List of Mining - Support Facilities Projects in QLD


CRACOW GOLD PROJECT - KLONDYKE/ROYAL SHOOT/CROWN/ROSES PRIDE
A project in the QLD Within Banana Shire. Single persons facility. Click for more details...

BAUHINIA REGIONAL RAIL PROJECT - ROLLESTON COAL PROJECT
A project in the QLD Within Central Highlands Regional. Queensland Rail will construct, own and operate a new 110 km spur to expand their existing rail network in the Blackwater system. The new spur will connect to the existing system near Kinrola. The Rolleston mine will be charged a fee under a 20 year contract to access the line. Click for more details...

GOONYELLA/RIVERSIDE COAL OPERATIONS
Mining - Support Facilities (Bath houses, Amenities, Dressing rooms) project for New development. The new bathhouse is for 30 people. Click for more details...

ROLLESTON COAL PROJECT - COAL HANDLING/INFRASTRUCTURE
Mining - Support Facilities (Administration facilities) New project at 16km west of, Rolleston, QLD 4702. This type is Crushing & Mine Site Infrastructure with Private ownership. Initial development will be for 6mtpa. Expansion to 8 mtpa allowed for. Click for more details...

COMALCO - WEIPA
off Duyfken Crescent, Trunding, Weipa, QLD 4874 Has Comalco - Weipa currently at Planning stage. Development of a vacant 7ha parcel of land off Duyfken Crescent in the residential area of Trunding within the Weipa township. It is envisaged that the proposed development site will contain at least 40 residential dwellings ranging from 2 - 4 bedroom low-set style homes. Consideration would also will be given to having the proposed development staged over a (2) year period. Click for more details...

PHOSPHATE HILL OPERATIONS
Mining - Support Facilities (Industrial buildings) project at Phosphate Hill approx 190 km south east of Mount Isa via, Cloncurry, QLD 4824 for New. Workshop, store & control building. Concrete slab & likely to be metal cladding. Click for more details...

CENTURY ZINC MINE
Buildings project at North west of, Mount Isa, QLD 4825 In The Council Area Of Mt Isa City of Private. Change-house, workshop, laboratory & administration. 36 week contract period. Click for more details...

PHOSPHATE HILL OPERATIONS
Phosphate Hill approx 190 km south east of Mount Isa via, Cloncurry, QLD 4824 Has Phosphate Hill Operations currently at Construction stage. Includes short-term accommodation and catering. Click for more details...

BALLERA GAS CENTRE - SOUTH WEST QUEENSLAND GAS PROJECT
Mining - Support Facilities (Industrial buildings) project at Ballera, ., QLD 4999 of Electrical Installation For Operations Village/Workshops & Admin. Facilities type of Subcontract development. Includes workshop, offices for permanent camp Click for more details...

RAVENSWOOD GOLD OPERATIONS - MOUNT WRIGHT - GOLD RESOURCE
Mining - Support Facilities (Industrial buildings) project for New development. Design work and equipment procurement is to commence shortly with major site works scheduled to start July 2006. The project is expect to cost $77 million with $28.8 million for underground facilities and equipment, $21.7 million for surface facilities and equipment and $26.4 million for capitalised mine development. During the first two years $42 million will be spent on development. Production cost is expected to be $34 per tonne of ore processed. The project will develop in two stages with phase one involving decline development and exploration access for the drill program, while providing a platform for production from the upper levels of the resource. Phase two will extract the remaining resources identified in phase one. The feasibility study completed a comprehensive metallurgical test work, processing strategy using the existing plant, options study on different mining methods, environmental issues connected to tailing storage have been addressed. Underground mining is the method of mining. The Mount Wright prospect is located 10 km northwest of the Sarsfield open pit and is proposed to be developed as a decline accessed underground mine. Mining is to be by open stoping with 50 metre sub-levels at an extraction rate of 1 million tonnes per annum. An extensive underground DC drilling program will be undertaken in conjunction with mine development to upgrade the resource status. Inferred and indicated resource estimate is 1,054,722 ounces of gold. An eight year production life to 2015 and production rate of 1 MTPA. Click for more details...

