List of Mining - Support Facilities Projects in Western Australia


ST IVES GOLD OPERATIONS EXPANSION -KAMBALDA VILLAGE
Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Coolgardie Council Area of Private ownership. 200 units. Click for more details...

LUDLOW MINERAL SANDS PROJECT - ON SITE BUILDINGS RELOCATION
Mining - Support Facilities (Accommodation - units, housing, group accom.) New project at 34 km south of, Bunbury, WA 6230. This type is On Site Buildings - Relocation (From Yarloop & Sandalwood) with Private ownership. On site buildings include: office/cribb room; plant buildings. Click for more details...

BLAIR NICKEL MINE - RESOURCE
Operating Mine project at North of, Kambalda, WA 6442 In The Council Area Of Coolgardie of Private. Resource estimate is 109,000 tonnes of ore @ 5.19% Ni for 5,660 tonnes of contained nickel. Excavation of new decline to access the ore on the 460 level and below. Click for more details...

TELFER PROJECT
Mining - Support Facilities (Industrial buildings) project In The Port Hedland Council Area of Gas Comresor Station/Vent/Offices type. Includes a storage room, control room, workshop,equipment room, foyer, kitchen and toilets, vent stack (5 metres high), turbines, scraper launcher, and other equipment for operation of the gas pipeline. The carpark and manouvering area will be sealed and includes four designated carparking spaces. Click for more details...

BERTH C
Bulk Loading & Storage Facilities project at Inner Harbour, Bunbury, WA 6230 In The Council Area Of Bunbury of State. Supply of components, fabrication, construction and commissioning of facilities associated with the new berth facilities. Mineral sands storage facility expected to involve several sheds approximately 100 m long, 55 m wide and up to 20 m high. Click for more details...

FIMISTON GOLD OPERATIONS
Concentrator Plant - Upgrade & Laboratory project at Golden Mile via, Kalgoorlie, WA 6430 In The Council Area Of Kalgoorlie-Boulder of Private. Overall upgrade aimed at centralising process facilities & streamlining Super Pit operations. Concentrate plant to undergo an upgrade & a new metallurgical laboratory will be required. Click for more details...

SUNRISE DAM GOLD OPERATIONS
Currently at the Construction stage In Laverton is a project estimated to be $ 1500000. This project Contract includes accommodation village for about 150 personnel, offices and ablution areas. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - RAIL INFRASTRUCTURE
Rail Infrastructure New project In The Port Hedland Council Area. Feasibility study has recommended a a 255 km railway line from Cloud Break to Port Headland port facility. A mine load out facility will be located at Cloud Break. There will be four train sets each comprising two locomotives and two hundred wagons. Supporting infrastructure will include sidings, passing bays and loading loops, train loader, temporary construction facilities, temporary track camps, administration offices and warehouses, trip servicing facilities, service and repair workshop, rail maintenance track, rail loops and marshalling yards, maintenance facilities, substations and communication systems. The proposed line does deviate where there are environmental, heritage and engineering constraints. Stage A PER covers the Port and North to South rail line. The Stage B PER covers the East to West rail spur. Click for more details...

MOUNT IDA PROJECT - GOLD RESOURCE
Mining - Support Facilities (Administration facilities) project at Via, Menzies, WA 6436 of Resource - Gold type of New development. Resource estimate for the Baldock, Meteor, Whinnen and Timoni ore bodies is 143,000 tonnes @ 24 g/t for 110,650 ounces of Au. Associated infrastructure includes camp, offices, refurbished shaft and mining equipment. Click for more details...

KOOLYANOBBING IRON ORE OPERATIONS - JACKSON/WINDARLING/BUNGALBIN/MAYFIELD
New project of Mining - Support Facilities (Accommodation - units, housing, group accom.) project at 5km north east of, Southern Cross, WA 6426. Limited infrastructure including a single persons camp and communications requirements: computer, phone (microwave link). Click for more details...

SALLY MALAY NICKEL PROJECT
Mining - Support Facilities (Accommodation - units, housing, group accom.) New project at 160 km southwest of, Kununurra, WA 6743. This type is Accommodation Village with Private ownership. 120 person village. Click for more details...

OREBODY 18 IRON ORE PROJECT
Accommodation project at In, Newman, WA 6753 in the Mining - Support Facilities (Accommodation - units, housing, group accom.). BHP plans to mine 116 million tonnes of ore over the next 12 - 15 years. Part of the development will be the construction of workforce accommodation in Newman, approx 30 km from the mine. Click for more details...

RAVENSTHORPE NICKEL PROJECT - BANDALUP HILL - INFRASTRUCTURE
Infrastructure project at 50km north of, Hopetoun, WA 6348 in the Mining - Support Facilities (Accommodation - units, housing, group accom.). A combination of multi user regional infrastructure and project infrastructure. The multi user infrastructure includes upgrade of local roads, new shire airstrip, emergency services, sewered land, housing, power and water. Project infrastructure includes site buildings, communication, plant roads, construction camp and port facilities at Esperance. Click for more details...

GASCOYNE PROJECT - ARTHUR RIVER/BERYL HILL
New project of Mining - Support Facilities (Accommodation - units, housing, group accom.) project at via, Gascoyne Junction, WA 6705. A 50 tonne per hour jig plant to assess production potential for columbite and alluvial tantalite. Click for more details...

WICKHAM TRANSIENT ACCOMMODATION COMPLEX
Mining - Support Facilities (Accommodation - units, housing, group accom.) project at Lot 103 Wickham Dr, Wickham, WA 6720 for New. To include 300 unit accommodation complex to cater for transient workforce. Additional on-site facilities to include kitchen/dining facilities, gymnasium & administration. Click for more details...

BHP BILLITON IRON ORE - NEWMAN ACCOMMODATION VILLAGE
Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The East Pilbara Council Area of Accommodation Village - 1000 Person type. A 1000 person accommodation village north of Les Tutt Drive, which is to be closed. Camp to have expected three year duration. Click for more details...

MID WEST IRON & STEEL PROJECT - KOOLANOOKA - STORAGE SHED/FACILITIES
Currently at the Construction stage In City Of Greater Geraldton is a project estimated to be $ 3000000. This project Construction of storage shed and associated facilities. Concrete floor, structural steel and cladding. Click for more details...

EMILY ANN WORKERS CAMP EXPANSION
Currently at the Planning stage In Dundas is a project estimated to be $ 13000000. This project Proposal comprises an expansion of the existing 240 person accommodation village by 100 rooms, the existing sewerage evaporation pond and the domestic tip. Click for more details...

SWAN RIVER - MECKERING KAOLIN PROJECT - PILOT PROCESSING PLANT & LABORATORY
Private ownership Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project In The Northam Council Area for New development. The pilot plant to be located at Avon Industrial Park, will be in operation from December 2005 till approximately June 2006. The plan is to produce between 50 and 500 tonnes of product. Click for more details...

PORT HEDLAND TRANSIENT WORKERS ACCOMMODATION UNITS
Transient Workers Units New project In The Port Hedland Council Area. 144 workers transient accommodation units. Click for more details...

BROCKMAN SYNCLINE 4 IRON ORE PROJECT - CONSTRUCTION CAMP
Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Ashburton Council Area of Construction Camp type. Construction of a 24 person camp. Click for more details...

IRON ORE RAPID GROWTH PROJECT 3 - PORT INFRASTRUCTURE
At, Finucane Island, WA 6721 Has Iron Ore Rapid Growth Project 3 - Port Infrastructure currently at Construction stage. Development comprises construction a new single stockyard row in area S, the Eastern Yard including a new stacker and new reclaimer. Constructing a new dedicated Return Screened Fines stockpile adjacent to Car Dumper 4 including new stacker and new reclaimer. Joining the existing Berths C & D together to allow existing shiploaders SLO3 and SLO4 to access either berth. Modifications to the long travel of shiploaders SLO3 and SLO4 so they can travel and shipload on Berth C and D. Upgrading and rebuilding the existing Berth C to accommodate shiploader SLO4 and 250,000 DWT vessels, modify the exisitng control system to suit the new operating regime, improve dust control measures, upgrade electrical infrastructure to suit the proposed development, upgrade the exisiting general infrastructure including upgrading a warhouse building , upgrading roads and constructing a new water recovery plant. The existing existing environmental berm will be extend to provide a visual buffer to the town of Port Hedland on the other side of the harbour from the new eastern stockyard. Construction of temporary lay down areas and buildings for the contractors and temporary construction offices for BHP and EPCM staff. Borrow pits will be developed for the taking of material for construction purposes. A new 66 Kv power line will also be constructed and installed. Click for more details...

MOUNT GIBSON IRON ORE MINE & INFRASTRUCTURE PROJECT - STORAGE SHED & FACILITIES
Mining - Support Facilities (Industrial buildings) project In The City Of Greater Geraldton Council Area of Storage Shed/Associated Facilities type. Construction of dedicated berth, storage shed and shiploading facilities to handle 130,000 tonnes of iron ore. Facilities will include hoppers, conveyors, storage tanks, clarifier, return water tank and pumps, HV cables, power transformer, MCC and switch rooms. A filter plant will be constructed to dry the slurry. Concrete floor, structural steel and cladding. Click for more details...

CENTRAL NORSEMAN GOLD OPERATIONS - RESOURCE
Resource -Gold project at 30 Km North of, Norseman, WA 6443 In The Council Area Of Dundas of Private. Norseman gold operation comprises two underground mines, Harlequin, Bullen, various open pits and the Phoenix mill treatment plant. The Davyhurst gold operation has been sold to Monarch Resources. Mining is to continue at all operations and various infrastructure projects will be undertaken. At Harlequin the mine ventilation system and the surface workshop will be upgraded in preparation for long term mining at the Harlequin decline. The Phoenix mill treatment plant will undergo maintenance of the crusher, ball and SAG mill and the installation of new ore feeders. A new tailings storage facility designed to provide 10 years storage will be developed. A major upgrade to the power distribution network will be undertaken. Lastly the single person quarters at Norseman will be upgraded and refurbished. Click for more details...

INDEE GOLD PROJECT - ACCOMODATION/ADMINISTRATION/STORAGE FACILITY
80 Km South west of, Port Hedland, WA 6721 Has Indee Gold Project - Accomodation/Administration/Storage Facility currently at Tenders & Building stage. Construction comprises an accommodation building for 40 persons, ablution block, kitchen/mess facilities, administration building and an equipment storage facility. Click for more details...

COBURN MINERAL SANDS PROJECT - ACCOMMODATION CAMP CATERING
Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Shark Bay Council Area of Accommodation Camp Catering type. Catering for accommodation camp. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - RAIL WORKERS CAMP
Private ownership Mining - Support Facilities (Medical facilities) project In The East Pilbara Council Area for New development. A 280 person accommodation camp to be constructed for rail workers. The camp will comprise 70 accommodation units containing 4 rooms with their own ensuite. Other buildings will be a camp management/office building, dry mess, a wet mess with covered beer garden, a recreation complex, 3 laundry buildings, fully equiped gymnasium, a first aid post with ambulance shelter and other ancillary buildings. A sports court, BBQ area and swimming pool with associated toliets and change rooms will be constructed. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - RAIL WORKERS CAMP
Mining - Support Facilities (Bath houses, Amenities, Dressing rooms) project at 15 Km North of Wodgina via, Newman, WA 6753 of Accommodation Camp type of New development. A 280 person accommodation camp to be constructed for rail workers. The camp will comprise 70 accommodation units containing 4 rooms with their own ensuite. Other buildings will be a camp management/office building, dry mess, a wet mess with covered beer garden, a recreation complex, 3 laundry buildings, fully equiped gymnasium, a first aid post with ambulance shelter and other ancillary buildings. A sports court, BBQ area and swimming pool with associated toliets and change rooms will be constructed. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - RAIL WORKERS CAMP
Mining - Support Facilities (Canteens, Messes, Crib room) project at 15 Km North of Wodgina via, Newman, WA 6753 of Accommodation Camp type of New development. A 280 person accommodation camp to be constructed for rail workers. The camp will comprise 70 accommodation units containing 4 rooms with their own ensuite. Other buildings will be a camp management/office building, dry mess, a wet mess with covered beer garden, a recreation complex, 3 laundry buildings, fully equiped gymnasium, a first aid post with ambulance shelter and other ancillary buildings. A sports court, BBQ area and swimming pool with associated toliets and change rooms will be constructed. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - RAIL WORKERS CAMP
Mining - Support Facilities (Medical facilities) project at 15 Km North of Wodgina via, Newman, WA 6753 of Accommodation Camp type of New development. A 280 person accommodation camp to be constructed for rail workers. The camp will comprise 70 accommodation units containing 4 rooms with their own ensuite. Other buildings will be a camp management/office building, dry mess, a wet mess with covered beer garden, a recreation complex, 3 laundry buildings, fully equiped gymnasium, a first aid post with ambulance shelter and other ancillary buildings. A sports court, BBQ area and swimming pool with associated toliets and change rooms will be constructed. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - TRANSIENT WORKERS CAMP
Mining - Support Facilities (Medical facilities) project for New development. A 704 persons accommodation camp to be constructed. The camp will comprise 126 permanent accommodation units containing 4 rooms with their own ensuites and 66 temporary accommodation units containing 4 rooms with their own ensuites. Other buildings will be a dry mess, a wet mess with covered beer garden, maintenance sheds, laundry buildings, fully equipped gymnasium, a first aid post with ambulance shelter. A sports court, BBQ area and swimming pool with associated toilets and change rooms will be constructed. Other ancillary buildings will also be constructed. Click for more details...

WORSLEY ALUMINA EFFICIENCY & GROWTH PROJECT - CAMP & ACCOMMODATION
New project of Mining - Support Facilities (Accommodation - units, housing, group accom.) project at 15 Km South east of, Collie, WA 6225. Contract includes busing workforce personnel. Camp and Accommodation construction includes civil works, water supply and sewage treatment plant. Accommodation village will comprise of 1000 person accommodation. Click for more details...

NULLAGINE GOLD PROJECT - ACCOMMODATION VILLAGE/ANCILLARY FACILITIES
Accommodation Village/Ancillary Facilities project at 10 km South of, Nullagine, WA 6758 In The Council Area Of East Pilbara of Private. A 120 person accommodation village and ancillary buildings to be constructed. Living units will be both two and four room transportable accommodation units with their own ensuite shower and toilet. Ancillary buildings and facilities to be constructed comprise a dry mess and kitchen including refrigeration and dry storage area, outdoor barbeque area, wet mess inclusive of a small retail facility, laundry facility, recreational room including TV, tea & coffee making facilities, gymnasium, sports court and equipment, resident phone facilities, 5 or 6 person transportable units for short term residents, additional ablutions for recreational areas and short term residential accommodation, LPG facility to provide gas for cooking and hot water systems, truck delivery and turn around area, parking area, transportable site administration office with capacity for approximately 12 offices and first aid facilities, small onsite laboratory to process treatment plant samples, workshop building housing electrical, mechanical and fabrication works, maintenance office and crib room, ablutions to service the site facilities. An onsite diesel power station will be installed by a contractor which will supply the power for the camp. Water will be pumped from bores and stored in water tanks and treated by osmosis processing facility. Sewage from the camp will be pumped into septic tanks into a sewage treatment plant and sewage from the processing plant will be pumped into sceptic tanks and then pumped to leach drains. Click for more details...

BODDINGTON GOLD MINE EXPANSION PROJECT - WORKSHOP/WASHDOWN FACILITY
Workshop/Washdown Facility project at Pinjarra - Williams Rd, Boddington, WA 6390 in the Mining - Support Facilities (Industrial buildings). Workshop and wash-down facility. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - MOUNT WHALEBACK RAIL LOOP MODIFICATIONS
Rail Loop Modifications New project In The East Pilbara Council Area. Rail Loop Modifications. The new Newman Hub layout covers modifications at the yard entry, modifications for the new train load-out, modifications for the new car dumper and installation of facility for loco servicing. Click for more details...

ABYDOS IRON ORE PROJECT
Operating Mine - Iron Ore project at 85km West of, Marble Bar, WA 6760 in the Mining - Support Facilities (Accommodation - units, housing, group accom.). Upgraded resource estimate of 22.2Mt @ 56.7% Fe. Project will consist of two open pits which will be mined using conventional drill and blast, load and haul techniques. Pit dewatering will not be required. Ore processing and transport. Additional infrastructure will include the administration area, haul road, Abydos Link road, access tracks, explosives magazines, water bores and associated reticulation and borrow pits. Re-fuelling and fuel storage areas, workshops, washdown areas and laydown areas will be located within the administration area and the ROM area. All personnel and staff will be housed at the Abydos accommodation village. Click for more details...

IRON ORE RAPID GROWTH 5 PROJECT - ACCOMMODATION VILLAGE EXPANSION
Mining - Support Facilities (Accommodation - units, housing, group accom.) project for New development. The contract is for the supply of an additional 600 rooms. Click for more details...

RAPID GROWTH 5 IRON ORE PROJECT - RAIL
Mining - Support Facilities (Accommodation - units, housing, group accom.) project at Between Port Hedland and, Newman, WA 6753 for New. The works include construction of more than 1 000 camp rooms complete with kitchens and recreation facilities, 1.2 million cubic metres of earthworks, construction of 10 new dual track bridges, laying of all required track to duplicate the existing 200km railway line and installation of 840 km of fibre optic cable. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1/PHASE A
Civils/Piping Works/Offices/Roads/Accommodation - Stage 1/Phase A New project In The City Of Karratha Council Area. As part of a plan to increase Rio Tinto's overall Pilbara operational capacity to 330million tonnes per annum (Mtpa), a project to increase the Cape Lambert Port iron ore handling, processing & ship loading capacity through construction in 2 stages (phases A 7 B) of new stockyard & port facilities of up to 100Mtpa capacity to the west of the existing 80Mtpa Port A operations. Construction of a 920m long jetty & a 2-berth wharf along with new shiploading facilities. Associated piping works expected to include relocation of the natural gas pipeline feeding the Cape Lambert power station, the Cape Lambert landfill site & a transmission line. Construction facilities expected to inlcude laydown & storage areas adjacent the stockpile area, construction contractor offices, minor roads & accommodation. Click for more details...

MOUNT MAGNET GOLD OPERATIONS
Resource - Gold New project In The Murchison Council Area. A project based on a Resource Estimate of 41.8 million tonnes (Mt) containing 2.96 million ounces (oz) of gold. Base case production of 520,000t over 6 years. Expansion through cut back of existing pits for production from Mars & Saturn pits for 2 years then eventually from 6 pits. Infrastructure required includes plant upgrade & accommodation camp with messing facilities. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - SUPPLY OF MODULAR CAROUSEL STORAGE SYSTEM
Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project at Via, Barrow Island, WA 6712 for New. For the supply of modular/carousel storage systems. To include: 3 Modular Carousels @ 4m (Wide) x 3m (Depth) x 6m (High); or o 4 Modular Carousels @ 3m (Wide) x 3m (Depth) x 6m (High). Units will need to be accessible from a single side. Each unit will need to have the capability to have its own dehumidified environment controlled to a fixed temperature. Installation will need to be provided for on Barrow Island or the supplier will need to partner with the current construction contractor of the warehouse on Barrow Island. Click for more details...

PORT HEDLAND BHP BILLITON NON-PROCESS INFRASTRUCTURE (PORT NPI) PHASE 1
Mining - Support Facilities (Administration facilities) project In The Port Hedland Council Area of Lubrication Facility/Office, Administration & Stores Buildings - Altn & Addns type. A Port Hedland Inner Harbour project to increase throughput by upgrading existing & construction of new support facilities. Construction of a new lube facility including lube storage & dispensing unit & storage area; a workshop with washdown pad, office & workstations along with an amenities block, traffic management, oily water separation system & bulk diesel storage. Upgrade after removal of some portable buildings of the belt store including new storage/laydown area, high bay belt workshop, portable offices & amenities block, a cool, dry storage facility, light vehicle car park & truck loading yard. Expansion of the existing administration building including offices, conference rooms, open plan work areas, amenities, crib room, tool lockers, secure & public car parking & relocation of the barbecue area. Refurbishment & internal refit of existing crib rooms & amenities at the Nelson Point Crushing Offices as well as the Emergency Services Office. Click for more details...

GREATER GORGON GAS PROJECT - CARBON DIOXIDE INJECTION PIPELINE & WELL SITE - SITE OFFICES & TOILETS
Private ownership Mining - Support Facilities (Bath houses, Amenities, Dressing rooms) project In The Ashburton Council Area for New development. For the hire (including installation & tear down) of temporary site offices & associated ablution facilities. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - TRUNKLINE SECONDARY STABILISATION - ACCOMMODATION OFFSHORE
Private ownership Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Ashburton Council Area for New development. For the provision of offshore accommodation. Click for more details...

YWHEATSTONE DEVELOPMENT PROJECT - TRUNKLINE SECONDARY STABILISATION - ACCOMMODATION ONSHORE
Accommodation Onshore project at Vicinity of, Onslow, WA 6710 In The Council Area Of Ashburton of Private. For the provision of onshore accommodation. Click for more details...

BHP BILLITON WORKER ACCOMMODATION
New project of Mining - Support Facilities (Accommodation - units, housing, group accom.) project at Barramine Loop & Limestone St, South Hedland, WA 6722. Construction of 28 x 3, 4 & 5 bedroom detached, single level dwellings. Concrete slab on ground, steel frame, metal or lightweight sheeting walls, metal roof. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - RAIL NON PROCESS - MODULAR BUILDING
Mining - Support Facilities (Administration facilities) project In The East Pilbara Council Area of Modular Buildings type. For the supply & installation of modular buildings. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - NORTH WEST OPERATIONS SHORE BASE & STAGING FACILITIES
Mining - Support Facilities (Administration facilities) project In The Ashburton Council Area of Private ownership. For the provision of North West Operations Shore Base Facility & North West Operations Staging Facility. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE & INFRASTRUCTURE - PINDAN - ELECTRICAL WORKS
Mining - Support Facilities (Accommodation - units, housing, group accom.) Renovations, Refurbishments etc. project at Barrarda Estate, Onslow, WA 6710. This type is Electrical Works with Private ownership. For the installation of mains cables from street to house, connection of AC & HWS for 50 modular houses. Includes excavation & backfill. Click for more details...

PILGANGOORA LITHIUM-TANTALUM PROJECT - MINE WORKSHOP & OFFICES
Mining - Support Facilities (Industrial buildings) project for New development. For the provision of a mine workshop & offices. Click for more details...