State

Categories

Sub Categories

Click Here to Find Current Projects

List of Oil & Gas Projects in QLD


STANWELL MAGNESIUM PROJECT
A project in the QLD Within Rockhampton Regional. A 22.2 km long pipeline to supply up to 5.4 petajoules of coal seam gas. Click for more details...

ATP-592 - DURHAM RANCH PROJECT
Oil & Gas (Onshore processing facilities) project for New development. Likely to include some steelwork/fabrication. Click for more details...

MORANBAH COAL SEAM METHANE GAS PROJECT
A project in the QLD Within Isaac Regional. Includes some in-field compression, reticulation of water and power. Click for more details...

MORANBAH TO TOWNSVILLE GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project In The Townsville City Council Area of Gas Pipeline/Compressor/Gas Processing Facility - Construction type. Pipeline from Moranbah to the Townsville Power Station at Yabulu. The pipeline, which will be 250mm in diameter, will be built, owned and operated by Enertrade. The pipeline will initially be configured for 20PJ per annum but can be expanded through further gas compression to approximately 50PJ per annum. Initially the Townsville Power Station will consume between 11PJ to 14PJ per annum. Click for more details...

ATP-632 - BERWYNDALE SOUTH - WINDIBRI PIPELINE
Oil & Gas (Pipelines & associated contracts) project at Gasfield, Surat Basin to existing Roma/Brisbane pipeline via, Miles, QLD 4415 for New. A 14 km lateral from field to existing Roma/Brisbane pipeline. The route for the pipeline was cleared in August 2005. Click for more details...

GATTON TO GYMPIE GAS PIPELINE
Gate Station project at via, Gatton, QLD 4343 In The Council Area Of Lockyer Valley Regional of Private. At the existing AGL Roma to Brisbane gas pipeline near Gatton. Click for more details...

GATTON TO GYMPIE GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project at Gatton to Gympie, ., QLD 4999 of Gas Pipeline type of New development. Class 600 high pressure gas transmission pipeline. Click for more details...

PEAT EXPORT COMPRESSOR STATION
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 500000. This project To supply and install the interconnecting pipework for the compressor station on the Peat Lateral Gas Pipeline that is currently under construction for connection to the Roma to Brisbane Gas Pipeline. Click for more details...

ATP - 632 - BERWYNDALE SOUTH - GAS COMPRESSION/PROCESSING FACILITIES
Surat Basin 17 km south west of, Miles, QLD 4415 Has Atp - 632 - Berwyndale South - Gas Compression/Processing Facilities currently at Planning stage. The processing facility will comprise dewatering, dehydration and compression equipment. Click for more details...

ATP-620 - ARGYLE/LAUREN - GAS PIPELINE
Atp-620 - Argyle/Lauren - Gas Pipeline is currently at the Planning stage, valued at about $ 10000000 it is An 18.5 km high pressure gas pipeline. Click for more details...

ATP 676/PLA194 - KOGAN NORTH - CENTRAL GAS PROCESSING FACILITY
Oil & Gas (Pipelines & associated contracts) project at Near, Chinchilla, QLD 4413 for New. Central gas processing facility will comprise dehydration, compressing and metering. An evaporation dam will be constructed. Pipeline for the project is 3 km long. Click for more details...

ATP 676/PLA194 - KOGAN NORTH - COMPRESSORS SUPPLY
Atp 676/Pla194 - Kogan North - Compressors Supply is currently at the Construction stage, valued at about $ 3000000 it is Three compressor units. Click for more details...

ARGYLE/ BERWYNDALE - GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project In The Maranoa Regional Council Area of Private ownership. It is proposed to construct and operate a 15 km pipeline linking the Argyle field and the Berwyndale South field. Click for more details...

PNG GAS PROJECT - PIPELINE FEED CONTRACT - RESOURCE
Png Gas Project - Pipeline Feed Contract - Resource is currently at the Planning stage, valued at about $ 25000000 it is Tender is for the Australian component of the project. FEED program will involve engineering design, route selection, regulatory and financial viability assessments, environmental and native title processes. The pipeline width will be 22 inches and approx 2020km in length. Pipeline from PNG/Australia maritime border through Cape York to Townsville off-take is approx 1220 km. From Townsville off-take to Gladstone is 700 km. A further 100 km from the Townsville off-take to Townsville. Click for more details...

TIPTON WEST GAS PROJECT - GAS COMPRESSING FACILITY/PIPELINES
Tipton West Gas Project - Gas Compressing Facility/Pipelines is currently at the Construction stage, valued at about $ 31000000 it is To construct a Gas Compressing facility and surface gathering network and associated pipelines. Six Compressors have been ordered from Universal Compression in the United States of America. Click for more details...

QUEENSLAND ALUMINA RED MUD DAM REDEVELOPMENT
Dam/Pipeline/Roadworks/Processing Plant project at ., Boyne Island, QLD 4680 in the Oil & Gas (Pipelines & associated contracts). Containment walls, processing plant, roads & pipes. Click for more details...

WALLUMBILLA GAS PIPELINE
New project of Oil & Gas (Pipelines & associated contracts) project at Surat basin to Wallumbilla via Warrego Highway, Wallumbilla, QLD 4428. To construct a 152 km high pressure gas pipeline from Undalla Nose acreage AT 676P Surat Basin to the Wallumbilla hub. Click for more details...

GLADSTONE LIQUEFIED NATURAL GAS (GLNG) PROJECT - PIPELINE CORRIDOR
Gas Pipeline project at From Roma to, Curtis Island, QLD 4680 In The Council Area Of Gladstone Regional of Private. Construction of a 42 inch diameter, 420km long underground gas transmission pipeline to connect gas fields in the Bowen & Surat Basins to a liquefied natural gas (LNG) processing plant at Curtis Island. To traverse north from Arcadia Valley & then turn northeast to cross the Expedition Range. Click for more details...

BRAEMAR 2 GAS PIPELINE PROJECT
Gas Pipeline project at Via, Condamine, QLD 4416 In The Council Area Of Western Downs Regional of Private. For the construction of a high pressure gas pipeline and associated infrastructure. The linepack pipeline will be a 100km long 16 inch Class 900 gas pipeline. Click for more details...

SOUTH WEST QUEENSLAND PIPELINE STAGE 3 EXPANSION
Oil & Gas (Pipelines & associated contracts) project In The Maranoa Regional Council Area of Gas Pipeline - Stage 3 type. As part of the QSN Link project (QSN3), construction of a 935km loop pipeline parallel to the existing South West Queensland Pipeline (SWQP) between Wallumbilla & Moomba. Construction also at the Wallumbilla hub of 2 additional compressor stations at existing scraper station sites & an upgrade to the existing Wallumbilla compressor station. The pipeline is anticipated to have a diameter of between 400-500mm approx. Construction crews will be housed in temporary construction camps that will be progressively moved ahead of construction activity. Each main camp will house up to 200 people & the smaller fly camps will house up to 150 people. Each camp will contain accommodation units & mess & recreation huts. Click for more details...

TALINGA DEVELOPMENT PROJECT
Oil & Gas (Onshore processing facilities) project In The Western Downs Regional Council Area of Resource - Coal Seam Gas type. The project involves transitioning the existing pilot trial of 12 wells to production of up to 90TJ/day of coal seam gas, which will contribute to the supply of gas to the Darling Downs Power Station. The development will involve installing coal seam gas wells at a spacing of between 750m and 1000m; associated gas and water gathering systems, a gas plant, a produced water treatment facility, evaporation ponds, offices, storage areas, workshops, camp and gravel pits. Based on current well production predictions, this equates to the installation of approximately 100 coal seam gas wells. This project will incorporate a water treatment facility to significantly reduce the evaporation pond surface area down to approximately 170ha. The water treatment facility will employ an integrated membrane system, including reverse osmosis, to achieve an 85% desalination recovery and create a freshwater resource. The freshwater will be discharged to the Condamine River catchment until higher level beneficial used, such as industrial, urban or agricultural use, can be implemented. Click for more details...

SURAT TO GLADSTONE LNG PIPELINE PROJECT - LINE PIPE SUPPLY
Currently at the Tenders & Building stage In Various is a project estimated to be $ 10000000. This project The 660mm diameter high pressure buried steel gas pipeline would be approximately 470km long. The pipeline would have a minimum technical design life of 40 years. Above ground facilities would be required at intervals along the pipeline, including: mainline valves; cathodic protection systems; and marker signs. The project will be from a proposed compressor facility adjacent to the Kogan North Central Gas Facility to the proposed LNG plant at Fisherman's Landing, Gladstone. Click for more details...

SOUTHERN CROSS/IMPEL LNG PROJECT
Private ownership Oil & Gas (Onshore processing facilities) project In The Gladstone Regional Council Area for New development. Proposed staged construction of a liquefied natural gas (LNG) plant with up to 3 trains ranging from 0.07-1.3million tonnes per annum (Mtpa) capacity. Associated facilities expected to include a construction jetty; an LNG dock & jetty to handle vessels up to 200,000cu m; cryogenic pipelines; LNG storage tanks up to 210,000cu m capacity & 400km approx pipeline with spur lines. The project is expected to generate 300-350 jobs during construction & 80-90 when fully operational. Click for more details...

SOUTHERN CROSS/IMPEL LNG PROJECT
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Gladstone Regional Council Area for New development. Proposed staged construction of a liquefied natural gas (LNG) plant with up to 3 trains ranging from 0.07-1.3million tonnes per annum (Mtpa) capacity. Associated facilities expected to include a construction jetty; an LNG dock & jetty to handle vessels up to 200,000cu m; cryogenic pipelines; LNG storage tanks up to 210,000cu m capacity & 400km approx pipeline with spur lines. The project is expected to generate 300-350 jobs during construction & 80-90 when fully operational. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project at From south of MILES to, Curtis Island, QLD 4680 for New. Part of a coal seam gas (CSG) to liquefied natural gas (LNG) project with Origin Energy responsible for developing CSG gas fields & transmission pipeline, ConocoPhillips responsible for developing a LNG processing plant & their joint venture company Australia Pacific LNG responsible for the export facilities. A 42 inch (1070mm) diameter, high pressure main pipeline to commence east of Wandoan at its junction with a 44km lateral pipeline from gas developments at Condabri & a 38km lateral from Woleebee gas developments south of Miles. To travel 362km underground with a marine crossing at The Narrows between Kangaroo Island & Port Curtis Island to finish at the LNG plant near Laird Point. Inlet stations to allow for insertion of cleaning & inspection equipment to be constructed at the start of the Condabri & Woleebee laterals & at their intersection a 0.5ha APLNG hub comprising the inlet station for the main pipeline, isolation valves & connections for future compression to also be constructed. Development of up to 5 x 15-20ha laydown areas to receive materials (Miles, Wandoan, Theodore, Biloela, Gladstone areas). 3 temporary accommodation camps each up to 15ha & operating for 3-7 months to be relocated along the pipeline route as required. Camps to include sleeping quarters for up to 1100 personnel, laundries, catering, medical centre, recreational facilities (eg gymnasium, cinema, reading room, sports grounds), diesel generators for power & package sewerage plants. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT
Oil & Gas (Onshore processing facilities) project for New development. QCLNG is a project to develop coal seam gas (CSG) fields in the Surat & Bowen Basins, pipe gas to a processing plant to be built on Curtis Island & then export product liquefied natural gas (LNG) by ship. Phase 1 to be constructed to include 2 LNG processing trains with a combined capacity of up to 8.5million tonnes per annum (Mtpa) along with associated gas wells, field facilities & pipelines. Some 820 operational personnel & over 5000 construction personnel expected. Workers accommodation to be required in the Gladstone region (250 approx dwellings) & Western Downs area (280 approx dwellings). Click for more details...

ROMA BRISBANE GAS PIPELINE UPGRADE - DALBY COMPRESSOR STATION
A project in the QLD Within Western Downs Regional. Part of a project to upgrade of the existing Roma Brisbane pipeline by 10% approx capacity & increased operating pressure. Installation at the Dalby Compressor Station of 2 additional 4570kW Centaur 50 solar gas turbine compressors along with inlet/exhaust systems, cooler units, fuel gas skids, pipework & valves. Associated works to include a diesel engine alternator for cold start up power, a bunded 6000l fuel store facility, oil store, control room, access road, car park & amenities. Click for more details...

ROMA BRISBANE GAS PIPELINE UPGRADE - PIPELINE DUPLICATION
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Brisbane City Council Area for New development. Part of a project to upgrade of the existing Roma Brisbane pipeline by 10% approx capacity & increased operating pressure. Duplication of a 6km section of the existing Roma Brisbane pipeline between Murarrie & Carina. Click for more details...

QGC SURAT BASIN CSG SERVICE CONTRACT
Coal Seam Gas Plant & Equipment - Service Contract project at Between WANDOAN &, Dalby, QLD 4405 in the Oil & Gas (Pipelines & associated contracts). A 5 year contract to service coal seam gas assets in southern & central Queensland. To include refurbishment of 191 well site processing units involving the decommissioning, replacement & recommissioning of vessels, pipe work, electrical & control instrumentation. Click for more details...

GLNG WALLUMBILLA GAS TREATMENT FACILITY (WGTF)
New project of Oil & Gas (Onshore processing facilities) project at Walumbilla South Rd Iona Bardlomey Rd (Lot 33 SP 212840) 12km south of, Wallumbilla, QLD 4428. Staged development adjacent the existing Santos compressor (WCS) & metering (WMS) stations of a gas treatment facility of 2 trains each with a capacity of 250TJ/day. Each train to consist of gas compression, natural gas liquid removal & cryogenic gas treatment units & a gas turbine power generator using non-methane gas liquids & distributing power through alternators. Ancillary infrastructure to include condensate storage, hot oil system, air compression system, nitrogen generation plant, fire water system, flare & vent system, oily water system along with potable & service water system. Plant control room & workforce amenities. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - TRAIN 2
Oil & Gas (Onshore processing facilities) project In The Gladstone Regional Council Area of Private ownership. Construction of a second 4.5 million tonne per annum (Mtpa) liquefied natural gas (LNG) processing train. Further Bowen & Surat Basin gas field development to provide 1000 wells for the first 2 trains. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - GAS FIELD DEVELOPMENT - GAS PROCESSING PLANTS
Private ownership Oil & Gas (Onshore processing facilities) project In The Various Council Area for New development. A contract for the construction of 7 gas processing plants at Condabri, Orana (east of Talinga), Reedy Creek, Combabula & Eurombah Creek. Associated integrated operations centres, warehouses, workshops & internal roadways. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - GAS FIELD DEVELOPMENT - FENCING
Currently at the Tenders & Building stage In Various is a project estimated to be $ 2000000. This project Contracts to repair & restore damaged fences, remove redundant fences & construct new fences & associated grids & gates on various rural properties. Supply also of fencing materials. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - COMPRESSION STATIONS & CENTRAL PROCESSING PLANTS
Compression Stations/Central Processing Plants New project In The Western Downs Regional Council Area. Construction & fabrication of 5 x compression stations & a central processing plant at the Woleebee Creek block southwest of Wandoan & 3 field compression stations & a central processing plant at the Bellevue block east of Miles. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - 6 + 1 UPSTREAM PIPING SUPPLY
A project in the QLD Within Western Downs Regional. Supply of all piping for the Ruby central processing plant including fabrication, welding, NDT, hydro testing, painting & delivery to site. Associated mechanical, structural & piping services. Click for more details...

WALLUMBILLA GAS HUB COMPRESSORS UPGRADE
Compressors project at via, Wallumbilla, QLD 4428 In The Council Area Of Maranoa Regional of Private. Upgrade at the Walumbilla gas hub which connects to APA's Roma-Brisbane & South West Queensland Pipelines. Installation of 3 new compressors & associated services. Click for more details...

APLNG LNG PLANT - CALIBRATION EQUIPMENT & MAINTENANCE
Oil & Gas (Onshore processing facilities) project for New development. For the provision of calibration equipment & maintenance. Click for more details...

APLNG LNG PLANT - FACILITIES MAINTENANCE
Oil & Gas (Onshore processing facilities) project In The Gladstone Regional Council Area of Facilities Maintenance - Liquefied Natural Gas Plant type. For the provision of facilties maintenance services. Click for more details...

APLNG LNG PLANT - FILTER SUPPLIES
Aplng Lng Plant - Filter Supplies is currently at the Tenders & Building stage, valued at about $ 2000000 it is For the provision of filters. Click for more details...

APLNG LNG PLANT - FREIGHT FORWARD & LOGISTICS
New project of Oil & Gas (Onshore processing facilities) project at At, Curtis Island, QLD 4680. For the provision of freight forwarding & logistic services. Click for more details...

APLNG LNG PLANT - GAS DETECTION EQUIPMENT & MAINTENANCE
Gas Detection Equipment - Supply & Maintain New project In The Gladstone Regional Council Area. For the provision of gas detection equipment & maintenance services. Click for more details...

APLNG LNG PLANT - GASES SUPPLY
Oil & Gas (Onshore processing facilities) project for New development. For the provision of gases. Click for more details...

APLNG LNG PLANT - LIFTING EQUIPMENT TESTING & INSPECTION SERVICES
Oil & Gas (Onshore processing facilities) project In The Gladstone Regional Council Area of Testing & Inspection - Lifting Equipment type. For the provision of testing & inspection services for lifting equipment. Click for more details...

APLNG LNG PLANT - SECURITY SERVICES
Aplng Lng Plant - Security Services is currently at the Tenders & Building stage, valued at about $ 2000000 it is For the provision of security services. Click for more details...

APLNG LNG PLANT - WASTE MANAGEMENT SERVICES
Oil & Gas (Onshore processing facilities) New project at At, Curtis Island, QLD 4680. This type is Waste Management Services with Private ownership. For the provision of waste management services. Click for more details...

QCLNG OPERATIONS - HARDWARE & INDUSTRIAL CONSUMABLES SUPPLIER
Oil & Gas (Onshore processing facilities) project at Suppy bases at CHINCHILLA & GLADSTONE, ., QLD 4999 of Hardware/Tools/Industrial Consumables type of New development. Ongoing contract for a single generalist supplier of workshop & hardware items. Click for more details...

QCLNG OPERATIONS - HV & LV SWITCHING MAINTENANCE
Maintenance - High & Low Voltage Switch Gear & Switchboards project at At, Curtis Island, QLD 4680 in the Oil & Gas (Onshore processing facilities). For the provision of maintenance services for high & low voltage switch gear & switchboards. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) - OPERATIONS & MAINTENANCE - WELL SITE MAINTENANCE & ASSOC SERVICES CONTRACT EXTENSION
Well Site Maintenance/Associated Services Contract - Extn project at Around, Curtis Island, QLD 4680 in the Oil & Gas (Onshore processing facilities). For the provision of scheduled & unscheduled maintenance & associated well site services for additional 2 years. Click for more details...

MIDDLEMOUNT COAL BINGEGANG PIPELINE RELOCATION
Pipeline - Relocation project at via, Middlemount, QLD 4746 in the Oil & Gas (Pipelines & associated contracts). The Middlemount Coal Mine is an open cut coal mine, located 270km north-west of Rockhampton. As part of ongoing operations, the existing Bingegang Pipeline will be relocated. To include replacement of existing pipe, break tank, pump station, outlets, crossings, drainage & associated access infrastructure. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect