State

Categories

Sub Categories

Click Here to Find Current Projects

List of Oil & Gas Projects in Victoria


OTWAY BASIN GAS PROJECT - GEOGRAPHE/THYLACINE
Oil & Gas (Pipelines & associated contracts) project In The Corangamite Council Area of Private ownership. Short onshore pipeline. Click for more details...

BASSGAS PROJECT - YOLLA/WHITE IBIS
Bassgas Project - Yolla/White Ibis is currently at the Construction stage, valued at about $ 400000000 it is Off-shore platform 135 km north of Burnie, undersea pipeline & on-shore treatment facilities. The construction timetable is as follows: 75MMSCFD onshore gas plant near Lang Lang construction to commence first quarter 2003; 32km onshore pipelines construction to commence third quarter 2003: 147 km sub-sea pipelines construction to commence first quarter 2004; offshore production platform platform installation first quarter installation. The offshore platform will be constructed in South Easet Asia and transported to Bass Strait. Construction of the gas plant located near Lang Lang in south-eastern Victoria will commence in late January 2003. Click for more details...

DOUGLAS MINERAL SANDS PROJECT
New project of Oil & Gas (Pipelines & associated contracts) project at Rocklands Reservoir via, Douglas, VIC 3401. Contracts 3 & 4 now combined into one package with supply pump units. Contract 4 will be for the construction of the pump station at Rocklands Reservoir, involving civil, structural, mechanical and electrical works. Contract 3 will be for supply of pump units on 2 skids each of approximately 150 kw. Click for more details...

LATROBE VALLEY COAL GASIFICATION & GAS TO LIQUIDS PROJECT
Oil & Gas (Pipelines & associated contracts) project for New development. The Victorian Government awarded Australian Power and Energy Ltd an exploration licence to undertake research, development and feasibility studies for one or more new brown coal-based projects. The company proposes to use a number of known technologies to produce low sulphur liquid fuels and to generate 500MW of electricity. Undergrounding (Geosequestration) of carbon dioxide produced in the process is proposed. In stage one, 52000 barrels per day of high quality low sulphur fuels, mainly diesel, as well as the electricity will be produced. Click for more details...

BASKER-MANTA OIL & GAS PROJECT - RESOURCE
Resource - Oil & Gas - Offshore New project In The Bass Coast Council Area. Installation associated the EPT comprise the Floating Production Storage and offloading Unit flexible flowline and control umbilical system and shuttle tanker mooring. The ocean patriot will be used for the drilling and expected to start July 2005. The majority of the development drilling will be undertaken in the fourth quarter 2005 when production licences are granted. A Floating Production Storage and Offloading vessel (FPSO) has been secured until January 15 2008. The FPSO has the capacity to handle up to 40,000 barrells of fluid per day and 50MMscf/d of gas. The Crystal Ocean (FPSO) has been obtained under a bareboat charter and manning will be provided by Upstream Petrolem Pty Ltd with assitance from Seatankers Management Co Ltd. The Crystal Ocean is expected to arrive in Melbourne August 2005. A shuttle tanker has been secured for a three year contract from Teekay Shipping and is expected in Bass Strait September 2005. The tanker called the Nordic Yukon is aframax sized, with dynamic positioning capability and a capacity for approx 650,000 bbls. Click for more details...

MINERVA GAS PROJECT
Onshore Facilities project at Brumby's Rd, Port Campbell, VIC 3269 In The Council Area Of Colac-Otway of Private. The gas plant will have a gross design production capacity of 150 terajoules of gas per day (TJ/d). Approximately 600 barrels (gross) of stabilised condensate will also be produced per day at initial gas sales rates. Click for more details...

DOUGLAS MINERAL SANDS PROJECT
Oil & Gas (Pipelines & associated contracts) project In The West Wimmera Council Area of Pipe - Supply type. Contract 1 for the supply of 22km of pipe of approximately 375 or 450mm diameter. Various materials for the pipeline will be considered, appropriate to achieving a 20 year design life. Click for more details...

OTWAY BASIN GAS PROJECT - GEOGRAPHE/THYLACINE
Oil & Gas (Sub-sea equipments, floating production facilities) project In The Offshore Council Area of Offshore Facilities - Jacket/Topsides Epic Contract type. The proposed development concept for offshore facilities includes a wellhead platform with five production wells on the Thylacine Reservoir and a subsea manifold and three production wells on the Geographe Reservoir. Click for more details...

OTWAY BASIN GAS PROJECT - GEOGRAPHE/THYLACINE
Oil & Gas (Topside - modules, platforms) project In The Offshore Council Area of Offshore Facilities - Jacket/Topsides Epic Contract type. The proposed development concept for offshore facilities includes a wellhead platform with five production wells on the Thylacine Reservoir and a subsea manifold and three production wells on the Geographe Reservoir. Click for more details...

WESTERN PIPELINE
Oil & Gas (Pipelines & associated contracts) project In The Warrnambool Council Area of J/V - Private & Govt ownership. 12 km gas pipeline from the McIntee well in PEP-154 to join the Heytesbury pipeline to the Heytesbury Gas Facility. Click for more details...

GAS PROCESSING PLANT - REGIONAL VICTORIA
Operation/Maintenance/Engineering Support Contract New project In The Not Yet Determined Council Area. Natural gas and associated liquids will be piped from the offshore fields to an onshore gas processing plant where gas will be treated and exported into an installed pipeline grid with liquids removed and sold. To be a continuous operation requiring production operations, maintenance management as well as operations engineering support. Minimum manning principles shall apply with an appropriate level of staff skilling. It is preferred the the same company provide core operations and maintenance, however, alliance arrangements will be considered. Contract may be up to five years plus extensions. The contractor will be responsible for the following: operation and maintenance of unmanned offshore platform/pipeline/onshore plant; establishing and implementing maintenance management system and operational procedures and for providing competent operation and maintenance staff, including all training requirements. The asset design life is 30 years. Maximum plant throughput is 205 Tj per day. Liquids produced include condensate, propane and autogas. Expressions of interest should include the following: company profile; contact detiails of principal or designate; HSE philosophy; capability to operate and maintain a medium sized natural gas processing plant and offshore facilities; capability to provide technical and engineering support; previous industry experience; brief overview of how such an operation would be established by your company; capability to establish operations and maintenance sytems at the development phase; capability to manage industrial harmony in Australia, including examples which demonstrate understanding and management of employee relations issues in Australia. Click for more details...

SEA GAS PIPELINE
Private ownership Oil & Gas (Onshore processing facilities) project In The Corangamite Council Area for New development. At Tugs. Click for more details...

SEA GAS PIPELINE
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Corangamite Council Area for New development. At Tugs. Click for more details...

KIPPER UNIT JOINT VENTURE GAS PROJECT
Resource - Gas - Offshore New project In The Gippsland Basin Council Area. The Kipper Gas Field is estimated to contain 620billion cubic feet (Bcf) of recoverable gas & 30million barrels (MMbl) of condensate/liquefied petroleum gas (LPG). Initial development includes 2 subsea gas wells along with 4 subsea coolers. Recovered gas to be piped through existing infrastructure via the West Tuna Platform to the onshore Esso & BHP Billiton processing facilities at Longford. Click for more details...

GIPPSLAND BASIN JOINT VENTURE PROJECT - TURRUM
Resource - Oil & Gas - Offshore project at Gippsland Basin Bass Strait, Gippsland Basin, VIC 3999 in the Oil & Gas (Sub-sea equipments, floating production facilities). Full development of the Turrum gas field expected to recover around 1 trillion cubic feet of natural gas and 110 million barrels of oil and gas liquids. Processing to be at the onshore Longford Gippsland Basin Joint Venture Facilities. Production to be enhanced with the late 2010 installation of the new Marlin B platform. Click for more details...

GIPPSLAND BASIN JOINT VENTURE PROJECT - TURRUM
Resource - Oil & Gas - Offshore project at Gippsland Basin Bass Strait, Gippsland Basin, VIC 3999 in the Oil & Gas (Topside - modules, platforms). Full development of the Turrum gas field expected to recover around 1 trillion cubic feet of natural gas and 110 million barrels of oil and gas liquids. Processing to be at the onshore Longford Gippsland Basin Joint Venture Facilities. Production to be enhanced with the late 2010 installation of the new Marlin B platform. Click for more details...

VIC P-44 - CASINO - PIPELINE/S
Oil & Gas (Pipelines & associated contracts) project In The Cardinia Council Area of Private ownership. Installation of a pipeline from the field to underneath the coastline near Port Campbell, continuing to TXU's Iona gas processing plant. Click for more details...

PATRICIA BALEEN GAS PROJECT
Currently at the Construction stage In Gippsland Basin is a project estimated to be $ 20000000. This project The offshore Baleen-3 development well has been completed as a future gas producer and flowed 764,600 cubic metres of gas per day through a 51mm surface choke. The offshore Patricia-2 development well has been completed as a future gas producer and flowed 790,000 cubic metres of gas per day through a 51mm choke. Click for more details...

SOUTH EAST SOUTH AUSTRALIA PIPELINE - POOLAIJELO TO LADBROKE GROVE
Natural Gas Pipeline New project In The Various Council Area. The pipeline will be 45 km long and 200 mm in diameter. Click for more details...

SANTOS GAS OPERATIONS - COASTAL LOGISTICS CONTRACT
Various Sites around Australia, ., VIC 3999 Has Santos Gas Operations - Coastal Logistics Contract currently at Tenders & Building stage. Services will include road and fixed installations linkages from Brisbane, through south-eastern Victoria, including Melbourne, Sale and Portland, inwards and outwards from Santos Adelaide hub and support up and down the coast from Perth to Dampier, extending at times to Darwin. Click for more details...

SANTO GAS OPERATIONS - CENTRAL LOGISTICS SERVICES
Santo Gas Operations - Central Logistics Services is currently at the Tenders & Building stage, valued at about $ 100000000 it is To provide general line haul services ex Adelaide and Brisbane to the Cooper Basin, Port Bonython, Eastern Queensland and Mereenie (N.T) operations as well as the inter-field and intra-field services in the Cooper Basin, Eastern Queensland and Mereenie (N.T) operations. Services include bulk crude oil haulage, coated and bare line pipe haulage, foodstuffs haulage, water haulage and other transport services supporting the operating environment. It excludes transport services from coastal or capital cities areas to the Santos key supply points of Brisbane and Adelaide. Click for more details...

SOLE GAS PLANT EXTENSION - DOUBLE ENTRY REFER ID 955674
Private ownership Oil & Gas (Onshore processing facilities) project In The East Gippsland Council Area for New development. Extension to an existing gas plant. The existing plant produces 43 terjoules per annum with potential to expand to 75 terjoules per annum. Click for more details...

PATRICIA-BALEEN GAS PLANT UPGRADE
Oil & Gas (Onshore processing facilities) project for New development. For the upgrade to the existing Patricia-Baleen Gas Plant. The works include: installation of a condensate separation and stabilisation system, installation of condensate storage tanks and truck load-out facility, installation of hydrocarbon dew point control facilities for the gas, reconfiguration of the existing compressors to increase compression capacity, upgrade to the sales gas dehydration system to accommodate higher gas rates and minimise glycol carryover, installation of monoethylene glycol (MEG) storage and injection facilities to prevent hydrate formation in the offshore pipeline and selected plant process locations, and associated MEG regeneration facilities. Installation of a corrosion inhibitor injection system for the offshore pipeline, installation of a hot oil heater and hot oil circulation system to provide process heat to the processing facilities, installation of a n"off-gas" compressor to recycle gas vented from the condensate stabilisation system to eliminate operations flaring. Installation of new flare systems and removal of existing flare system, modifications to the drainage system, including a new API Separator and extension of the storm water system. Installation of a water vaporiser to dispose of excess produced water that cannot be reused or naturally evaporates. Modifications to various plant utilities, namely, the fuel gas system, odourisation system, compressed air system and plant process control system. Upgrade of the fire and gas protection facilities including installation of fixed firewater pumps and foam systems. Exte4nsion of office facilities and installation of a laboratory, and the construction of a new workshop/warehouse facility. Click for more details...

LONGFORD TO LONG ISLAND POINT GAS PIPELINE REPLACEMENT
Longford To Long Island Point Gas Pipeline Replacement is currently at the Construction stage, valued at about $ 10000000 it is Construction of a replacement 350mm diameter pipeline alongside the existing 700m pipeline which will be mothballed. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect