETY & TRAINING SCHOOL
Mining - Support Facilities (Industrial buildings) project In The Singleton Council Area of Training School type. Establishment of a stand alone mine safety & training school for around 30 staff & 100 students a year. Construction of dedicated surface infrastructure to include a training room, on site accommodation modules for 8 visiting students & a large building to simulate underground mining conditions. Subsequent development to include a separate portal to the West Borehole Seam plus a network of first workings with 20m centre pillars at a rate of 400m a year (8,000 tpa) for more than 21 years. Click for more details...

HERA-NYMAGEE GOLD PROJECT - ACCOMMODATION CAMP
Accommodation Camp project at Via, Nymagee, NSW 2831 in the Mining - Support Facilities (Accommodation - units, housing, group accom.). Staged construction of worker accommodation. Click for more details...

THE MAC ACCOMMODATION CENTRE BOGGABRI STAGE 1
Mining - Support Facilities (Administration facilities) New project at 262 Carloola Rd, Boggabri, NSW 2382. This type is Accommodation Modules/Administration/Kitchen/Dining/Laundry/Civils/Reservoir with Private ownership. Construction of stage 1 of an accommodation village to provide 328 rooms & laundry facilities in prefabricated modules. Construction also of an office/administration building & a kitchen/dining building with concrete floors & metal walls & roofs. Civil works package expected to include bulk earthworks, roadworks, stormwater & construction of an 8ML reservoir. Click for more details...

THE MAC ACCOMMODATION CENTRE BOGGABRI STAGE 1
Mining - Support Facilities (Canteens, Messes, Crib room) New project at 262 Carloola Rd, Boggabri, NSW 2382. This type is Accommodation Modules/Administration/Kitchen/Dining/Laundry/Civils/Reservoir with Private ownership. Construction of stage 1 of an accommodation village to provide 328 rooms & laundry facilities in prefabricated modules. Construction also of an office/administration building & a kitchen/dining building with concrete floors & metal walls & roofs. Civil works package expected to include bulk earthworks, roadworks, stormwater & construction of an 8ML reservoir. Click for more details...

EDGEWORTH ST CESSNOCK MIXED DEVELOPMENT
A project in the NSW Within Cessnock. Demolition of existing building. Construction of a new single storey mixed clad community centre, to include open foyer & reception area leading to a covered outdoor area. Gym, pool, plant room, 4 storage rooms, 2 training rooms separated by foldable partition, 4 individual water closets/change rooms & 1 assisted. Six consulting/meeting rooms, office, male, female & disabled toilets. Lunch room & kitchen, dining area & maintenance shed & bin storage area. Wall, masonry, rendered masonry, fibre cement sheeting, glass. Roof, metal sheeting & trims, painted steelwork columns & exposed structure. Disability housing to include, 34 dwelings including (6 x 2 bedroom SAIF dwellings, 8 x 3 bedroom dwellings, 4 x 2 bedroom dwellings & 16 x 1 bedroom dwellings. Seventeen separate buildings will contain the units & will be a mixture of 1 & 2 storeys in height. Walls, masonry, fibre cement sheeting, weatherboard & metal roof sheeting. Overall parking for 57 parking spaces. Extensive landscaping Click for more details...

LIDDELL COAL OPERATIONS EXPANSION
Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project at Old New England Hwy, Ravensworth, NSW 2330 for New. A project for a 5 year life-of-mine (LoM) extension by expanding the existing South pit followed by expansion of the Entrance pit after which a new MIA pit to be developed involving relocation of the current mine infrastructure area. Construction of a new conveyor & transfer point to link to the existing overland conveyor to allow transfer of up to 1.5 million tonnes per annum (Mtpa) of coal to the Ravensworth coal handling & preparation plant (CHPP) now that the demolished Cumnock CHPP is no longer available to take excess run-of-mine (ROM) coal. A new 50,000t stockpile at the new conveyor & expansion of the existing ROM stockpile capacity to 200,000t as well as a new tailings emplacement area in the South Pit void. Associated infrastructure expected to include access & haul roads, surface water management systems, new dewatering bores for the Hazeldene, Entrance & South pit workings, an explosive reload facility, powerlines, pipelines & a water truck fill point. Click for more details...