List of Oil & Gas Projects


BASKER-MANTA OIL & GAS PROJECT - RESOURCE
Resource - Oil & Gas - Offshore New project In The Bass Coast Council Area. Installation associated the EPT comprise the Floating Production Storage and offloading Unit flexible flowline and control umbilical system and shuttle tanker mooring. The ocean patriot will be used for the drilling and expected to start July 2005. The majority of the development drilling will be undertaken in the fourth quarter 2005 when production licences are granted. A Floating Production Storage and Offloading vessel (FPSO) has been secured until January 15 2008. The FPSO has the capacity to handle up to 40,000 barrells of fluid per day and 50MMscf/d of gas. The Crystal Ocean (FPSO) has been obtained under a bareboat charter and manning will be provided by Upstream Petrolem Pty Ltd with assitance from Seatankers Management Co Ltd. The Crystal Ocean is expected to arrive in Melbourne August 2005. A shuttle tanker has been secured for a three year contract from Teekay Shipping and is expected in Bass Strait September 2005. The tanker called the Nordic Yukon is aframax sized, with dynamic positioning capability and a capacity for approx 650,000 bbls. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - 6 + 1 UPSTREAM PIPING SUPPLY
A project in the QLD Within Western Downs Regional. Supply of all piping for the Ruby central processing plant including fabrication, welding, NDT, hydro testing, painting & delivery to site. Associated mechanical, structural & piping services. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE LNG PLANT CONTRACTS - MARINE GENERAL SERVICES
Currently at the Construction stage In Ashburton is a project estimated to be $ 10000000. This project For the provision of marine general services including: Maintenance on navigational aids. Maintenance on marine infrastructure (such as fenders). Diving Works. Minor maintenance dredging (i.e. sweeping or plough works, backhoe dredging, small size trailer suction hopper dredge etc). Crew transfer vessel. Line boat services. Click for more details...

MOUNT ARTHUR UNDERGROUND COAL PROJECT - SITE SERVICES
Oil & Gas (Pipelines & associated contracts) project at Approx 3 km south west of, Muswellbrook, NSW 2333 for New. Site services required will include powerlines, potable water pipelines, mine water and groundwater pipelines, a water extraction point on the Hunter River and a clean water pipeline and minor access roads and other such minor infrastructure within the project mining leases. Click for more details...

WA-28-L GREATER ENFIELD OIL & GAS - DRILLING & COMPLETIONS - SUPPLY OF OCTG
Oil & Gas (Sub-sea equipments, floating production facilities) project for New development. For the supply of OCTG. Click for more details...

GREATER GORGON PROJECT - DOWNSTREAM PROCUREMENT LNG PLANT - EMERGENCY AIR COMPRESSORS
Oil & Gas (Onshore processing facilities) New project at On, Barrow Island, WA 6712. This type is Emergency Air Compressors with Private ownership. For the supply of oil free screw emergency air compressors that are diesel engine driven. Option 2 dry screw air compressor is acceptable. The multiple units are acceptable. In addition, the project required packaged unit(s) completely self contained to be used in Black start condition. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE - MOLECULAR SIEVE ACTIVATED CARBON & INERT BALLS
Oil & Gas (Onshore processing facilities) project at In the vicinity of, Onslow, WA 6710 of Molecular Sieve/Activated Carbon/Inert Balls type of New development. For the provision of a molecular sieve, activated carbon and inert balls. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - TRENCHING
Oil & Gas (Pipelines & associated contracts) project at From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846 of Trenching type of New development. For the provision of trenching services for a 275 km pipeline. Click for more details...

WA-28-L GREATER ENFIELD OIL & GAS - ELECTRICAL FLYING LEADS
Oil & Gas (Sub-sea equipments, floating production facilities) New project at 49km off the coast of, Exmouth, WA 6707. This type is Electrical Flying Leads with Private ownership. Provision for the supply of electrical flying leads for Greater Enfield Project. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - LNG STORAGE & CONDENSATE TANKS - FORMWORK SYSTEMS
Formwork Systems New project In The Ashburton Council Area. For the provision of formwork systems. Click for more details...

PADULLA PROJECT - OIL RESOURCE
A project in the SA Within Far North. Development will comprise one exploratory well and six appraisal and development wells and oilfield facilities. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - INSTRUMENTS
A project in the WA Within Ashburton. For the provision of instruments & connections. Click for more details...

APLNG LNG PLANT - FILTER SUPPLIES
Aplng Lng Plant - Filter Supplies is currently at the Tenders & Building stage, valued at about $ 2000000 it is For the provision of filters. Click for more details...

PNG GAS PROJECT - PIPELINE FEED CONTRACT - RESOURCE
Png Gas Project - Pipeline Feed Contract - Resource is currently at the Planning stage, valued at about $ 25000000 it is Tender is for the Australian component of the project. FEED program will involve engineering design, route selection, regulatory and financial viability assessments, environmental and native title processes. The pipeline width will be 22 inches and approx 2020km in length. Pipeline from PNG/Australia maritime border through Cape York to Townsville off-take is approx 1220 km. From Townsville off-take to Gladstone is 700 km. A further 100 km from the Townsville off-take to Townsville. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - PIPE STRINGING & BENDING CONTRACT
From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846 Has Bonaparte Gas Pipeline Project - Pipe Stringing & Bending Contract currently at Construction stage. For a 275 km pipeline capable of delivering 30 petajoules per year. Click for more details...

SOUTH WEST QUEENSLAND PIPELINE (SWQP) EASTERN HAUL PROJECT - MOOMBA COMPRESSION FACILITIES
Oil & Gas (Pipelines & associated contracts) project at MOOMBA via, Innamincka, SA 5731 of Compression Facilities type of New development. Part of a project to develop bi-directional gas supply with eastern haul capability to allow gas to be shipped from the Cooper Basin region to customers in southeast Queensland. Installation of 3 compressors at a new station at Epic Energy's Moomba Station site. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE - OSBL ELECTRICAL & INSTRUMENTATION INSTALLATION
Vicinity of, Onslow, WA 6710 Has Wheatstone Development Project - Onshore - Osbl Electrical & Instrumentation Installation currently at Construction stage. For the provision of OSBL electrical and instrumentation instllation. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT
Oil & Gas (Pipelines & associated contracts) project for New development. QCLNG is a project to develop coal seam gas (CSG) fields in the Surat & Bowen Basins, pipe gas to a processing plant to be built on Curtis Island & then export product liquefied natural gas (LNG) by ship. Phase 1 to be constructed to include 2 LNG processing trains with a combined capacity of up to 8.5million tonnes per annum (Mtpa) along with associated gas wells, field facilities & pipelines. Some 820 operational personnel & over 5000 construction personnel expected. Workers accommodation to be required in the Gladstone region (250 approx dwellings) & Western Downs area (280 approx dwellings). Click for more details...

WA-28-L GREATER ENFIELD OIL & GAS - SUBSEA HARDWARE - FEED
Front End Engineering/Design project at 49km off the coast of, Exmouth, WA 6707 in the Oil & Gas (Sub-sea equipments, floating production facilities). For the provision of front-end engineering & design (FEED) of the full subsea production system architecture solution, including subsea multiphase boosting, for the field that will be tied-back to existing Ngujima-Yin FPSO. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - TEMPORARY LAYDOWN AREAS
From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846 Has Bonaparte Gas Pipeline Project - Temporary Laydown Areas currently at Construction stage. For the provision of temporary laydown areas for the 275 km pipeline. Click for more details...

ATP - 632 - BERWYNDALE SOUTH - GAS COMPRESSION/PROCESSING FACILITIES
Surat Basin 17 km south west of, Miles, QLD 4415 Has Atp - 632 - Berwyndale South - Gas Compression/Processing Facilities currently at Planning stage. The processing facility will comprise dewatering, dehydration and compression equipment. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - CS PLATES TO A36 & AS3678 250
Oil & Gas (Onshore processing facilities) project for New development. For the provision of 250 CS plates MTO to A36 & AS3678. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - BOTTOM SUMP
Oil & Gas (Onshore processing facilities) New project at On, Barrow Island, WA 6712. This type is Bottom Sump with Private ownership. For the provision of a bottom sump. Click for more details...

KARRATHA GAS PLANT LIQUEFIED NATURAL GAS PRODUCTION CAPACITY PROJECT
Private ownership Oil & Gas (Onshore processing facilities) project In The City Of Karratha Council Area for New development. Work will comprise: alterations to the LNG storage and loading system; modifying the Fin Fans; installing a Boil-Off Gas (BOG) Liquefaction Unit; installing an Inlet Air Chilling (IAC) Package; installing four Gas Engines; installing a 6th Stabiliser Unit. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - ANCHOR LEG LOAD MONITORING SYSTEM (ALLMS)
Oil & Gas (Sub-sea equipments, floating production facilities) project at 475km N/NE of, Broome, WA 6725 of Anchor Leg Load Monitoring System (Allms) type of New development. For the provision of an Anchor Leg Load Monitoring System (ALLMS). Click for more details...

WOODSIDE OIL & GAS OPERATIONS - CLASSIFICATION/ASSET SERVICES
Oil & Gas (Pipelines & associated contracts) New project at Various Sites Indian Ocean, ., WA 6999. This type is Classification/Asset Services with Private ownership. Work includes providing classification and asset services to FFPSO assets including production systems, equipment and safety systems. ABS will also provide a consulting service on behalf of Woodside dealing with government authorities. These services involve engineering design review and survey services. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - COMPRESSION BARS
Oil & Gas (Onshore processing facilities) project at On, Barrow Island, WA 6712 for New. For the provision of compression bars. Click for more details...

GREATER GORGON GAS PROJECT - SUBSEA ROCK INSTALLATION - PNEUMATIC FENDERS
New project of Oil & Gas (Sub-sea equipments, floating production facilities) project at Off, Barrow Island, WA 6712. For the purchase of pneumatic fenders. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - SUPPLY PUMPS SPARES
A project in the WA Within Ashburton. For the supply of pumps spares & sparing parts. Type of pumps included controlled volume pumps, cryogenic pumps, progressive cavity pumps & sea water pumps. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - LIMIT SWITCHES & PUSH BUTTON
Oil & Gas (Sub-sea equipments, floating production facilities) project In The Broome Council Area of Limit Switches/Push Button type. For the provision of limit switches & push button. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - SUPPLY OF MODULAR CAROUSEL STORAGE SYSTEM
Oil & Gas (Onshore processing facilities) project at Via, Barrow Island, WA 6712 for New. For the supply of modular/carousel storage systems. To include: 3 Modular Carousels @ 4m (Wide) x 3m (Depth) x 6m (High); or o 4 Modular Carousels @ 3m (Wide) x 3m (Depth) x 6m (High). Units will need to be accessible from a single side. Each unit will need to have the capability to have its own dehumidified environment controlled to a fixed temperature. Installation will need to be provided for on Barrow Island or the supplier will need to partner with the current construction contractor of the warehouse on Barrow Island. Click for more details...

PILBARA TO GOLDFIELDS GAS TRANSMISSION
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Various Council Area for New development. The 1,380 km gas pipeline will require two compressor stations to handle the initial capacity of about 70 tjs per day. Installation will follow the main pipelaying activity. Gas measuring equipment to also be installed at Yarraloola, Newman, Mt Keith, Leinster and Kalgoorlie. Click for more details...

SOUTHERN CROSS/IMPEL LNG PROJECT
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Gladstone Regional Council Area for New development. Proposed staged construction of a liquefied natural gas (LNG) plant with up to 3 trains ranging from 0.07-1.3million tonnes per annum (Mtpa) capacity. Associated facilities expected to include a construction jetty; an LNG dock & jetty to handle vessels up to 200,000cu m; cryogenic pipelines; LNG storage tanks up to 210,000cu m capacity & 400km approx pipeline with spur lines. The project is expected to generate 300-350 jobs during construction & 80-90 when fully operational. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - LUMINARIES - (MR-16520)
Oil & Gas (Onshore processing facilities) project at On, Barrow Island, WA 6712 of Luminaries type of New development. For the provision of luminaries. Cooper Crouse Hinds LA, LB, LC, LD type lights "Full Shielded". Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - MUELLER COUPLINGS
Oil & Gas (Onshore processing facilities) project In The Ashburton Council Area of Private ownership. For the provision of Mueller couplings. Click for more details...

CAMDEN GAS PROJECT - SPRING FARM/MENANGLE PARK - RESOURCE
Resource - Coal Base Methane New project In The Camden Council Area. Construction and operation of up 4 surface well locations at Spring Farm and up to 12 surface well locations at Menangle Park (to contain a variety of horizontal, directional and surface-in-seam wells); construction and use of access roads, a gas gathering system and water transport lines; connection of the wells to the Rosalind Park Gas Plant; and production of methane gas. Click for more details...

PLUTO LNG PLANT PROJECT - REFRIGERANT COMPRESSORS
A project in the WA Within City Of Karratha. Liquefaction 1400 Unit. Mixed / Propane Refrigerant Compressors. Type : Centrifugal Compressors and associated packages. Material of construction : 3.5% Nickel. Compressor Ratings 37-72 MW, Capacity 58-243 Km3/hr. This is a major proprietary equipment package within the Train. Full String testing required in the Main Equipment Suppliers Workshop. Click for more details...

WOOLLYBUTT OIL FIELD - WA-25-L - SOUTH LOBE PROJECT
Oil & Gas (Sub-sea equipments, floating production facilities) project at West of Barrow Island, Barrow Sub-Basin, WA 6999 for New. Work comprises the drilling and completion of Woollybutt-4 horizontal development well and Woollybutt-6 appraisal well. There will be modifications to the existing FPSO, new sub-sea christmas trees, flowlines, manifolds and control systems. Resource estimate is 7 million barrels of oil. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - BACKFILLING & COMPACTION CONTRACT FOR PIPELINE
Oil & Gas (Pipelines & associated contracts) project at From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846 for New. For a 275 km pipeline capable of delivering 30 petajoules per year. Click for more details...

PILBARA TO GOLDFIELDS GAS TRANSMISSION
Oil & Gas (Pipelines & associated contracts) project at Pilbara Region to Goldfields, WA 6999 for New. Natural gas to be piped approximately 1,400 km underground from the off-shore North-West Shelf gasfields to Kalgoorlie and surrounding centres. Construction of the pipeline will be in three stages. In August 1995 one crew will begin to lay 310 km of pipe at Yaraloola, south of Dampier in the Pilbara, then pass south-east of Paraburdoo through to a point south-west of Newman by January 1996. This section of pipe will be 400 mm diameter. A second crew will commence in September 1995 on a 670 km section to run from near Newman to Mt Keith via Wiluna. Once work on the Yaraloola to Newman section is complete, the crew will start working north from Kalgoorlie in January 1996 and the two teams will meet at Mt Keith, 400 km away, in June 1996. The section from Newman to Kalgoorlie will have a 350 mm diameter. The first gas should be supplied to the Eastern Goldfields by August 1996. The pipeline will require two compressor stations to handle the initial capacity of about 70 tjs per day. With additional compression, the future load can be expanded up to 160 tjs per day. Main pipelaying will be followed by installation of compressor stations at Yaraloola, Ilgarari and possibly Paraburdoo and Leinster. Click for more details...

WEST KIMBERLEY RESOURCE DEVELOPMENT STUDY
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Various Council Area for New development. Qualified consultants to provide services to undertake a "West Australian Resource Development Study" - a strategic infrastructure planning study identifying the long term requirements for multi-use industrial infrastructure, social infrastructure and associated services related to mineral and petroleum development in the West Kimberley. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - CABLE GLANDS - (MR-16153 & MR_17283)
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - Cable Glands - (Mr-16153 & Mr_17283) currently at Construction stage. For the provision of CMP or equivalent cable glands (complete with heavy duty nickel plated brass lock nuts & fibre weather washer). Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE - LEVEL GAUGES & TRANSMITTERS
Private ownership Oil & Gas (Onshore processing facilities) project In The Ashburton Council Area for New development. For the provision of level gauges (magnetic float) and transmitters. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - WASTE MANAGEMENT - FOR TEMPORARY CAMPSITES
Bonaparte Gas Pipeline Project - Waste Management - For Temporary Campsites is currently at the Construction stage, valued at about $ 2000000 it is For the provision of waste management services for the temporary campsites. Click for more details...

PUFFIN OIL PROJECT - AC-P22 - FPSO
Floating Production Storage Operation project at Vulcan Sub-Basin, ., WA 6999 In The Council Area Of Offshore of Private. The Front Puffin has been procured for offshore production. Click for more details...

WA-28-L GREATER ENFIELD OIL & GAS - DRILLING & COMPLETIONS - SOLIDS CONTROL & EQUIPMENT SERVICES
Solids Control/Equipment Services New project In The Exmouth Council Area. For the provision of Solids control & equipment services. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - PERMANENT ACCESS ROADS
New project of Oil & Gas (Pipelines & associated contracts) project at From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846. For the provision of permanent access roads. Click for more details...

CAPE LAMBERT CCGT POWER STATION
A project in the WA Within City Of Karratha. As part of the Pilbara Power System Upgrade project (PSU 330) supporting an increase iron ore production to 333 million tonnes per annum (Mtpa), replacement of the existing low efficiency 105MW power station. Construction of a 100-120MW power station with 2 x 40-45MW gas turbines & a 20-30MW steam turbine. A 220/132/33kV switchyard with 132kV & 220kV distribution lines. Gas feed to come by a new 1.6km lateral from the PL8 pipeline to a gas receival & conditioning station. Associated workshop/administration complex. Water to come by 2km pipeline from the West Pilbara Water Supply Scheme, water treatment plant & sedimentation & lined evaporation ponds. Back up diesel fuel store. Click for more details...

OTWAY BASIN GAS PROJECT - GEOGRAPHE/THYLACINE
Oil & Gas (Topside - modules, platforms) project In The Offshore Council Area of Offshore Facilities - Jacket/Topsides Epic Contract type. The proposed development concept for offshore facilities includes a wellhead platform with five production wells on the Thylacine Reservoir and a subsea manifold and three production wells on the Geographe Reservoir. Click for more details...

CHINCHILLA CSM GAS DEVELOPMENT - PLA 185/ATP-676
Oil & Gas (Onshore processing facilities) project In The Western Downs Regional Council Area of Development Agreement type. Arrow may supply 4 Peta Joules (PJ) per annum for 15 years to CS Energy, subject to the outcome of feasibility studies to be completed by December 2002. Click for more details...