COPPABELLA COAL OPERATIONS
Currently at the Construction stage In Mackay Regional is a project estimated to be $ 1000000. This project To reduce risks of dry periods. The pipeline will run between Coppabella and a large source of water. This pipeline could also benefit the Monto coal project. This previously long term plan has been brought forward in response to dry conditions in the region. Click for more details...

MORANBAH TO TOWNSVILLE GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project In The Townsville City Council Area of Gas Pipeline/Compressor/Gas Processing Facility - Construction type. Pipeline from Moranbah to the Townsville Power Station at Yabulu. The pipeline, which will be 250mm in diameter, will be built, owned and operated by Enertrade. The pipeline will initially be configured for 20PJ per annum but can be expanded through further gas compression to approximately 50PJ per annum. Initially the Townsville Power Station will consume between 11PJ to 14PJ per annum. Click for more details...

CHINCHILLA CSM GAS DEVELOPMENT - PLA 185/ATP-676
Oil & Gas (Onshore processing facilities) project In The Western Downs Regional Council Area of Development Agreement type. Arrow may supply 4 Peta Joules (PJ) per annum for 15 years to CS Energy, subject to the outcome of feasibility studies to be completed by December 2002. Click for more details...

BALLERA TO MOOMBA PIPELINE
Currently at the Early Planning stage In Quilpie Shire is a project estimated to be $ 100000000. This project FEED study will look at the most effective route for the North Gas Link. The pipeline will join the EPIC South West Queensland pipeline at Ballera to both the Moomba Sydney Pipeline and Moomba Adelaide Pipe System. Click for more details...

GATTON TO GYMPIE GAS PIPELINE
Gate Station project at via, Gatton, QLD 4343 In The Council Area Of Lockyer Valley Regional of Private. At the existing AGL Roma to Brisbane gas pipeline near Gatton. Click for more details...

GATTON TO GYMPIE GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project at Gatton to Gympie, ., QLD 4999 of Gas Pipeline type of New development. Class 600 high pressure gas transmission pipeline. Click for more details...

ATP 676/PLA194 - KOGAN NORTH - COMPRESSORS SUPPLY
Atp 676/Pla194 - Kogan North - Compressors Supply is currently at the Construction stage, valued at about $ 3000000 it is Three compressor units. Click for more details...

ATP-683P DALBY BLOCK - TIPTON - PIPELINE
A project in the QLD Within Not Yet Determined. Lateral connections from Tipton to Roma-Brisbane trunk line as well as for the direct Tipton to Oakey pipeline and Dalby-Kogan pipeline. Click for more details...

ARGYLE/ BERWYNDALE - GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project In The Maranoa Regional Council Area of Private ownership. It is proposed to construct and operate a 15 km pipeline linking the Argyle field and the Berwyndale South field. Click for more details...

PNG GAS PROJECT - PIPELINE FEED CONTRACT - RESOURCE
Png Gas Project - Pipeline Feed Contract - Resource is currently at the Planning stage, valued at about $ 25000000 it is Tender is for the Australian component of the project. FEED program will involve engineering design, route selection, regulatory and financial viability assessments, environmental and native title processes. The pipeline width will be 22 inches and approx 2020km in length. Pipeline from PNG/Australia maritime border through Cape York to Townsville off-take is approx 1220 km. From Townsville off-take to Gladstone is 700 km. A further 100 km from the Townsville off-take to Townsville. Click for more details...

COMET RIDGE TO WALLUMBILLA PIPELINE
New project of Oil & Gas (Pipelines & associated contracts) project at From Roma to Wallumbilla, ., QLD 4999. To construct and operate a 130 km underground high pressure natural (DN350) gas pipeline. Facilities include a custody transfer meter station and an inlet mass flow meter station. Will source coal seam gas from the Fairview coal seam gas fields. Click for more details...

QUEENSLAND ALUMINA RED MUD DAM REDEVELOPMENT
Dam/Pipeline/Roadworks/Processing Plant project at ., Boyne Island, QLD 4680 in the Oil & Gas (Pipelines & associated contracts). Containment walls, processing plant, roads & pipes. Click for more details...

WALLUMBILLA GAS PIPELINE
New project of Oil & Gas (Pipelines & associated contracts) project at Surat basin to Wallumbilla via Warrego Highway, Wallumbilla, QLD 4428. To construct a 152 km high pressure gas pipeline from Undalla Nose acreage AT 676P Surat Basin to the Wallumbilla hub. Click for more details...

XSTRATA GAS FIRED POWER STATION
Oil & Gas (Pipelines & associated contracts) New project at Cnr X41 Access Rd & Link Rd, Mount Isa, QLD 4825. This type is Gas Fired Power Station with Private ownership. A 30 MW gas fired modular power station with an associated pipeline from the Copper Smelter area. Click for more details...

QSN LINK GAS PIPELINE
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Not Yet Determined Council Area for New development. The QSN Link pipeline will extend south-west from the Ballera Gas facility in Queensland. It will pass approximately 7km to the south of Innamincka in South Australia and terminate at the Moomba plant. The pipeline will be some 180km in length, with approximately 90km in Queensland and 91.5km in South Australia. The pipeline will be typical of a modern, small to medium diameter gas transmission pipeline. Final design parameters are yet to be determined, but it is likely to involve the following infrastructure: a buried, high pressure, steel, natural gas pipeline, with a diameter in the order of 400mm, an inlet station at Ballera, above ground facilities at intervals along the pipeline include a mid-line mainline valve, cathodic protection systems and marker signs and an outlet delivery station at Moomba. The construction workforce will be accommodated in temporary camps and at local accommodation. two preliminary campsite locations have been selected which will accommodate a single camp that will be mobilised from one location to the other during the construction phase of the project. construction depots will be used primarily for equipment storage and will typically be co-located with the construction camps. Facilities and equipment stored at the construction depots may include: site office and administration centre, construction vehicles, diesel fuel and lubricants, vehicle maintenance equipment, sand bags, sediment fencing, star droppers and wooden stakes and pipe wrapping and joint coating materials. When the utility is no longer required, the pipeline will be decommissioned in accordance with the regulatory requirements and accepted environmental best practices at the time. currently decommissioning procedures require the removal of all above ground infrastructure and the restoration of associated disturbed areas. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - LNG PLANT
Currently at the Construction stage In Gladstone Regional is a project estimated to be $ 8000000000. This project QCLNG is a project to develop coal seam gas wells in the Surat & Bowen Basins, pipe gas to a processing plant to be built on Curtis Island & then export product LNG by ship. The LNG plant to have an ultimate capacity of up to 12 million tonnes per annum (Mtpa) from 3 LNG trains, each of 3 to 4 Mtpa production capacity. These involve feed gas metering & filtration to remove entrained pipeline debris; gas processing to remove carbon dioxide & other components contained in the gas; gas chilling & drying in a 3-bed molecular sieve system to remove the final traces of water;dry gas processing through activated carbon bed system for mercury removal & gas refrigeration for liquefaction to LNG . The refrigeration systems to be powered by gas turbines equipped with dry low NOx emission systems; heat removal (as part of the liquefaction process) using fin coolers. Onshore LNG storage in tanks including 2 LNG storage tanks up to 200,000cu m for the first 2 trains & a tank of similar size for the third train; 1 butane storage tank up to 100,000cu m (including vapour recovery system) for imported butane required for spiking LNG product to meet a required high heating value (HHV) along with ancillary equipment & infrastructure including flares. Storage of refrigerant as well diesel fuel, lube oil etc. Associated infrastructure to include fuel gas systems; effluent treatment & outfall for treated wastewater, power generation/distribution; fire protection systems; water systems including seawater desalination plant for process & potable water supply. Additional buildings to include compressor control building, analyser shelter, maintenance buildings, offices and staff amenities building. A temporary pioneer construction camp to accommodate 100-300 people expected to be built within the LNG facility area before early site preparation activities for the first LNG train. This camp will be replaced by a larger construction camp on Curtis Island and/or on the mainland during the LNG Facility construction to house a workforce of 3000 approx people. The construction camp expected to include necessary amenities such as a dining hall & kitchen, a primary health care facility & recreation centre. Other services & camp infrastructure to include a water treatment plant & storage, sewerage treatment plant, temporary power supply, fuel storage facility & fire-fighting equipment, some of which will remain as permanent facilities for the operations phase. Click for more details...

SOUTH WEST QUEENSLAND PIPELINE STAGE 3 EXPANSION
Oil & Gas (Pipelines & associated contracts) project In The Maranoa Regional Council Area of Gas Pipeline - Stage 3 type. As part of the QSN Link project (QSN3), construction of a 935km loop pipeline parallel to the existing South West Queensland Pipeline (SWQP) between Wallumbilla & Moomba. Construction also at the Wallumbilla hub of 2 additional compressor stations at existing scraper station sites & an upgrade to the existing Wallumbilla compressor station. The pipeline is anticipated to have a diameter of between 400-500mm approx. Construction crews will be housed in temporary construction camps that will be progressively moved ahead of construction activity. Each main camp will house up to 200 people & the smaller fly camps will house up to 150 people. Each camp will contain accommodation units & mess & recreation huts. Click for more details...

TALINGA DEVELOPMENT PROJECT
Oil & Gas (Onshore processing facilities) project In The Western Downs Regional Council Area of Resource - Coal Seam Gas type. The project involves transitioning the existing pilot trial of 12 wells to production of up to 90TJ/day of coal seam gas, which will contribute to the supply of gas to the Darling Downs Power Station. The development will involve installing coal seam gas wells at a spacing of between 750m and 1000m; associated gas and water gathering systems, a gas plant, a produced water treatment facility, evaporation ponds, offices, storage areas, workshops, camp and gravel pits. Based on current well production predictions, this equates to the installation of approximately 100 coal seam gas wells. This project will incorporate a water treatment facility to significantly reduce the evaporation pond surface area down to approximately 170ha. The water treatment facility will employ an integrated membrane system, including reverse osmosis, to achieve an 85% desalination recovery and create a freshwater resource. The freshwater will be discharged to the Condamine River catchment until higher level beneficial used, such as industrial, urban or agricultural use, can be implemented. Click for more details...

SURAT TO GLADSTONE LNG PIPELINE PROJECT - LINE PIPE SUPPLY
Currently at the Tenders & Building stage In Various is a project estimated to be $ 10000000. This project The 660mm diameter high pressure buried steel gas pipeline would be approximately 470km long. The pipeline would have a minimum technical design life of 40 years. Above ground facilities would be required at intervals along the pipeline, including: mainline valves; cathodic protection systems; and marker signs. The project will be from a proposed compressor facility adjacent to the Kogan North Central Gas Facility to the proposed LNG plant at Fisherman's Landing, Gladstone. Click for more details...

SOUTHERN CROSS/IMPEL LNG PROJECT
Private ownership Oil & Gas (Onshore processing facilities) project In The Gladstone Regional Council Area for New development. Proposed staged construction of a liquefied natural gas (LNG) plant with up to 3 trains ranging from 0.07-1.3million tonnes per annum (Mtpa) capacity. Associated facilities expected to include a construction jetty; an LNG dock & jetty to handle vessels up to 200,000cu m; cryogenic pipelines; LNG storage tanks up to 210,000cu m capacity & 400km approx pipeline with spur lines. The project is expected to generate 300-350 jobs during construction & 80-90 when fully operational. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project at From south of MILES to, Curtis Island, QLD 4680 for New. Part of a coal seam gas (CSG) to liquefied natural gas (LNG) project with Origin Energy responsible for developing CSG gas fields & transmission pipeline, ConocoPhillips responsible for developing a LNG processing plant & their joint venture company Australia Pacific LNG responsible for the export facilities. A 42 inch (1070mm) diameter, high pressure main pipeline to commence east of Wandoan at its junction with a 44km lateral pipeline from gas developments at Condabri & a 38km lateral from Woleebee gas developments south of Miles. To travel 362km underground with a marine crossing at The Narrows between Kangaroo Island & Port Curtis Island to finish at the LNG plant near Laird Point. Inlet stations to allow for insertion of cleaning & inspection equipment to be constructed at the start of the Condabri & Woleebee laterals & at their intersection a 0.5ha APLNG hub comprising the inlet station for the main pipeline, isolation valves & connections for future compression to also be constructed. Development of up to 5 x 15-20ha laydown areas to receive materials (Miles, Wandoan, Theodore, Biloela, Gladstone areas). 3 temporary accommodation camps each up to 15ha & operating for 3-7 months to be relocated along the pipeline route as required. Camps to include sleeping quarters for up to 1100 personnel, laundries, catering, medical centre, recreational facilities (eg gymnasium, cinema, reading room, sports grounds), diesel generators for power & package sewerage plants. Click for more details...

PL 16 SILVER SPRINGS UNDERGROUND GAS STORAGE PROJECT
Oil & Gas (Pipelines & associated contracts) project In The Maranoa Regional Council Area of Private ownership. Reuse of the existing Silver Springs Processing Plant & now depleted, 1.5km deep Silver Springs/Renlim Field underground reservoir for temporary storage of up to 44billion standard cubic feet (Bscf) of gas as part of Queensland Gas Company's Queensland Curtis Liquified Natural Gas (QCLNG) project. Extension at the plant site of the the existing Berwyndale to Wallumbilla & Silver Springs pipelines (PPLs 123 & 4) for gas injection & later withdrawl using 4 refurbished wells & a new well along with an additional 5 monitoring wells. Initial gas injection planned from 2011-2013 & withdrawl expected 2014-2017. Click for more details...

ROMA BRISBANE GAS PIPELINE UPGRADE - DALBY COMPRESSOR STATION
A project in the QLD Within Western Downs Regional. Part of a project to upgrade of the existing Roma Brisbane pipeline by 10% approx capacity & increased operating pressure. Installation at the Dalby Compressor Station of 2 additional 4570kW Centaur 50 solar gas turbine compressors along with inlet/exhaust systems, cooler units, fuel gas skids, pipework & valves. Associated works to include a diesel engine alternator for cold start up power, a bunded 6000l fuel store facility, oil store, control room, access road, car park & amenities. Click for more details...

COOPER & EROMANGA BASINS CONSTRUCTION & MAINTENANCE CONTRACT
Construction & Maintenance Contract project at via QUILPIE, ., QLD 4999 In The Council Area Of Various of Private. A 5 year contract with 3 x 1 year optional extensions. To include project delivery, brownfields construction, flow line construction, shutdown, maintenance & industrial services. Click for more details...

GLNG WALLUMBILLA GAS TREATMENT FACILITY (WGTF)
New project of Oil & Gas (Onshore processing facilities) project at Walumbilla South Rd Iona Bardlomey Rd (Lot 33 SP 212840) 12km south of, Wallumbilla, QLD 4428. Staged development adjacent the existing Santos compressor (WCS) & metering (WMS) stations of a gas treatment facility of 2 trains each with a capacity of 250TJ/day. Each train to consist of gas compression, natural gas liquid removal & cryogenic gas treatment units & a gas turbine power generator using non-methane gas liquids & distributing power through alternators. Ancillary infrastructure to include condensate storage, hot oil system, air compression system, nitrogen generation plant, fire water system, flare & vent system, oily water system along with potable & service water system. Plant control room & workforce amenities. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - TRAIN 2
Oil & Gas (Onshore processing facilities) project In The Gladstone Regional Council Area of Private ownership. Construction of a second 4.5 million tonne per annum (Mtpa) liquefied natural gas (LNG) processing train. Further Bowen & Surat Basin gas field development to provide 1000 wells for the first 2 trains. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - GAS FIELD DEVELOPMENT - FENCING
Currently at the Tenders & Building stage In Various is a project estimated to be $ 2000000. This project Contracts to repair & restore damaged fences, remove redundant fences & construct new fences & associated grids & gates on various rural properties. Supply also of fencing materials. Click for more details...

GLADSTONE LIQUEFIED NATURAL GAS (GLNG) PROJECT - THE NARROWS PIPELINE
Oil & Gas (Pipelines & associated contracts) project In The Gladstone Regional Council Area of Pipeline - Under Sea Bed type. Construction of a pipeline under the sea bed of The Narrows to provide a marine crossing for the supply of coal seam gas (CSG) to the Santos GLNG liquefied natural gas (LNG) plant on Curtis Island. The pipeline to traverse a 4.3km tunnel. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - COMPRESSION STATIONS ECI CONTRACT
Oil & Gas (Pipelines & associated contracts) project In The Western Downs Regional Council Area of Compression Stations - Early Contractor Involvement type. Contract for the early civil site works (bulk earthworks, piling & concrete foundations) & front end planning work for 5 x compression stations & a central processing plant at the Woleebee Creek block southwest of Wandoan & 3 field compression stations & a central processing plant at the Bellevue block east of Miles. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - 6 + 1 UPSTREAM CONTRACT
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 300000000. This project Construction of 6 field compressor stations & a central processing plant within 60km of Dalby with works extending into the Chinchilla & Miles regions. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - 6 + 1 UPSTREAM PIPING SUPPLY
A project in the QLD Within Western Downs Regional. Supply of all piping for the Ruby central processing plant including fabrication, welding, NDT, hydro testing, painting & delivery to site. Associated mechanical, structural & piping services. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - PROCESSING FACILITIES
Oil & Gas (Onshore processing facilities) project for New development. Construction of the balance of 12 field compressor stations (FCS) & 3 central processing plants (CPP). Each FCS will need up to 7ha & will include a flare, up to 8 screw compressors, a water management system including a pond as well as a substation/switchyard if connected to the grid instead of being powered by decentralised gas fired turbines. Associated infrastructure to include access tracks, warehouses, construction camps, operations camps, offices & telecommunication services. Each CPP to need up to 19ha & will include a flare, a tri-ethylene glycol (TEG) unit per compressor, plant gas inlet & export systems, drainage, gas or grid power supply, storage for air, nitrogen, water, chemical & lube oil, office & workshop buildings, switch gear & instrument rooms & access roads. Water separated at the well heads will be gathered separately into ponds/tanks prior to treatment & reuse. Click for more details...

PL65 GILMORE GAS FIELD LNG PROJECT
A project in the QLD Within Quilpie Shire. Construction of a 56,000tpa liquefied natural gas (LNG) plant adjacent the existing Gilmore gas plant. Click for more details...

APLNG LNG PLANT - DATA LOGGING EQUIPMENT & MAINTENANCE
Data Logging Equipment & Maintenance - Liquefied Natural Gas Plant project at At, Curtis Island, QLD 4680 In The Council Area Of Gladstone Regional of Private. For the provision of data logging equipment & maintenance. Click for more details...

APLNG LNG PLANT - ELECTRICAL EQUIPMENT TESTING & CALIBRATION
At, Curtis Island, QLD 4680 Has Aplng Lng Plant - Electrical Equipment Testing & Calibration currently at Tenders & Building stage. For the provision of electrical equipment testing & calibration. Click for more details...

APLNG LNG PLANT - FIRE SERVICES
Fire Protection Equipment/Fire Truck/Maintenance/Consultancy New project In The Gladstone Regional Council Area. For the provision of fire protection services including fire truck, equipment, maintenance & consultancy. Click for more details...

APLNG LNG PLANT - FREIGHT FORWARD & LOGISTICS
New project of Oil & Gas (Onshore processing facilities) project at At, Curtis Island, QLD 4680. For the provision of freight forwarding & logistic services. Click for more details...

APLNG LNG PLANT - GAS DETECTION EQUIPMENT & MAINTENANCE
Gas Detection Equipment - Supply & Maintain New project In The Gladstone Regional Council Area. For the provision of gas detection equipment & maintenance services. Click for more details...

APLNG LNG PLANT - HOSES & FITTINGS SUPPLY
Hoses & Fittings Supply project at At, Curtis Island, QLD 4680 in the Oil & Gas (Onshore processing facilities). For the provision of hoses & fittings. Click for more details...

APLNG LNG PLANT - LABORATORY SERVICES
Laboratory Services - Personnel/Analysis project at At, Curtis Island, QLD 4680 in the Oil & Gas (Onshore processing facilities). For the provision of laboratory services including analysis & personnel. Click for more details...

APLNG LNG PLANT - LIFTING EQUIPMENT TESTING & INSPECTION SERVICES
Oil & Gas (Onshore processing facilities) project In The Gladstone Regional Council Area of Testing & Inspection - Lifting Equipment type. For the provision of testing & inspection services for lifting equipment. Click for more details...

APLNG LNG PLANT - PALLET RACKING SUPPLY
Oil & Gas (Onshore processing facilities) project for New development. For the provision of warehouse pallet racking. Click for more details...

APLNG LNG PLANT - ROAD MAINTENANCE SERVICES
Oil & Gas (Onshore processing facilities) project In The Gladstone Regional Council Area of Private ownership. For the provision of road maintenance services. Click for more details...

APLNG LNG PLANT - WASTE MANAGEMENT SERVICES
Oil & Gas (Onshore processing facilities) New project at At, Curtis Island, QLD 4680. This type is Waste Management Services with Private ownership. For the provision of waste management services. Click for more details...

QCLNG OPERATIONS - HARDWARE & INDUSTRIAL CONSUMABLES SUPPLIER
Oil & Gas (Onshore processing facilities) project at Suppy bases at CHINCHILLA & GLADSTONE, ., QLD 4999 of Hardware/Tools/Industrial Consumables type of New development. Ongoing contract for a single generalist supplier of workshop & hardware items. Click for more details...

QCLNG OPERATIONS - HV & LV SWITCHING MAINTENANCE
Maintenance - High & Low Voltage Switch Gear & Switchboards project at At, Curtis Island, QLD 4680 in the Oil & Gas (Onshore processing facilities). For the provision of maintenance services for high & low voltage switch gear & switchboards. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) - OPERATIONS & MAINTENANCE - IT SOFTWARE
Oil & Gas (Onshore processing facilities) project In The Gladstone Regional Council Area of Private ownership. For the provision of IT Software including staff/shift rostering. Click for more details...

BUNDABERG GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project for New development. Construction of a 24.7km gas pipeline from the existing Wide Bay pipeline west of Bundaberg (Kensington Gate Station & extension through to the Port of Bundaberg.) Associated works. Click for more details...

MIDDLEMOUNT COAL BINGEGANG PIPELINE RELOCATION
Pipeline - Relocation project at via, Middlemount, QLD 4746 in the Oil & Gas (Pipelines & associated contracts). The Middlemount Coal Mine is an open cut coal mine, located 270km north-west of Rockhampton. As part of ongoing operations, the existing Bingegang Pipeline will be relocated. To include replacement of existing pipe, break tank, pump station, outlets, crossings, drainage & associated access infrastructure. Click for more details...