State

Categories

Sub Categories

Click Here to Find Current Projects

List of Oil & Gas Projects in Queensland


STANWELL MAGNESIUM PROJECT
A project in the QLD Within Rockhampton Regional. A 22.2 km long pipeline to supply up to 5.4 petajoules of coal seam gas. Click for more details...

COPPABELLA COAL OPERATIONS
Currently at the Construction stage In Mackay Regional is a project estimated to be $ 1000000. This project To reduce risks of dry periods. The pipeline will run between Coppabella and a large source of water. This pipeline could also benefit the Monto coal project. This previously long term plan has been brought forward in response to dry conditions in the region. Click for more details...

ATP-592 - DURHAM RANCH PROJECT
Oil & Gas (Onshore processing facilities) project for New development. Likely to include some steelwork/fabrication. Click for more details...

SANTOS CBU - SOUTH WEST QUEENSLAND/NORTHERN SOUTH AUSTRALIAN GAS FIELDS
Epc Contract New project In The Not Yet Determined Council Area. The contract is for the provision of integrated engineering, procurement and construction services for Santos' Central Business Unit (CBU), which operates the oil and gas fields in northern South Australia and South West Queensland. The contract is a consolidation of services previously provided by a range of providers into a single contract. A potential of $20-$40 million per annum for and initial three years, with possible extensions up to eight years. Click for more details...

BALLERA TO MOOMBA PIPELINE
Currently at the Early Planning stage In Quilpie Shire is a project estimated to be $ 100000000. This project FEED study will look at the most effective route for the North Gas Link. The pipeline will join the EPIC South West Queensland pipeline at Ballera to both the Moomba Sydney Pipeline and Moomba Adelaide Pipe System. Click for more details...

ATP-632 - BERWYNDALE SOUTH - WINDIBRI PIPELINE
Oil & Gas (Pipelines & associated contracts) project at Gasfield, Surat Basin to existing Roma/Brisbane pipeline via, Miles, QLD 4415 for New. A 14 km lateral from field to existing Roma/Brisbane pipeline. The route for the pipeline was cleared in August 2005. Click for more details...

GATTON TO GYMPIE GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project at Gatton to Gympie, ., QLD 4999 of Gas Pipeline type of New development. Class 600 high pressure gas transmission pipeline. Click for more details...

PEAT EXPORT COMPRESSOR STATION
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 500000. This project To supply and install the interconnecting pipework for the compressor station on the Peat Lateral Gas Pipeline that is currently under construction for connection to the Roma to Brisbane Gas Pipeline. Click for more details...

ATP-620 - ARGYLE/LAUREN - GAS PIPELINE
Atp-620 - Argyle/Lauren - Gas Pipeline is currently at the Planning stage, valued at about $ 10000000 it is An 18.5 km high pressure gas pipeline. Click for more details...

ARGYLE/ BERWYNDALE - GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project In The Maranoa Regional Council Area of Private ownership. It is proposed to construct and operate a 15 km pipeline linking the Argyle field and the Berwyndale South field. Click for more details...

PNG GAS PROJECT - PIPELINE FEED CONTRACT - RESOURCE
Png Gas Project - Pipeline Feed Contract - Resource is currently at the Planning stage, valued at about $ 25000000 it is Tender is for the Australian component of the project. FEED program will involve engineering design, route selection, regulatory and financial viability assessments, environmental and native title processes. The pipeline width will be 22 inches and approx 2020km in length. Pipeline from PNG/Australia maritime border through Cape York to Townsville off-take is approx 1220 km. From Townsville off-take to Gladstone is 700 km. A further 100 km from the Townsville off-take to Townsville. Click for more details...

TIPTON WEST GAS PROJECT - GAS COMPRESSING FACILITY/PIPELINES
Tipton West Gas Project - Gas Compressing Facility/Pipelines is currently at the Construction stage, valued at about $ 31000000 it is To construct a Gas Compressing facility and surface gathering network and associated pipelines. Six Compressors have been ordered from Universal Compression in the United States of America. Click for more details...

QSN LINK GAS PIPELINE
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Not Yet Determined Council Area for New development. The QSN Link pipeline will extend south-west from the Ballera Gas facility in Queensland. It will pass approximately 7km to the south of Innamincka in South Australia and terminate at the Moomba plant. The pipeline will be some 180km in length, with approximately 90km in Queensland and 91.5km in South Australia. The pipeline will be typical of a modern, small to medium diameter gas transmission pipeline. Final design parameters are yet to be determined, but it is likely to involve the following infrastructure: a buried, high pressure, steel, natural gas pipeline, with a diameter in the order of 400mm, an inlet station at Ballera, above ground facilities at intervals along the pipeline include a mid-line mainline valve, cathodic protection systems and marker signs and an outlet delivery station at Moomba. The construction workforce will be accommodated in temporary camps and at local accommodation. two preliminary campsite locations have been selected which will accommodate a single camp that will be mobilised from one location to the other during the construction phase of the project. construction depots will be used primarily for equipment storage and will typically be co-located with the construction camps. Facilities and equipment stored at the construction depots may include: site office and administration centre, construction vehicles, diesel fuel and lubricants, vehicle maintenance equipment, sand bags, sediment fencing, star droppers and wooden stakes and pipe wrapping and joint coating materials. When the utility is no longer required, the pipeline will be decommissioned in accordance with the regulatory requirements and accepted environmental best practices at the time. currently decommissioning procedures require the removal of all above ground infrastructure and the restoration of associated disturbed areas. Click for more details...

GLADSTONE LIQUEFIED NATURAL GAS (GLNG) PROJECT
Oil & Gas (Onshore processing facilities) New project at On, Curtis Island, QLD 4680. This type is Gas Field Development/Pipeline/Lng Plant with Private ownership. A project to develop gasfields in the Bowen & Surat Basins & then pipe gas to a processing plant on Curtis Island where 2 trains will produce 7.8 million tonnes per annum (Mtpa) of liquefied natural gas (LNG) for export. Click for more details...

GLADSTONE LIQUEFIED NATURAL GAS (GLNG) PROJECT - PIPELINE CORRIDOR
Gas Pipeline project at From Roma to, Curtis Island, QLD 4680 In The Council Area Of Gladstone Regional of Private. Construction of a 42 inch diameter, 420km long underground gas transmission pipeline to connect gas fields in the Bowen & Surat Basins to a liquefied natural gas (LNG) processing plant at Curtis Island. To traverse north from Arcadia Valley & then turn northeast to cross the Expedition Range. Click for more details...

BRAEMAR 2 GAS PIPELINE PROJECT
Gas Pipeline project at Via, Condamine, QLD 4416 In The Council Area Of Western Downs Regional of Private. For the construction of a high pressure gas pipeline and associated infrastructure. The linepack pipeline will be a 100km long 16 inch Class 900 gas pipeline. Click for more details...

SOUTH WEST QUEENSLAND PIPELINE STAGE 3 EXPANSION
Oil & Gas (Pipelines & associated contracts) project In The Maranoa Regional Council Area of Gas Pipeline - Stage 3 type. As part of the QSN Link project (QSN3), construction of a 935km loop pipeline parallel to the existing South West Queensland Pipeline (SWQP) between Wallumbilla & Moomba. Construction also at the Wallumbilla hub of 2 additional compressor stations at existing scraper station sites & an upgrade to the existing Wallumbilla compressor station. The pipeline is anticipated to have a diameter of between 400-500mm approx. Construction crews will be housed in temporary construction camps that will be progressively moved ahead of construction activity. Each main camp will house up to 200 people & the smaller fly camps will house up to 150 people. Each camp will contain accommodation units & mess & recreation huts. Click for more details...

SURAT TO GLADSTONE LNG PIPELINE PROJECT - LINE PIPE SUPPLY
Currently at the Tenders & Building stage In Various is a project estimated to be $ 10000000. This project The 660mm diameter high pressure buried steel gas pipeline would be approximately 470km long. The pipeline would have a minimum technical design life of 40 years. Above ground facilities would be required at intervals along the pipeline, including: mainline valves; cathodic protection systems; and marker signs. The project will be from a proposed compressor facility adjacent to the Kogan North Central Gas Facility to the proposed LNG plant at Fisherman's Landing, Gladstone. Click for more details...

SOUTHERN CROSS/IMPEL LNG PROJECT
Private ownership Oil & Gas (Onshore processing facilities) project In The Gladstone Regional Council Area for New development. Proposed staged construction of a liquefied natural gas (LNG) plant with up to 3 trains ranging from 0.07-1.3million tonnes per annum (Mtpa) capacity. Associated facilities expected to include a construction jetty; an LNG dock & jetty to handle vessels up to 200,000cu m; cryogenic pipelines; LNG storage tanks up to 210,000cu m capacity & 400km approx pipeline with spur lines. The project is expected to generate 300-350 jobs during construction & 80-90 when fully operational. Click for more details...

SOUTHERN CROSS/IMPEL LNG PROJECT
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Gladstone Regional Council Area for New development. Proposed staged construction of a liquefied natural gas (LNG) plant with up to 3 trains ranging from 0.07-1.3million tonnes per annum (Mtpa) capacity. Associated facilities expected to include a construction jetty; an LNG dock & jetty to handle vessels up to 200,000cu m; cryogenic pipelines; LNG storage tanks up to 210,000cu m capacity & 400km approx pipeline with spur lines. The project is expected to generate 300-350 jobs during construction & 80-90 when fully operational. Click for more details...

ROMA BRISBANE GAS PIPELINE UPGRADE - DALBY COMPRESSOR STATION
A project in the QLD Within Western Downs Regional. Part of a project to upgrade of the existing Roma Brisbane pipeline by 10% approx capacity & increased operating pressure. Installation at the Dalby Compressor Station of 2 additional 4570kW Centaur 50 solar gas turbine compressors along with inlet/exhaust systems, cooler units, fuel gas skids, pipework & valves. Associated works to include a diesel engine alternator for cold start up power, a bunded 6000l fuel store facility, oil store, control room, access road, car park & amenities. Click for more details...

GLNG WALLUMBILLA GAS TREATMENT FACILITY (WGTF)
New project of Oil & Gas (Onshore processing facilities) project at Walumbilla South Rd Iona Bardlomey Rd (Lot 33 SP 212840) 12km south of, Wallumbilla, QLD 4428. Staged development adjacent the existing Santos compressor (WCS) & metering (WMS) stations of a gas treatment facility of 2 trains each with a capacity of 250TJ/day. Each train to consist of gas compression, natural gas liquid removal & cryogenic gas treatment units & a gas turbine power generator using non-methane gas liquids & distributing power through alternators. Ancillary infrastructure to include condensate storage, hot oil system, air compression system, nitrogen generation plant, fire water system, flare & vent system, oily water system along with potable & service water system. Plant control room & workforce amenities. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - TRAIN 2
Oil & Gas (Onshore processing facilities) project In The Gladstone Regional Council Area of Private ownership. Construction of a second 4.5 million tonne per annum (Mtpa) liquefied natural gas (LNG) processing train. Further Bowen & Surat Basin gas field development to provide 1000 wells for the first 2 trains. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - GAS FIELD DEVELOPMENT - GAS PROCESSING PLANTS
Private ownership Oil & Gas (Onshore processing facilities) project In The Various Council Area for New development. A contract for the construction of 7 gas processing plants at Condabri, Orana (east of Talinga), Reedy Creek, Combabula & Eurombah Creek. Associated integrated operations centres, warehouses, workshops & internal roadways. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - GAS FIELD DEVELOPMENT - FENCING
Currently at the Tenders & Building stage In Various is a project estimated to be $ 2000000. This project Contracts to repair & restore damaged fences, remove redundant fences & construct new fences & associated grids & gates on various rural properties. Supply also of fencing materials. Click for more details...

MORANBAH GAS FIELD DEVELOPMENT
Oil & Gas (Pipelines & associated contracts) New project at Between COPPABELLA &, Moranbah, QLD 4744. This type is Operating Gas Field - Expansion with Private ownership. A project to develop the existing Moranbah gas field which comprises over 500 production wells & mostly buried gas/water flowlines with compressors leading to water facilities (15 dams, a water treatment facility under construction) & the Moranbah Gas Processing Facility (PL191). Further development to include drilling of 5 exploration wells & 6 appraisal wells with associated water handling systems including flowlines & 5 small (10ML) aggregation dams to store well head water. Drilling also of over 100 fenced, steel & concrete cased production wells each comprising a wellhead, electric drive rotating screw pump, wellhead gas/water separator & control valve as well as monitoring, metering & communications equipment. Typically the wells will be chevron style with surface-to-in-seam horizontal/lateral wells requiring up to 3 pads each but some will be multi-branch lateral wells linked from 2 separate pads. Gathering lines to be buried 53-500mm diameter high density polyethylene (HDPE) pipe. Associated infrastructure to include access tracks, overhead powerlines (for wellhead & compressor facilities), borrow pits, quarries & storage areas. Construction also of up to 4 large (400-600ML) dams for treated water, up to 3 brine storages & groundwater monitoring bores. Any accommodation camps to be developed over the project to include canteen facilities, communications, vehicle maintenance & parking areas, fuel handling & storage areas sewerage treatment. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - COMPRESSION STATIONS ECI CONTRACT
Oil & Gas (Pipelines & associated contracts) project In The Western Downs Regional Council Area of Compression Stations - Early Contractor Involvement type. Contract for the early civil site works (bulk earthworks, piling & concrete foundations) & front end planning work for 5 x compression stations & a central processing plant at the Woleebee Creek block southwest of Wandoan & 3 field compression stations & a central processing plant at the Bellevue block east of Miles. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - COMPRESSION STATIONS & CENTRAL PROCESSING PLANTS
Compression Stations/Central Processing Plants New project In The Western Downs Regional Council Area. Construction & fabrication of 5 x compression stations & a central processing plant at the Woleebee Creek block southwest of Wandoan & 3 field compression stations & a central processing plant at the Bellevue block east of Miles. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - 6 + 1 UPSTREAM CONTRACT
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 300000000. This project Construction of 6 field compressor stations & a central processing plant within 60km of Dalby with works extending into the Chinchilla & Miles regions. Click for more details...

WALLUMBILLA GAS HUB COMPRESSORS UPGRADE
Compressors project at via, Wallumbilla, QLD 4428 In The Council Area Of Maranoa Regional of Private. Upgrade at the Walumbilla gas hub which connects to APA's Roma-Brisbane & South West Queensland Pipelines. Installation of 3 new compressors & associated services. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - PROCESSING FACILITIES
Oil & Gas (Onshore processing facilities) project for New development. Construction of the balance of 12 field compressor stations (FCS) & 3 central processing plants (CPP). Each FCS will need up to 7ha & will include a flare, up to 8 screw compressors, a water management system including a pond as well as a substation/switchyard if connected to the grid instead of being powered by decentralised gas fired turbines. Associated infrastructure to include access tracks, warehouses, construction camps, operations camps, offices & telecommunication services. Each CPP to need up to 19ha & will include a flare, a tri-ethylene glycol (TEG) unit per compressor, plant gas inlet & export systems, drainage, gas or grid power supply, storage for air, nitrogen, water, chemical & lube oil, office & workshop buildings, switch gear & instrument rooms & access roads. Water separated at the well heads will be gathered separately into ponds/tanks prior to treatment & reuse. Click for more details...

PL65 GILMORE GAS FIELD LNG PROJECT
A project in the QLD Within Quilpie Shire. Construction of a 56,000tpa liquefied natural gas (LNG) plant adjacent the existing Gilmore gas plant. Click for more details...

APLNG LNG PLANT - CALIBRATION EQUIPMENT & MAINTENANCE
Oil & Gas (Onshore processing facilities) project for New development. For the provision of calibration equipment & maintenance. Click for more details...

APLNG LNG PLANT - CLEANING SERVICES
New project of Oil & Gas (Onshore processing facilities) project at At, Curtis Island, QLD 4680. For the provision of cleaning services. Click for more details...

APLNG LNG PLANT - COATING CONSULTANCY
Oil & Gas (Onshore processing facilities) project for New development. For the provision of consultancy services on coatings. Click for more details...

APLNG LNG PLANT - DIESEL SUPPLY
New project of Oil & Gas (Onshore processing facilities) project at At, Curtis Island, QLD 4680. For the provision of diesel. Click for more details...

APLNG LNG PLANT - ELECTRICAL EQUIPMENT TESTING & CALIBRATION
At, Curtis Island, QLD 4680 Has Aplng Lng Plant - Electrical Equipment Testing & Calibration currently at Tenders & Building stage. For the provision of electrical equipment testing & calibration. Click for more details...

APLNG LNG PLANT - FACILITIES MAINTENANCE
Oil & Gas (Onshore processing facilities) project In The Gladstone Regional Council Area of Facilities Maintenance - Liquefied Natural Gas Plant type. For the provision of facilties maintenance services. Click for more details...

APLNG LNG PLANT - GAS DETECTION EQUIPMENT & MAINTENANCE
Gas Detection Equipment - Supply & Maintain New project In The Gladstone Regional Council Area. For the provision of gas detection equipment & maintenance services. Click for more details...

APLNG LNG PLANT - GASES SUPPLY
Oil & Gas (Onshore processing facilities) project for New development. For the provision of gases. Click for more details...

APLNG LNG PLANT - IT SOFTWARE
Oil & Gas (Onshore processing facilities) project In The Gladstone Regional Council Area of It Software - Staff/Change type. For the provision of information technology software including for management of change & staff & shift rostering. Click for more details...

APLNG LNG PLANT - LABORATORY SERVICES
Laboratory Services - Personnel/Analysis project at At, Curtis Island, QLD 4680 in the Oil & Gas (Onshore processing facilities). For the provision of laboratory services including analysis & personnel. Click for more details...

APLNG LNG PLANT - MARINE SAFETY & FIRE FIGHTING EQUIPMENT
Oil & Gas (Onshore processing facilities) project In The Gladstone Regional Council Area of Marine Equipment Supply - Safety/Fire Fighting type. For the provision of marine safety & fire fighting equipment. Click for more details...

APLNG LNG PLANT - PALLET RACKING SUPPLY
Oil & Gas (Onshore processing facilities) project for New development. For the provision of warehouse pallet racking. Click for more details...

APLNG LNG PLANT - ROAD MAINTENANCE SERVICES
Oil & Gas (Onshore processing facilities) project In The Gladstone Regional Council Area of Private ownership. For the provision of road maintenance services. Click for more details...

APLNG LNG PLANT - ROPE ACCESS SERVICES
Aplng Lng Plant - Rope Access Services is currently at the Tenders & Building stage, valued at about $ 2000000 it is For the provision of rope access services. Click for more details...

APLNG LNG PLANT - SECURITY SERVICES
Aplng Lng Plant - Security Services is currently at the Tenders & Building stage, valued at about $ 2000000 it is For the provision of security services. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) - OPERATIONS & MAINTENANCE - IT SOFTWARE
Around, Curtis Island, QLD 4680 Has Australia Pacific Lng (Aplng) - Operations & Maintenance - It Software currently at Tenders & Building stage. For the provision of IT software including for Change Management. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) - OPERATIONS & MAINTENANCE - IT SOFTWARE
Oil & Gas (Onshore processing facilities) project In The Gladstone Regional Council Area of Private ownership. For the provision of IT Software including staff/shift rostering. Click for more details...

BUNDABERG GAS PIPELINE
Oil & Gas (Pipelines & associated contracts) project for New development. Construction of a 24.7km gas pipeline from the existing Wide Bay pipeline west of Bundaberg (Kensington Gate Station & extension through to the Port of Bundaberg.) Associated works. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect