TASSIE SHOAL METHANOL PROJECT - LNG PRODUCTION FACILITY/STORAGE TANKS
Lng Production Facility/Storage Tanks project at Tassie Shoal in the Timor Sea 275 km north of, Darwin Mc, NT 0820 in the Oil & Gas (Sub-sea equipments, floating production facilities). A 2.5 million tonnes per annum LNG production and export facility. Includes construction for two concrete structure each containing conventional nickel steel LNG storage tanks. These structure would provide support for the LNG production module. The facility would be serviced and provisioned out of Darwin. Click for more details...

TASSIE SHOAL METHANOL PROJECT - LNG PRODUCTION FACILITY/STORAGE TANKS
Lng Production Facility/Storage Tanks project at Tassie Shoal in the Timor Sea 275 km north of, Darwin Mc, NT 0820 in the Oil & Gas (Topside - modules, platforms). A 2.5 million tonnes per annum LNG production and export facility. Includes construction for two concrete structure each containing conventional nickel steel LNG storage tanks. These structure would provide support for the LNG production module. The facility would be serviced and provisioned out of Darwin. Click for more details...

TASSIE SHOAL METHANOL PROJECT - JETTY/OFFSHORE MOORINGS
Jetty/Offshore Moorings New project In The Darwin City Council Area. Key components of the Tasie Shoal project include a jetty (200 metres long for loading methanol onto export tankers); and two offshore moorings ( one on Tassie Shoal and one beside Tassie Shoal) for use by service boats, tugs and visiting fishing vessels. Click for more details...

TASSIE SHOAL METHANOL PROJECT - ACCOMMODATION & CONTROL PLATFORM
Oil & Gas (Topside - modules, platforms) project for New development. Key components of the Tassie Shoal Methanol project include accommodation and control platform for personnel living quarters. Click for more details...

ELANG
Oil & Gas (Pipelines & associated contracts) project In The Darwin City Council Area of Resource - Oil/Gas - Field Development - Offshore & Floating Production Facility type. Field development plan involves subsea completions of the existing vertical Elang 1 & 2 wellbores; connection of wells via subsea flowlines to leased FPSO moored over the field using a disconnectable single point riser turret moring; production & export of crude oil using shuttle tankers. Click for more details...

ELANG
Oil & Gas (Topside - modules, platforms) project In The Darwin City Council Area of Resource - Oil/Gas - Field Development - Offshore & Floating Production Facility type. Field development plan involves subsea completions of the existing vertical Elang 1 & 2 wellbores; connection of wells via subsea flowlines to leased FPSO moored over the field using a disconnectable single point riser turret moring; production & export of crude oil using shuttle tankers. Click for more details...

TASSIE SHOAL METHANOL PROJECT - EPCM CONTRACT
Oil & Gas (Pipelines & associated contracts) project for New development. Construction and installation of the methanol priduction facilities on Tassie Shoal. Click for more details...

TASSIE SHOAL METHANOL PROJECT - EPCM CONTRACT
Oil & Gas (Sub-sea equipments, floating production facilities) project for New development. Construction and installation of the methanol priduction facilities on Tassie Shoal. Click for more details...

MEREENIE OIL/GAS FIELD
Oil & Gas (Onshore processing facilities) project In The Alice Springs Town Council Area of Private ownership. The original gas plant was constructed in 1987 & upgraded in 1995. Click for more details...

TASSIE SHOAL METHANOL PROJECT - METHANOL PLANT
Methanol Plant - Offshore project at Tassie Shoal in the Timor Sea 275 km north of, Darwin, NT 0800 in the Oil & Gas (Onshore processing facilities). The first of two large gas reforming and methanol production plants in Australian waters of the Timor Sea. Combined value of stages one and two is two billion. Stage one will have a capacity of 5,000 tonnes of methanol per day and could be operational by late 2007. Click for more details...

TASSIE SHOAL METHANOL PROJECT - METHANOL PLANT
Methanol Plant - Offshore project at Tassie Shoal in the Timor Sea 275 km north of, Darwin, NT 0800 in the Oil & Gas (Pipelines & associated contracts). The first of two large gas reforming and methanol production plants in Australian waters of the Timor Sea. Combined value of stages one and two is two billion. Stage one will have a capacity of 5,000 tonnes of methanol per day and could be operational by late 2007. Click for more details...

TASSIE SHOAL METHANOL PROJECT - METHANOL PLANT
Methanol Plant - Offshore project at Tassie Shoal in the Timor Sea 275 km north of, Darwin, NT 0800 in the Oil & Gas (Sub-sea equipments, floating production facilities). The first of two large gas reforming and methanol production plants in Australian waters of the Timor Sea. Combined value of stages one and two is two billion. Stage one will have a capacity of 5,000 tonnes of methanol per day and could be operational by late 2007. Click for more details...

TASSIE SHOAL METHANOL PROJECT - METHANOL PLANT
Methanol Plant - Offshore project at Tassie Shoal in the Timor Sea 275 km north of, Darwin, NT 0800 in the Oil & Gas (Topside - modules, platforms). The first of two large gas reforming and methanol production plants in Australian waters of the Timor Sea. Combined value of stages one and two is two billion. Stage one will have a capacity of 5,000 tonnes of methanol per day and could be operational by late 2007. Click for more details...

ELANG-KAKATUA OIL OPERATIONS
A project in the NT Within Darwin City. Includes the removal of all subsea facilities and waste disposal at the Elang-Kakatua fields. Click for more details...

MEREENIE OIL/GAS OPERATIONS
Oil & Gas (Pipelines & associated contracts) project at North Flank to Eastern Satellite Station via, Alice Springs, NT 0872 of Oil Pipeline type of New development. An 8 km oil pipeline. Click for more details...

GOVE BAUXITE OPERATIONS
Currently at the Construction stage In East Arnhem Shire is a project estimated to be $ 1000000. This project The agreement proposes supply of gas from the Blacktip Gasfield from 2007. Blacktip gas provides Alcan with a long-term secure and clean energy source capable of supporting the gasification and expansion of its Gove alumina refinery. Click for more details...

SUNRISE PROJECT - TROUBABOUR/LOXTON SHOALS
J/V - Private & Govt ownership Oil & Gas (Pipelines & associated contracts) project In The Offshore Council Area for New development. A proposal for piping gas 500 km to shore for sale in Darwin and elsewhere in Australia has been found to be not viable. Domestic consumers have been notified. The joint venture partners will now focus on securing ratification of the Timor Sea Treaty and the International Unitisation Agreement for sunrice, finalsing joint venture commercial agreements and securing customers for Sunrise. Success on these fronts will be required before the project can enter the basis of design phase. Click for more details...

WICKHAM POINT HELIUM PLANT - GHE STORAGE TANK "A" (VERTICLE W/SADDLES)
Wickham Point Helium Plant - Ghe Storage Tank "a" (Verticle W/Saddles) is currently at the Construction stage, valued at about $ 2000000 it is For the provision of a 30,000 US gallon (136,000 litre) verticle storage vessel "A" with saddles rated for 300 psig. Click for more details...

WICKHAM POINT HELIUM PLANT - GHE STORAGE TANK "B"
Oil & Gas (Onshore processing facilities) project at Wickham Point, Darwin, NT 0909 of 136,000 Lt Ghe Storage Tank "b" (Vertical W/Saddles) type of New development. For the provision of a 30,000 US gallon (136,000 litre) verticle storage vessel "B" with saddles rated for 300 psig. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - TOPSOIL REMOVAL
Oil & Gas (Pipelines & associated contracts) New project at From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846. This type is Topsoil Removal with Private ownership. For the provision of topsoil removal services. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - TEMPORARY ACCESS ROADS
Bonaparte Gas Pipeline Project - Temporary Access Roads is currently at the Construction stage, valued at about $ 1800000 it is For the provision of temporaty access roads along the pipeline route. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - PERMANENT ACCESS ROADS
New project of Oil & Gas (Pipelines & associated contracts) project at From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846. For the provision of permanent access roads. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - PERMANENT LAYDOWN AREAS
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Coomalie Community Council Area for New development. For the provision of permanent laydown areas. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - CLEARING CONTRACT
Bonaparte Gas Pipeline Project - Clearing Contract is currently at the Construction stage, valued at about $ 10000000 it is For the provision of clearing services for 275 km pipeline. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - EARTHWORKS
Earthworks project at From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846 in the Oil & Gas (Pipelines & associated contracts). For the provision of earthworks for the pipeline. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - WASTE MANAGEMENT - FOR TEMPORARY CAMPSITES
Bonaparte Gas Pipeline Project - Waste Management - For Temporary Campsites is currently at the Construction stage, valued at about $ 2000000 it is For the provision of waste management services for the temporary campsites. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - BACKFILLING & COMPACTION CONTRACT FOR PIPELINE
Oil & Gas (Pipelines & associated contracts) project at From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846 for New. For a 275 km pipeline capable of delivering 30 petajoules per year. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - PIPELINE PLACEMENT
Currently at the Construction stage In Coomalie Community is a project estimated to be $ 2000000. This project For the provision of pipeline placement services for a 275 km pipeline. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - PIPE STRINGING & BENDING CONTRACT
From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846 Has Bonaparte Gas Pipeline Project - Pipe Stringing & Bending Contract currently at Construction stage. For a 275 km pipeline capable of delivering 30 petajoules per year. Click for more details...

JPDA 06-105 & 11-106 KITAN DRILLING RIG SERVICES CONTRACTS
Oil & Gas (Sub-sea equipments, floating production facilities) project for New development. Proposed drilling of additional wells & connection back to existing FPSO vessel. Specific Services & goods to include: Anchor handling support vessels; Helicopter services; Marine gas oil supply; Supply base; General waste services & dangerous goods disposal; Vessel stevedoring; International Freight Forwarder & Ships agency services; Logistics services (including containers, warehousing & customs); Drilling fluid services; Cementing services; Logging-while-drilling/measurement-while-drilling/directional drilling services; Wireline services; Mud logging services; ROV services; Casing running & tubular handling services; Rig positioning services; Coring services; Fishing services; Down hole tool & well heated abandonment services; Well testing, slickline & sampling services; Well testing heat suppression; Liner hanger equipment; Drill bit supply, Weather forecasting (including tow advice & cyclone alerts); Rig satellite communication services; Wellheads (subsea); Third party QA/QC inspection services; Technical Engineering studies; Geophysical survey; Satellite based oil spill detection; Casing supply; Aeromedical support; Blowout response. Click for more details...

ICHTHYS MAIN CIVIL WORKS (CVL3) - GRE/GRVE PIPING INSTALLATION
Oil & Gas (Onshore processing facilities) project for New development. Contract for installation & spooling of 16km of DN 150mm-900mm glass reinforced vinyl ester (GRVE) & DN 1050mm-1800mm glass-fibre reinforced epoxy (GRE) pipes. Contract to also include lamination of rubber ring jointing at the Ichthys Onshore LNG facilities project. Click for more details...

ICHTHYS MAIN CIVIL WORKS (CVL3) - GRE/GRVE PIPING INSTALLATION
Oil & Gas (Pipelines & associated contracts) project for New development. Contract for installation & spooling of 16km of DN 150mm-900mm glass reinforced vinyl ester (GRVE) & DN 1050mm-1800mm glass-fibre reinforced epoxy (GRE) pipes. Contract to also include lamination of rubber ring jointing at the Ichthys Onshore LNG facilities project. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE - GAS EXPORT PIPELINE - HYDROSTATIC TESTING AND PRE-COMMISSIONING
Oil & Gas (Pipelines & associated contracts) New project at Blaydin Point via, Darwin, NT 0800. This type is Hydrostatic Testing/Pre-Commissioning with Private ownership. For the provision of hydrostatic testing & pre-commissioning. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE FACILITIES - TANK CALIBRATION
Tank Calibration Services New project In The Darwin City Council Area. Comprehensive post-build survey of the interior of tanks followed by preparation of detailed calibration charts. To include a propane refrigerant storage sphere & miscellaneous non-cryogenic storage tanks (eg condensate, hydrocarbon drain, solvent, water, diesel). Click for more details...

