State

Categories

Sub Categories

Click Here to Find Current Projects

List of Oil & Gas Projects


SANTOS CBU - SOUTH WEST QUEENSLAND/NORTHERN SOUTH AUSTRALIAN GAS FIELDS
Santos Cbu - South West Queensland/Northern South Australian Gas Fields is currently at the Construction stage, valued at about $ 50000000 it is The contract is for the provision of integrated engineering, procurement and construction services for Santos' Central Business Unit (CBU), which operates the oil and gas fields in northern South Australia and South West Queensland. The contract is a consolidation of services previously provided by a range of providers into a single contract. A potential of $20-$40 million per annum for and initial three years, with possible extensions up to eight years. Click for more details...

PEL106 COOPER BASIN JOINT VENTURE OIL & GAS PROJECT
Oil & Gas (Pipelines & associated contracts) project In The Unincorporated Council Area of Resource - Oil/Gas type. A project based on the Brownlow Wet Gas Discovery located on the Beach Farmin block (PEL 106B) & which contains estimated 2C reserves of at least 2.8million barrels of oil equivalent (MMBOE) including 1.3million barrels (MMbbls) of liquid hydrocarbons (light oil, condensate & LPG). Canunda-1 produced over 12,000 barrels (bbls) of condensate & 63 million standard cubic feet (mmscf) of raw gas in extended production testing. Installation of surface production facilities at the Brownlow & Middleton discoveries & connection into the raw gas pipeline gathering system at the South Australian Cooper Basin Joint Venture (SACB) field. Follow up with a 5 wet gas exploration well campaign (Admella-1, Baird-1, Coolawang-1, Haslam-1, Southend-1). Click for more details...

MORANBAH TO TOWNSVILLE GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project at Moranbah coal seam methane gas field to, Townsville, QLD 4810 for New. The diameter and coating system remain under review but will be limited to the following options: Pipe Options - Pipe Option 1 Light Wall DN250 360KM SPECIFICATION X-70x 6.1MM, Heavy Wall 40km specification x-70x7.2mm; Option 2 DN300 Light Wall x-70X 7.1mm, Heavy Wall 40km X-70 x 8.6mm. Coating Options- Coating Option 1 Coating System trilaminate, Application Standard CAN/CSA-Z245.21-M92; Coating System Dual layer FBE, Application Standard AS 3862. Click for more details...

TASSIE SHOAL METHANOL PROJECT - EPCM CONTRACT
Oil & Gas (Pipelines & associated contracts) project for New development. Construction and installation of the methanol priduction facilities on Tassie Shoal. Click for more details...

BALLERA TO MOOMBA PIPELINE
Currently at the Early Planning stage In Quilpie Shire is a project estimated to be $ 100000000. This project FEED study will look at the most effective route for the North Gas Link. The pipeline will join the EPIC South West Queensland pipeline at Ballera to both the Moomba Sydney Pipeline and Moomba Adelaide Pipe System. Click for more details...

SEA GAS PIPELINE
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Corangamite Council Area for New development. At Tugs. Click for more details...

DAMPIER TO BUNBURY NATURAL GAS PIPELINE - NORTHERN LOOPING PROJECT - STAGE 4
Oil & Gas (Pipelines & associated contracts) New project at Dampier to, Bunbury, WA 6230. This type is Natural Gas Pipeline For Capacity - Upgrade with Private ownership. There are nine separate looping sections proposed from Compressor Station 1 (CS1) south of Karratha to Compressor Station 9, north of Gingin, Western Australia (known as the Northern Looping project). The proposed looping pipeline sections will be 660 mm in diameter with a total length of 193 kms approximately. Subject to approvals, the pipeline construction activities could commence in first quarter 2006 and take approximately 10 months. Activities to include clearing, trenching, welding, joint coating, backfilling and pressure testing. Commissioning and commencement of operations could occur by the end of 2006. Pipeline Operation Activities will include: gas metering, prevention of pipeline damage, cathodic protection & general operations. Click for more details...

HARRIET OIL & GAS OPERATIONS - AGINCOURT
Oil & Gas (Pipelines & associated contracts) project In The Carnarvon Basin Council Area of Private ownership. The joint venturers propose to develop the Agincourt oil field via an unmanned offshore monopod, comprising one horizontal well, which will be tied back to the existing processing facilities on Varanus Island. The monopod will accommodate corrosion and scale inhibition equipment, and will allow wellbore access via wireline techniques. A 150mm, 6.5km production pipeline will be constructed to transport oil, gas and water to Varanus Island for separation and processing using the existing Tanami facilities. Click for more details...

ATP-683P DALBY BLOCK - TIPTON - PIPELINE
A project in the QLD Within Not Yet Determined. Lateral connections from Tipton to Roma-Brisbane trunk line as well as for the direct Tipton to Oakey pipeline and Dalby-Kogan pipeline. Click for more details...

PNG GAS PROJECT - PIPELINE FEED CONTRACT - RESOURCE
Png Gas Project - Pipeline Feed Contract - Resource is currently at the Planning stage, valued at about $ 25000000 it is Tender is for the Australian component of the project. FEED program will involve engineering design, route selection, regulatory and financial viability assessments, environmental and native title processes. The pipeline width will be 22 inches and approx 2020km in length. Pipeline from PNG/Australia maritime border through Cape York to Townsville off-take is approx 1220 km. From Townsville off-take to Gladstone is 700 km. A further 100 km from the Townsville off-take to Townsville. Click for more details...

ANGEL GAS PROJECT - JACKET/PIPELINE INSTALLATION CONTRACT
Private ownership Oil & Gas (Sub-sea equipments, floating production facilities) project In The Dampier Sub Basin Council Area for New development. The contract comprises the substructure and pipeline installation of a 7500 MT jacket and piles by J.Ray's launch barge, the Intermac 650, from a fabrication yard in China to the offshore installation site as well as the launch, upend, and set down of the jacket. One of J Ray's marine vessels will install the jackets and pipelines. Pipeline work will involve the installation of an 80 mile x 30 inch pipeline from the first trunk-line and the installation of three infield 14 inch CRA pipelines. The jacket foundation will be drilled and gouted and will require the installation of eight primary and eight secondary piles in holes up to 10 feet in diameter. Installation welding will be done by the inhouse automated welding systems. The construction of drilling work decks, caissons and other items will be fabricated at Batam Island, Indonesia. Click for more details...

PLUTO LNG PLANT PROJECT - PRE-INSULATED PIPEWORK
A project in the WA Within City Of Karratha. Pre-Insulated Pipework Click for more details...

KARRATHA GAS PLANT LIQUEFIED NATURAL GAS PRODUCTION CAPACITY PROJECT
Private ownership Oil & Gas (Onshore processing facilities) project In The City Of Karratha Council Area for New development. Work will comprise: alterations to the LNG storage and loading system; modifying the Fin Fans; installing a Boil-Off Gas (BOG) Liquefaction Unit; installing an Inlet Air Chilling (IAC) Package; installing four Gas Engines; installing a 6th Stabiliser Unit. Click for more details...

CAMDEN GAS PROJECT - SPRING FARM/MENANGLE PARK - RESOURCE
Resource - Coal Base Methane New project In The Camden Council Area. Construction and operation of up 4 surface well locations at Spring Farm and up to 12 surface well locations at Menangle Park (to contain a variety of horizontal, directional and surface-in-seam wells); construction and use of access roads, a gas gathering system and water transport lines; connection of the wells to the Rosalind Park Gas Plant; and production of methane gas. Click for more details...

NORTH WEST SHELF GAS PROJECT - PHASE VI EXPANSION
Oil & Gas (Onshore processing facilities) project at Burrup Peninsula North of, Dampier, WA 6713 of Processing Trains 6 & & type of New development. Expansion of the existing KGP facility through the addition of two processing trains (Trains 6 & 7, both with a LNG capacity of 5.9Mtpa), a LNG storage tank (Tank 6), flare facilities, a slug catcher, power generating systems, instrument and service air, water and drainage systsms, onshore gas and process effluent pipeline, safety, control and communication equipment, utitility liquid and gaseous ful systems, chemical storage and distribution systems. Potential constructino of a new loading jetty, berthing pocket and dreding of an additional turning basin, potential further development of access roads. It is therefore anticipated that relatively minor site preparation work will be required. This preparation work may include: geotechnical investigations, contaminated land investigations, vegetation clearance, cut and fill activited to level the site, nearshore dredging and blasting, earthworks to prepare the site for construction, temporary drainage and runoff collection facilities (bunding). Click for more details...

BONAPARTE GAS PIPELINE PROJECT - TRENCHING
Oil & Gas (Pipelines & associated contracts) project at From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846 of Trenching type of New development. For the provision of trenching services for a 275 km pipeline. Click for more details...

BRAEMAR 2 GAS PIPELINE PROJECT
Gas Pipeline project at Via, Condamine, QLD 4416 In The Council Area Of Western Downs Regional of Private. For the construction of a high pressure gas pipeline and associated infrastructure. The linepack pipeline will be a 100km long 16 inch Class 900 gas pipeline. Click for more details...

PORT BONYTHON FUEL STORAGE & DISTRIBUTION FACILITY STAGE 2
Currently at the Construction stage In Whyalla is a project estimated to be $ 110000000. This project For the construction and operation of a fuel storage and distribution facility at Port Bonython in South Australia's Upper Spencer Gulf Region. To include construction of fuel unloading facilities at Port Bonython Jetty. Construction of 5.3 km long fuel pipeline from jetty head to land owned by Port Bonython Fuels. Construction of tanks with a diesel storage capacity in excess of 100 million litres. Construction of truck loadout & associated facilities. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE LNG PLANT - TURBINE FLOW METERS
Turbine Flow Meters project at Vicinity of, Onslow, WA 6710 in the Oil & Gas (Onshore processing facilities). For the provision of turbine flow meters. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - INSTALLATION WINCH
Installation Winch project at Approx 475km NNE, Broome, WA 6725 In The Council Area Of Broome of Private. For the provision of an installation winch. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - ICSS EQUIPMENT
Shell Prelude Gas Field Project - Turret & Mooring - Icss Equipment is currently at the Construction stage, valued at about $ 2500000 it is For the provision of ICSS equipment. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - FIRE & GAS FIELD EQUIPMENTS
Fire/Gas Field Equipments New project In The Broome Council Area. For the provision of fire & gas field equipments. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - DUPLEX BARRED TEES
Oil & Gas (Sub-sea equipments, floating production facilities) project at Approx 475km NNE, Broome, WA 6725 of Duplex Barred Tees type of New development. For the provision of duplex barred tees. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - CHECK VALVES
Oil & Gas (Sub-sea equipments, floating production facilities) project In The Broome Council Area of Private ownership. For the provision of check valves. Click for more details...

WESTERN COOPER BASIN JOINT VENTURE OIL FLOWLINE PROJECT
Northwest of MOOMBA via, Innamincka, SA 5731 Has Western Cooper Basin Joint Venture Oil Flowline Project currently at Construction stage. A project to link the Growler gas field to Moomba by construction of 2 flowlines. The Growler oil field (PRL 15, PEL 104) to link to the Lycium oil field (PEL 92) by a 70km long, 6 inch diameter liquids flowline with an initial capacity of 8000 barrels of oil a day (bbl/d). A 74km long, 8 inch diameter trunkline with an initial capacity of 15,000 bbl/d then to be constructed via PELs 106B & 107 from Lycium east to Moomba. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE - LEVEL GAUGES & TRANSMITTERS
Private ownership Oil & Gas (Onshore processing facilities) project In The Ashburton Council Area for New development. For the provision of level gauges (magnetic float) and transmitters. Click for more details...

GREATER GORGON GAS PROJECT - DOMGAS PIPELINE INSTALLATION - PROJECT SUPPORT SERVICES - SECURITY
Oil & Gas (Pipelines & associated contracts) project at On & Off, Barrow Island, WA 6712 of Security type of New development. For the provision of project support services - security. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE LNG PLANT - LABORATORY SERVICES FOR SOIL & WATER TESTING
Oil & Gas (Onshore processing facilities) project for New development. For the provision of laboratory services for soil & water testing. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE - OSBL CONCRETE & CIVIL WORKS
Wheatstone Development Project - Onshore - Osbl Concrete & Civil Works is currently at the Construction stage, valued at about $ 5000000 it is For the provision of OSBL concrete and civil works. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - FLNG - MIXED REFRIGERANT & PREMIXED REFRIGERANT COMPRESSORS
Oil & Gas (Sub-sea equipments, floating production facilities) project at 475km NNE, Broome, WA 6725 of Mixed Refrigerant/Premixed Refrigerant Compressors type of New development. For the provision of mixed refrigerant & premixed refrigerant compressors. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - BULK STEEL PLATES
Currently at the Construction stage In Broome is a project estimated to be $ 1500000. This project For the provision of bulk steel plates. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - HYDRAULIC POWER SYSTEMS
Currently at the Construction stage In Broome is a project estimated to be $ 1000000. This project For the provision of hydraulic power systems. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - TELEPHONE HOODS
Shell Prelude Gas Field Project - Turret & Mooring - Telephone Hoods is currently at the Construction stage, valued at about $ 50000 it is For the provision of telephone hoods. Click for more details...

WA-26-L & WA-191-P JOINT VENTURE FLETCHER-FINUCANE OIL DEVELOPMENT - SURF WELL CONNECTION CONTRACT
Subsea/Umbilicals/Risers/Flowlines project at North West Shelf 150km north of DAMPIER, ., WA 6999 In The Council Area Of Offshore of Private. A contract including 55km of flexible flowlines & more than 60km of umbilicals. Associated structures to connect wells to the existing Exeter-Mutineer facilities. Pre-commissioning activities & associated services. Click for more details...

GOLDFIELDS GAS TRANSMISSION PIPELINE EXPANSION
Oil & Gas (Pipelines & associated contracts) project In The East Pilbara Council Area of Private ownership. Increase in the pipeline's capacity by an additional 24 TJ/d. Installation of additional compression at Turee Creek & at the inlet to the Newman lateral. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - ANCHOR BOLT ASSEMBLY
Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - Anchor Bolt Assembly is currently at the Construction stage, valued at about $ 200000 it is For the fabrication & provision of Anchor Bolt Assembly for 10 miscellaneous tanks. Click for more details...

MORANBAH GAS FIELD DEVELOPMENT
Oil & Gas (Pipelines & associated contracts) New project at Between COPPABELLA &, Moranbah, QLD 4744. This type is Operating Gas Field - Expansion with Private ownership. A project to develop the existing Moranbah gas field which comprises over 500 production wells & mostly buried gas/water flowlines with compressors leading to water facilities (15 dams, a water treatment facility under construction) & the Moranbah Gas Processing Facility (PL191). Further development to include drilling of 5 exploration wells & 6 appraisal wells with associated water handling systems including flowlines & 5 small (10ML) aggregation dams to store well head water. Drilling also of over 100 fenced, steel & concrete cased production wells each comprising a wellhead, electric drive rotating screw pump, wellhead gas/water separator & control valve as well as monitoring, metering & communications equipment. Typically the wells will be chevron style with surface-to-in-seam horizontal/lateral wells requiring up to 3 pads each but some will be multi-branch lateral wells linked from 2 separate pads. Gathering lines to be buried 53-500mm diameter high density polyethylene (HDPE) pipe. Associated infrastructure to include access tracks, overhead powerlines (for wellhead & compressor facilities), borrow pits, quarries & storage areas. Construction also of up to 4 large (400-600ML) dams for treated water, up to 3 brine storages & groundwater monitoring bores. Any accommodation camps to be developed over the project to include canteen facilities, communications, vehicle maintenance & parking areas, fuel handling & storage areas sewerage treatment. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - LNG STORAGE & CONDENSATE TANKS - CONCRETE EQUIPMENT
Currently at the Construction stage In Ashburton is a project estimated to be $ 500000. This project For the provision of concrete equipment. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - CRYOGENIC MANUAL VALVES
Oil & Gas (Onshore processing facilities) project In The Ashburton Council Area of Cryogenic Manual Valves type. For the provision of cryogenic manual valves. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - PROCESSING FACILITIES
Oil & Gas (Onshore processing facilities) project for New development. Construction of the balance of 12 field compressor stations (FCS) & 3 central processing plants (CPP). Each FCS will need up to 7ha & will include a flare, up to 8 screw compressors, a water management system including a pond as well as a substation/switchyard if connected to the grid instead of being powered by decentralised gas fired turbines. Associated infrastructure to include access tracks, warehouses, construction camps, operations camps, offices & telecommunication services. Each CPP to need up to 19ha & will include a flare, a tri-ethylene glycol (TEG) unit per compressor, plant gas inlet & export systems, drainage, gas or grid power supply, storage for air, nitrogen, water, chemical & lube oil, office & workshop buildings, switch gear & instrument rooms & access roads. Water separated at the well heads will be gathered separately into ponds/tanks prior to treatment & reuse. Click for more details...

APLNG LNG PLANT - FACILITIES MAINTENANCE
Oil & Gas (Onshore processing facilities) project In The Gladstone Regional Council Area of Facilities Maintenance - Liquefied Natural Gas Plant type. For the provision of facilties maintenance services. Click for more details...

APLNG LNG PLANT - GARDENING & GROUNDS MAINTENANCE
A project in the QLD Within Gladstone Regional. For the provision of gardening & grounds maintenance services. Click for more details...

APLNG LNG PLANT - IT SOFTWARE
Oil & Gas (Onshore processing facilities) project In The Gladstone Regional Council Area of It Software - Staff/Change type. For the provision of information technology software including for management of change & staff & shift rostering. Click for more details...

APLNG LNG PLANT - SECURITY SERVICES
Aplng Lng Plant - Security Services is currently at the Tenders & Building stage, valued at about $ 2000000 it is For the provision of security services. Click for more details...

QCLNG OPERATIONS - HV & LV SWITCHING MAINTENANCE
Maintenance - High & Low Voltage Switch Gear & Switchboards project at At, Curtis Island, QLD 4680 in the Oil & Gas (Onshore processing facilities). For the provision of maintenance services for high & low voltage switch gear & switchboards. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE FACILITIES - MECHANICAL WORKS (MEC-1) - PRESSURE TESTING & FLUSHING SERVICES
A project in the NT Within Darwin City. For the provision of pressure testing & flushing services. Click for more details...

WA-28-L GREATER ENFIELD OIL & GAS - DRILLING & COMPLETIONS - CEMENT CEMENTING CHEMICALS & SERVICES
Oil & Gas (Sub-sea equipments, floating production facilities) project In The Exmouth Council Area of Private ownership. For the provision of cement, cementing chemicals & services. Click for more details...

WA-28-L GREATER ENFIELD OIL & GAS - DRILLING & COMPLETIONS - PROVISION OF CONDUCTORS & ASSOCIATED SERVICES
Conductors/Associated Services - Provision project at 49km off the coast of, Exmouth, WA 6707 In The Council Area Of Exmouth of Private. For the provision of conductors & associated services. Click for more details...

NORTHERN GAS PIPELINE ACCOMMODATION
Northern Gas Pipeline Accommodation is currently at the Construction stage, valued at about $ 1000000 it is Provision of temporary workers accommodation for the construction of the Northern Gas Pipeline. Click for more details...

WA-28-L GREATER ENFIELD OIL & GAS - SUBSEA -PRODUCTION HYDRAULIC POWER UNIT
Wa-28-L Greater Enfield Oil & Gas - Subsea -Production Hydraulic Power Unit is currently at the Construction stage, valued at about $ 10000000 it is For the provision of a one off Production Hydraulic Power Unit for Greater Enfield Project. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect