List of Oil & Gas Projects in QLD


ATP-592 - DURHAM RANCH PROJECT
Oil & Gas (Onshore processing facilities) project for New development. Likely to include some steelwork/fabrication. Click for more details...

MORANBAH COAL SEAM METHANE GAS PROJECT
A project in the QLD Within Isaac Regional. Includes some in-field compression, reticulation of water and power. Click for more details...

MORANBAH TO TOWNSVILLE GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project at Moranbah coal seam methane gas field to, Townsville, QLD 4810 for New. The diameter and coating system remain under review but will be limited to the following options: Pipe Options - Pipe Option 1 Light Wall DN250 360KM SPECIFICATION X-70x 6.1MM, Heavy Wall 40km specification x-70x7.2mm; Option 2 DN300 Light Wall x-70X 7.1mm, Heavy Wall 40km X-70 x 8.6mm. Coating Options- Coating Option 1 Coating System trilaminate, Application Standard CAN/CSA-Z245.21-M92; Coating System Dual layer FBE, Application Standard AS 3862. Click for more details...

CHINCHILLA CSM GAS DEVELOPMENT - PLA 185/ATP-676
Oil & Gas (Onshore processing facilities) project In The Western Downs Regional Council Area of Development Agreement type. Arrow may supply 4 Peta Joules (PJ) per annum for 15 years to CS Energy, subject to the outcome of feasibility studies to be completed by December 2002. Click for more details...

CHINCHILLA CSM GAS DEVELOPMENT - PLA 185/ATP-676
Oil & Gas (Pipelines & associated contracts) project In The Western Downs Regional Council Area of Development Agreement type. Arrow may supply 4 Peta Joules (PJ) per annum for 15 years to CS Energy, subject to the outcome of feasibility studies to be completed by December 2002. Click for more details...

ATP-632 - BERWYNDALE SOUTH - WINDIBRI PIPELINE
Oil & Gas (Pipelines & associated contracts) project at Gasfield, Surat Basin to existing Roma/Brisbane pipeline via, Miles, QLD 4415 for New. A 14 km lateral from field to existing Roma/Brisbane pipeline. The route for the pipeline was cleared in August 2005. Click for more details...

GATTON TO GYMPIE GAS PIPELINE
Gate Station project at via, Gatton, QLD 4343 In The Council Area Of Lockyer Valley Regional of Private. At the existing AGL Roma to Brisbane gas pipeline near Gatton. Click for more details...

GATTON TO GYMPIE GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project at Gatton to Gympie, ., QLD 4999 of Gas Pipeline type of New development. Class 600 high pressure gas transmission pipeline. Click for more details...

PEAT EXPORT COMPRESSOR STATION
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 500000. This project To supply and install the interconnecting pipework for the compressor station on the Peat Lateral Gas Pipeline that is currently under construction for connection to the Roma to Brisbane Gas Pipeline. Click for more details...

ATP-620 - ARGYLE/LAUREN - GAS PIPELINE
Atp-620 - Argyle/Lauren - Gas Pipeline is currently at the Planning stage, valued at about $ 10000000 it is An 18.5 km high pressure gas pipeline. Click for more details...

ATP 676/PLA194 - KOGAN NORTH - COMPRESSORS SUPPLY
Atp 676/Pla194 - Kogan North - Compressors Supply is currently at the Construction stage, valued at about $ 3000000 it is Three compressor units. Click for more details...

PNG GAS PROJECT - PIPELINE FEED CONTRACT - RESOURCE
Png Gas Project - Pipeline Feed Contract - Resource is currently at the Planning stage, valued at about $ 25000000 it is Tender is for the Australian component of the project. FEED program will involve engineering design, route selection, regulatory and financial viability assessments, environmental and native title processes. The pipeline width will be 22 inches and approx 2020km in length. Pipeline from PNG/Australia maritime border through Cape York to Townsville off-take is approx 1220 km. From Townsville off-take to Gladstone is 700 km. A further 100 km from the Townsville off-take to Townsville. Click for more details...

TIPTON WEST GAS PROJECT - GAS COMPRESSING FACILITY/PIPELINES
Tipton West Gas Project - Gas Compressing Facility/Pipelines is currently at the Construction stage, valued at about $ 31000000 it is To construct a Gas Compressing facility and surface gathering network and associated pipelines. Six Compressors have been ordered from Universal Compression in the United States of America. Click for more details...

FAIRVIEW GAS FIELDS TO WALLUMBILLA PIPELINE - TELECOMMUNICATIONS INFRASTRUCTURE
Oil & Gas (Pipelines & associated contracts) project In The Maranoa Regional Council Area of Telecommunications Infrastructure Contract type. To supply a dark optical fibre infrastructure along the pipeline route. Click for more details...

WALLUMBILLA GAS PIPELINE
New project of Oil & Gas (Pipelines & associated contracts) project at Surat basin to Wallumbilla via Warrego Highway, Wallumbilla, QLD 4428. To construct a 152 km high pressure gas pipeline from Undalla Nose acreage AT 676P Surat Basin to the Wallumbilla hub. Click for more details...

XSTRATA GAS FIRED POWER STATION
Oil & Gas (Pipelines & associated contracts) New project at Cnr X41 Access Rd & Link Rd, Mount Isa, QLD 4825. This type is Gas Fired Power Station with Private ownership. A 30 MW gas fired modular power station with an associated pipeline from the Copper Smelter area. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - LNG PLANT
Currently at the Construction stage In Gladstone Regional is a project estimated to be $ 8000000000. This project QCLNG is a project to develop coal seam gas wells in the Surat & Bowen Basins, pipe gas to a processing plant to be built on Curtis Island & then export product LNG by ship. The LNG plant to have an ultimate capacity of up to 12 million tonnes per annum (Mtpa) from 3 LNG trains, each of 3 to 4 Mtpa production capacity. These involve feed gas metering & filtration to remove entrained pipeline debris; gas processing to remove carbon dioxide & other components contained in the gas; gas chilling & drying in a 3-bed molecular sieve system to remove the final traces of water;dry gas processing through activated carbon bed system for mercury removal & gas refrigeration for liquefaction to LNG . The refrigeration systems to be powered by gas turbines equipped with dry low NOx emission systems; heat removal (as part of the liquefaction process) using fin coolers. Onshore LNG storage in tanks including 2 LNG storage tanks up to 200,000cu m for the first 2 trains & a tank of similar size for the third train; 1 butane storage tank up to 100,000cu m (including vapour recovery system) for imported butane required for spiking LNG product to meet a required high heating value (HHV) along with ancillary equipment & infrastructure including flares. Storage of refrigerant as well diesel fuel, lube oil etc. Associated infrastructure to include fuel gas systems; effluent treatment & outfall for treated wastewater, power generation/distribution; fire protection systems; water systems including seawater desalination plant for process & potable water supply. Additional buildings to include compressor control building, analyser shelter, maintenance buildings, offices and staff amenities building. A temporary pioneer construction camp to accommodate 100-300 people expected to be built within the LNG facility area before early site preparation activities for the first LNG train. This camp will be replaced by a larger construction camp on Curtis Island and/or on the mainland during the LNG Facility construction to house a workforce of 3000 approx people. The construction camp expected to include necessary amenities such as a dining hall & kitchen, a primary health care facility & recreation centre. Other services & camp infrastructure to include a water treatment plant & storage, sewerage treatment plant, temporary power supply, fuel storage facility & fire-fighting equipment, some of which will remain as permanent facilities for the operations phase. Click for more details...

GLADSTONE LIQUEFIED NATURAL GAS (GLNG) PROJECT
Oil & Gas (Onshore processing facilities) New project at On, Curtis Island, QLD 4680. This type is Gas Field Development/Pipeline/Lng Plant with Private ownership. A project to develop gasfields in the Bowen & Surat Basins & then pipe gas to a processing plant on Curtis Island where 2 trains will produce 7.8 million tonnes per annum (Mtpa) of liquefied natural gas (LNG) for export. Click for more details...

SOUTH WEST QUEENSLAND PIPELINE STAGE 3 EXPANSION
Oil & Gas (Pipelines & associated contracts) project In The Maranoa Regional Council Area of Gas Pipeline - Stage 3 type. As part of the QSN Link project (QSN3), construction of a 935km loop pipeline parallel to the existing South West Queensland Pipeline (SWQP) between Wallumbilla & Moomba. Construction also at the Wallumbilla hub of 2 additional compressor stations at existing scraper station sites & an upgrade to the existing Wallumbilla compressor station. The pipeline is anticipated to have a diameter of between 400-500mm approx. Construction crews will be housed in temporary construction camps that will be progressively moved ahead of construction activity. Each main camp will house up to 200 people & the smaller fly camps will house up to 150 people. Each camp will contain accommodation units & mess & recreation huts. Click for more details...

TALINGA DEVELOPMENT PROJECT
Oil & Gas (Onshore processing facilities) project In The Western Downs Regional Council Area of Resource - Coal Seam Gas type. The project involves transitioning the existing pilot trial of 12 wells to production of up to 90TJ/day of coal seam gas, which will contribute to the supply of gas to the Darling Downs Power Station. The development will involve installing coal seam gas wells at a spacing of between 750m and 1000m; associated gas and water gathering systems, a gas plant, a produced water treatment facility, evaporation ponds, offices, storage areas, workshops, camp and gravel pits. Based on current well production predictions, this equates to the installation of approximately 100 coal seam gas wells. This project will incorporate a water treatment facility to significantly reduce the evaporation pond surface area down to approximately 170ha. The water treatment facility will employ an integrated membrane system, including reverse osmosis, to achieve an 85% desalination recovery and create a freshwater resource. The freshwater will be discharged to the Condamine River catchment until higher level beneficial used, such as industrial, urban or agricultural use, can be implemented. Click for more details...

SOUTHERN CROSS/IMPEL LNG PROJECT
Private ownership Oil & Gas (Onshore processing facilities) project In The Gladstone Regional Council Area for New development. Proposed staged construction of a liquefied natural gas (LNG) plant with up to 3 trains ranging from 0.07-1.3million tonnes per annum (Mtpa) capacity. Associated facilities expected to include a construction jetty; an LNG dock & jetty to handle vessels up to 200,000cu m; cryogenic pipelines; LNG storage tanks up to 210,000cu m capacity & 400km approx pipeline with spur lines. The project is expected to generate 300-350 jobs during construction & 80-90 when fully operational. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project at From south of MILES to, Curtis Island, QLD 4680 for New. Part of a coal seam gas (CSG) to liquefied natural gas (LNG) project with Origin Energy responsible for developing CSG gas fields & transmission pipeline, ConocoPhillips responsible for developing a LNG processing plant & their joint venture company Australia Pacific LNG responsible for the export facilities. A 42 inch (1070mm) diameter, high pressure main pipeline to commence east of Wandoan at its junction with a 44km lateral pipeline from gas developments at Condabri & a 38km lateral from Woleebee gas developments south of Miles. To travel 362km underground with a marine crossing at The Narrows between Kangaroo Island & Port Curtis Island to finish at the LNG plant near Laird Point. Inlet stations to allow for insertion of cleaning & inspection equipment to be constructed at the start of the Condabri & Woleebee laterals & at their intersection a 0.5ha APLNG hub comprising the inlet station for the main pipeline, isolation valves & connections for future compression to also be constructed. Development of up to 5 x 15-20ha laydown areas to receive materials (Miles, Wandoan, Theodore, Biloela, Gladstone areas). 3 temporary accommodation camps each up to 15ha & operating for 3-7 months to be relocated along the pipeline route as required. Camps to include sleeping quarters for up to 1100 personnel, laundries, catering, medical centre, recreational facilities (eg gymnasium, cinema, reading room, sports grounds), diesel generators for power & package sewerage plants. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT
Oil & Gas (Onshore processing facilities) project for New development. QCLNG is a project to develop coal seam gas (CSG) fields in the Surat & Bowen Basins, pipe gas to a processing plant to be built on Curtis Island & then export product liquefied natural gas (LNG) by ship. Phase 1 to be constructed to include 2 LNG processing trains with a combined capacity of up to 8.5million tonnes per annum (Mtpa) along with associated gas wells, field facilities & pipelines. Some 820 operational personnel & over 5000 construction personnel expected. Workers accommodation to be required in the Gladstone region (250 approx dwellings) & Western Downs area (280 approx dwellings). Click for more details...

ROMA BRISBANE GAS PIPELINE UPGRADE - PIPELINE DUPLICATION
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Brisbane City Council Area for New development. Part of a project to upgrade of the existing Roma Brisbane pipeline by 10% approx capacity & increased operating pressure. Duplication of a 6km section of the existing Roma Brisbane pipeline between Murarrie & Carina. Click for more details...

COOPER & EROMANGA BASINS CONSTRUCTION & MAINTENANCE CONTRACT
Construction & Maintenance Contract project at via QUILPIE, ., QLD 4999 In The Council Area Of Various of Private. A 5 year contract with 3 x 1 year optional extensions. To include project delivery, brownfields construction, flow line construction, shutdown, maintenance & industrial services. Click for more details...

QGC SURAT BASIN CSG SERVICE CONTRACT
Coal Seam Gas Plant & Equipment - Service Contract project at Between WANDOAN &, Dalby, QLD 4405 in the Oil & Gas (Onshore processing facilities). A 5 year contract to service coal seam gas assets in southern & central Queensland. To include refurbishment of 191 well site processing units involving the decommissioning, replacement & recommissioning of vessels, pipe work, electrical & control instrumentation. Click for more details...

QGC SURAT BASIN CSG SERVICE CONTRACT
Coal Seam Gas Plant & Equipment - Service Contract project at Between WANDOAN &, Dalby, QLD 4405 in the Oil & Gas (Pipelines & associated contracts). A 5 year contract to service coal seam gas assets in southern & central Queensland. To include refurbishment of 191 well site processing units involving the decommissioning, replacement & recommissioning of vessels, pipe work, electrical & control instrumentation. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - TRAIN 2
Oil & Gas (Onshore processing facilities) project In The Gladstone Regional Council Area of Private ownership. Construction of a second 4.5 million tonne per annum (Mtpa) liquefied natural gas (LNG) processing train. Further Bowen & Surat Basin gas field development to provide 1000 wells for the first 2 trains. Click for more details...

MORANBAH GAS FIELD DEVELOPMENT
Oil & Gas (Pipelines & associated contracts) New project at Between COPPABELLA &, Moranbah, QLD 4744. This type is Operating Gas Field - Expansion with Private ownership. A project to develop the existing Moranbah gas field which comprises over 500 production wells & mostly buried gas/water flowlines with compressors leading to water facilities (15 dams, a water treatment facility under construction) & the Moranbah Gas Processing Facility (PL191). Further development to include drilling of 5 exploration wells & 6 appraisal wells with associated water handling systems including flowlines & 5 small (10ML) aggregation dams to store well head water. Drilling also of over 100 fenced, steel & concrete cased production wells each comprising a wellhead, electric drive rotating screw pump, wellhead gas/water separator & control valve as well as monitoring, metering & communications equipment. Typically the wells will be chevron style with surface-to-in-seam horizontal/lateral wells requiring up to 3 pads each but some will be multi-branch lateral wells linked from 2 separate pads. Gathering lines to be buried 53-500mm diameter high density polyethylene (HDPE) pipe. Associated infrastructure to include access tracks, overhead powerlines (for wellhead & compressor facilities), borrow pits, quarries & storage areas. Construction also of up to 4 large (400-600ML) dams for treated water, up to 3 brine storages & groundwater monitoring bores. Any accommodation camps to be developed over the project to include canteen facilities, communications, vehicle maintenance & parking areas, fuel handling & storage areas sewerage treatment. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - COMPRESSION STATIONS & CENTRAL PROCESSING PLANTS
Compression Stations/Central Processing Plants New project In The Western Downs Regional Council Area. Construction & fabrication of 5 x compression stations & a central processing plant at the Woleebee Creek block southwest of Wandoan & 3 field compression stations & a central processing plant at the Bellevue block east of Miles. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - 6 + 1 UPSTREAM PIPING SUPPLY
A project in the QLD Within Western Downs Regional. Supply of all piping for the Ruby central processing plant including fabrication, welding, NDT, hydro testing, painting & delivery to site. Associated mechanical, structural & piping services. Click for more details...

PL65 GILMORE GAS FIELD LNG PROJECT
A project in the QLD Within Quilpie Shire. Construction of a 56,000tpa liquefied natural gas (LNG) plant adjacent the existing Gilmore gas plant. Click for more details...

APLNG LNG PLANT - CLEANING SERVICES
New project of Oil & Gas (Onshore processing facilities) project at At, Curtis Island, QLD 4680. For the provision of cleaning services. Click for more details...

APLNG LNG PLANT - COATING CONSULTANCY
Oil & Gas (Onshore processing facilities) project for New development. For the provision of consultancy services on coatings. Click for more details...

APLNG LNG PLANT - DIESEL SUPPLY
New project of Oil & Gas (Onshore processing facilities) project at At, Curtis Island, QLD 4680. For the provision of diesel. Click for more details...

APLNG LNG PLANT - FACILITIES MAINTENANCE
Oil & Gas (Onshore processing facilities) project In The Gladstone Regional Council Area of Facilities Maintenance - Liquefied Natural Gas Plant type. For the provision of facilties maintenance services. Click for more details...

APLNG LNG PLANT - FILTER SUPPLIES
Aplng Lng Plant - Filter Supplies is currently at the Tenders & Building stage, valued at about $ 2000000 it is For the provision of filters. Click for more details...

APLNG LNG PLANT - FREIGHT FORWARD & LOGISTICS
New project of Oil & Gas (Onshore processing facilities) project at At, Curtis Island, QLD 4680. For the provision of freight forwarding & logistic services. Click for more details...

APLNG LNG PLANT - GAS DETECTION EQUIPMENT & MAINTENANCE
Gas Detection Equipment - Supply & Maintain New project In The Gladstone Regional Council Area. For the provision of gas detection equipment & maintenance services. Click for more details...

APLNG LNG PLANT - GASES SUPPLY
Oil & Gas (Onshore processing facilities) project for New development. For the provision of gases. Click for more details...

APLNG LNG PLANT - HOSES & FITTINGS SUPPLY
Hoses & Fittings Supply project at At, Curtis Island, QLD 4680 in the Oil & Gas (Onshore processing facilities). For the provision of hoses & fittings. Click for more details...

APLNG LNG PLANT - MARINE SAFETY & FIRE FIGHTING EQUIPMENT
Oil & Gas (Onshore processing facilities) project In The Gladstone Regional Council Area of Marine Equipment Supply - Safety/Fire Fighting type. For the provision of marine safety & fire fighting equipment. Click for more details...

APLNG LNG PLANT - OFFLOADING EQUIPMENT SUPPLY
Offloading Equipment Supply project at At, Curtis Island, QLD 4680 In The Council Area Of Gladstone Regional of Private. For the provision of offloading equipment. Click for more details...

APLNG LNG PLANT - PROPANE SUPPLY
New project of Oil & Gas (Onshore processing facilities) project at At, Curtis Island, QLD 4680. For the provision of propane. Click for more details...

APLNG LNG PLANT - ROAD MAINTENANCE SERVICES
Oil & Gas (Onshore processing facilities) project In The Gladstone Regional Council Area of Private ownership. For the provision of road maintenance services. Click for more details...

QCLNG OPERATIONS - HARDWARE & INDUSTRIAL CONSUMABLES SUPPLIER
Oil & Gas (Onshore processing facilities) project at Suppy bases at CHINCHILLA & GLADSTONE, ., QLD 4999 of Hardware/Tools/Industrial Consumables type of New development. Ongoing contract for a single generalist supplier of workshop & hardware items. Click for more details...

QCLNG OPERATIONS - HV & LV SWITCHING MAINTENANCE
Maintenance - High & Low Voltage Switch Gear & Switchboards project at At, Curtis Island, QLD 4680 in the Oil & Gas (Onshore processing facilities). For the provision of maintenance services for high & low voltage switch gear & switchboards. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) - OPERATIONS & MAINTENANCE - IT SOFTWARE
Oil & Gas (Onshore processing facilities) project In The Gladstone Regional Council Area of Private ownership. For the provision of IT Software including staff/shift rostering. Click for more details...

BUNDABERG GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project for New development. Construction of a 24.7km gas pipeline from the existing Wide Bay pipeline west of Bundaberg (Kensington Gate Station & extension through to the Port of Bundaberg.) Associated works. Click for more details...