State

Categories

Sub Categories

Click Here to Find Current Projects

List of Mining - Support Facilities Projects in QLD


ROLLESTON COAL PROJECT - COAL HANDLING/INFRASTRUCTURE
Mining - Support Facilities (Administration facilities) New project at 16km west of, Rolleston, QLD 4702. This type is Crushing & Mine Site Infrastructure with Private ownership. Initial development will be for 6mtpa. Expansion to 8 mtpa allowed for. Click for more details...

ROLLESTON COAL PROJECT - COAL HANDLING/INFRASTRUCTURE
Mining - Support Facilities (Bath houses, Amenities, Dressing rooms) New project at 16km west of, Rolleston, QLD 4702. This type is Crushing & Mine Site Infrastructure with Private ownership. Initial development will be for 6mtpa. Expansion to 8 mtpa allowed for. Click for more details...

PHOSPHATE HILL OPERATIONS
Mining - Support Facilities (Industrial buildings) project at Phosphate Hill approx 190 km south east of Mount Isa via, Cloncurry, QLD 4824 for New. Workshop, store & control building. Concrete slab & likely to be metal cladding. Click for more details...

MOUNT MOSS PROJECT - MAGNETITE/COPPER/ZINC RESOURCE
Resource - Magnetite/Copper/Zinc project at Ewan Road via, Greenvale, QLD 4816 In The Council Area Of Charters Towers Regional of Private. Resource estimate is 3.5 Mt of magnetite ore and 600,000 tonnes of copper oxide ore. The operation comprises of open cut mining of magnetite, copper and zinc in one to three pits. Processing facility for the crushing and magnetic separation/enrichment of magnetite, stockpile area and loadout facilities and vat leaching processing facility for the production of copper concentrate. Other infrastructure included the upgrade of a 30 km haul road, waste rock dumps, ore stockpiles and the upgrade of an accommodation camp for 60 persons. Click for more details...

GROSVENOR COAL PROJECT
via, Moranbah, QLD 4744 Has Grosvenor Coal Project currently at Construction stage. Underground longwall mining at a rate of 7 million tonnes a year (Mtpa) for 26 years. Run-of-mine (ROM) coal to be transported by new conveyor to the adjacent Moranbah North Mine from where 5 Mtpa of product export coking coal to be transported by existing rail facilities to the Abbot Point Coal Terminal. Mining infrastructure to include a new portal entrance to the underground mine access drift, ventilation shafts, water management infrastructure, gas drainage boreholes, underground communication cables, services & boreholes for supply of materials from the surface. Associated surface infrastructure to include administration & warehouse buildings, workshop & vehicle servicing facilities, bath house & employee facilities. Also required at Moranbah North new ROM & product stockpiles at its Coal Handling & Preparation Plant (CHPP) & expansion of the Co-disposal Area (CDA) to accommodate the increase tailings & coarse rejects. Possible relocation of a section of the Blair Athol rail line in the event of subsidence. Click for more details...

CRACOW GOLD PROJECT - KLONDYKE/ROYAL SHOOT/CROWN/ROSES PRIDE
Surface Works New project In The Banana Shire Council Area. Includes excavation of box cut. Click for more details...

TARONG NORTH POWER STATION
New project of Mining - Support Facilities (Administration facilities) project at Tarong Rd adjacent to existing power station, Tarong, QLD 4615. Building with office component to include over head crane. Concrete, concrete block, steel cladding & metal roof. Click for more details...

KOGAN CREEK POWER PROJECT - ELECTRICAL INSTALLATION/WORKSHOP
South of, Brigalow, QLD 4412 Has Kogan Creek Power Project - Electrical Installation/Workshop currently at Construction stage. Erection of 1 Siemens Steam Turbine, 1 Siemens Generator THDF 125/67, Condenser, Tanks, Pumps, Compressors, Assembly of Workshop and Store, Electrical and I & C installation Click for more details...

MILLENNIUM MORANBAH COAL PROJECT - MINING CONTRACT
New project of Mining - Support Facilities (Industrial buildings) project at North of Poitrel via, Moranbah, QLD 4744. Includes infrastructure, administration facilities, workshops etc. Click for more details...

BMA COAL MORANBAH ACCOMMODATION - TRANSIT SITE
New project of Mining - Support Facilities (Accommodation - units, housing, group accom.) project at Mills Ave & Rupert St, Moranbah, QLD 4744. Construction of 20 x 2 bedroom units in duplex style (10 separate buildings). Associated parking & landscaping. Click for more details...

COLLINGWOOD TIN PROJECT - PLANT/INFRASTRUCTURE
Mining - Support Facilities (Administration facilities) project at 35 km south of, Cooktown, QLD 4871 for New. Water only gravity concentration process. Click for more details...

MOUNT ETNA MINE - PURCHASE & REMOVAL OF WORKSHOP BUILDING & FENCING
Workshop Building & Fencing - Purchase & Removal project at The Caves, 20 km north of, Rockhampton, QLD 4700 In The Council Area Of Rockhampton Regional of Private. Purchase and removal of Workshop Building and 2m Manproof Fencing to Workshop Perimeter. Click for more details...

RG TANNA COAL TERMINAL - DOUBLE ENTRY REFER ID 857583
Office Building/Amenities Block project at RG Tanna Coal Terminal Port of Gladstone, Gladstone, QLD 4680 In The Council Area Of Gladstone Regional of State. Construction of 1 x single storey cribbing room, 1 x single storey bathhouse, 1 x Corporate Relations (office) building 500 sqm approx & security kiosk. Click for more details...

COPPABELLA ACCOMMODATION CENTRE
Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Isaac Regional Council Area of Mining Camp type. Proposed 558 Units (1200 rooms) accommodation centre to be constructed. Associated infrastructure includes kitchen, dining room, administration rooms, training rooms and car parking. Click for more details...

COPPABELLA ACCOMMODATION CENTRE - CENTRAL FACILITIES BUILDING - STAGE 2
Central Facilities Building - Stage 2 New project In The Isaac Regional Council Area. Likely to include gymnasium, additional meeting rooms, pool rooms & recreation areas. Click for more details...

DAWSON MINE OFFICE ACCOMMODATION/BATH HOUSE
Mining - Support Facilities (Administration facilities) New project at 10 km north west of, Theodore, QLD 4719. This type is Office Accommodation/Bath House with Private ownership. Construction of office accommodation & bath house amenities. Click for more details...

CHINCHILLA COAL SEAM GAS & UNDERGROUND COAL GASIFICATION PROJECT - STAGE 2 - EARTHWORKS FOR LABORATORY
Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) New project at Capowie, 16 Mile Hall Rd, Hopeland via, Chinchilla, QLD 4413. This type is Earthworks - For Laboratory with Private ownership. For the larger mine site laboratory. Click for more details...

CHINCHILLA COAL SEAM GAS & UNDERGROUND COAL GASIFICATION PROJECT - STAGE 2 - MECHANICAL FOR LABORATORY
Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project In The Western Downs Regional Council Area of Mechanical - For Laboratory type. For the larger mine site laboratory. Click for more details...

CHINCHILLA COAL SEAM GAS & UNDERGROUND COAL GASIFICATION PROJECT - STAGE 2 - CRIB ROOM FOR LABORATORY
Mining - Support Facilities (Canteens, Messes, Crib room) project at Capowie, 16 Mile Hall Rd, Hopeland via, Chinchilla, QLD 4413 of Crib Room - For Laboratory type of New development. For the larger mine site laboratory. Click for more details...

CHINCHILLA COAL SEAM GAS & UNDERGROUND COAL GASIFICATION PROJECT - STAGE 2 - CRIB ROOM FOR LABORATORY
Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project at Capowie, 16 Mile Hall Rd, Hopeland via, Chinchilla, QLD 4413 of Crib Room - For Laboratory type of New development. For the larger mine site laboratory. Click for more details...

ANTHILL COPPER PROJECT
via McNamara's Hwy 100km northwest of, Mount Isa, QLD 4825 Has Anthill Copper Project currently at Construction stage. A project based on a resource estimate (inferred, indicated) of 2.4 million tonnes (Mt) containing 27,000t of copper. Conventional drill & blast open cut operations to develop a pit 500 x 800m & 120m deep. After removal by hydraulic excavators, ore to be trucked to an interim run-of-mine (ROM) stockpile prior to haulage along McNamara Road to the existing processing plant at Mt Kelly. A mine infrastructure area (office building, first aid room, crib room, ablutions). Also heavy vehicle workshop with down pad & oil water separator, storage (explosives, fuel, scrap steel, stores, waste hydrocarbon). Diversion of Johnson Creek. Dewatering bores. Bunded waste rock dumps up to 40-50m high. Sediment dams. Haulage & access roads. Sewerage treatment plant. Click for more details...

MT COOLON CENTRAL TREATMENT PLANT
Mining - Support Facilities (Accommodation - units, housing, group accom.) project at Via, Mount Coolon, QLD 4804 for New. For the construction of a central treatment plant and related infrastructure. Click for more details...

CLONCURRY COPPER GOLD PROJECT - ACCOMMODATION CAMP
Accommodation Camp New project In The Cloncurry Shire Council Area. The project will employ approximately 250 staff. A permanent accommodation camp has been proposed. The camp will accommodate approximately 220 operational personnel including contractors. Click for more details...

NEWLANDS SOUTHERN UNDERGROUND COAL OPERATIONS - DISMANTLE & REMOVAL OF OFFICES & WORKSHOP
Offices/Workshop - Dismantle/Removal New project In The Isaac Regional Council Area. For the dismantling & removal of: 1 x office building & change house (approx 55m x 25m), 1 x office building & fittings (approx 20m x 15m), and, 1 x workshop building & fittings (approx 35m x 25 m), all located at the Southern Underground area of the Newlands Coal Mine. Buildings & associated items to be removed from site within agreed time of notification. Click for more details...

SOUTH WEST QUEENSLAND PIPELINE STAGE 3 EXPANSION
Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Maranoa Regional Council Area of Gas Pipeline - Stage 3 type. As part of the QSN Link project (QSN3), construction of a 935km loop pipeline parallel to the existing South West Queensland Pipeline (SWQP) between Wallumbilla & Moomba. Construction also at the Wallumbilla hub of 2 additional compressor stations at existing scraper station sites & an upgrade to the existing Wallumbilla compressor station. The pipeline is anticipated to have a diameter of between 400-500mm approx. Construction crews will be housed in temporary construction camps that will be progressively moved ahead of construction activity. Each main camp will house up to 200 people & the smaller fly camps will house up to 150 people. Each camp will contain accommodation units & mess & recreation huts. Click for more details...

BLACKWATER MINE WORKERS ACCOMODATION STAGE 2
Mining - Support Facilities (Accommodation - units, housing, group accom.) project at Blackwater Mine Qld,, Blackwater, QLD 4717 of Accomodation -Stage 2 type of New development. Stage 2 - 94 units. This project now being done progressively as one project with ID 1050639, (136 units). Click for more details...

TALINGA DEVELOPMENT PROJECT
Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Western Downs Regional Council Area of Resource - Coal Seam Gas type. The project involves transitioning the existing pilot trial of 12 wells to production of up to 90TJ/day of coal seam gas, which will contribute to the supply of gas to the Darling Downs Power Station. The development will involve installing coal seam gas wells at a spacing of between 750m and 1000m; associated gas and water gathering systems, a gas plant, a produced water treatment facility, evaporation ponds, offices, storage areas, workshops, camp and gravel pits. Based on current well production predictions, this equates to the installation of approximately 100 coal seam gas wells. This project will incorporate a water treatment facility to significantly reduce the evaporation pond surface area down to approximately 170ha. The water treatment facility will employ an integrated membrane system, including reverse osmosis, to achieve an 85% desalination recovery and create a freshwater resource. The freshwater will be discharged to the Condamine River catchment until higher level beneficial used, such as industrial, urban or agricultural use, can be implemented. Click for more details...

TALINGA DEVELOPMENT PROJECT
Mining - Support Facilities (Administration facilities) project In The Western Downs Regional Council Area of Resource - Coal Seam Gas type. The project involves transitioning the existing pilot trial of 12 wells to production of up to 90TJ/day of coal seam gas, which will contribute to the supply of gas to the Darling Downs Power Station. The development will involve installing coal seam gas wells at a spacing of between 750m and 1000m; associated gas and water gathering systems, a gas plant, a produced water treatment facility, evaporation ponds, offices, storage areas, workshops, camp and gravel pits. Based on current well production predictions, this equates to the installation of approximately 100 coal seam gas wells. This project will incorporate a water treatment facility to significantly reduce the evaporation pond surface area down to approximately 170ha. The water treatment facility will employ an integrated membrane system, including reverse osmosis, to achieve an 85% desalination recovery and create a freshwater resource. The freshwater will be discharged to the Condamine River catchment until higher level beneficial used, such as industrial, urban or agricultural use, can be implemented. Click for more details...

GLADSTONE LIQUID NATURAL GAS (GLNG) PROJECT - TEMPORARY SUPPORT BUILDINGS
Temporary Support Buildings project at ., Curtis Island, QLD 4680 in the Mining - Support Facilities (Industrial buildings). Construction of temporary support buildings that require a shelf life of 5 years. 20 plant infrastructure buildings including plant offices, medical facility, workshops, store rooms, equipment rooms, crib rooms & recreation rooms. Accommodation camp providing for 1860 persons in 48 pods. Click for more details...

BURTON COAL OPERATIONS - BUILDINGS REMOVAL
Mining - Support Facilities (Accommodation - units, housing, group accom.) New project at Near, Glenden, QLD 4743. This type is Buildings Removal with Private ownership. Removal of 7 transportable buildings from the Burton Mine Accommodation Camp. Click for more details...

ROLLESTON ACCOMMODATION VILLAGE EXPANSION
Mining - Support Facilities (Accommodation - units, housing, group accom.) project at via Dawson Hwy 10km northwest of, Rolleston, QLD 4702 of Bedrooms/Dining Hall/Parking/Water Treatment/Dam Relocation type of New development. Doubling of the existing 350 person accommodation village with another 200 rooms in stage 1 & 150 rooms in stage 2. New mess hall. Upgrades to the existing sewerage & water treatment facilities. Expansion of car parks. Relocation of existing silt retention dam. Click for more details...

MORANBAH REGION EXPANSION PROJECT - CIVIL WORKS PACKAGES
Private ownership Mining - Support Facilities (Administration facilities) project In The Isaac Regional Council Area for New development. Packages to include site wide pioneering earthworks, road, drainage & civil works (C001). Bulk earthworks (cut & cover) from the mining infrastructure area (MIA) to the run-of-mine (ROM) area (C002) & from the ROM area to the train load out (C003). The co-disposal dam wall (C004). Supply of gravel (C005); crush rock backfill (C006); precast concrete pipes, boxes & headwalls (C007); high density polyethylene (HDPE) liners (C008) & geogrids (C009). Construction of warehouse & workshop building (C010); bathhouse & administration building (C011) & roadways & carparks in the MIA (C013). Spillway (C014). Supply of concrete (C015); fuel handling equipment (C016); lube handling equipment (C017); tanks (C020); hydrants & hose reels (C021); sewage treatment plant (C022); potable water treatment plant (C023) & fencing (C024). Design & construction of gas drainage plant & booster station (C025) along with supply of vacuum pumps (C029); surface reticulation piping (C030); underground reticulation piping (C031) & installation of the surface & underground reticulation system (C032). Mine cooling system (C026); stone dust system (C027) & diesel & lubrication supply (C028). Click for more details...

MORANBAH REGION EXPANSION PROJECT - CIVIL WORKS PACKAGES
Private ownership Mining - Support Facilities (Industrial buildings) project In The Isaac Regional Council Area for New development. Packages to include site wide pioneering earthworks, road, drainage & civil works (C001). Bulk earthworks (cut & cover) from the mining infrastructure area (MIA) to the run-of-mine (ROM) area (C002) & from the ROM area to the train load out (C003). The co-disposal dam wall (C004). Supply of gravel (C005); crush rock backfill (C006); precast concrete pipes, boxes & headwalls (C007); high density polyethylene (HDPE) liners (C008) & geogrids (C009). Construction of warehouse & workshop building (C010); bathhouse & administration building (C011) & roadways & carparks in the MIA (C013). Spillway (C014). Supply of concrete (C015); fuel handling equipment (C016); lube handling equipment (C017); tanks (C020); hydrants & hose reels (C021); sewage treatment plant (C022); potable water treatment plant (C023) & fencing (C024). Design & construction of gas drainage plant & booster station (C025) along with supply of vacuum pumps (C029); surface reticulation piping (C030); underground reticulation piping (C031) & installation of the surface & underground reticulation system (C032). Mine cooling system (C026); stone dust system (C027) & diesel & lubrication supply (C028). Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - ACCOMMODATION MODULES INSTALLATION
Accommodation Modules - Installation project at Woleebee Creek Camp via WANDOAN & Ruby Camp via, Dalby, QLD 4405 in the Mining - Support Facilities (Accommodation - units, housing, group accom.). Installation of 1250 approx accommodation modules. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - ACCOMMODATION CAMPS SERVICES PACKAGES
New project of Mining - Support Facilities (Accommodation - units, housing, group accom.) project at Various locations, ., QLD 4999. Packages for various camps to include cleaning, handyman, launder, information security & waste disposal. Click for more details...

KESTREL COAL OPERATIONS - TEMPORARY CONSTRUCTION CAMP EXPANSION
Accommodation Modules project at Lilyvale Rd (Lot 11 SP 178401), Capella, QLD 4702 In The Council Area Of Central Highlands Regional of Private. Additional 88 modular accommodation rooms to temporary workers camp. Click for more details...

GLADSTONE LIQUEFIED NATURAL GAS (GLNG) PROJECT - COAL SEAM GAS FIELDS - ACCOMMODATION PACKAGES
Gladstone Liquefied Natural Gas (Glng) Project - Coal Seam Gas Fields - Accommodation Packages is currently at the Construction stage, valued at about $ 10000000 it is For the provision of accommodation camps. Click for more details...

BMA MORANBAH TEMPORARY ACCOMMODATION VILLAGE EXTENSION STAGES 1 & 2
Workers Accommodation - Extn - Stages 1 & 2 project at Belyando Ave, Curtin St, Goonyella Rd, Moranbah, QLD 4744 in the Mining - Support Facilities (Accommodation - units, housing, group accom.). Expansion of temporary accommodation village to provide additional 96 rooms in modular buildings. Each building to provide 4 x single rooms. Stage 1 - 64 rooms. Stage 2 - 32 rooms. Click for more details...

BOWEN BASIN ACCOMMODATION VILLAGE PACKAGES
Currently at the Tenders & Building stage In Various is a project estimated to be $ 10000000. This project Packages for supplier & construction involvement in The Mac's Developed-Owned-Operated accommodation village projects in the Bowen Basin (non-mining sites). To include civil site & road works, accommodation village transportable buildings as well as on site construction of kitchen/dining rooms, taverns, administration & retail facilities. Click for more details...

JELLINBAH COAL OPERATIONS - WORKERS ACCOMMODATION
Mining - Support Facilities (Accommodation - units, housing, group accom.) New project at Capricorn Hwy, Bluff, QLD 4702. This type is Accommodation Camp with Private ownership. Staged construction of 557 units for a workers accommodation camp. Stage 1 to include 251 units & central facilties. Subsequent stages 2-7 to comprise 51 units each. Click for more details...

BARALABA COAL OPERATIONS EXPANSION MIA
Mining - Support Facilities (Administration facilities) project at near, Baralaba, QLD 4702 for New. Construction of all infrastructure associated with 20 year expansion for central, south & north pits. To include workshops, wash down area, administration, fuel tanks, water & sewerage treatment & other civil infrastructure. Concrete, structural steel, civil/earthworks, hydraulics & drainage, piling & electrical works. Click for more details...

DUGALD RIVER BASE METAL PROJECT - MINE INDUSTRIAL AREA & PLANT BUILDINGS
Private ownership Mining - Support Facilities (Administration facilities) project In The Mt Isa City Council Area for New development. Construction of Plant & Industrial buildings. Click for more details...

DUGALD RIVER BASE METAL PROJECT - MINE INDUSTRIAL AREA & PLANT BUILDINGS
Private ownership Mining - Support Facilities (Industrial buildings) project In The Mt Isa City Council Area for New development. Construction of Plant & Industrial buildings. Click for more details...

EUROMBAH SUBSTATION WORKERS ACCOMMADATION
Temporary Workers Accommadation New project In The Banana Shire Council Area. Temporary workers accommodation on the furure Eurombah Substation site. Power generation room, water storage & pump room, theatre & gymnasium, laundry & sick room, food storage & cold room, food preparation room, kitchen & dining room. 4 person accommodation demountable modular units. Click for more details...

YARRABEE ACCOMMODATION FACILITY
Currently at the Construction stage In Central Highlands Regional is a project estimated to be $ 20000000. This project Build, own & operate a 250 man accommodation facility at Yarrabee. Click for more details...

BAUXITE HILLS BAUXITE DSO PROJECT - ACCOMMODATION CAMP
A project in the QLD Within Mapoon Shire. Accommodation camp/village for the Bauxite Hills DSO Project. Click for more details...

BAUXITE HILLS BAUXITE DSO PROJECT - MINE & BARGE LOADING INFRASTRUCTURE
35km North of, Mapoon, QLD 4876 Has Bauxite Hills Bauxite Dso Project - Mine & Barge Loading Infrastructure currently at Construction stage. Barge loading facility on the Skardon River for the Bauxite Hills DSO Project. Vessels of between 60,000 to 80,000 t each will be loaded at the transhipment anchorage site. Vessels will be loaded in approximately four to six days with barges having a capacity of between 3500 - 6500t. Mine infrastructure Area (MIA) to include the run of mine (ROM) stockpile, bauxite stockpiles, barge loading, conveyor load point, earthmoving equipment hard park, administration offices, workshops & fuelling facilities. Raw & potable water supply from great artesian basin & shallow alluvial aquifers. Sewage treatment plant. Power requirements sourced from onsite generators located within the MIA. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect