STANWELL MAGNESIUM PROJECT
A project in the QLD Within Rockhampton Regional. A 22.2 km long pipeline to supply up to 5.4 petajoules of coal seam gas. Click for more details...

DEPARTMENT OF INDUSTRY & RESOURCES
Oil & Gas (Onshore processing facilities) project for New development. A consultancy study of "Energy for Minerals Development in the South West Coast Region of Western Australia". Click for more details...

GORGON GAS PROJECT - PIPELINE
Oil & Gas (Pipelines & associated contracts) project at Barrow Island to mainland northeast of, Onslow, WA 6710 for New. 80 km approx. To tie in with the existing mainland pipeline network. Click for more details...

VARANUS ISLAND GAS EXPANSION PROJECT
Oil & Gas (Onshore processing facilities) project at Varanus Island, ., WA 6999 for New. An expansion of capacity from 100Tj/d to around 220 Tj/d. To include a new sales gas compressor, new gas processing train, new stabilisation train and upgrade of existing trains and compressors. Click for more details...

EAST SPAR GAS OPERATIONS
Oil & Gas (Onshore processing facilities) project at Approximately 160 km west of, Dampier, WA 6713 of Field Development - Flame Detection Equipment type of New development. Supply of flame & gas detection equipment for new gas field development. Click for more details...

MINERVA GAS PROJECT
Onshore Facilities project at Brumby's Rd, Port Campbell, VIC 3269 In The Council Area Of Colac-Otway of Private. The gas plant will have a gross design production capacity of 150 terajoules of gas per day (TJ/d). Approximately 600 barrels (gross) of stabilised condensate will also be produced per day at initial gas sales rates. Click for more details...

WESTERN PIPELINE
Oil & Gas (Pipelines & associated contracts) project In The Warrnambool Council Area of J/V - Private & Govt ownership. 12 km gas pipeline from the McIntee well in PEP-154 to join the Heytesbury pipeline to the Heytesbury Gas Facility. Click for more details...

WA-286P - CLIFF HEAD - OFFSHORE PIPELINES
Private ownership Oil & Gas (Pipelines & associated contracts) project In The City Of Greater Geraldton Council Area for New development. A pipeline with a nominal internal diameter of 300 mm to carry produced hydrocarbons and water to shore for processing and a return pipeline with a nominal internal diameter of 300mm to carry produced water back to the platform for reinjection. Two directionally drilled pipeline shore crossings under beach and foredune. An electrical umbilical line and small umbilical lines to supply corrosion and emulsion inhibitors to the production wells and hydraulic fluid (water) by which to remotely operate the platform equipment. Click for more details...

TELFER PROJECT
Gas Pipeline project at Port Hedland to Telfer gold-copper mine,, Telfer, WA 6762 in the Oil & Gas (Pipelines & associated contracts). A 450 km g 10 inch (250mm) class 600 gas pipeline, utilising a single compressor station with one duty and one stand-by compressor. The pipeline will provide gas to the power station at Telfer. Click for more details...

GATTON TO GYMPIE GAS PIPELINE
Gate Station project at via, Gatton, QLD 4343 In The Council Area Of Lockyer Valley Regional of Private. At the existing AGL Roma to Brisbane gas pipeline near Gatton. Click for more details...

EP389 GINGIN-1 & RED GULLY-1 OIL & GAS PROJECT
Oil & Gas (Onshore processing facilities) New project at Straddling Brand Hwy north & south of, Gingin, WA 6503. This type is Resource - Oil/Gas - Onshore with Private ownership. Estimated total potential Recoverable Reserves are 172 to 190 billion cubic feet of gas & over 6 million barrels of oil & condensate. The main objective in the Gingin & Gingin West prospects are fluvial & continental sandstones of the Early Jurassic aged Cattamarra Coal Measures. Porosities in the Gingin-Bootine area vary from 6%-13% with permeabilities up to 112 millidarcies. This gas reservoir quality & the proximity to pipeline infrastructure & the markets makes for robust economics on gas discovery & any developments for natural gas, & also the value added component of generating electricity. Infrastructure to include a 3km export pipeline that will link up to the DBNGP, a gas & condensate plant, 30 man camp & earthworks. Click for more details...

PATRICIA BALEEN GAS PROJECT
Currently at the Construction stage In Gippsland Basin is a project estimated to be $ 20000000. This project The offshore Baleen-3 development well has been completed as a future gas producer and flowed 764,600 cubic metres of gas per day through a 51mm surface choke. The offshore Patricia-2 development well has been completed as a future gas producer and flowed 790,000 cubic metres of gas per day through a 51mm choke. Click for more details...

METHANEX SYNGAS GAS TO LIQUIDS (GTL) FACILITY
Oil & Gas (Onshore processing facilities) project In The Darwin City Council Area of Synthesis Gas Generation Facility type. Proposed large-scale synthesis gas (syngas) generation facility. Syngas can be used as a feedstock to produce a variety of chemicals and fuels. Methanex is exploring product and technology options for this proposed syngas project including methanol, hydrogen and gas-to-liquids. Methanex, with the cooperation of the Northern Australia Gas Venture (NAGV), is also seeking downstream customers for methanol for production of ethylene and propylene, and for hydrogen to production of ammonia. Click for more details...

TASSIE SHOAL METHANOL PROJECT - METHANOL PLANT
Methanol Plant - Offshore project at Tassie Shoal in the Timor Sea 275 km north of, Darwin, NT 0800 in the Oil & Gas (Topside - modules, platforms). The first of two large gas reforming and methanol production plants in Australian waters of the Timor Sea. Combined value of stages one and two is two billion. Stage one will have a capacity of 5,000 tonnes of methanol per day and could be operational by late 2007. Click for more details...

TASMANIAN NATURAL GAS PROJECT - SOUTHERN EXTENSION
Rosevale to Bridgewater, Hobart, TAS 7000 Has Tasmanian Natural Gas Project - Southern Extension currently at Construction stage. 200mm diameter pipeline whiCh stretches 168 km from Rosevale (west of Launceston) to Bridgewater). Click for more details...

AC-RL3 - MONTARA OIL & GAS PROJECT
A project in the WA Within Offshore. The Company proposes to develop the oilfields, which are located within Permit Area AC/L7 & 8 in the Australian Commonwealth Territory of Ashmore and Cartier islands, approximately 690 km west of Darwin. Click for more details...

STYBARROW PROJECT - SUBSEA CONTROL SYSTEMS
A project in the WA Within Exmouth. Design, manufacture, transport, installation and precommissioning of approximately 48 kms of flexible risers, flowlines and jumpers. Click for more details...

PNG GAS PROJECT - PIPELINE FEED CONTRACT - RESOURCE
Png Gas Project - Pipeline Feed Contract - Resource is currently at the Planning stage, valued at about $ 25000000 it is Tender is for the Australian component of the project. FEED program will involve engineering design, route selection, regulatory and financial viability assessments, environmental and native title processes. The pipeline width will be 22 inches and approx 2020km in length. Pipeline from PNG/Australia maritime border through Cape York to Townsville off-take is approx 1220 km. From Townsville off-take to Gladstone is 700 km. A further 100 km from the Townsville off-take to Townsville. Click for more details...

VINCENT OILFIELD PROJECT - DISCONNECTABLE TURRET MOORING SYSTEM
A project in the WA Within Offshore. Main items include, an STP Buoy with integrated turret, mooring system, STP Ship system for handling and locking of STP Buoy and Multi-path swivel system. The mooring system will contain the proposed following components. 9 chain sections of 122mm with a total length of 4800m and total weight of 1450 tons. 27 wire sections of 100mm with a total length of 5400m and a total weight of 300 tons. 9 mooring line buoyancy elements (3.0m dia / 5.0m length) with a total weight of 135 tons. 9 fluke anchors with a total weight of 180 tons. 15 concrete clump weights with a total weight of 100 tons. Click for more details...

SOLE GAS PLANT EXTENSION - DOUBLE ENTRY REFER ID 955674
Private ownership Oil & Gas (Onshore processing facilities) project In The East Gippsland Council Area for New development. Extension to an existing gas plant. The existing plant produces 43 terjoules per annum with potential to expand to 75 terjoules per annum. Click for more details...

ICHTHYS LNG PROJECT - CENTRAL PROCESSING FACILITY
Processing Facility project at Off Maret Island Via, Wyndham, WA 6740 In The Council Area Of Wyndham-E Kimberley of Private. The offshore CPF facilities include process, power generation, utilities & accommodation facilities. Work involves fabrication, installation, mechanical completion, pre-commissioning & commissioning of equipment, piping, electrical, instrumentation & controls, safety system & accommodation facilities. The CPF topside is modularised on a Semi submersible substructure. Semi-sub includes pontoons, columns & deck box with a plan dimension of approximately 96mx96m to support topsides. Topside to comprise modules up to a maximum of 5000 te & packages if appropriate. The living quarters module can be a part of the semi-sub deck box or separate module. Alternative concepts for integrated topsides will be considered. Click for more details...

GLADSTONE LIQUEFIED NATURAL GAS (GLNG) PROJECT - PIPELINE CORRIDOR
Gas Pipeline project at From Roma to, Curtis Island, QLD 4680 In The Council Area Of Gladstone Regional of Private. Construction of a 42 inch diameter, 420km long underground gas transmission pipeline to connect gas fields in the Bowen & Surat Basins to a liquefied natural gas (LNG) processing plant at Curtis Island. To traverse north from Arcadia Valley & then turn northeast to cross the Expedition Range. Click for more details...

SOUTHERN CROSS/IMPEL LNG PROJECT
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Gladstone Regional Council Area for New development. Proposed staged construction of a liquefied natural gas (LNG) plant with up to 3 trains ranging from 0.07-1.3million tonnes per annum (Mtpa) capacity. Associated facilities expected to include a construction jetty; an LNG dock & jetty to handle vessels up to 200,000cu m; cryogenic pipelines; LNG storage tanks up to 210,000cu m capacity & 400km approx pipeline with spur lines. The project is expected to generate 300-350 jobs during construction & 80-90 when fully operational. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE LNG PLANT - NON DESTRUCTIVE EXAMINATION
Currently at the Construction stage In Ashburton is a project estimated to be $ 2500000. This project This subcontract scope includes the performance of non-destructive examination (NDE) services, including radiography, dye penetrant, magnetic particle, positive material identification & ultrasonic examination of welded connections & materials. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - PERLITE - INSULATION
Oil & Gas (Onshore processing facilities) project at On, Barrow Island, WA 6712 for New. For the provision of loose fill perlite insulation for use in non evacuated low temperature & cryogenic vessels. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - MUELLER COUPLINGS
Oil & Gas (Onshore processing facilities) project In The Ashburton Council Area of Private ownership. For the provision of Mueller couplings. Click for more details...

WHEATSONE DEVELOPMENT PROJECT - OFFSHORE PLATFORM - HOOKUP & COMMISSIONING
Oil & Gas (Sub-sea equipments, floating production facilities) New project at Wheatstone Gas Field, 85km Northwest of, Barrow Island, WA 6712. This type is Platform Hookup/Commissioning with Private ownership. For the provision of the Wheatstone Platform hookup and commissioning. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - BALL VALVES MANUAL
Ball Valves Manual New project In The Broome Council Area. For the provision of manual ball valves. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - GATE VALVES
A project in the WA Within Broome. For the provision of gate valves. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - DRAIN TANKS
Currently at the Construction stage In Broome is a project estimated to be $ 500000. This project For the provision of drain tanks. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - ELECTRIC HEATER FOR OPEN DRAIN TANK
Oil & Gas (Sub-sea equipments, floating production facilities) project In The Broome Council Area of Private ownership. For the provision of an electric heater for an open drain tank. Click for more details...

ROMA BRISBANE GAS PIPELINE UPGRADE - PIPELINE DUPLICATION
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Brisbane City Council Area for New development. Part of a project to upgrade of the existing Roma Brisbane pipeline by 10% approx capacity & increased operating pressure. Duplication of a 6km section of the existing Roma Brisbane pipeline between Murarrie & Carina. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - MINOR PRECAST CONCRETE WORKS
A project in the WA Within Ashburton. For the provision & installation of minor precast concrete works (including concrete, steel reinforcing, embedded materials, & anchor bolts where necessary). Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - SUPPLY & INSTALL HDPE LINER
Oil & Gas (Onshore processing facilities) project at Both on & off, Barrow Island, WA 6712 for New. For the supply & installation of the HDPE liner. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE - OSBL CONCRETE & CIVIL WORKS
Wheatstone Development Project - Onshore - Osbl Concrete & Civil Works is currently at the Construction stage, valued at about $ 5000000 it is For the provision of OSBL concrete and civil works. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - SUBSEA - INSTALLATION SERVICES - ANCHOR HANDLING TUGS (TOG MOR)
A project in the WA Within Ashburton. For the provision of anchor handling tugs (Tog Mor). Click for more details...

GREATER GORGON GAS PROJECT - OFFSHORE - TUGS & BARGES
Currently at the Construction stage In Ashburton is a project estimated to be $ 10000000. This project For the provision of tugs and barges (330ft and 400ft). Click for more details...

CAPE LAMBERT CCGT POWER STATION
A project in the WA Within City Of Karratha. As part of the Pilbara Power System Upgrade project (PSU 330) supporting an increase iron ore production to 333 million tonnes per annum (Mtpa), replacement of the existing low efficiency 105MW power station. Construction of a 100-120MW power station with 2 x 40-45MW gas turbines & a 20-30MW steam turbine. A 220/132/33kV switchyard with 132kV & 220kV distribution lines. Gas feed to come by a new 1.6km lateral from the PL8 pipeline to a gas receival & conditioning station. Associated workshop/administration complex. Water to come by 2km pipeline from the West Pilbara Water Supply Scheme, water treatment plant & sedimentation & lined evaporation ponds. Back up diesel fuel store. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - COMPRESSION STATIONS ECI CONTRACT
Oil & Gas (Pipelines & associated contracts) project In The Western Downs Regional Council Area of Compression Stations - Early Contractor Involvement type. Contract for the early civil site works (bulk earthworks, piling & concrete foundations) & front end planning work for 5 x compression stations & a central processing plant at the Woleebee Creek block southwest of Wandoan & 3 field compression stations & a central processing plant at the Bellevue block east of Miles. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - COMPRESSION STATIONS & CENTRAL PROCESSING PLANTS
Compression Stations/Central Processing Plants New project In The Western Downs Regional Council Area. Construction & fabrication of 5 x compression stations & a central processing plant at the Woleebee Creek block southwest of Wandoan & 3 field compression stations & a central processing plant at the Bellevue block east of Miles. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - ONSITE MACHINING SERVICES
Currently at the Construction stage In Ashburton is a project estimated to be $ 500000. This project For the provision of onsite machining services. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - ALIMAK LIFTS
Alimak Lifts project at Vicinity of, Onslow, WA 6710 In The Council Area Of Ashburton of Private. For the supply of Alimak lifts. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - JOHN HOLLAND PERMANENT BUILDINGS - CRANE HIRE
Vicinity of, Onslow, WA 6710 Has Wheatstone Development Project - John Holland Permanent Buildings - Crane Hire currently at Construction stage. For the supply & installation of crane hire. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - PROCESSING FACILITIES
Oil & Gas (Onshore processing facilities) project for New development. Construction of the balance of 12 field compressor stations (FCS) & 3 central processing plants (CPP). Each FCS will need up to 7ha & will include a flare, up to 8 screw compressors, a water management system including a pond as well as a substation/switchyard if connected to the grid instead of being powered by decentralised gas fired turbines. Associated infrastructure to include access tracks, warehouses, construction camps, operations camps, offices & telecommunication services. Each CPP to need up to 19ha & will include a flare, a tri-ethylene glycol (TEG) unit per compressor, plant gas inlet & export systems, drainage, gas or grid power supply, storage for air, nitrogen, water, chemical & lube oil, office & workshop buildings, switch gear & instrument rooms & access roads. Water separated at the well heads will be gathered separately into ponds/tanks prior to treatment & reuse. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE - GAS EXPORT PIPELINE - HYDROSTATIC TESTING AND PRE-COMMISSIONING
Oil & Gas (Pipelines & associated contracts) New project at Blaydin Point via, Darwin, NT 0800. This type is Hydrostatic Testing/Pre-Commissioning with Private ownership. For the provision of hydrostatic testing & pre-commissioning. Click for more details...

QCLNG OPERATIONS - HARDWARE & INDUSTRIAL CONSUMABLES SUPPLIER
Oil & Gas (Onshore processing facilities) project at Suppy bases at CHINCHILLA & GLADSTONE, ., QLD 4999 of Hardware/Tools/Industrial Consumables type of New development. Ongoing contract for a single generalist supplier of workshop & hardware items. Click for more details...

NORTH WEST SHELF SUBSEA TIEBACK PROGRAM (WA-1-1 PERSEPHONE LNG) - LOGISTICS SERVICES
Oil & Gas (Sub-sea equipments, floating production facilities) New project at 135km North/NW of, Karratha, WA 6714. This type is Logistics Services with Private ownership. For the provision of logistics services. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE LNG PLANT CONTRACTS - MARINE GENERAL SERVICES
Currently at the Construction stage In Ashburton is a project estimated to be $ 10000000. This project For the provision of marine general services including: Maintenance on navigational aids. Maintenance on marine infrastructure (such as fenders). Diving Works. Minor maintenance dredging (i.e. sweeping or plough works, backhoe dredging, small size trailer suction hopper dredge etc). Crew transfer vessel. Line boat services. Click for more details...

NORTH WEST SHELF SUBSEA TIEBACK PROGRAM (GWF PH 2) - SUPPLY OF SUBSEA XT FRAMES & TUBING HEAD FRAMES
Currently at the Construction stage In Carnarvon Basin is a project estimated to be $ 5000000. This project For the provision of Subsea XT Frames & Tubing Head Frames. Click for more details...

NORTHERN GAS PIPELINE WATER TREATMENT SYSTEM
New project of Oil & Gas (Pipelines & associated contracts) project at Tennant Creek to Mount Isa, ., NT 8999. Design, manufacture, test & deliver a Water Treatment System for the Phillip Creek Compressor Station to operate remotely. Associated works. Click for more details...