OTWAY BASIN GAS PROJECT - GEOGRAPHE/THYLACINE
Oil & Gas (Pipelines & associated contracts) project In The Corangamite Council Area of Private ownership. Short onshore pipeline. Click for more details...

ATP-592 - DURHAM RANCH PROJECT
Oil & Gas (Onshore processing facilities) project for New development. Likely to include some steelwork/fabrication. Click for more details...

CHINCHILLA CSM GAS DEVELOPMENT - PLA 185/ATP-676
Oil & Gas (Pipelines & associated contracts) project In The Western Downs Regional Council Area of Development Agreement type. Arrow may supply 4 Peta Joules (PJ) per annum for 15 years to CS Energy, subject to the outcome of feasibility studies to be completed by December 2002. Click for more details...

ELANG
Oil & Gas (Sub-sea equipments, floating production facilities) project In The Darwin City Council Area of Resource - Oil/Gas - Field Development - Offshore & Floating Production Facility type. Field development plan involves subsea completions of the existing vertical Elang 1 & 2 wellbores; connection of wells via subsea flowlines to leased FPSO moored over the field using a disconnectable single point riser turret moring; production & export of crude oil using shuttle tankers. Click for more details...

BASKER-MANTA OIL & GAS PROJECT - RESOURCE
Resource - Oil & Gas - Offshore New project In The Bass Coast Council Area. Installation associated the EPT comprise the Floating Production Storage and offloading Unit flexible flowline and control umbilical system and shuttle tanker mooring. The ocean patriot will be used for the drilling and expected to start July 2005. The majority of the development drilling will be undertaken in the fourth quarter 2005 when production licences are granted. A Floating Production Storage and Offloading vessel (FPSO) has been secured until January 15 2008. The FPSO has the capacity to handle up to 40,000 barrells of fluid per day and 50MMscf/d of gas. The Crystal Ocean (FPSO) has been obtained under a bareboat charter and manning will be provided by Upstream Petrolem Pty Ltd with assitance from Seatankers Management Co Ltd. The Crystal Ocean is expected to arrive in Melbourne August 2005. A shuttle tanker has been secured for a three year contract from Teekay Shipping and is expected in Bass Strait September 2005. The tanker called the Nordic Yukon is aframax sized, with dynamic positioning capability and a capacity for approx 650,000 bbls. Click for more details...

DAMPIER TO BUNBURY NATURAL GAS PIPELINE
Dampier To Bunbury Natural Gas Pipeline is currently at the Early Planning stage, valued at about $ 20000000 it is The study is focusing on the marketing potential in the south west area of Western Australia for a possible extension to the Dampier to Bunbury natural gas pipeline. Click for more details...

BLACKTIP GAS PROJECT - PLATFORM
Oil & Gas (Topside - modules, platforms) project In The Offshore Council Area of Private ownership. Offshore unmanned wellhead platform (WHP) in 50 metres of water. Click for more details...

WESTERN PIPELINE
Oil & Gas (Pipelines & associated contracts) project In The Warrnambool Council Area of J/V - Private & Govt ownership. 12 km gas pipeline from the McIntee well in PEP-154 to join the Heytesbury pipeline to the Heytesbury Gas Facility. Click for more details...

ATP-632 - BERWYNDALE SOUTH - WINDIBRI PIPELINE
Oil & Gas (Pipelines & associated contracts) project at Gasfield, Surat Basin to existing Roma/Brisbane pipeline via, Miles, QLD 4415 for New. A 14 km lateral from field to existing Roma/Brisbane pipeline. The route for the pipeline was cleared in August 2005. Click for more details...

KIPPER UNIT JOINT VENTURE GAS PROJECT
Resource - Gas - Offshore New project In The Gippsland Basin Council Area. The Kipper Gas Field is estimated to contain 620billion cubic feet (Bcf) of recoverable gas & 30million barrels (MMbl) of condensate/liquefied petroleum gas (LPG). Initial development includes 2 subsea gas wells along with 4 subsea coolers. Recovered gas to be piped through existing infrastructure via the West Tuna Platform to the onshore Esso & BHP Billiton processing facilities at Longford. Click for more details...

GIPPSLAND BASIN JOINT VENTURE PROJECT - TURRUM
Resource - Oil & Gas - Offshore project at Gippsland Basin Bass Strait, Gippsland Basin, VIC 3999 in the Oil & Gas (Sub-sea equipments, floating production facilities). Full development of the Turrum gas field expected to recover around 1 trillion cubic feet of natural gas and 110 million barrels of oil and gas liquids. Processing to be at the onshore Longford Gippsland Basin Joint Venture Facilities. Production to be enhanced with the late 2010 installation of the new Marlin B platform. Click for more details...

GATTON TO GYMPIE GAS PIPELINE
Gate Station project at via, Gatton, QLD 4343 In The Council Area Of Lockyer Valley Regional of Private. At the existing AGL Roma to Brisbane gas pipeline near Gatton. Click for more details...

PATRICIA BALEEN GAS PROJECT
Currently at the Construction stage In Gippsland Basin is a project estimated to be $ 20000000. This project The offshore Baleen-3 development well has been completed as a future gas producer and flowed 764,600 cubic metres of gas per day through a 51mm surface choke. The offshore Patricia-2 development well has been completed as a future gas producer and flowed 790,000 cubic metres of gas per day through a 51mm choke. Click for more details...

TASSIE SHOAL METHANOL PROJECT - METHANOL PLANT
Methanol Plant - Offshore project at Tassie Shoal in the Timor Sea 275 km north of, Darwin, NT 0800 in the Oil & Gas (Sub-sea equipments, floating production facilities). The first of two large gas reforming and methanol production plants in Australian waters of the Timor Sea. Combined value of stages one and two is two billion. Stage one will have a capacity of 5,000 tonnes of methanol per day and could be operational by late 2007. Click for more details...

MEREENIE OIL/GAS OPERATIONS
Oil & Gas (Pipelines & associated contracts) project at North Flank to Eastern Satellite Station via, Alice Springs, NT 0872 of Oil Pipeline type of New development. An 8 km oil pipeline. Click for more details...

ANGEL GAS PROJECT - RESOURCE
Resource - Gas & Oil project at 130 Km North of Dampier, ., WA 6999 In The Council Area Of Offshore of Private. The project will comprise of the drilling of four wells in 2007, installing a processing platform and exporting the gas and condesate via a new 49 Km pipeline and the existing trunkline to the onshore gas plant near Karratha. Processing platform facilities include accommodation for up to 40 persons; helideck; emergency flare and vent; Produced water treatment and disposal with allowance for potential future volumes; Gas/condensate cooling via air cooled heat exchangers; Gas/condensate seperation and condensate/water seperation; gas dehydration; Gas/condensate metering; Power generation gas turbines (7MW) and 4 installed risers and two additional risers as provision for tie in of future fields. A floating production, storage and offloading vessel. Click for more details...

PNG GAS PROJECT - PIPELINE FEED CONTRACT - RESOURCE
Png Gas Project - Pipeline Feed Contract - Resource is currently at the Planning stage, valued at about $ 25000000 it is Tender is for the Australian component of the project. FEED program will involve engineering design, route selection, regulatory and financial viability assessments, environmental and native title processes. The pipeline width will be 22 inches and approx 2020km in length. Pipeline from PNG/Australia maritime border through Cape York to Townsville off-take is approx 1220 km. From Townsville off-take to Gladstone is 700 km. A further 100 km from the Townsville off-take to Townsville. Click for more details...

SANTOS GAS OPERATIONS - COASTAL LOGISTICS CONTRACT
Various Sites around Australia, ., VIC 3999 Has Santos Gas Operations - Coastal Logistics Contract currently at Tenders & Building stage. Services will include road and fixed installations linkages from Brisbane, through south-eastern Victoria, including Melbourne, Sale and Portland, inwards and outwards from Santos Adelaide hub and support up and down the coast from Perth to Dampier, extending at times to Darwin. Click for more details...

GREATER GORGON GAS PROJECT - NEAR SHORE PIPELINES
New project of Oil & Gas (Pipelines & associated contracts) project at Off, Barrow Island, WA 6712. Near shore pipelines, Horizontal Directional Drilling and Secondary Stabilisation, excluding Rock Dumping. Click for more details...

PADULLA PROJECT - OIL RESOURCE
A project in the SA Within Far North. Development will comprise one exploratory well and six appraisal and development wells and oilfield facilities. Click for more details...

KARRATHA GAS PLANT LIQUEFIED NATURAL GAS PRODUCTION CAPACITY PROJECT
Private ownership Oil & Gas (Onshore processing facilities) project In The City Of Karratha Council Area for New development. Work will comprise: alterations to the LNG storage and loading system; modifying the Fin Fans; installing a Boil-Off Gas (BOG) Liquefaction Unit; installing an Inlet Air Chilling (IAC) Package; installing four Gas Engines; installing a 6th Stabiliser Unit. Click for more details...

WOOLLYBUTT OIL FIELD - WA-25-L - SOUTH LOBE PROJECT
Oil & Gas (Sub-sea equipments, floating production facilities) project at West of Barrow Island, Barrow Sub-Basin, WA 6999 for New. Work comprises the drilling and completion of Woollybutt-4 horizontal development well and Woollybutt-6 appraisal well. There will be modifications to the existing FPSO, new sub-sea christmas trees, flowlines, manifolds and control systems. Resource estimate is 7 million barrels of oil. Click for more details...

ICHTHYS LNG PROJECT - CENTRAL PROCESSING FACILITY
Processing Facility project at Off Maret Island Via, Wyndham, WA 6740 In The Council Area Of Wyndham-E Kimberley of Private. The offshore CPF facilities include process, power generation, utilities & accommodation facilities. Work involves fabrication, installation, mechanical completion, pre-commissioning & commissioning of equipment, piping, electrical, instrumentation & controls, safety system & accommodation facilities. The CPF topside is modularised on a Semi submersible substructure. Semi-sub includes pontoons, columns & deck box with a plan dimension of approximately 96mx96m to support topsides. Topside to comprise modules up to a maximum of 5000 te & packages if appropriate. The living quarters module can be a part of the semi-sub deck box or separate module. Alternative concepts for integrated topsides will be considered. Click for more details...

ICHTHYS GAS FIELD DEVELOPMENT - ONSHORE - EPC PRODUCT LOADING JETTY
Oil & Gas (Onshore processing facilities) project at Blaydin Point via, Darwin, NT 0800 of Product Loading Jetty type of New development. The scope of work for this package includes the engineering, supply and installation of the product loading jetty trestle and platforms approximately 1.2km long including fenders, quick release hooks, catwalks, mooring and breasting dolphins and navigation aids. Work not included is the top side modules, jetty head superstructure, piping, loading arms, local electrical room, local instrument room, electrical and instrumentation installations. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - PIPE STRINGING & BENDING CONTRACT
From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846 Has Bonaparte Gas Pipeline Project - Pipe Stringing & Bending Contract currently at Construction stage. For a 275 km pipeline capable of delivering 30 petajoules per year. Click for more details...

BEVERLEY NORTH EXTENSION URANIUM PROJECT
Oil & Gas (Pipelines & associated contracts) project at Northeast of, Lyndhurst, SA 5731 of Resource - Uranium type of New development. It is proposed to mine the Beverley North deposits by In-Situ Recovery (ISR) methods, utilising the existing infrastructure and workforce for processing the product, and thereby extend the life of the Beverley operations. The proposed mining methods involve pumping the mining solution to the injection wells in the wellfields. Pumping the uranium rich solution from the extraction well pumps to the wellhouse, and through a field filter bank to remove any sand, and then to a storage tank. Pumping the uranium rich solution from the storage tank to ion exchange columns at the Beverley North satellite plant. Pumping loaded resin to surge tanks which are used to supply loaded resin for hte transport to the Beverley Plant. Extracting the uranium from the loaded resin in the Beverley processing plant, and returning barren resin to Beverley North. Click for more details...

SOUTHERN CROSS/IMPEL LNG PROJECT
Private ownership Oil & Gas (Onshore processing facilities) project In The Gladstone Regional Council Area for New development. Proposed staged construction of a liquefied natural gas (LNG) plant with up to 3 trains ranging from 0.07-1.3million tonnes per annum (Mtpa) capacity. Associated facilities expected to include a construction jetty; an LNG dock & jetty to handle vessels up to 200,000cu m; cryogenic pipelines; LNG storage tanks up to 210,000cu m capacity & 400km approx pipeline with spur lines. The project is expected to generate 300-350 jobs during construction & 80-90 when fully operational. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - INSTRUMENTS
A project in the WA Within Ashburton. For the provision of instruments & connections. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - SS PIPES FOR PUMP TUBES
Oil & Gas (Onshore processing facilities) project for New development. For the provision of stainless steel pipes for pump tubes. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE LNG PLANT - NON DESTRUCTIVE EXAMINATION
Currently at the Construction stage In Ashburton is a project estimated to be $ 2500000. This project This subcontract scope includes the performance of non-destructive examination (NDE) services, including radiography, dye penetrant, magnetic particle, positive material identification & ultrasonic examination of welded connections & materials. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE LNG PLANT - PERLITE INSULATION
Oil & Gas (Onshore processing facilities) project for New development. For the provision of Perlite insulation. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - NDT SERVICES
Currently at the Construction stage In Ashburton is a project estimated to be $ 250000. This project For the provision of NDT services. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - CHAINSTOPPERS CCTV CAMERAS
Chainstoppers Cctv Cameras project at 475km N/NE of, Broome, WA 6725 in the Oil & Gas (Sub-sea equipments, floating production facilities). For the provision of chainstoppers CCTV cameras. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - CS BOLTING FOR MANIFOLD
Private ownership Oil & Gas (Sub-sea equipments, floating production facilities) project In The Broome Council Area for New development. For the provision of CS bolting for the manifold. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - SUPPLY & INSTALL HDPE LINER
Oil & Gas (Onshore processing facilities) project at Both on & off, Barrow Island, WA 6712 for New. For the supply & installation of the HDPE liner. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE - CONSTRUCTION GENERAL SERVICES PACKAGE NO 3
Oil & Gas (Onshore processing facilities) New project at Within the vicinity of, Onslow, WA 6710. This type is Construction General Services Package No 3 with Private ownership. Includes providing labour and equipment for onsite works for five years. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - REINFORCEMENT SUPPLY (PACKAGE 2)
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Civils & Underground Services - Reinforcement Supply (Package 2) currently at Construction stage. For the provision of reinforcement bar. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - COMPACT FLANGES
Oil & Gas (Sub-sea equipments, floating production facilities) project In The Broome Council Area of Compact Flanges type. For the provision of compact flanges. Click for more details...

GREATER GORGON GAS PROJECT - OFFSHORE - TUGS & BARGES
Currently at the Construction stage In Ashburton is a project estimated to be $ 10000000. This project For the provision of tugs and barges (330ft and 400ft). Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - CABLE GLANDS - (MR-16153 & MR_17283)
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - Cable Glands - (Mr-16153 & Mr_17283) currently at Construction stage. For the provision of CMP or equivalent cable glands (complete with heavy duty nickel plated brass lock nuts & fibre weather washer). Click for more details...

JPDA 06-105 & 11-106 KITAN DRILLING RIG SERVICES CONTRACTS
Oil & Gas (Pipelines & associated contracts) project for New development. Proposed drilling of additional wells & connection back to existing FPSO vessel. Specific Services & goods to include: Anchor handling support vessels; Helicopter services; Marine gas oil supply; Supply base; General waste services & dangerous goods disposal; Vessel stevedoring; International Freight Forwarder & Ships agency services; Logistics services (including containers, warehousing & customs); Drilling fluid services; Cementing services; Logging-while-drilling/measurement-while-drilling/directional drilling services; Wireline services; Mud logging services; ROV services; Casing running & tubular handling services; Rig positioning services; Coring services; Fishing services; Down hole tool & well heated abandonment services; Well testing, slickline & sampling services; Well testing heat suppression; Liner hanger equipment; Drill bit supply, Weather forecasting (including tow advice & cyclone alerts); Rig satellite communication services; Wellheads (subsea); Third party QA/QC inspection services; Technical Engineering studies; Geophysical survey; Satellite based oil spill detection; Casing supply; Aeromedical support; Blowout response. Click for more details...

PL65 GILMORE GAS FIELD LNG PROJECT
A project in the QLD Within Quilpie Shire. Construction of a 56,000tpa liquefied natural gas (LNG) plant adjacent the existing Gilmore gas plant. Click for more details...

APLNG LNG PLANT - ETHANOL SUPPLY
Oil & Gas (Onshore processing facilities) project at At, Curtis Island, QLD 4680 of Ethanol Supply - For Liquefied Natural Gas Plant type of New development. For the provision of ethanol. Click for more details...

APLNG LNG PLANT - GAS DETECTION EQUIPMENT & MAINTENANCE
Gas Detection Equipment - Supply & Maintain New project In The Gladstone Regional Council Area. For the provision of gas detection equipment & maintenance services. Click for more details...

APLNG LNG PLANT - PALLET RACKING SUPPLY
Oil & Gas (Onshore processing facilities) project for New development. For the provision of warehouse pallet racking. Click for more details...

NORTH WEST SHELF SUBSEA TIEBACK PROGRAM (GWF PH 2) - SUBSEA FORGED COMPONENTS
Subsea Forged Components project at Within the, Carnarvon Basin, WA 6999 in the Oil & Gas (Sub-sea equipments, floating production facilities). For the provision of subsea forged components. Click for more details...

WA-28-L GREATER ENFIELD OIL & GAS - ELECTRICAL FLYING LEADS
Oil & Gas (Sub-sea equipments, floating production facilities) New project at 49km off the coast of, Exmouth, WA 6707. This type is Electrical Flying Leads with Private ownership. Provision for the supply of electrical flying leads for Greater Enfield Project. Click for more details...

WA-28-L GREATER ENFIELD OIL & GAS - SENSORS
Private ownership Oil & Gas (Sub-sea equipments, floating production facilities) project In The Exmouth Council Area for New development. Provision for the supply of sensors for the Greater Enfield Project. Click for more details...

SHELL PRELUDE GAS FIELD - OFFSHORE INSTALLATION - AIR DIVING SERVICES
Air Diving Services New project In The Broome Council Area. Supply, delivery & operation of an integrated surface supplied diving spread for the Prelude FLNG Turret hook-up contingency diving operation. Click for more details...