COPPABELLA COAL OPERATIONS
Currently at the Construction stage In Mackay Regional is a project estimated to be $ 1000000. This project To reduce risks of dry periods. The pipeline will run between Coppabella and a large source of water. This pipeline could also benefit the Monto coal project. This previously long term plan has been brought forward in response to dry conditions in the region. Click for more details...

HARRIET JV - LINDA
Oil & Gas (Topside - modules, platforms) project In The City Of Karratha Council Area of Platform type. The development will include a multi-slot platform to allow development of the Linda Gas/condensate field via two or three wells. The platform is positioned to allow development of the Rose and Lee Gas/condensate fields and other future discoveries in the area. The platform is to be connected to the Campbell pipeline. Processing to be at Varanus Island. Click for more details...

BASSGAS PROJECT - YOLLA/WHITE IBIS
Bassgas Project - Yolla/White Ibis is currently at the Construction stage, valued at about $ 400000000 it is Off-shore platform 135 km north of Burnie, undersea pipeline & on-shore treatment facilities. The construction timetable is as follows: 75MMSCFD onshore gas plant near Lang Lang construction to commence first quarter 2003; 32km onshore pipelines construction to commence third quarter 2003: 147 km sub-sea pipelines construction to commence first quarter 2004; offshore production platform platform installation first quarter installation. The offshore platform will be constructed in South Easet Asia and transported to Bass Strait. Construction of the gas plant located near Lang Lang in south-eastern Victoria will commence in late January 2003. Click for more details...

MORANBAH COAL SEAM METHANE GAS PROJECT
A project in the QLD Within Isaac Regional. Includes some in-field compression, reticulation of water and power. Click for more details...

TL-1/TL-6 - VICTORIA/PEDIRKA/LITTLE SANDY/ROSE/GUDRUN/AVON/HOOVER
Pipleine project at Between Double Island and Victoria oil production platforms north of, Onslow, WA 6710 in the Oil & Gas (Pipelines & associated contracts). Installation and stabilisation of approximately 7 km of 8inch and 4 inch pipelines between the Double Island and Victoris oil production platforms, adding to the subsea network feeding oil to the hub at Varanus Island. The joint venture's lay barge Challenge will be utilised. Click for more details...

PORT HEDLAND LNG PLANT
Via, Port Hedland, WA 6721 Has Port Hedland Lng Plant currently at Early Planning stage. The Kimberley Power proposal involved the establishment of an LNG Plant in Port Hedland and the supply of LNG as the primary fuel to be used in new gas fired power plants in each of the above towns. Click for more details...

MORANBAH TO TOWNSVILLE GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project at Moranbah coal seam methane gas field to, Townsville, QLD 4810 for New. The diameter and coating system remain under review but will be limited to the following options: Pipe Options - Pipe Option 1 Light Wall DN250 360KM SPECIFICATION X-70x 6.1MM, Heavy Wall 40km specification x-70x7.2mm; Option 2 DN300 Light Wall x-70X 7.1mm, Heavy Wall 40km X-70 x 8.6mm. Coating Options- Coating Option 1 Coating System trilaminate, Application Standard CAN/CSA-Z245.21-M92; Coating System Dual layer FBE, Application Standard AS 3862. Click for more details...

TELFER PROJECT
Oil & Gas (Onshore processing facilities) project In The Port Hedland Council Area of Gas Comresor Station/Vent/Offices type. Includes a storage room, control room, workshop,equipment room, foyer, kitchen and toilets, vent stack (5 metres high), turbines, scraper launcher, and other equipment for operation of the gas pipeline. The carpark and manouvering area will be sealed and includes four designated carparking spaces. Click for more details...

CAMDEN GAS PEL2/PPL1/PPL2- BULLI/AMERICAN/BALGOWNIE/WONGAWILLI/TONGARRA/WOONONA
Resource - Gas - Onshore project at via, Kulnura, NSW 2250 in the Oil & Gas (Onshore processing facilities). PPL-2 is a 21 year licence. 40 wells within stage 2 are planned by mid 2003 approx. Nine wells (Glenlee) are to be drilled before the end of December 2002. The remaining 31 wells to be drilled first half 2003. Stage 2 in total will comprise up to 100 vertical wells, a second treatment plant, all gas gathering lines and a steel gas sales line connecting Stage 2 to the main gas transmission lines. Click for more details...

CHINCHILLA CSM GAS DEVELOPMENT - PLA 185/ATP-676
Oil & Gas (Onshore processing facilities) project In The Western Downs Regional Council Area of Development Agreement type. Arrow may supply 4 Peta Joules (PJ) per annum for 15 years to CS Energy, subject to the outcome of feasibility studies to be completed by December 2002. Click for more details...

PILBARA TO GOLDFIELDS GAS TRANSMISSION
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Various Council Area for New development. The 1,380 km gas pipeline will require two compressor stations to handle the initial capacity of about 70 tjs per day. Installation will follow the main pipelaying activity. Gas measuring equipment to also be installed at Yarraloola, Newman, Mt Keith, Leinster and Kalgoorlie. Click for more details...

DAMPIER TO BUNBURY NATURAL GAS PIPELINE
Dampier To Bunbury Natural Gas Pipeline is currently at the Early Planning stage, valued at about $ 20000000 it is The study is focusing on the marketing potential in the south west area of Western Australia for a possible extension to the Dampier to Bunbury natural gas pipeline. Click for more details...

MINERVA GAS PROJECT
Onshore Facilities project at Brumby's Rd, Port Campbell, VIC 3269 In The Council Area Of Colac-Otway of Private. The gas plant will have a gross design production capacity of 150 terajoules of gas per day (TJ/d). Approximately 600 barrels (gross) of stabilised condensate will also be produced per day at initial gas sales rates. Click for more details...

BLACKTIP GAS PROJECT - SUBSEA PIPELINE
Currently at the Construction stage In Offshore is a project estimated to be $ 100000000. This project 108 km offshore pipeline is to be constructed from the gas field to the onshore processing facility. Click for more details...

DOUGLAS MINERAL SANDS PROJECT
Oil & Gas (Pipelines & associated contracts) project In The West Wimmera Council Area of Pipe - Supply type. Contract 1 for the supply of 22km of pipe of approximately 375 or 450mm diameter. Various materials for the pipeline will be considered, appropriate to achieving a 20 year design life. Click for more details...

BALLERA TO MOOMBA PIPELINE
Currently at the Early Planning stage In Quilpie Shire is a project estimated to be $ 100000000. This project FEED study will look at the most effective route for the North Gas Link. The pipeline will join the EPIC South West Queensland pipeline at Ballera to both the Moomba Sydney Pipeline and Moomba Adelaide Pipe System. Click for more details...

WESTERN PIPELINE
Oil & Gas (Pipelines & associated contracts) project In The Warrnambool Council Area of J/V - Private & Govt ownership. 12 km gas pipeline from the McIntee well in PEP-154 to join the Heytesbury pipeline to the Heytesbury Gas Facility. Click for more details...

LNG TRAIN 4 EXPANSION - TRUNKLINE SYSTEM EXPANSION (TSEP)
Currently at the Construction stage In City Of Karratha is a project estimated to be $ 5000000. This project Installation of two large subsea valve skids manufactured in Kwinana. Installation over the deepwater section of the trunkline of 900, 32 pre-cast concrete gravity anchors manufactured near Karratha and removal of 40"/30" ball valves currently at the base of the North Rankin A gas production platform and installation of a skid-based 40' subsea insolation check valve. Installation engineering will be done in Perth and Australian crews will be used for the offshore campaign. Click for more details...

ENFIELD OILFIELD PROJECT - WA271-P
Fpso - Hull Construction project at Barrow Sub-Basin south west of, Onslow, WA 6710 In The Council Area Of Ashburton of Private. A double hull deadweight of about 150,000 tonnes and storage capacity of 900,000 barrels of oil. It will be self propelled and able to leave location in bad weather. Click for more details...

SEA GAS PIPELINE
Private ownership Oil & Gas (Onshore processing facilities) project In The Corangamite Council Area for New development. At Tugs. Click for more details...

TELFER PROJECT
Gas Pipeline project at Port Hedland to Telfer gold-copper mine,, Telfer, WA 6762 in the Oil & Gas (Pipelines & associated contracts). A 450 km g 10 inch (250mm) class 600 gas pipeline, utilising a single compressor station with one duty and one stand-by compressor. The pipeline will provide gas to the power station at Telfer. Click for more details...

METHANEX AUSTRALIA PROJECT
Oil & Gas (Pipelines & associated contracts) New project at King Bay-Hearson's Cove Industrial Precinct, Burrup Peninsula, Dampier, WA 6713. This type is Methanol Plant with Private ownership. A 1.3 million tonne per year methanol project, as the first stage of a planned Asia Pacific hub. This was a reduction in capacity of about 35% compared to the original project plan of 2 million tonnes per annum. Click for more details...

DAMPIER TO BUNBURY NATURAL GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) Addition project at To the Oakajee Industrial Estate via, Geraldton, WA 6530. This type is Consultancy For Environmental & Geotechnical with Private ownership. The Western Australian Department of Resources Development is participating, along with the Office of Energy, the Department of Land Administration and State Treasury, in the Gas Pipeline Sale Steering Committee (GPSSC). The GPSSC is planning and managing the expansion of the Dampier to Bunbury Natural Gas Pipeline (DBNGP) land corridor, and establishing associated strategic gas laterals. As part of the work already completed for the project, specialist consultants have been engaged to conduct feasibility studies and provide advice on the most appropriate route for the proposed widened DBNGP land corridor. Consideration is now being given to associated strategic gas laterals, and the GPSSC now seeks suitable qualified consultants for environmental and geotechnical work. The objectives of the studies are to provide advice on the selection of a suitable land corridor for a gas lateral from the DBNGP to Oakajee and complement work already completed for the expansion of the DBNGP land corridor between Karratha and Bullsbrook. Click for more details...

JOHNDILO GAS PROJECT
Johndilo gasfield to, Camden, NSW 2570 Has Johndilo Gas Project currently at Construction stage. 4.8 km 20 cm steel pipeline from APAP No.1 well to the town boundary at Camden. To deliver coal bed methane gas to the AGL gas network at Camden. Part of the Johndilo CBM pilot project which includes of its gas gathering system and treatment facility and the pipeline to deliver gas to AGL at Camden. Click for more details...

MEREENIE OIL/GAS OPERATIONS
Oil & Gas (Pipelines & associated contracts) project at North Flank to Eastern Satellite Station via, Alice Springs, NT 0872 of Oil Pipeline type of New development. An 8 km oil pipeline. Click for more details...

LNG TRAIN 4 EXPANSION
Oil & Gas (Onshore processing facilities) project In The City Of Karratha Council Area of Electrical/Instrumentation Works - On Plot type. Includes all above ground electrical and instrumentation work Click for more details...

MONDARRA GAS STORAGE FACILITY - EXPANSION
Expansion Of Facilities project at North of, Perth, WA 6000 In The Council Area Of Perth of Private. Includes an additional gas storage well, additional gas processing and compression facilities, and debottlenecking of intrastructure. Click for more details...

STYBARROW PROJECT - SUBSEA FACILITIES
Oil & Gas (Sub-sea equipments, floating production facilities) project at Exmouth Sub Basin 55 Km Northwest of, Exmouth, WA 6707 of Subsea Facilities/Fpso Mooring System Installation type of New development. Installation of the FPSO spider buoy and mooring system complete with anchors to be provided by BHP Petroleum. Click for more details...

STYBARROW PROJECT - SUBSEA UMBILICALS
Oil & Gas (Sub-sea equipments, floating production facilities) project In The Exmouth Council Area of Private ownership. Transport, installation and precommissioning of approxiamtely 16 km's of dynamic and static umbilicals and associated electrical and hydraulic flying leads. Click for more details...

STYBARROW PROJECT - FPSO VESSEL
Oil & Gas (Sub-sea equipments, floating production facilities) project for New development. An FPSO will be constructed and operated by the contractor. Works will comprise engineering, procurement, construction, installation, commissioning and operations, including the topsides processing equipment, hull and disconnectable internal turret mooring system. It will be capable of processing 80,000 barrels of liquid per day and has a storage capacity in the order of 900,000 barrels. Click for more details...

NORTH WEST SHELF LNG TRAIN 5 PROJECT - STEEL FABRICATION SERVICES CONTRACT
Oil & Gas (Onshore processing facilities) New project at Burrup Peninsula north of, Dampier, WA 6713. This type is Steel Fabrication Services Contract with Private ownership. 13,574 tonnes of structural steel will be used in the project. Click for more details...

PILBARA LNG PROCESSING FACILITY
New project of Oil & Gas (Onshore processing facilities) project at Reserve 19291, 4.5 Km South West of, Onslow, WA 6710. To construct a 6 Mt LNG Plant. A materials offloading facilities site is being investigated along Beadon Creek. The facility will comprise a new wharf and hard stand area for the unloading of equipment and plant modules. Click for more details...

WICKHAM POINT HELIUM PLANT - GHE STORAGE TANK "A" (VERTICLE W/SADDLES)
Wickham Point Helium Plant - Ghe Storage Tank "a" (Verticle W/Saddles) is currently at the Construction stage, valued at about $ 2000000 it is For the provision of a 30,000 US gallon (136,000 litre) verticle storage vessel "A" with saddles rated for 300 psig. Click for more details...

GREATER GORGON GAS PROJECT - NEAR SHORE PIPELINES
New project of Oil & Gas (Pipelines & associated contracts) project at Off, Barrow Island, WA 6712. Near shore pipelines, Horizontal Directional Drilling and Secondary Stabilisation, excluding Rock Dumping. Click for more details...

TIPTON WEST GAS PROJECT - GAS COMPRESSING FACILITY/PIPELINES
Tipton West Gas Project - Gas Compressing Facility/Pipelines is currently at the Construction stage, valued at about $ 31000000 it is To construct a Gas Compressing facility and surface gathering network and associated pipelines. Six Compressors have been ordered from Universal Compression in the United States of America. Click for more details...

WOODSIDE GAS OFFSHORE CRANE ENGINEERING/MAINTENANCE CONTRACT
Oil & Gas (Topside - modules, platforms) project In The Offshore Council Area of Crane Engineering/Maintenance Contract type. Work comprises the delivery of specialised offshore crane engineering and maintenance services to gas resources at Goodwyn A and North Rankin A. Click for more details...

PUFFIN OIL PROJECT - AC-P22 - FPSO
Floating Production Storage Operation project at Vulcan Sub-Basin, ., WA 6999 In The Council Area Of Offshore of Private. The Front Puffin has been procured for offshore production. Click for more details...

CAMDEN GAS PROJECT - RAZORBACK WELLS - RESOURCE
Resource - Coal Bed Methane project at Finns Rd & Woodbridge Rd, Camden Park, NSW 2568 In The Council Area Of Wollondilly of Private. To construct nine coal seam gas wells including gas gathering systems and access roads. The wells will be connected to the Rosalind Park Gas Plant for production. Click for more details...

PLUTO LNG PLANT PROJECT - MAIN CRYOGENIC HEAT EXCHANGER (MCHE)
Burrup Peninsula Via, Roebourne, WA 6718 Has Pluto Lng Plant Project - Main Cryogenic Heat Exchanger (Mche) currently at Construction stage. Main Cryogenic Heat Exhanger. Tpe: Spiral Wound. Material of construction: Aluminium. Design Temp: 65/-175 deg. C, Heat Load approx 49 Mw. Click for more details...

PLUTO LNG PLANT PROJECT - REFRIGERANT COMPRESSORS
A project in the WA Within City Of Karratha. Liquefaction 1400 Unit. Mixed / Propane Refrigerant Compressors. Type : Centrifugal Compressors and associated packages. Material of construction : 3.5% Nickel. Compressor Ratings 37-72 MW, Capacity 58-243 Km3/hr. This is a major proprietary equipment package within the Train. Full String testing required in the Main Equipment Suppliers Workshop. Click for more details...

CAMDEN GAS PROJECT - SPRING FARM/MENANGLE PARK - RESOURCE
Resource - Coal Base Methane New project In The Camden Council Area. Construction and operation of up 4 surface well locations at Spring Farm and up to 12 surface well locations at Menangle Park (to contain a variety of horizontal, directional and surface-in-seam wells); construction and use of access roads, a gas gathering system and water transport lines; connection of the wells to the Rosalind Park Gas Plant; and production of methane gas. Click for more details...

SASOL PROJECT - GAS TO LIQUIDS PLANT
New project of Oil & Gas (Onshore processing facilities) project at Wheatstone Gas Field, 85km Northwest of, Barrow Island, WA 6712. Plans are for a 25 million tonne per annum Liquified Natural Gas & Domestic Gas Complex. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - PERMANENT ACCESS ROADS
New project of Oil & Gas (Pipelines & associated contracts) project at From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846. For the provision of permanent access roads. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - ROAD HAULAGE
Road Haulage New project In The Coomalie Community Council Area. For the provision of road haulage. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - PIPELINE PLACEMENT
Currently at the Construction stage In Coomalie Community is a project estimated to be $ 2000000. This project For the provision of pipeline placement services for a 275 km pipeline. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - PIPE STRINGING & BENDING CONTRACT
From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846 Has Bonaparte Gas Pipeline Project - Pipe Stringing & Bending Contract currently at Construction stage. For a 275 km pipeline capable of delivering 30 petajoules per year. Click for more details...

TALINGA DEVELOPMENT PROJECT
Oil & Gas (Onshore processing facilities) project In The Western Downs Regional Council Area of Resource - Coal Seam Gas type. The project involves transitioning the existing pilot trial of 12 wells to production of up to 90TJ/day of coal seam gas, which will contribute to the supply of gas to the Darling Downs Power Station. The development will involve installing coal seam gas wells at a spacing of between 750m and 1000m; associated gas and water gathering systems, a gas plant, a produced water treatment facility, evaporation ponds, offices, storage areas, workshops, camp and gravel pits. Based on current well production predictions, this equates to the installation of approximately 100 coal seam gas wells. This project will incorporate a water treatment facility to significantly reduce the evaporation pond surface area down to approximately 170ha. The water treatment facility will employ an integrated membrane system, including reverse osmosis, to achieve an 85% desalination recovery and create a freshwater resource. The freshwater will be discharged to the Condamine River catchment until higher level beneficial used, such as industrial, urban or agricultural use, can be implemented. Click for more details...

GOLDFIELDS GAS TRANSMISSION PIPELINE EXPANSION
Oil & Gas (Pipelines & associated contracts) project In The East Pilbara Council Area of Private ownership. Increase in the pipeline's capacity by an additional 20 TJ/d. Installation of additional compression at the existing Yarraloola & Paraburdoo compressor stations. Click for more details...

WA-26-L & WA-191-P JOINT VENTURE FLETCHER-FINUCANE OIL DEVELOPMENT - SURF WELL CONNECTION CONTRACT
Subsea/Umbilicals/Risers/Flowlines project at North West Shelf 150km north of DAMPIER, ., WA 6999 In The Council Area Of Offshore of Private. A contract including 55km of flexible flowlines & more than 60km of umbilicals. Associated structures to connect wells to the existing Exeter-Mutineer facilities. Pre-commissioning activities & associated services. Click for more details...