CRACOW GOLD PROJECT - KLONDYKE/ROYAL SHOOT/CROWN/ROSES PRIDE
Surface Works New project In The Banana Shire Council Area. Includes excavation of box cut. Click for more details...

MILLENNIUM MORANBAH COAL PROJECT - MINING CONTRACT
New project of Mining - Support Facilities (Industrial buildings) project at North of Poitrel via, Moranbah, QLD 4744. Includes infrastructure, administration facilities, workshops etc. Click for more details...

TWIN HILLS GOLD PROJECT - PERMANENT CAMP
Twin Hills Gold Project - Permanent Camp is currently at the Construction stage, valued at about $ 2000000 it is 40 person camp and associated office building. Click for more details...

MORANBAH NORTH COAL OPERATIONS - WORK CAMP
Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Isaac Regional Council Area of Private ownership. Extension of 21 rooms in 7 portables to an existing 400 room camp site. Click for more details...

MOUNT ETNA MINE - PURCHASE & REMOVAL OF OFFICE BUILDING & ASSOC INFRASTRUCTURE
Mining - Support Facilities (Administration facilities) project In The Rockhampton Regional Council Area of Office Building & Assoc Infrastructure - Purchase & Removal type. Purchase and removal of timber and fibro office building and associated infrastructure. Click for more details...

RG TANNA COAL TERMINAL - DOUBLE ENTRY REFER ID 857583
Office Building/Amenities Block project at RG Tanna Coal Terminal Port of Gladstone, Gladstone, QLD 4680 In The Council Area Of Gladstone Regional of State. Construction of 1 x single storey cribbing room, 1 x single storey bathhouse, 1 x Corporate Relations (office) building 500 sqm approx & security kiosk. Click for more details...

ENSHAM CENTRAL PROJECT EXPANSION - TEMPORARY ACCOMMODATION BUILDINGS
New project of Mining - Support Facilities (Accommodation - units, housing, group accom.) project at Lot 1 Adam Street (Rp886246), Comet, QLD 4702. Temporary accommodation building and mess hall. Click for more details...

ENSHAM CENTRAL EXPANSION PROJECT - DRAGLINE ASSEMBLY WORKSHOP
Mining - Support Facilities (Administration facilities) project at (Lot 34 RP 864576) Duckponds Road, Emerald, QLD 4720 of Dragline Assembly Workshop type of New development. Construction comprises an assembly workshop (450 sqm), abultion block, crib room, office, 8 metre wide sealed road and 2 buses & 15 vehicle parking spaces. Click for more details...

ENSHAM CENTRAL EXPANSION PROJECT - DRAGLINE ASSEMBLY WORKSHOP
Mining - Support Facilities (Canteens, Messes, Crib room) project at (Lot 34 RP 864576) Duckponds Road, Emerald, QLD 4720 of Dragline Assembly Workshop type of New development. Construction comprises an assembly workshop (450 sqm), abultion block, crib room, office, 8 metre wide sealed road and 2 buses & 15 vehicle parking spaces. Click for more details...

ENSHAM CENTRAL UNDERGROUND COAL PROJECT
New project of Mining - Support Facilities (Administration facilities) project at 40 km north east of, Emerald, QLD 4720. A project to extend Ensham's Life-Of-Mine by 20-30 years by expanding into underground mining. Operations at around 7.6 million tonnes per annum (Mt/y) expected initially to be bord & pillar. New surface facilities likely to include access roads, workshop & vehicle servicing facilities, administration building, accommodation camp, washplant, tailings dams, conveyors, coal stockpile areas, coal handling & preparation facilities, ventilation shafts & access boreholes. A new conveyor to connect the underground product coal stockpile to the existing conveyor serving the train loading bin. Click for more details...

QSN LINK GAS PIPELINE
Private ownership Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Not Yet Determined Council Area for New development. The QSN Link pipeline will extend south-west from the Ballera Gas facility in Queensland. It will pass approximately 7km to the south of Innamincka in South Australia and terminate at the Moomba plant. The pipeline will be some 180km in length, with approximately 90km in Queensland and 91.5km in South Australia. The pipeline will be typical of a modern, small to medium diameter gas transmission pipeline. Final design parameters are yet to be determined, but it is likely to involve the following infrastructure: a buried, high pressure, steel, natural gas pipeline, with a diameter in the order of 400mm, an inlet station at Ballera, above ground facilities at intervals along the pipeline include a mid-line mainline valve, cathodic protection systems and marker signs and an outlet delivery station at Moomba. The construction workforce will be accommodated in temporary camps and at local accommodation. two preliminary campsite locations have been selected which will accommodate a single camp that will be mobilised from one location to the other during the construction phase of the project. construction depots will be used primarily for equipment storage and will typically be co-located with the construction camps. Facilities and equipment stored at the construction depots may include: site office and administration centre, construction vehicles, diesel fuel and lubricants, vehicle maintenance equipment, sand bags, sediment fencing, star droppers and wooden stakes and pipe wrapping and joint coating materials. When the utility is no longer required, the pipeline will be decommissioned in accordance with the regulatory requirements and accepted environmental best practices at the time. currently decommissioning procedures require the removal of all above ground infrastructure and the restoration of associated disturbed areas. Click for more details...

CHINCHILLA COAL SEAM GAS & UNDERGROUND COAL GASIFICATION PROJECT - STAGE 2 - CONCRETE FOR LABORATORY
Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project for New development. Concrete work for the larger mine site laboratory. Also the clay soil will need to be converted to a hardstand/hard ground area with compacted gravel. Click for more details...

CHINCHILLA COAL SEAM GAS & UNDERGROUND COAL GASIFICATION PROJECT - STAGE 2 - ELECTRICAL FOR LABORATORY
Capowie, 16 Mile Hall Rd, Hopeland via, Chinchilla, QLD 4413 Has Chinchilla Coal Seam Gas & Underground Coal Gasification Project - Stage 2 - Electrical For Laboratory currently at Construction stage. For the larger mine site laboratory. Click for more details...

CHINCHILLA COAL SEAM GAS & UNDERGROUND COAL GASIFICATION PROJECT - STAGE 2 - CRIB ROOM FOR LABORATORY
Mining - Support Facilities (Canteens, Messes, Crib room) project at Capowie, 16 Mile Hall Rd, Hopeland via, Chinchilla, QLD 4413 of Crib Room - For Laboratory type of New development. For the larger mine site laboratory. Click for more details...

NEWLANDS SOUTHERN UNDERGROUND COAL OPERATIONS - DISMANTLE & REMOVAL OF OFFICES & WORKSHOP
Offices/Workshop - Dismantle/Removal New project In The Isaac Regional Council Area. For the dismantling & removal of: 1 x office building & change house (approx 55m x 25m), 1 x office building & fittings (approx 20m x 15m), and, 1 x workshop building & fittings (approx 35m x 25 m), all located at the Southern Underground area of the Newlands Coal Mine. Buildings & associated items to be removed from site within agreed time of notification. Click for more details...

TALINGA DEVELOPMENT PROJECT
Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Western Downs Regional Council Area of Resource - Coal Seam Gas type. The project involves transitioning the existing pilot trial of 12 wells to production of up to 90TJ/day of coal seam gas, which will contribute to the supply of gas to the Darling Downs Power Station. The development will involve installing coal seam gas wells at a spacing of between 750m and 1000m; associated gas and water gathering systems, a gas plant, a produced water treatment facility, evaporation ponds, offices, storage areas, workshops, camp and gravel pits. Based on current well production predictions, this equates to the installation of approximately 100 coal seam gas wells. This project will incorporate a water treatment facility to significantly reduce the evaporation pond surface area down to approximately 170ha. The water treatment facility will employ an integrated membrane system, including reverse osmosis, to achieve an 85% desalination recovery and create a freshwater resource. The freshwater will be discharged to the Condamine River catchment until higher level beneficial used, such as industrial, urban or agricultural use, can be implemented. Click for more details...

TALINGA DEVELOPMENT PROJECT
Mining - Support Facilities (Administration facilities) project In The Western Downs Regional Council Area of Resource - Coal Seam Gas type. The project involves transitioning the existing pilot trial of 12 wells to production of up to 90TJ/day of coal seam gas, which will contribute to the supply of gas to the Darling Downs Power Station. The development will involve installing coal seam gas wells at a spacing of between 750m and 1000m; associated gas and water gathering systems, a gas plant, a produced water treatment facility, evaporation ponds, offices, storage areas, workshops, camp and gravel pits. Based on current well production predictions, this equates to the installation of approximately 100 coal seam gas wells. This project will incorporate a water treatment facility to significantly reduce the evaporation pond surface area down to approximately 170ha. The water treatment facility will employ an integrated membrane system, including reverse osmosis, to achieve an 85% desalination recovery and create a freshwater resource. The freshwater will be discharged to the Condamine River catchment until higher level beneficial used, such as industrial, urban or agricultural use, can be implemented. Click for more details...

GLADSTONE LIQUID NATURAL GAS (GLNG) PROJECT - TEMPORARY SUPPORT BUILDINGS
Temporary Support Buildings project at ., Curtis Island, QLD 4680 in the Mining - Support Facilities (Canteens, Messes, Crib room). Construction of temporary support buildings that require a shelf life of 5 years. 20 plant infrastructure buildings including plant offices, medical facility, workshops, store rooms, equipment rooms, crib rooms & recreation rooms. Accommodation camp providing for 1860 persons in 48 pods. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - GAS PIPELINE
Mining - Support Facilities (Accommodation - units, housing, group accom.) project at From south of MILES to, Curtis Island, QLD 4680 for New. Part of a coal seam gas (CSG) to liquefied natural gas (LNG) project with Origin Energy responsible for developing CSG gas fields & transmission pipeline, ConocoPhillips responsible for developing a LNG processing plant & their joint venture company Australia Pacific LNG responsible for the export facilities. A 42 inch (1070mm) diameter, high pressure main pipeline to commence east of Wandoan at its junction with a 44km lateral pipeline from gas developments at Condabri & a 38km lateral from Woleebee gas developments south of Miles. To travel 362km underground with a marine crossing at The Narrows between Kangaroo Island & Port Curtis Island to finish at the LNG plant near Laird Point. Inlet stations to allow for insertion of cleaning & inspection equipment to be constructed at the start of the Condabri & Woleebee laterals & at their intersection a 0.5ha APLNG hub comprising the inlet station for the main pipeline, isolation valves & connections for future compression to also be constructed. Development of up to 5 x 15-20ha laydown areas to receive materials (Miles, Wandoan, Theodore, Biloela, Gladstone areas). 3 temporary accommodation camps each up to 15ha & operating for 3-7 months to be relocated along the pipeline route as required. Camps to include sleeping quarters for up to 1100 personnel, laundries, catering, medical centre, recreational facilities (eg gymnasium, cinema, reading room, sports grounds), diesel generators for power & package sewerage plants. Click for more details...

PL 16 SILVER SPRINGS UNDERGROUND GAS STORAGE PROJECT
Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project In The Maranoa Regional Council Area of Private ownership. Reuse of the existing Silver Springs Processing Plant & now depleted, 1.5km deep Silver Springs/Renlim Field underground reservoir for temporary storage of up to 44billion standard cubic feet (Bscf) of gas as part of Queensland Gas Company's Queensland Curtis Liquified Natural Gas (QCLNG) project. Extension at the plant site of the the existing Berwyndale to Wallumbilla & Silver Springs pipelines (PPLs 123 & 4) for gas injection & later withdrawl using 4 refurbished wells & a new well along with an additional 5 monitoring wells. Initial gas injection planned from 2011-2013 & withdrawl expected 2014-2017. Click for more details...

BURTON COAL OPERATIONS - BUILDINGS REMOVAL
Mining - Support Facilities (Accommodation - units, housing, group accom.) New project at Near, Glenden, QLD 4743. This type is Buildings Removal with Private ownership. Removal of 7 transportable buildings from the Burton Mine Accommodation Camp. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - ACCOMMODATION MODULES
Curtis Island Lng (Qclng) Project - Gas Field Development - Accommodation Modules is currently at the Construction stage, valued at about $ 20000000 it is Contract for the supply of 1250 approx accommodation modules including 540 approx to be hired. Click for more details...

DAISY STREET WORKERS ACCOMMODATION & TOWNHOUSES - CIVIL WORKS
Mining - Support Facilities (Accommodation - units, housing, group accom.) New project at Daisy St (Lot 3 SP197442), Miles, QLD 4415. This type is Civil Works - For Accommodation Village with Private ownership. Civil works, including road widening & reticulation of services, for a workers' accommodation village to cater for up to 340 people. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - ACCOMMODATION MODULES INSTALLATION
Accommodation Modules - Installation project at Woleebee Creek Camp via WANDOAN & Ruby Camp via, Dalby, QLD 4405 in the Mining - Support Facilities (Accommodation - units, housing, group accom.). Installation of 1250 approx accommodation modules. Click for more details...

MOUNT COLIN COPPER GOLD OPERATIONS EXPANSION
Mining - Support Facilities (Administration facilities) project at North of Barkly Hwy 50km west of, Cloncurry, QLD 4824 for New. A project located on the Mount Roseby station & based on a resource estimate (indicated, inferred) of 1.9 million tonnes (Mt) containing 50,000t of copper & 26,000 ounces (oz) of gold. Expansion of 130,000tpa open cut operations to 350,000tpa including progressing to new underground workings for an additional 7 year life-of-mine (LoM). Expansion over 18 months of the existing pit using excavators & dump trucks with ore trucked to run-of-mine (ROM) stockpiles prior to trucking by double or triple road trains for off-site processing at the Great Australian Operations Cloncurry. Once the pit is expanded (440m along strike x 220m wide x 170m deep), underground operations (open & backfilled longhole stoping) to commence via a portal to be located within the pit. Workings to include twin boom development jumbos, production drills & ventilation including auxiliary fans & vent ducting in working areas. Underground loaders (boggers) & haul trucks to bring ore from the decline to the surface. Upgrade of the 8.7km unsealed road from the Barkly Highway as well as internal haul & access roads. Water to be sourced from workings dewatering, a surface water management system & truck deliveries to site. Power to continue to be supplied by diesel generators with associated fuel storage. Some 80 operational staff expected to be bussed in from Cloncurry or Mt Isa. Click for more details...

GLADSTONE LIQUEFIED NATURAL GAS (GLNG) PROJECT - ACCOMMODATION CAMPS MANAGEMENT SERVICES
Mining - Support Facilities (Accommodation - units, housing, group accom.) project for New development. Three year camp services contract with Santos including catering & housekeeping. Click for more details...

GLNG WALLUMBILLA GAS TREATMENT FACILITY (WGTF)
New project of Mining - Support Facilities (Industrial buildings) project at Walumbilla South Rd Iona Bardlomey Rd (Lot 33 SP 212840) 12km south of, Wallumbilla, QLD 4428. Staged development adjacent the existing Santos compressor (WCS) & metering (WMS) stations of a gas treatment facility of 2 trains each with a capacity of 250TJ/day. Each train to consist of gas compression, natural gas liquid removal & cryogenic gas treatment units & a gas turbine power generator using non-methane gas liquids & distributing power through alternators. Ancillary infrastructure to include condensate storage, hot oil system, air compression system, nitrogen generation plant, fire water system, flare & vent system, oily water system along with potable & service water system. Plant control room & workforce amenities. Click for more details...

BOWEN BASIN ACCOMMODATION VILLAGE PACKAGES
Currently at the Tenders & Building stage In Various is a project estimated to be $ 10000000. This project Packages for supplier & construction involvement in The Mac's Developed-Owned-Operated accommodation village projects in the Bowen Basin (non-mining sites). To include civil site & road works, accommodation village transportable buildings as well as on site construction of kitchen/dining rooms, taverns, administration & retail facilities. Click for more details...

FISHER STREET ACCOMMODATION VILLAGE
Accommodation Modules project at Fisher St, Dysart, QLD 4745 In The Council Area Of Isaac Regional of Private. Construction of an accommodation village for 400 persons. Click for more details...

DUGALD RIVER BASE METAL PROJECT - PERMANENT ACCOMMODATION VILLAGE
Accommodation Modules/Ancillary Buildings/Services project at Off the Burke Developmental Rd 85km NE of, Mount Isa, QLD 4825 In The Council Area Of Mt Isa City of Private. Construction of a 500 bed permanent accommodation village for the 25 year life-of-mine. Single storey modules with 3 bedrooms each. Associated kitchen, dining, laundry, recreation facilities. Parking. Click for more details...

GROSVENOR COAL PROJECT - MINE INFRASTRUCTURE AREA (MIA)
Support Buildings New project In The Isaac Regional Council Area. Construction of 7 separate buildings to provide support infrastructure. To include workshops, training room, administration buildings, amenities buildings & truck wash area. Concrete slab, steel portal frame, lightweight cladding, metal roof. Click for more details...

DUGALD RIVER BASE METAL PROJECT - MINE INDUSTRIAL AREA & PLANT BUILDINGS
Private ownership Mining - Support Facilities (Administration facilities) project In The Mt Isa City Council Area for New development. Construction of Plant & Industrial buildings. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - CONSTRUCTION ACCOMMODATION CAMP
South of, Weipa, QLD 4874 Has Amrun (South Of Embley) Bauxite Project - Construction Accommodation Camp currently at Construction stage. A 280 person temporary construction camp to be expandable up to 630 beds. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - DREDGING
Mining - Support Facilities (Administration facilities) project In The Weipa Shire Council Area of Private ownership. For the provision of dredging works for the following locations: Hey River Terminal, Humbug Terminal, Amrun Export Terminal, Berth pocket, & Wharf area. The scope is fully inclusive of all requirements to complete the works in accordance with the contract including mobilisation, any temporary works & navigation aids, any requirements to comply with quarantine or other statutory conditions, & demobilisation. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - ACCOMMODATION VILLAGE (DESIGN & CONSTRUCTION)
New project of Mining - Support Facilities (Bath houses, Amenities, Dressing rooms) project at 40km SW of, Weipa, QLD 4874. For the design & construction of an Accommodation Village (comprising approximately 1,200 accommodation rooms) & temporary on-site construction facilities at different locations external to the construction camp. Accommodation rooms will be supplied by Rio Tinto. The accommodation village & the temporary on-site construction facilities includes but is not limited to: Four (4) bed unsuited accommodation modules. People with Disabilities (PWD) two (2) bed unsuited accommodation modules. Maintenance & storage facilities. Office & administration facilities. Communications/data/television signal facility. Close Circuit Television (CCTV) monitoring facilities. Ablutions modules. Kitchen, dining & crib facilities. Entertainment facilities. Gymnasiums. Sporting facilities. Training/education centre. Laundry modules. Commercial laundry facility. First aid facility Power generation units & distribution panels with reticulation network. Area & general lighting requirements. Potable water treatment, storage & distribution networks. Waste water treatment systems & collection networks. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - ACCOMMODATION VILLAGE (DESIGN & CONSTRUCTION)
New project of Mining - Support Facilities (Sporting facilities, Gymnasiums, etc.) project at 40km SW of, Weipa, QLD 4874. For the design & construction of an Accommodation Village (comprising approximately 1,200 accommodation rooms) & temporary on-site construction facilities at different locations external to the construction camp. Accommodation rooms will be supplied by Rio Tinto. The accommodation village & the temporary on-site construction facilities includes but is not limited to: Four (4) bed unsuited accommodation modules. People with Disabilities (PWD) two (2) bed unsuited accommodation modules. Maintenance & storage facilities. Office & administration facilities. Communications/data/television signal facility. Close Circuit Television (CCTV) monitoring facilities. Ablutions modules. Kitchen, dining & crib facilities. Entertainment facilities. Gymnasiums. Sporting facilities. Training/education centre. Laundry modules. Commercial laundry facility. First aid facility Power generation units & distribution panels with reticulation network. Area & general lighting requirements. Potable water treatment, storage & distribution networks. Waste water treatment systems & collection networks. Click for more details...

BAUXITE HILLS BAUXITE DSO PROJECT - WORKSHOPS
Mining - Support Facilities (Industrial buildings) project In The Mapoon Shire Council Area of Private ownership. For the provision of workshops. Click for more details...

BAUXITE HILLS BAUXITE DSO PROJECT - FUEL STORAGE
Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) New project at 35km North of, Mapoon, QLD 4876. This type is Fuel Storage with Private ownership. For the provision of fuel storage tanks for storage of up to 1 megalitre of fuel. Click for more details...