DARWIN LNG PLANT - MAINTENANCE CONTRACT
Private ownership Oil & Gas (Onshore processing facilities) project In The Litchfield Shire Council Area for New development. Two year extension of an existing contract for onshore maintenance works including shutdowns. Click for more details...

ICHTHYS LNG PLANT - ONSHORE MECHANICAL WORKS (MEC-2) CONTRACT
Mechanical Works (Mec-2) Contract project at Blaydin Point via, Darwin, NT 0800 In The Council Area Of Darwin City of Private. For the provision of Onshore Mechanical Works (MEC-2) services. Click for more details...

ICHTHYS LNG PLANT - ONSHORE MECHANICAL WORKS - MEC 2 - SUPPLY & INSTALLATION OF GROUT
Grout - Supply & Installation New project In The Darwin City Council Area. For the supply & installation of grout. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE FACILITIES - MECHANICAL WORKS (MEC-2) - POST WELD TREATMENT SERVICES
Currently at the Construction stage In Darwin City is a project estimated to be $ 2500000. This project For the provision of post weld heat treatment services. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE FACILITIES - MECHANICAL WORKS (MEC-1) - LUBE OIL FLUSHING
Lube Oil Flushing project at Blaydin Point, via, Darwin, NT 0800 in the Oil & Gas (Onshore processing facilities). For the provision of pop testing. Click for more details...

AMADEUS GAS PIPELINE UPGRADE
Darwin to, Alice Springs, NT 0870 Has Amadeus Gas Pipeline Upgrade currently at Construction stage. For the provision of below ground pipework coating at 25 stations. To include assessment of the coating condition as well asrestoring the stations to their original condition. Click for more details...

NORTHERN GAS PIPELINE GEOTECHNICAL INVESTIGATION
Oil & Gas (Pipelines & associated contracts) project for New development. Provision of consultancy services for geotechnical investigation for the 623km Northern Gas Pipeline. To include recommendation for footing design & excavation characteristics. Assessment of pavement design parameters & soil strength. Click for more details...

NORTHERN GAS PIPELINE EARLY WORKS
Oil & Gas (Pipelines & associated contracts) project In The Various Council Area of Design Consultancy - Pipeline - Gas - Early Works type. Design consultancy for early works for the Northern Gas Pipeline at the Warrego Compressor Station & Mica Creek. To include fencing, bulk earthworks & hardstand area. Provision of underground services. Underground drainage, storm water drainage & run-off control. Site access from adjacent public roads. Click for more details...

NORTHERN GAS PIPELINE PIPE LAYDOWN CIVIL WORKS
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Barkly Shire Council Area for New development. Construction of laydown to store the line pipe for the Northern Gas Pipeline in Tennant Creek. To include drainage work & earthworks. Supply, placement & compaction of quarry material. Installation of sand berms to place line pipe. Construction access roads & turnouts. Supply & installation of perimeter fencing. Click for more details...

NORTHERN GAS PIPELINE GEOTECHNICAL TEST PITS
Oil & Gas (Pipelines & associated contracts) project In The Various Council Area of Geotechnical Test Pits - For Gas Pipeline type. Construction of geotechnical test pits for the Northern Gas Pipeline. To include backfilling test pits with excavated material. Click for more details...

NORTHERN GAS PIPELINE WATER TREATMENT SYSTEM
New project of Oil & Gas (Pipelines & associated contracts) project at Tennant Creek to Mount Isa, ., NT 8999. Design, manufacture, test & deliver a Water Treatment System for the Phillip Creek Compressor Station to operate remotely. Associated works. Click for more details...

NORTHERN GAS PIPELINE WELDING ENGINEERING SERVICES
Oil & Gas (Pipelines & associated contracts) project at Warrego & Mica Creek, ., NT 8999 for New. For the provision of welding engineering advice. Click for more details...

NORTHERN GAS PIPELINE - GAS CHROMATOGRAPHS
Private ownership Oil & Gas (Onshore processing facilities) project In The Various Council Area for New development. For the provision of 2 C6+ Gas Chromatographs & 1 C9+ Gas Chromatograp & associated ancillaries. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect