State

Categories

Sub Categories

Click Here to Find Current Projects

List of Non-Construction Items Projects


LAVERTON GOLD OPERATIONS - TREATMENT PLANT REFURBISHMENT/EXPANSION
Treatment Plant - Refurbishment/Expansion Renovations, Refurbishments etc. project In The Laverton Council Area. Expansion to 1.5 million tonnes. Additional test work will be undertaken to obtain further information to fully optimise the process flow sheet at the 1.5 Mtpa throughput rate. Infrastructure proposed to be added are a second ball mill, additional tankage, a gravity circuit and in pit tailings disposal. The recent acquisition of additional tenenaments in the Laverton area has made the expansion of the plant economically viable. Click for more details...

LAVERTON GOLD PROJECT - SICKLE - RESOURCE
Resource - Gold project at 50 km surrounding the Laverton treatment plant, Laverton, WA 6440 in the Non-Construction Items (Freight - Air, Sea, Land). Mine production is expected to be 90,000 ounces of gold per annum. Resource estimate is ore reserve of 6,424,000 tonnes of ore @ 1.8 g/t for 374,000 ounces of gold. Indicated Resource is 20,100,000 tonnes of ore @ 1.5 g/t for 950,000 ounces of gold and inferred resource is 10,400,000 tonnes of ore @ 1.5 g/t for 480,000 ounces of gold. The low grade stockpile is 1,160,000 tonnes of ore @ 0.7 g/t for 26,000 ounces of gold. The first gold pour occured on 19th March 2007 and a total gold poured for the month of March was 953oz compared to a forecast of 754oz. Click for more details...

FORTNUM GOLD PROJECT - RESOURCE
Non-Construction Items (Airservices for personnel) project for New development. Resource estimate of 13,100,000 tonnes @ 2.5 g/t for 1,045,300 ounces of gold. Click for more details...

DANDENONG CITY CONCRETE WORKS
Non-Construction Items (Supply/fabrication) project In The Greater Dandenong Council Area of Local Govt ownership. Annual Supply of Concrete Works, associated Drainage Works, and Footpath Grinding Works. Click for more details...

TATURA PRECAST CONCRETE FACTORY
Aggregate - Supply & Delivery project at Not Known, Tatura, VIC 3616 In The Council Area Of Campaspe of Local Govt. The supply and delivery of coarse and fine aggregate to the Tatura Precast Concrete Factory. Click for more details...

CS ENERGY
Non-Construction Items (Supply of consumables e.g.chemicals, fuels, etc.) project In The Maranoa Regional Council Area of Gas Supply Contract type. An early delivery of 3 terrajoules per day will take plane in June, July, August and December 2004. Substantial delivery of 3PJ each year will begin in April 2005. The contract is for five years. Ther amount of gas can be increased by mutual consent to 4PJ per year. Click for more details...

BP REFINERY - BULWER ISLAND
Gas - Supply project at Tingira St, Pinkenba, QLD 4008 in the Non-Construction Items (Supply of consumables e.g.chemicals, fuels, etc.). 15 PJ of gas over 5 years. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - ORE WAGONS
Ore Wagons project at Via, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Design, supply and assembly of 2 prototype ore wagons and 820 ore wagons. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - MINING CONTRACT
Pilbara Iron Ore & Infrastructure Project - Mining Contract is currently at the Construction stage, valued at about $ 200000000 it is Work will be carried out in two stages. The first stage comprises mine planning, equipment selection, procurement and commissioning, mine infrastructure planning, operator input to design, pre-production of initial bulk earthworks, pre-strip, pre-production ore mining, construction of haul roads, service reticulation, dewatering, installation and commissioning of mine site conveyancing and development of all mine site management systems. The second stage comprises ore production and mine planning to optimise annual operations and annual operating targets of the mine. Click for more details...

LIDDELL POWER STATION - CLEANING CONTRACT
Private ownership Non-Construction Items (Catering, Cleaning, Laundering) project In The Muswellbrook Council Area for New development. The work covered by this specification include the routine cleaning of various offices, amenities and miscellaneous plant and structures at the power station and surrounding plant areas. Surrounding areas include coal conveyors, rail unloader facility, Liddell ash dam, switchyards and switchrooms. The work will include the cleaning of offices, meal rooms, kitchens, public areas, vestibules, porches, toilets, showers, plant and equipment rooms at the power station and environs. This shall cover the exteriors of buildings including any courtyard areas, external paving, adjacent footpaths, nature strips and guttering. Clean up and /or removal of various accumulated, or split, non toxic materials and rubbish from all areas of the plant. Unblocking/cleaning out material transfer points (ie. coal chutes), various pits, pipes,conduits, trenches, gutters, bunds, sluiceways etc. Degreasing and pressure cleaning of plant and equipment. Click for more details...

LIDDELL POWER STATION - BEARING/SEALS/V BELTS SUPPLY CONTRACT
Non-Construction Items (Supply of consumables e.g.chemicals, fuels, etc.) project at Via, Liddell, NSW 2333 for New. Contract comprises the supply and delivery of bearings, seals and V-belts. The contractor will also provide technical support and information on contract materials and on new or substitute materials which are compatible with the existing plant and equipment. Click for more details...

CAMEBY DOWNS COAL PROJECT - STRUCTURAL STEEL FOR CHPP
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 10000000. This project For a 1.8Mtpa processing facility. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - JIMBELBAR - METAL DETECTOR
Currently at the Construction stage In East Pilbara is a project estimated to be $ 250000. This project For the supply of metal detector. Click for more details...

SURAT TO GLADSTONE LNG PIPELINE PROJECT - LINE PIPE SUPPLY
Currently at the Tenders & Building stage In Various is a project estimated to be $ 10000000. This project The 660mm diameter high pressure buried steel gas pipeline would be approximately 470km long. The pipeline would have a minimum technical design life of 40 years. Above ground facilities would be required at intervals along the pipeline, including: mainline valves; cathodic protection systems; and marker signs. The project will be from a proposed compressor facility adjacent to the Kogan North Central Gas Facility to the proposed LNG plant at Fisherman's Landing, Gladstone. Click for more details...

RAPID GROWTH 6 IRON ORE PROJECT (RGP6)
Non-Construction Items (Supply/fabrication) project In The East Pilbara Council Area of Private ownership. The Rapid Growth Project 6 (RGP6) project aims to increase iron ore capacity installed in Western Australia to 240 million tonnes per annum (Mtpa) from the Rapid Growth Project 5 (RGP5) target of 205Mtpa. March 2011 financial approval for Jimblebar mine expansion (rail links, mining equipment, rolling stock for 35Mtpa capacity) & Port Hedland expansion (2 new berths & shiploaders, car dumper, connecting conveyor routes with associated rail works & rolling stock) as well as blending facilities in preparation for future growth beyond the inner harbour. Click for more details...

WOODS POINT GOLD PROJECT - MORNING STAR OPERATIONS - TAILINGS DISPOSAL PLANT
Non-Construction Items (Supply/fabrication) project at West of, Woods Point, VIC 3723 of Structural Steel - For Paste Backfill Plant type of New development. Supply of structural steel for a paste backfill plant to allow for the disposal underground of tailings from the Gravity Mill plant. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - ANCHOR LEG LOAD MONITORING SYSTEM (ALLMS)
Non-Construction Items (Supply/fabrication) project at 475km N/NE of, Broome, WA 6725 of Anchor Leg Load Monitoring System (Allms) type of New development. For the provision of an Anchor Leg Load Monitoring System (ALLMS). Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - GLOBE VALVES
Currently at the Construction stage In Broome is a project estimated to be $ 500000. This project For the provision of globe valves. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - DRAIN TANKS
Currently at the Construction stage In Broome is a project estimated to be $ 500000. This project For the provision of drain tanks. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - MAN RIDING WINCH
Non-Construction Items (Supply/fabrication) project at 475km N/NE of, Broome, WA 6725 of Man Riding Winch type of New development. For the provision of a man riding winch. Click for more details...

PILBARA TRANSPORTABLE BUILDINGS SUPPLY CONTRACT
New project of Non-Construction Items (Supply/fabrication) project at Pilbara Region, ., WA 6999. Five year contract to construct at least 240 ancillary buildings annually including for administration units, crib rooms, administration units & security offices. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - MEG & CHEMICAL DISTRIBUTION UNITS
Non-Construction Items (Supply/fabrication) project at Approx 475km NNE of, Broome, WA 6725 of Meg/Chemical Distribution Units type of New development. For the provision of MEG & chemical distribution units. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - TELEPHONE HOODS
Shell Prelude Gas Field Project - Turret & Mooring - Telephone Hoods is currently at the Construction stage, valued at about $ 50000 it is For the provision of telephone hoods. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - UHF ANTENNAS
Uhf Antennas project at Approx 475km NNE, Broome, WA 6725 In The Council Area Of Broome of Private. For the provision of UHF antennas. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - SUPPLY OF MODULAR CAROUSEL STORAGE SYSTEM
Non-Construction Items (Supply/fabrication) project at Via, Barrow Island, WA 6712 for New. For the supply of modular/carousel storage systems. To include: 3 Modular Carousels @ 4m (Wide) x 3m (Depth) x 6m (High); or o 4 Modular Carousels @ 3m (Wide) x 3m (Depth) x 6m (High). Units will need to be accessible from a single side. Each unit will need to have the capability to have its own dehumidified environment controlled to a fixed temperature. Installation will need to be provided for on Barrow Island or the supplier will need to partner with the current construction contractor of the warehouse on Barrow Island. Click for more details...

GREATER GORGON GAS PROJECT - HEAVY LIFT & TIE INS - CREW TRANSFER VESSEL
New project of Non-Construction Items (Supply/fabrication) project at Off, Barrow Island, WA 6712. For the provision of a crew transport vessel. Click for more details...

ROY HILL IRON ORE PROJECT - GENERAL - BUS SUPPLY
Bus Supply project at 110km North of, Newman, WA 6753 In The Council Area Of East Pilbara of Private. For the provision of Roy Hill Iron Ore (RHIO) buses. Click for more details...

GREATER GORGON GAS PROJECT - CARBON DIOXIDE INJECTION PIPELINE & WELL SITE - CONTAINER HIRE
Greater Gorgon Gas Project - Carbon Dioxide Injection Pipeline & Well Site - Container Hire is currently at the Construction stage, valued at about $ 250000 it is For the provision of container hire. Click for more details...

GREATER GORGON GAS PROJECT - CARBON DIOXIDE INJECTION PIPELINE & WELL SITE - TOOLS/CONSUMABLES
New project of Non-Construction Items (Supply/fabrication) project at On, Barrow Island, WA 6712. For the provision of tools and consumables. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - SS CABLE LABLES & FERRULES (MR-17100)
Non-Construction Items (Supply/fabrication) project at On, Barrow Island, WA 6712 for New. For the provision of SS cable lables & ferrules heat shrinkable tubes. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - CRYOGENIC MANUAL VALVES
Non-Construction Items (Supply/fabrication) project In The Ashburton Council Area of Cryogenic Manual Valves type. For the provision of cryogenic manual valves. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - FIBERGLASS FOR SUSPENDED DECK
Non-Construction Items (Supply/fabrication) project In The Ashburton Council Area of Private ownership. For the provision of fiberglass for the suspended deck. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - FOAM SYSTEM
Vicinity of, Onslow, WA 6710 Has Wheatstone Development Project - Storage & Field Erected Condensate Tanks - Foam System currently at Construction stage. For the provision of a foam system. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - BRINE OUTFALL PIPING FOR HEAVY LIFT FACILITY
Private ownership Non-Construction Items (Supply/fabrication) project In The Ashburton Council Area for New development. For the supply & fabrication of brine outfall piping for heavy lift facility. To include: pipe works, pipe supports, & emergency escape access platform & ladders. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - OCEAN BOTTOM NODE SEISMIC SURVEY
Non-Construction Items (Supply/fabrication) project In The Ashburton Council Area of Private ownership. For the provision of an ocean bottom node seismic survey. Click for more details...

CAROSUE DAM GOLD OPERATIONS - BLASTING SERVICES CONTRACT
Non-Construction Items (Supply/fabrication) project at 80 km south of, Laverton, WA 6440 for New. Drill & blast contract including full down-the-hole services & product supply. Click for more details...

ROY HILL IRON ORE PROJECT - MINE PROCESS PLANT - CONVEYOR DRIVE SYSTEM FOR PLANT CONVEYOR
Non-Construction Items (Other mining services) project In The Port Hedland Council Area of Private ownership. For the provision of conveyor drive system for plant conveyor. Click for more details...

ROY HILL IRON ORE PROJECT - GENERAL - AIR CHARTER SERVICES
Roy Hill Iron Ore Project - General - Air Charter Services is currently at the Construction stage, valued at about $ 10000000 it is For the provision of air charter services. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE - GAS EXPORT PIPELINE - HYDROSTATIC TESTING AND PRE-COMMISSIONING
Non-Construction Items (Other mining services) New project at Blaydin Point via, Darwin, NT 0800. This type is Hydrostatic Testing/Pre-Commissioning with Private ownership. For the provision of hydrostatic testing & pre-commissioning. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - PORT NON PROCESS - MODULAR BUILDINGS
Modular Buildings project at 110km north of, Newman, WA 6753 in the Non-Construction Items (Supply/fabrication). For the provision of modular buildings. Click for more details...

ROY HILL IRON ORE PROJECT - NON-PROCESS INFRASTRUCTURE - MINE SERVICES BUILDINGS - SECURITY SERVICES
A project in the WA Within East Pilbara. For the provision of security services. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - NORTH WEST OPERATIONS SHORE BASE & STAGING FACILITIES
Non-Construction Items (Other mining services) project In The Ashburton Council Area of Private ownership. For the provision of North West Operations Shore Base Facility & North West Operations Staging Facility. Click for more details...

ICHTHYS LNG PLANT - ONSHORE MECHANICAL WORKS - MEC 2 - SUPPLY & INSTALLATION OF GROUT
Grout - Supply & Installation New project In The Darwin City Council Area. For the supply & installation of grout. Click for more details...

ROY HILL IRON ORE PROJECT - PKG 3 - PORT LANDSIDE - EPC CONTRACT
Epc Contract project at Boodarie Industrials Estate, Southwest of, Port Hedland, WA 6721 In The Council Area Of Port Hedland of Private. For the provision of EPC services consisting of all SMPE&I for installation of the Train unloading systems, multiple conveyor systems including transfer stations & rescreening buildings, installation of stockyard Stackers & Reclaimers and all other services required. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE & INFRASTRUCTURE - PINDAN - POOL SUPPLY INSTALLATION & MAINTENANCE
Barrarda Estate, Onslow, WA 6710 Has Wheatstone Development Project - Onshore & Infrastructure - Pindan - Pool Supply Installation & Maintenance currently at Construction stage. For the design, supply & installation & maintenance of 50 below ground fibreglass pools 6m x 3m. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE & INFRASTRUCTURE - PINDAN - SMALL BUS HIRE
Non-Construction Items (Other mining services) project at Barrarda Estate, Onslow, WA 6710 for New. For the provision of small bus hire - dry hire of 10 seater buses for a period of up to 40 weeks. Click for more details...

THUNDERBOX GOLD & NICKEL OPERATIONS RECOMMENCEMENT - PLANT REFURBISHMENT - LABOUR
Non-Construction Items (Supply/fabrication) Renovations, Refurbishments etc. project at Via Goldfields Hwy & 25km SE of, Leinster, WA 6437. This type is Plant Refurbishment - Labour with Private ownership. For the provision of labour for the plant refurbishment. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - BULK EARTHWORKS
40km SW of, Weipa, QLD 4874 Has Amrun (South Of Embley) Bauxite Project - Bulk Earthworks currently at Construction stage. For the provision of Bulk Earthworks package including the clearing, grubbing, mass earthworks & drainage & pavement development of eighteen (18) major facilities across twenty-four (24) separate construction areas on the South of Embley Project. The earthworks requirements are as follows: Clearing, grubbing & topsoil stripping at nominated areas at the Process Plant Site. Construction of an unlined 5 ML sedimentation pond. Construction of nine (9) sealed light vehicle roads. Construction of three (3) unsealed heavy vehicle roads. Construction of four (4) earthworks foundation pads for conveyors. Construction of seven (7) earthworks hardstand & building platforms. Construction of a 230ML, in ground water treatment/harvesting unlined pond. Construction of an earthen dump station ramp & reinforced earth wall designed for HV dump trucks to unload into the dump hopper. Clearing & topsoil stripping of the ROM stockpile area for ore to be dumped & rehandled by mine haul trucks. Construction of a stockpile pad & machine berms for the stacking & reclaiming of product bauxite including stockpile drainage to direct stockpile runoff to the north & south sedimentation ponds. Construction of a 110ML unlined sedimentation pond designed to treat runoff directed to the north from the product stockpile including inlet & outlet drainage works. Construction of a 120ML unlined sedimentation pond designed to treat runoff directed to the south from the product stockpile including inlet & outlet drainage works. Click for more details...

WA-28-L GREATER ENFIELD OIL & GAS - SUBSEA -PRODUCTION HYDRAULIC POWER UNIT
Wa-28-L Greater Enfield Oil & Gas - Subsea -Production Hydraulic Power Unit is currently at the Construction stage, valued at about $ 10000000 it is For the provision of a one off Production Hydraulic Power Unit for Greater Enfield Project. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect