VARANUS ISLAND GAS EXPANSION PROJECT
Oil & Gas (Onshore processing facilities) project at Varanus Island, ., WA 6999 for New. An expansion of capacity from 100Tj/d to around 220 Tj/d. To include a new sales gas compressor, new gas processing train, new stabilisation train and upgrade of existing trains and compressors. Click for more details...

PILBARA TO GOLDFIELDS GAS TRANSMISSION
Oil & Gas (Pipelines & associated contracts) project at Pilbara Region to Goldfields, WA 6999 for New. Natural gas to be piped approximately 1,400 km underground from the off-shore North-West Shelf gasfields to Kalgoorlie and surrounding centres. Construction of the pipeline will be in three stages. In August 1995 one crew will begin to lay 310 km of pipe at Yaraloola, south of Dampier in the Pilbara, then pass south-east of Paraburdoo through to a point south-west of Newman by January 1996. This section of pipe will be 400 mm diameter. A second crew will commence in September 1995 on a 670 km section to run from near Newman to Mt Keith via Wiluna. Once work on the Yaraloola to Newman section is complete, the crew will start working north from Kalgoorlie in January 1996 and the two teams will meet at Mt Keith, 400 km away, in June 1996. The section from Newman to Kalgoorlie will have a 350 mm diameter. The first gas should be supplied to the Eastern Goldfields by August 1996. The pipeline will require two compressor stations to handle the initial capacity of about 70 tjs per day. With additional compression, the future load can be expanded up to 160 tjs per day. Main pipelaying will be followed by installation of compressor stations at Yaraloola, Ilgarari and possibly Paraburdoo and Leinster. Click for more details...

BLACKTIP GAS PROJECT - SUBSEA PIPELINE
Currently at the Construction stage In Offshore is a project estimated to be $ 100000000. This project 108 km offshore pipeline is to be constructed from the gas field to the onshore processing facility. Click for more details...

LNG TRAIN 4 EXPANSION - TRUNKLINE SYSTEM EXPANSION (TSEP)
Currently at the Construction stage In City Of Karratha is a project estimated to be $ 5000000. This project Installation of two large subsea valve skids manufactured in Kwinana. Installation over the deepwater section of the trunkline of 900, 32 pre-cast concrete gravity anchors manufactured near Karratha and removal of 40"/30" ball valves currently at the base of the North Rankin A gas production platform and installation of a skid-based 40' subsea insolation check valve. Installation engineering will be done in Perth and Australian crews will be used for the offshore campaign. Click for more details...

TELFER PROJECT
Gas Pipeline project at Port Hedland to Telfer gold-copper mine,, Telfer, WA 6762 in the Oil & Gas (Pipelines & associated contracts). A 450 km g 10 inch (250mm) class 600 gas pipeline, utilising a single compressor station with one duty and one stand-by compressor. The pipeline will provide gas to the power station at Telfer. Click for more details...

METHANEX AUSTRALIA PROJECT
Oil & Gas (Onshore processing facilities) New project at King Bay-Hearson's Cove Industrial Precinct, Burrup Peninsula, Dampier, WA 6713. This type is Methanol Plant with Private ownership. A 1.3 million tonne per year methanol project, as the first stage of a planned Asia Pacific hub. This was a reduction in capacity of about 35% compared to the original project plan of 2 million tonnes per annum. Click for more details...

LNG TRAIN 4 EXPANSION
Oil & Gas (Onshore processing facilities) project In The City Of Karratha Council Area of Electrical/Instrumentation Works - On Plot type. Includes all above ground electrical and instrumentation work Click for more details...

NORTH WEST SHELF LNG TRAIN 5 EXPANSION - LNG TRAIN
Lng Facilities - Expansion project at Burrup Peninsula north of, Dampier, WA 6713 in the Oil & Gas (Onshore processing facilities). The 5th LNG Train will be 4.2 mtpa. The expansion involves the construction of an Acid Gas Removal Unit, 3rd Fractioned Unit, 2 GT Power Generators (70 MW), 3rd Boil Off Gas Compressor, Brownfield tie-ins and piping. This will include the relocation of existing plant buildings and services. Construction and removal of temporary facilities will also be involved. Click for more details...

KWINANA ALUMINA REFINERY
Oil & Gas (Pipelines & associated contracts) New project at Lot 100 Anketell Rd, Hope Valley, WA 6165. This type is Gas Pipeline For Carbonation Facility Upgrade with Private ownership. A high pressure gas pipeline for conveying gaseous CO2 from the CSBP to the carbonation facility. 25 per cent above ground and 75 per cent below ground, along existing easements for majority of route. Click for more details...

AC-RL3 - MONTARA OIL & GAS PROJECT
A project in the WA Within Offshore. The Company proposes to develop the oilfields, which are located within Permit Area AC/L7 & 8 in the Australian Commonwealth Territory of Ashmore and Cartier islands, approximately 690 km west of Darwin. Click for more details...

MONDARRA GAS STORAGE FACILITY - EXPANSION
Expansion Of Facilities project at North of, Perth, WA 6000 In The Council Area Of Perth of Private. Includes an additional gas storage well, additional gas processing and compression facilities, and debottlenecking of intrastructure. Click for more details...

STYBARROW PROJECT - FPSO VESSEL
Oil & Gas (Sub-sea equipments, floating production facilities) project for New development. An FPSO will be constructed and operated by the contractor. Works will comprise engineering, procurement, construction, installation, commissioning and operations, including the topsides processing equipment, hull and disconnectable internal turret mooring system. It will be capable of processing 80,000 barrels of liquid per day and has a storage capacity in the order of 900,000 barrels. Click for more details...

VINCENT OILFIELD PROJECT - DISCONNECTABLE TURRET MOORING SYSTEM
A project in the WA Within Offshore. Main items include, an STP Buoy with integrated turret, mooring system, STP Ship system for handling and locking of STP Buoy and Multi-path swivel system. The mooring system will contain the proposed following components. 9 chain sections of 122mm with a total length of 4800m and total weight of 1450 tons. 27 wire sections of 100mm with a total length of 5400m and a total weight of 300 tons. 9 mooring line buoyancy elements (3.0m dia / 5.0m length) with a total weight of 135 tons. 9 fluke anchors with a total weight of 180 tons. 15 concrete clump weights with a total weight of 100 tons. Click for more details...

PLUTO LNG PLANT PROJECT - REFRIGERANT COMPRESSORS
A project in the WA Within City Of Karratha. Liquefaction 1400 Unit. Mixed / Propane Refrigerant Compressors. Type : Centrifugal Compressors and associated packages. Material of construction : 3.5% Nickel. Compressor Ratings 37-72 MW, Capacity 58-243 Km3/hr. This is a major proprietary equipment package within the Train. Full String testing required in the Main Equipment Suppliers Workshop. Click for more details...

ICHTHYS LNG PROJECT - CENTRAL PROCESSING FACILITY
Processing Facility project at Off Maret Island Via, Wyndham, WA 6740 In The Council Area Of Wyndham-E Kimberley of Private. The offshore CPF facilities include process, power generation, utilities & accommodation facilities. Work involves fabrication, installation, mechanical completion, pre-commissioning & commissioning of equipment, piping, electrical, instrumentation & controls, safety system & accommodation facilities. The CPF topside is modularised on a Semi submersible substructure. Semi-sub includes pontoons, columns & deck box with a plan dimension of approximately 96mx96m to support topsides. Topside to comprise modules up to a maximum of 5000 te & packages if appropriate. The living quarters module can be a part of the semi-sub deck box or separate module. Alternative concepts for integrated topsides will be considered. Click for more details...

NORTH WEST SHELF GAS PROJECT - PHASE VI EXPANSION
Oil & Gas (Onshore processing facilities) project at Burrup Peninsula North of, Dampier, WA 6713 of Processing Trains 6 & & type of New development. Expansion of the existing KGP facility through the addition of two processing trains (Trains 6 & 7, both with a LNG capacity of 5.9Mtpa), a LNG storage tank (Tank 6), flare facilities, a slug catcher, power generating systems, instrument and service air, water and drainage systsms, onshore gas and process effluent pipeline, safety, control and communication equipment, utitility liquid and gaseous ful systems, chemical storage and distribution systems. Potential constructino of a new loading jetty, berthing pocket and dreding of an additional turning basin, potential further development of access roads. It is therefore anticipated that relatively minor site preparation work will be required. This preparation work may include: geotechnical investigations, contaminated land investigations, vegetation clearance, cut and fill activited to level the site, nearshore dredging and blasting, earthworks to prepare the site for construction, temporary drainage and runoff collection facilities (bunding). Click for more details...

GREATER GORGON GAS PROJECT - DOWNSTREAM - CO2 INJECTION PIPELINE
Oil & Gas (Pipelines & associated contracts) project In The Ashburton Council Area of Private ownership. Includes the installation of a 300mm NB x 19.05mm thickness high pressure API Gr.X65 CS pipeline & the supply & installation of a power cable & fibre optic cable from the LNG facility to three injection wells located on a 7.23km pipe route from Barrow Island for the purpose of CO2 sequestration. Work includes transport of all materials on Barrow Island, supply & erect pipe supports on concrete foundations poured by others, install pipeline on pipe supports, surface laying & protection of power & fibre optic cables from LNG facility to well locations, commissioning of the pipeline, power supply & fibre optic cable in conjunction with the client & CO2 injection & well contractors. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - PERLITE - INSULATION
Oil & Gas (Onshore processing facilities) project at On, Barrow Island, WA 6712 for New. For the provision of loose fill perlite insulation for use in non evacuated low temperature & cryogenic vessels. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - CS PLATES TO A36 & AS3678 250
Oil & Gas (Onshore processing facilities) project for New development. For the provision of 250 CS plates MTO to A36 & AS3678. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - J-CHANNEL GASKET, WHITE
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - J-Channel Gasket, White currently at Construction stage. For the provision of (70 Nitrile 30 Vinyl) J-channel gaskets. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - RESISTANCE TEMPERATURE DETECTORS
Oil & Gas (Onshore processing facilities) project In The Ashburton Council Area of Private ownership. For the provision of resistance temperature detectors. Click for more details...

GREATER GORGON PROJECT - DOWNSTREAM PROCUREMENT LNG PLANT - EMERGENCY AIR COMPRESSORS
Oil & Gas (Onshore processing facilities) New project at On, Barrow Island, WA 6712. This type is Emergency Air Compressors with Private ownership. For the supply of oil free screw emergency air compressors that are diesel engine driven. Option 2 dry screw air compressor is acceptable. The multiple units are acceptable. In addition, the project required packaged unit(s) completely self contained to be used in Black start condition. Click for more details...

WHEATSONE DEVELOPMENT PROJECT - OFFSHORE PLATFORM - HOOKUP & COMMISSIONING
Oil & Gas (Sub-sea equipments, floating production facilities) New project at Wheatstone Gas Field, 85km Northwest of, Barrow Island, WA 6712. This type is Platform Hookup/Commissioning with Private ownership. For the provision of the Wheatstone Platform hookup and commissioning. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - CHAINTABLE CASTINGS
Shell Prelude Gas Field Project - Turret & Mooring - Chaintable Castings is currently at the Construction stage, valued at about $ 500000 it is For the provision of chaintable castings. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - INSTALLATION WINCH
Installation Winch project at Approx 475km NNE, Broome, WA 6725 In The Council Area Of Broome of Private. For the provision of an installation winch. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - ICSS EQUIPMENT
Shell Prelude Gas Field Project - Turret & Mooring - Icss Equipment is currently at the Construction stage, valued at about $ 2500000 it is For the provision of ICSS equipment. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - ADDRESSABLE SMOKE DETECTOR
Oil & Gas (Sub-sea equipments, floating production facilities) New project at 475km N/NE of, Broome, WA 6725. This type is Addressable Smoke Detector with Private ownership. For the provision of an addressable smoke detector. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - LEVEL TRANSMITTERS RADAR TYPE
Oil & Gas (Sub-sea equipments, floating production facilities) project In The Broome Council Area of Level Transmitters Radar Type type. For the provision of laser type level transmitters. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - ANCHOR LEG LOAD MONITORING SYSTEM (ALLMS)
Oil & Gas (Sub-sea equipments, floating production facilities) project at 475km N/NE of, Broome, WA 6725 of Anchor Leg Load Monitoring System (Allms) type of New development. For the provision of an Anchor Leg Load Monitoring System (ALLMS). Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - DUPLEX PIPING & FITTINGS
A project in the WA Within Broome. For the provision of duplex piping & fitting. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - LIMIT SWITCHES & PUSH BUTTON
Oil & Gas (Sub-sea equipments, floating production facilities) project In The Broome Council Area of Limit Switches/Push Button type. For the provision of limit switches & push button. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - SUPPLY & INSTALL HDPE LINER
Oil & Gas (Onshore processing facilities) project at Both on & off, Barrow Island, WA 6712 for New. For the supply & installation of the HDPE liner. Click for more details...

BALNAVES GAS CONDENSATE PROJECT
48km NW of Monetebello Islands via, Dampier, WA 6713 Has Balnaves Gas Condensate Project currently at Construction stage. The field consists of a small light condensate accumulation with a large gas cap. Condensate reserves will be extracted using two subsea production wells connected to a single subsea production manifold with flowlines tied back to a double hull floating production, storage & offtake vessel (FPSO). Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - FLNG - MIXED REFRIGERANT & PREMIXED REFRIGERANT COMPRESSORS
Oil & Gas (Sub-sea equipments, floating production facilities) project at 475km NNE, Broome, WA 6725 of Mixed Refrigerant/Premixed Refrigerant Compressors type of New development. For the provision of mixed refrigerant & premixed refrigerant compressors. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - OPTIC FIBRE CABLE
Optic Fibre Cable New project In The Broome Council Area. For the provision of fibre optic cable. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - SPEAKERS & WARNING LIGHTS
Oil & Gas (Sub-sea equipments, floating production facilities) project at Approx 475km NNE of, Broome, WA 6725 of Speakers/Warning Lights type of New development. For the provision of speakers & warning lights. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - SUCTION PILE INSTALLATION AIDS
Oil & Gas (Sub-sea equipments, floating production facilities) project In The Broome Council Area of Private ownership. For the provision of suction pile installation aids. Click for more details...


GOLDFIELDS GAS TRANSMISSION PIPELINE EXPANSION
Oil & Gas (Pipelines & associated contracts) project In The East Pilbara Council Area of Private ownership. Increase in the pipeline's capacity by an additional 24 TJ/d. Installation of additional compression at Turee Creek & at the inlet to the Newman lateral. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - SUBSEA - INSTALLATION SERVICES - SAFETY EQUIPMENT
Safety Equipment project at Wheatstone Gas Field, 85km NW of, Barrow Island, WA 6712 in the Oil & Gas (Sub-sea equipments, floating production facilities). For the provision of safety equipment. Click for more details...

GREATER GORGON GAS PROJECT - HEAVY LIFT & TIE INS - CREW TRANSFER VESSEL
New project of Oil & Gas (Sub-sea equipments, floating production facilities) project at Off, Barrow Island, WA 6712. For the provision of a crew transport vessel. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - NDT SERVICES
Oil & Gas (Sub-sea equipments, floating production facilities) project at Off, Barrow Island, WA 6712 of Ndt Services type of New development. For the provision of NDT services. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - BULK PIPE SUPPORTS
Private ownership Oil & Gas (Onshore processing facilities) project In The Ashburton Council Area for New development. For the provision of bulk pipe supports. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - COMPRESSION BARS
Oil & Gas (Onshore processing facilities) project at On, Barrow Island, WA 6712 for New. For the provision of compression bars. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - FUEL & WATER TRUCKS
Vicinity of, Onslow, WA 6710 Has Wheatstone Development Project - Storage & Field Erected Condensate Tanks - Fuel & Water Trucks currently at Construction stage. For the supply of fuel & water trucks. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - HELIUM LEAK TESTING
Helium Leak Testing project at On & off, Barrow Island, WA 6712 in the Oil & Gas (Sub-sea equipments, floating production facilities). For the provision of helium leak testing. Click for more details...

NORTH WEST SHELF SUBSEA TIEBACK PROGRAM (GWF PH 2) - SUBSEA FORGED COMPONENTS
Subsea Forged Components project at Within the, Carnarvon Basin, WA 6999 in the Oil & Gas (Sub-sea equipments, floating production facilities). For the provision of subsea forged components. Click for more details...

NORTH WEST SHELF SUBSEA TIEBACK PROGRAM (WA-1-1 PERSEPHONE LNG) - ENGINEERING SERVICES
Oil & Gas (Sub-sea equipments, floating production facilities) project In The City Of Karratha Council Area of Private ownership. For the provision of engineering services. Click for more details...

NORTH WEST SHELF SUBSEA TIEBACK PROGRAM (GWF PH 2) - SUPPLY OF SUBSEA XT FRAMES & TUBING HEAD FRAMES
Currently at the Construction stage In Carnarvon Basin is a project estimated to be $ 5000000. This project For the provision of Subsea XT Frames & Tubing Head Frames. Click for more details...

WA-28-L GREATER ENFIELD OIL & GAS - SUBSEA HARDWARE - FEED
Front End Engineering/Design project at 49km off the coast of, Exmouth, WA 6707 in the Oil & Gas (Sub-sea equipments, floating production facilities). For the provision of front-end engineering & design (FEED) of the full subsea production system architecture solution, including subsea multiphase boosting, for the field that will be tied-back to existing Ngujima-Yin FPSO. Click for more details...