State

Categories

Sub Categories

Click Here to Find Current Projects

List of Oil & Gas Projects


STANWELL MAGNESIUM PROJECT
A project in the QLD Within Rockhampton Regional. A 22.2 km long pipeline to supply up to 5.4 petajoules of coal seam gas. Click for more details...

MORANBAH TO TOWNSVILLE GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project In The Townsville City Council Area of Gas Pipeline/Compressor/Gas Processing Facility - Construction type. Pipeline from Moranbah to the Townsville Power Station at Yabulu. The pipeline, which will be 250mm in diameter, will be built, owned and operated by Enertrade. The pipeline will initially be configured for 20PJ per annum but can be expanded through further gas compression to approximately 50PJ per annum. Initially the Townsville Power Station will consume between 11PJ to 14PJ per annum. Click for more details...

SANTOS CBU - SOUTH WEST QUEENSLAND/NORTHERN SOUTH AUSTRALIAN GAS FIELDS
Epc Contract New project In The Not Yet Determined Council Area. The contract is for the provision of integrated engineering, procurement and construction services for Santos' Central Business Unit (CBU), which operates the oil and gas fields in northern South Australia and South West Queensland. The contract is a consolidation of services previously provided by a range of providers into a single contract. A potential of $20-$40 million per annum for and initial three years, with possible extensions up to eight years. Click for more details...

CAMDEN GAS PEL2/PPL1/PPL2- BULLI/AMERICAN/BALGOWNIE/WONGAWILLI/TONGARRA/WOONONA
Resource - Gas - Onshore project at via, Kulnura, NSW 2250 in the Oil & Gas (Pipelines & associated contracts). PPL-2 is a 21 year licence. 40 wells within stage 2 are planned by mid 2003 approx. Nine wells (Glenlee) are to be drilled before the end of December 2002. The remaining 31 wells to be drilled first half 2003. Stage 2 in total will comprise up to 100 vertical wells, a second treatment plant, all gas gathering lines and a steel gas sales line connecting Stage 2 to the main gas transmission lines. Click for more details...

LNG TRAIN 4 EXPANSION - TRUNKLINE SYSTEM EXPANSION (TSEP)
Rock Dumping project at Burrup Peninsula, Dampier, WA 6713 in the Oil & Gas (Onshore processing facilities). Involves the placement of 450,000 cubic metres approx of locally quarried rock on the trunkline to stabilise it on the seabed. The rock will be placed over the trunkline for the first 30 km from shore, as well as around the concrete gravity anchors in the deepwater section. Australian-based crews will be used on board the specialist vessels, SSDV Jan Steen and FFPV Rocky Giant as well as onshore to load rock on board the vessels. Click for more details...

WEST KIMBERLEY RESOURCE DEVELOPMENT STUDY
Private ownership Oil & Gas (Onshore processing facilities) project In The Various Council Area for New development. Qualified consultants to provide services to undertake a "West Australian Resource Development Study" - a strategic infrastructure planning study identifying the long term requirements for multi-use industrial infrastructure, social infrastructure and associated services related to mineral and petroleum development in the West Kimberley. Click for more details...

MOOMBA GAS OPERATIONS
Oil & Gas (Onshore processing facilities) project at Via, Innamincka, SA 5731 for New. The Moomba Gas Facility (Liquids Recovery Section) was damaged in a gas leak and fire on 1 January 2004. Initial investigation has pointed to a failure of a heat exchanger inlet nozzle as the source of the gas release. Findings from an independent metallurgical laboratory study have confirmed that the failure of the heat exchanger inlet nozzle (which led to the fire) was due to Liquid Metal Embrittlement of the train B aluminium cold box by elemental mercury. Further investigations are in progress to determine if any other factors could have contributed. Re-instatement plans included procurement of new cold boxes and associated facilities. Click for more details...

WA-286P - CLIFF HEAD - OFFSHORE PIPELINES
Private ownership Oil & Gas (Pipelines & associated contracts) project In The City Of Greater Geraldton Council Area for New development. A pipeline with a nominal internal diameter of 300 mm to carry produced hydrocarbons and water to shore for processing and a return pipeline with a nominal internal diameter of 300mm to carry produced water back to the platform for reinjection. Two directionally drilled pipeline shore crossings under beach and foredune. An electrical umbilical line and small umbilical lines to supply corrosion and emulsion inhibitors to the production wells and hydraulic fluid (water) by which to remotely operate the platform equipment. Click for more details...

CAMDEN GAS - PEL2/PPL1/PPL2 - STAGE 2
Currently at the Construction stage In Campbelltown is a project estimated to be $ 45000000. This project The planned treatment plant in stage 2 has been designed to initially process 40 million cubic feet of gas per day. This new plant will be able to handle several times the volume of gas delivered from the existing Ray Beddoe Treatment Plant. It will be tied into the main north-south gas transmission lines that feed the broader Sydney residential and industrial market. Click for more details...

DONGARA GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project at Mondara to, Dongara, WA 6525 for New. A pipeline to transport natural gas from the Dampier to Bunbury Natural Gas Pipeline in the vicinity of the Mondara metering Station to Cockburn Cement's Quicklime Plant (Dongara Lime Sand Operations). The 114.3 mm pipeline will be approx 18 km long and will be constructed within existing easements, freehold lands, mining tenements, dedicated road reserves and a railway reserve. Disturbance of the land during construction will involve digging a trench, laying the pipeline and backfilling. The pipeline will be buried to a minimum cover of 750 mm and the area will be rehabilitated. Click for more details...

KIPPER UNIT JOINT VENTURE GAS PROJECT
Resource - Gas - Offshore New project In The Gippsland Basin Council Area. The Kipper Gas Field is estimated to contain 620billion cubic feet (Bcf) of recoverable gas & 30million barrels (MMbl) of condensate/liquefied petroleum gas (LPG). Initial development includes 2 subsea gas wells along with 4 subsea coolers. Recovered gas to be piped through existing infrastructure via the West Tuna Platform to the onshore Esso & BHP Billiton processing facilities at Longford. Click for more details...

HARRIET OIL & GAS OPERATIONS - AGINCOURT
Oil & Gas (Pipelines & associated contracts) project In The Carnarvon Basin Council Area of Private ownership. The joint venturers propose to develop the Agincourt oil field via an unmanned offshore monopod, comprising one horizontal well, which will be tied back to the existing processing facilities on Varanus Island. The monopod will accommodate corrosion and scale inhibition equipment, and will allow wellbore access via wireline techniques. A 150mm, 6.5km production pipeline will be constructed to transport oil, gas and water to Varanus Island for separation and processing using the existing Tanami facilities. Click for more details...

METHANEX AUSTRALIA PROJECT
Oil & Gas (Onshore processing facilities) New project at King Bay-Hearson's Cove Industrial Precinct, Burrup Peninsula, Dampier, WA 6713. This type is Methanol Plant with Private ownership. A 1.3 million tonne per year methanol project, as the first stage of a planned Asia Pacific hub. This was a reduction in capacity of about 35% compared to the original project plan of 2 million tonnes per annum. Click for more details...

VIC P-44 - CASINO - PIPELINE/S
Oil & Gas (Pipelines & associated contracts) project In The Cardinia Council Area of Private ownership. Installation of a pipeline from the field to underneath the coastline near Port Campbell, continuing to TXU's Iona gas processing plant. Click for more details...

KARRATHA GAS PLANT LIQUEFIED NATURAL GAS PRODUCTION CAPACITY PROJECT
Private ownership Oil & Gas (Onshore processing facilities) project In The City Of Karratha Council Area for New development. Work will comprise: alterations to the LNG storage and loading system; modifying the Fin Fans; installing a Boil-Off Gas (BOG) Liquefaction Unit; installing an Inlet Air Chilling (IAC) Package; installing four Gas Engines; installing a 6th Stabiliser Unit. Click for more details...

CAMDEN GAS PROJECT - SPRING FARM/MENANGLE PARK - RESOURCE
Resource - Coal Base Methane New project In The Camden Council Area. Construction and operation of up 4 surface well locations at Spring Farm and up to 12 surface well locations at Menangle Park (to contain a variety of horizontal, directional and surface-in-seam wells); construction and use of access roads, a gas gathering system and water transport lines; connection of the wells to the Rosalind Park Gas Plant; and production of methane gas. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - BACKFILLING & COMPACTION CONTRACT FOR PIPELINE
Oil & Gas (Pipelines & associated contracts) project at From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846 for New. For a 275 km pipeline capable of delivering 30 petajoules per year. Click for more details...

SHELL PRELUDE GAS FIELD - END FLASH & BOIL OFF GAS COMPRESSORS FOR FLOATING LNG FACILITY
Oil & Gas (Sub-sea equipments, floating production facilities) project In The Broome Council Area of Private ownership. For the provision of end flash/boil off gas compressors. Click for more details...

GREATER GORGON GAS PROJECT - DOWNSTREAM PRE ASSEMBLY - PREASSEMBLED PIPERACKS P4
Oil & Gas (Onshore processing facilities) project at Via, Barrow Island, WA 6712 for New. For the supply of pre-assembled piperacks. Click for more details...

SOUTHERN CROSS/IMPEL LNG PROJECT
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Gladstone Regional Council Area for New development. Proposed staged construction of a liquefied natural gas (LNG) plant with up to 3 trains ranging from 0.07-1.3million tonnes per annum (Mtpa) capacity. Associated facilities expected to include a construction jetty; an LNG dock & jetty to handle vessels up to 200,000cu m; cryogenic pipelines; LNG storage tanks up to 210,000cu m capacity & 400km approx pipeline with spur lines. The project is expected to generate 300-350 jobs during construction & 80-90 when fully operational. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT
Oil & Gas (Pipelines & associated contracts) project for New development. QCLNG is a project to develop coal seam gas (CSG) fields in the Surat & Bowen Basins, pipe gas to a processing plant to be built on Curtis Island & then export product liquefied natural gas (LNG) by ship. Phase 1 to be constructed to include 2 LNG processing trains with a combined capacity of up to 8.5million tonnes per annum (Mtpa) along with associated gas wells, field facilities & pipelines. Some 820 operational personnel & over 5000 construction personnel expected. Workers accommodation to be required in the Gladstone region (250 approx dwellings) & Western Downs area (280 approx dwellings). Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - ANODES
Oil & Gas (Sub-sea equipments, floating production facilities) project In The Broome Council Area of Anodes type. For the provision of anodes. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - E & I JUNCTION BOXES
Oil & Gas (Sub-sea equipments, floating production facilities) project at Approx 475km NNE, Broome, WA 6725 of E & I Junction Boxes type of New development. For the provision of E & I junction boxes. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - CHAINSTOPPERS ASSEMBLY
Currently at the Construction stage In Broome is a project estimated to be $ 250000. This project For the provision of the chainstoppers assembly. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - LIMIT SWITCHES & PUSH BUTTON
Oil & Gas (Sub-sea equipments, floating production facilities) project In The Broome Council Area of Limit Switches/Push Button type. For the provision of limit switches & push button. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - GLOBE VALVES
Currently at the Construction stage In Broome is a project estimated to be $ 500000. This project For the provision of globe valves. Click for more details...

GREATER GORGON GAS PROJECT - DOMGAS PIPELINE INSTALLATION - PROJECT SUPPORT SERVICES - WASTE SERVICES & DISPOSAL
Greater Gorgon Gas Project - Domgas Pipeline Installation - Project Support Services - Waste Services & Disposal is currently at the Construction stage, valued at about $ 2500000 it is For the provision of project support services - waste services and disposal. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - COMPACT FLANGES
Oil & Gas (Sub-sea equipments, floating production facilities) project In The Broome Council Area of Compact Flanges type. For the provision of compact flanges. Click for more details...


CHEVRON AUSTRALIA - OPERATIONS - MECHANICAL INSPECTION SERVICES
Mechanical Inspection Services New project In The Ashburton Council Area. For the provision of mechanical inspection services. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - CABLE GLANDS - (MR-16153 & MR_17283)
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - Cable Glands - (Mr-16153 & Mr_17283) currently at Construction stage. For the provision of CMP or equivalent cable glands (complete with heavy duty nickel plated brass lock nuts & fibre weather washer). Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - COMPRESSION STATIONS & CENTRAL PROCESSING PLANTS
Compression Stations/Central Processing Plants New project In The Western Downs Regional Council Area. Construction & fabrication of 5 x compression stations & a central processing plant at the Woleebee Creek block southwest of Wandoan & 3 field compression stations & a central processing plant at the Bellevue block east of Miles. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - CELLULAR GLASS
Currently at the Construction stage In Ashburton is a project estimated to be $ 500000. This project For the provision of cellular glass. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - SUBSEA INSTALLATION - UMBILICAL & FLOWLINE PRECOMMISSIONING
A project in the WA Within Ashburton. For the provision of umbilical & flowline precommissioning. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - BOOMLIFTS & TELEHANDLERS
Oil & Gas (Onshore processing facilities) project for New development. For the supply of materials handling equipment (Boomlifts & Telehandlers). Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - COMPRESSORS
New project of Oil & Gas (Onshore processing facilities) project at Vicinity of, Onslow, WA 6710. For the supply of compressors. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - FUEL & WATER TRUCKS
Vicinity of, Onslow, WA 6710 Has Wheatstone Development Project - Storage & Field Erected Condensate Tanks - Fuel & Water Trucks currently at Construction stage. For the supply of fuel & water trucks. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - ALIMAK LIFTS
Alimak Lifts project at Vicinity of, Onslow, WA 6710 In The Council Area Of Ashburton of Private. For the supply of Alimak lifts. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - JOHN HOLLAND PERMANENT BUILDINGS - CRANE HIRE
Vicinity of, Onslow, WA 6710 Has Wheatstone Development Project - John Holland Permanent Buildings - Crane Hire currently at Construction stage. For the supply & installation of crane hire. Click for more details...

PL65 GILMORE GAS FIELD LNG PROJECT
A project in the QLD Within Quilpie Shire. Construction of a 56,000tpa liquefied natural gas (LNG) plant adjacent the existing Gilmore gas plant. Click for more details...

APLNG LNG PLANT - COATING CONSULTANCY
Oil & Gas (Onshore processing facilities) project for New development. For the provision of consultancy services on coatings. Click for more details...

APLNG LNG PLANT - FACILITIES MAINTENANCE
Oil & Gas (Onshore processing facilities) project In The Gladstone Regional Council Area of Facilities Maintenance - Liquefied Natural Gas Plant type. For the provision of facilties maintenance services. Click for more details...

APLNG LNG PLANT - GARDENING & GROUNDS MAINTENANCE
A project in the QLD Within Gladstone Regional. For the provision of gardening & grounds maintenance services. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE LNG PLANT - HYDROLYSING SERVICES
Oil & Gas (Onshore processing facilities) project at Vicinity of, Onslow, WA 6710 for New. For the provision of Hydrolysing/Aquamilling Services. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - HELIUM LEAK TESTING
Helium Leak Testing project at On & off, Barrow Island, WA 6712 in the Oil & Gas (Sub-sea equipments, floating production facilities). For the provision of helium leak testing. Click for more details...

NORTH WEST SHELF SUBSEA TIEBACK PROGRAM (WA-1-1 PERSEPHONE LNG) - SUBSEA XT STRUCTURAL FABRICATION WORK
Oil & Gas (Sub-sea equipments, floating production facilities) project for New development. For the provision of Subsea XT Structural Fabrication Work. Click for more details...

BROWSE BASIN FLNG PROJECT - SAMSUNG - HULL SUBSTRUCTURE - FITTING ? TITANIUM
Currently at the Tenders & Building stage In Broome is a project estimated to be $ 500000. This project For the provision of Titanium fittings. To include: elbow, reducing tee, straight tee, concentric reducer, & sleeve. Various sizes required. Click for more details...

BROWSE BASIN FLNG PROJECT - SAMSUNG - HULL SUBSTRUCTURE - FLANGE - CU-NI
New project of Oil & Gas (Sub-sea equipments, floating production facilities) project at 300km North of, Broome, WA 6725. For the provision of Flange - Cu-Ni. Various sizes required. Click for more details...

WA-28-L GREATER ENFIELD OIL & GAS - DRILLING & COMPLETIONS - SUPPLY OF OCTG
Oil & Gas (Sub-sea equipments, floating production facilities) project for New development. For the supply of OCTG. Click for more details...

WA-28-L GREATER ENFIELD OIL & GAS - DRILLING & COMPLETIONS - SURFACE LOGGING SERVICES
Oil & Gas (Sub-sea equipments, floating production facilities) project at 49km off the coast of, Exmouth, WA 6707 for New. For the provision of surface logging services. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect