WANNEROO 132/22 KV SUBSTATION UPGRADE
Wanneroo 132/22 Kv Substation Upgrade is currently at the Construction stage, valued at about $ 150000 it is Works comprise extension to relay room as part of Wanneroo 132/22 Kv Substation upgrade. Click for more details...

BULGA COAL OPERATIONS - REDBANK II COAL TAILINGS PREPARATION & WASTE MANAGEMENT
Coal Tailings Dewatering Plant & Associated Infrastructure New project In The Singleton Council Area. The proposal included construction & operation of a tailings dewatering plant (DBT) and associated infrastructure and facilities. Supply of BDT fuel to the Redbank 2 power plant and receipt and disposal of fly ash, water treatment plant sludge, and wastewater from the Redbank 2 power plant. Click for more details...

DROMANA RESERVOIR BYPASS
Reservoir-Pipeline project at Dromana Reservoir, Dromana, VIC 3936 in the Public Utilities (Reservoirs). For the construction of a 300m long 900mm diameter MSCL pipeline for the Dromana Reservoir Bypass Main including associated roadworks. Click for more details...

ROKEBY/TRANMERE SEWERAGE SCHEME
Electrical & Control Works For Rokeby Waste Water Treatment Plant project, Rokeby, TAS 7019 in the Public Utilities (Treatment plants, Sewerage reticulation). Supply of materials and construction of electrical and control works. Click for more details...

WYONG PARK
A project in the WA Within Canning. Works comprise rejuvenation of sports playing surface at Wyong Park & will include removal of top surface, hollow tine/verti-draining & sweeping, top dressing & fertiliser application. Click for more details...

COASTAL FACILITIES TRIGG SEWER CONVERSION
Public Utilities (Treatment plants, Sewerage reticulation) project In The Stirling Council Area of Local Govt ownership. Conversion of coastal facilities to sewerage works comprise of: Part A - construction of gravity waste drainage system to service Trigg Island Cafe, Trigg Surf Life Saving Club facilities, Surfing WA Facility & North Trigg changerooms & toilets. Part B - Construction of pumping facilities & pressure rising main to service South Trigg Kiosk/Changerooms/Toilets. Click for more details...

JERVIS BAY TERRITORY WATER SUPPLY/TREATMENT PLANT
Jervis Bay Territory Water Supply/Treatment Plant is currently at the Tenders & Building stage, valued at about $ 500000 it is JBTA-2004-002 this contract is for the operation of the existing water supply system at Jervis Bay. This system includes intake works, pump stations, reticulation, reservoirs & water treatment plant. The contractor will be responsible for all routine maintenance of the infrastructure, supply of materials including power, water & chemicals & ensuring that performance standards are maintained. Click for more details...

LAKE TOOLIBIN - SOLAR SALT FIELD
Lake Toolibin - Solar Salt Field is currently at the Early Planning stage, valued at about $ 800000 it is It was proposed to establish solar salt field to extract commercial grade salt from groundwater brine at Lake Toolibin. Click for more details...

TILLEY RESERVE & HARPERS FIELD
Bore Pump/Associated Works For Reserves (2) Supply & Install project In The Tea Tree Gully Council Area. Supply & install bore pump & associated works for 2 x reserves. Click for more details...

NYIRRIPI COMMUNITY
Currently at the Construction stage In Alice Springs Town is a project estimated to be $ 1200000. This project 2kms of reticulated gravity sewer connected to existing houses. Rising main & sewerage pond & 2 pump station within Community. Click for more details...

CHARLTON WATER TREATMENT PLANT
Local Govt ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Buloke Council Area for New development. Design and Construction of Water Treatment Plant and Associated Works. Click for more details...

NORTH BEACH CARAVAN PARK
Public Utilities (Water distribution systems, Drainage) project In The Bellingen Council Area of Caravan Park - Upgrade type. Refurbishment of existing caravan park including landscaping, signage, childrens playground, electrical switch room, refurbish swimming pool, water reticulation system, new ablution building, install & equip 6 new cabins. Water, sewer & electricity reticulation works due for completion October 2001. Cabin, amenities & camp kitchen construction due for commencement April 2002 & completion by December 2002. Click for more details...

COLLEX WASTE WATER TREATMENT PLANT
Public Utilities (Treatment plants, Sewerage reticulation) project In The Parramatta Council Area of Factory - Altns & Addns type. Expansion of existing liquid treatment plant. Click for more details...

WALLERAWANG POWER STATION
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) Renovations, Refurbishments etc. project at Power Station, Wallerawang, NSW 2845. This type is Electro Hydraulic Governor - Upgrade with State ownership. Upgrade of governor for Units 7 & 8. Click for more details...

MUTITJULU COMMUNITY INCORPORATED
Currently at the Tenders & Building stage In Alice Springs Town is a project estimated to be $ 1500000. This project Civil Works: Upgrade of existing CED sewerage system, upgrade of an existing sewerage pond, new effluent disposal system, approx 1.4 km of new roads, lot servicing to 14 house lots. Click for more details...

PARKMORE RIDGE ESTATE - SEWER MAINS
Public Utilities (Treatment plants, Sewerage reticulation) project In The Wanneroo Council Area of Private ownership. Works comprise construction of DN450 sewer mains within & adjacent to Parkmore Ridge Estate. Contract length: 7 weeks. Click for more details...

COOPER LANE DRAINAGE
Cooper Ln btwn Grosvenor St & Grasmere Ln, Cremorne, NSW 2090 Has Cooper Lane Drainage currently at Construction stage. Construction of stormwater trunk drainage. Work also includes the construction of a sideline in Martens Lane; trenching, backfill & pavement reconstruction, localised road regrading & other associated works. Click for more details...

QUEECHY SEWAGE PUMPING STATION
Currently at the Construction stage In Launceston is a project estimated to be $ 3400000. This project The scope of works under this contract includes the supply, delivery and installation of all materials and equipment for the construction of a new sewage pumping station and covered storage that will pump flow (via a new rising main) to Hoblers Bridge Wastewater Treatment Plant. The pumping station and covered storage will include a below ground circular concrete structure divided into multiple chambers, installation of inlet and outlet pipework, three 22kw (approximate) variable speed pumps, pumping equipment, control systems, flushing systems, mechanical ventilation and an architecturally designed above ground control building. Two DN 375 Ductile iron cement lined, rubber ring, jointed PN 35 pipelines installed below ground and two 450 OD, PE 100, PN 10 butt fusion welded pipelines installed below ground surface that connect to a new PE rising main (installed under separate contract) to the existing Norwood Rising Main. A flowmeter and valve pit complete with two electromagnetic flow meters, actuated valves and control systems. Upgrading power supply and water supply to the site. A new access road to the pumping station. Significant earthworks and rock retaining walls. Landscaping of the site. Decommissioning of the existing pumping station and associated infrastructure and the existing open storage basin. Click for more details...

GOLD COAST CITY COUNCIL PIMPAMA COOMERA WATER FUTURE PACKAGE D
Public Utilities (Reservoirs) New project at Various Locations in, Gold Coast Mc, QLD 4217. This type is Reservoirs/Sewerage Treatment - Package D with Local Govt ownership. Includes the design and construction of potable and recycled water mains and sub-mains, pumping stations, reservoirs, wastewater gravity mains, wastewater rising mains and pumping mains. Click for more details...

AQWEST - ENGINEERING FABRICATION & SITE INSTALLATION SERVICES
Public Utilities (Treatment plants, Sewerage reticulation) project In The Bunbury Council Area of Engineering Fabrication & Site Installation Service type. Works to include engineering fabrication & site installation at various locations within City of Bunbury for 3 years on as required basis. Click for more details...

HOSKIN ROAD EFFLUENT TREATMENT LAGOONS & STORAGE DAMS
Local Govt ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Berri Barmera Council Area for New development. Construct effluent treatmenty lagoons & storage dams. Click for more details...

POWER & WATER CORPORATION - NORTHERN REGION WATER SUPPLY/SEWERAGE SYSTEMS INSTRUMENTATION/EQUIPMENT
Public Utilities (Treatment plants, Sewerage reticulation) Renovations, Refurbishments etc. project at Various sites within northern region of, Darwin, NT 0801. This type is Water Supply/Sewerage Systems Instument/Equipment - Install/Repairs/Service/Main with State ownership. Installation, repairs, service & maintenance to general instrumentation & control equipment for water supply & sewerage systems for 36 month period contract in northern region. Click for more details...

BLUEWATERS COAL-FIRED POWER STATION
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at Lot 8 Wellington Loc 796, Boys Home Rd, Bluewaters, approx 4 km northeast of, Collie, WA 6225 for New. Construction of ash plant switchroom & processor room. Click for more details...

POTTS HILL RESERVOIRS SITE REDEVELOPMENT
Potts Hill Reservoirs Site Redevelopment is currently at the Construction stage, valued at about $ 9000000 it is Eastern Precinct - Employment land. Infrastructure civil works for proposed employment lands, which includes subdivision, demolition, bulk earthworks, soil remediation & site infrastructure. Following remediation & bulk earthworks site infrastructure comprising internal roads & drainage works, installation of water & sewerage, power & gas services will be necessary prior to building construction Click for more details...

BROADWAY IRRIGATION WORKS
New project of Public Utilities (Water distribution systems, Drainage) project at Broadway, Crawley, WA 6009. Works to comprise supply & installation of an automatic irrigation system as well as supply of a pump irrigation control cabinet & major bore at Broadway, Crawley. Click for more details...

ILUKA EBB TIDE RIVER RELEASE
Ebb Tide Release System project at Johnson St, Iluka, NSW 2466 in the Public Utilities (Treatment plants, Sewerage reticulation). Project will involve horizontal drilling & marine works for the Iluka Sewerage System to allow discretionary discharge to the Clarence River near Moriarty's Wall. Work comprises Connection to the recycled water transfer main (to be constructed by others) & extension of that main to the shoreline entry point of the submarine pipeline. A submarine pipeline by trenchless technology such as Horizontal directional drill (HDD) from the shoreline entry point to the diffuser location on the bed of the Clarence River. Diffuser structure including foundation, supporting & protective structures, pipework & fittings on the bed of the Clarence River. Appurtenances such as navigational marker buoy, marker posts, thrust block & related items. Click for more details...

DENILIQUIN SHIRE COUNCIL SEWER SYSTEM
A project in the NSW Within Deniliquin. Schedule of rates contract for the rehalibition of the gravity sewer system. The priority area for rehabilitation is either side of and through the CBD area. This comprises approximately 914m of 375mm dia pipe and 706m of 300mm dia pipe with nominally 10 digups ranging in depth from 5 to 7 metres. There will also be some other isolated sections external from this area Click for more details...

EAST PINGELLY SANDALWOOD PLANTATION
Plantation New project In The Pingelly Council Area. Works to include the construction of a sandalwood plantation. Click for more details...

TOWNSVILLE CITY COUNCIL SEWERAGE REHABILITATION PROGRAM 2009/2010
Relining Of Reticulation Sewers project at ., Townsville, QLD 4810 In The Council Area Of Townsville City of Local Govt. Sewer Rehabilitation Program 2009/2010 relining of reticulation sewers. Click for more details...

SIR CHARLES GAIRDNER HOSPITAL (QUEEN ELIZABETH II)
Central Plant Building (Cep) - Relocation project at Western side of Hospital Av, Nedlands, WA 6009 In The Council Area Of Nedlands of State. The CEP will be a separate building to comprise of: emergency power, major mechnical & fire services, hydraulic engineering plant to be able to provide hot water & chilled water, reverse osmosis water for clinical use & medical gases for the existing health facilities/buildings on the QEII Medical Centre site. The relocation of the central plant facility will allow for the existing facility to be demolished, hence clearing the site to allow the New Children's Hospital (NCH) construction to commence. Approximate cost of central plant relocation & associated tunnelling works is in the range of $200 million. Click for more details...

BRISBANE ST STORMWATER DRAIN
Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Dubbo Council Area for New development. Brisbane Street stormwater drainage works. The work involves the installation of up to 831m x 1350 diameter reinforced concrete pipes by either open-trenching or pipe-jacking. Click for more details...

ENERGYAUSTRALIA CROWS NEST SUBSTATION
cnr Albany, Hume & Oxley Sts, Crows Nest, NSW 2065 Has Energyaustralia Crows Nest Substation currently at Construction stage. Demolition of existing office building. Construction of a new building & yard Click for more details...

CAMDEN HILLS GOLF PRACTICE RANGE
Currently at the Planning stage In Camden is a project estimated to be $ 2500000. This project Removal of approximately 17.300³ of contaminated fill currently stockpiled on Lot 100 DP1153216 & transportation to Lot 10 DP1086849. Construction of a temporary haulage route approximately 250m in length across Lot 1 DO795836. Construction of drainage swales & installation of sediment & erosion control plans. Drain & desilt the existing dam on Lot 10. Stockpile silt & clay from darn for reuse in capping over contaminated full. Remediate the site. Earthworks & associated landscaping for the construction & use for a golf practice range. Click for more details...

NORTHERN VICTORIA IRRIGATION RENEWAL PROJECT (NVIRP) PRE-CAST CONCRETE FLUME STRUCTURES FOR REGULATORS
Public Utilities (Water distribution systems, Drainage) project at Various sites in theGoulburn Murray Region including, Shepparton, VIC 3630 of Precast Concrete Flume Structures type of New development. Supply of Pre-Cast Concrete Flume Structures for Regulators which will be installed in to the GMID channels. Click for more details...

GOLDRING STREET EARTHWORKS
Earthworks project at Goldring St, Richmond, QLD 4740 In The Council Area Of Mackay Regional of State. to include excavating, site levelling & preparation for the construction of concrete hardstand & compliant pole storage units. Click for more details...

TOWN OF PORT HEDLAND FUTURE GROWTH PROGRAM
Public Utilities (Water distribution systems, Drainage) project at Town of, Port Hedland, WA 6721 for New. Consultant or team of consultants required to work with Town of Port Hedland staff to project manage & prepare integrated planning & reporting framework comprising of a series of key strategic documents being: 10 year Financial Plan; 10 year Community Strategic Plan; 10 year Asset Management Plan; 5 year Information Communication Technology (ICT) Strategy & 4 year Workforce Plan including a Housing & Accommodation Strategy which are to be integrated with the Town of Port Hedland's Growth Plan currently being worked on. Click for more details...

JFR (JIM) MCGEOUGH RESOURCE RECOVERY FACILITY (FORMERLY BROCKWAY WASTE TRANSFER STATION) - RECONFIGURATION
Renovations, Refurbishments etc. project of Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at 60 (Lot 11541, Reserve 33986) Lemnos St, Shenton Park, WA 6008. Reconfiguration of the existing waste transfer station would include relocation of greenwaste tipping area, expanded residential tipping area, installation of walking floors, establishment of waste compaction system & additional car parking on site. Click for more details...

MITCHELL STREET SEWER RETICULATION
Public Utilities (Water distribution systems, Drainage) project In The Darwin City Council Area of Truck Sewer Main/Stormwater Drainage type. Construction of approximately 87m of trunk sewer main with associated stormwater drain reconstruction along Mitchell Street. To include construction of approximately 35m of sewer reticulation & reconnection to all property sanitary drains to new sewer system. Click for more details...

SOUTHERN CROSS HOSPITAL - DRAINAGE WORKS
Public Utilities (Water distribution systems, Drainage) project at Great Eastern Hwy, Southern Cross, WA 6426 of Drainage Works - Repairs type of Renovations, Refurbishments etc. development. Works to include site drainage repairs at Southern Cross Hospital. Click for more details...

CITY OF MELVILLE - CIVIL WORKS
Public Utilities (Water distribution systems, Drainage) project In The Melville Council Area of Irrigation Systems - Supply/Install type. Works to include the supply/installation of new irrigation systems to be located at the following Reserves within the City of Melville - John Connell Reserve, 11 Diamond Ct, Leeming; Marmion Reserve, 436 Marmion St, Myaree; Layman Park, 1 Layman St, Booragoon & Ratcliffe Park, 31 Pickering Wy, Booragoon. Click for more details...

MOUNT PETER CATHOLIC COLLEGE EXTERNAL INFRASTRUCTURE WORKS
Public Utilities (Water distribution systems, Drainage) project In The Cairns Regional Council Area of Private ownership. External infrastructure works for new Mount Peter Catholic College. Work to include construction of roads. drainage, sewer, water & electrical/communications infrastructure. Click for more details...

WESTERN POWER SERVICE CONTRACTORS
Public Utilities (Water distribution systems, Drainage) project at Various locations within, ., WA 6999 of Civil Works/Commercial/Electrical type of New development. Western Power is seeking suitably qualified & experienced companies to provide various services within the areas operated by Western Power to include: Balcatta, Bentley, Forrestfield, Fremantle, Head Office (Wellington St), Hope & Prinsep Rds in Jandakot, Kewdale, Mt Claremont, Perth International Airport & Power Training Svcs (PTS). Categories of services to be provided: asphalting; paving works; concrete works to include slabs, foundations, paving & kerbing; masonry & brickwork; structural framing, cladding & roofing works; earthworks to include excavation & controlled disposal of contaminated soil; internal fitouts to include carpentry, joinery, ceilings, carpeting, furniture, fixtures, fittings, painting & decorating; plumbing, hydraulics & drainage works; fire, HVAC & electrical works; security, CCTV & audio visual works; landscaping; demolition & asbestos removal works; fencing & gates & other general civil, building & maintenance works. Click for more details...

PINE RIVERS PARK AMPHITHEATRE GRADING & DRAINAGE WORKS
125 Gympie Rd, Strathpine, QLD 4500 Has Pine Rivers Park Amphitheatre Grading & Drainage Works currently at Construction stage. Design & construction of grading & drainage works at the Pine Rivers Park ampitheatre. Works to include renovation of the existing turf surface. Supply, delivery & install of a new automated underground irrigation system & laying of turfgrass. Minor earthworks. Associated landscaping. Click for more details...

WYNDHAM CITY COUNCIL CENTRAL CONTROL IRRIGATION SYSTEM
Irrigation System New project In The Wyndham Council Area. The installation of a Central Control Irrigation System on Council?s Sports Fields at 32 locations across the Municipality. Click for more details...

NEWCOMBE ST STREETSCAPE
Newcombe St Streetscape is currently at the Construction stage, valued at about $ 1035000 it is Newcombe St partial road opening & closure, a streetscapes upgrade involving 180 degree switching of Newcombe St, redesignation of community land to operational & vice versa. Scope of work consists of: stormwater upgrade; pedestrian pavements; kerb, gutter & road pavement construction; soft & hard landscaping. Click for more details...

INFILL SEWERAGE AREA CITY BEACH 2A
New project of Public Utilities (Pumping Stations) project at West Coast Hwy, Floreat, WA 6014. Construction of City Beach 2A infill sewerage, pumping station & pressure main. Works to include approximately 8.5km of pvc gravity sewers to be installed by a combination of open trench & trenchless methods, a type 40 wastewater pumping station & 1.8km of PE sewer pressure main. Click for more details...

ELSIE DORRINGTON RESERVE NETBALL COURT UPGRADE
Public Utilities (Water distribution systems, Drainage) project In The Mornington Peninsula Council Area of Netball Courts (7) - Upgrade type. Mornington Netball Courts at Elsie Dorrington Reserve, Mornington. The proposed construction works will include, reconstruction of 7 Netball Courts (fenced), footpath & drainage works, electrical lighting works for all 7 Netball Courts, & other associated works. Click for more details...

OXFORD STREET SUBSTATION
Local Govt ownership Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project In The Sydney Council Area for New development. Construction of a new substation, main switchboard & minor modification to building essential services. Scope of works includes demolition of an existing internal basement floor slab around the position of the new substation. Modification and/or removal of the existing concrete lintel, brick facade concrete slab & fire egress door. Excavation within the footprint of the new substation to install new high voltage cabling. Construction of a reinforced concrete slab around the position of the new substation. Installation of the substation and associated work. Construction of fire rated wall behind the windows of ground floor shop no. 62 & 64 Oxford St. Base building services modification to suit new layout at basement level. Electrical reticulation from the new main switchboard to the existing switchboards and new reticulation. Click for more details...

MOUNT ZERO WATER TREATMENT PLANT
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at In, Laharum, VIC 3401. Works to include the design & construction of a tank to provide contact time & mixing of Powdered Activated Carbon (PAC) at Horsham Mt Zero water treatment plant. Scope of works to include: develop detailed design for all components, preliminary site works including relocation of existing plumbing & fences, construct a 315kL concrete or lined steel tank & connecting pipeworks & valves, supply & install mechanical mixers & complete all civil, mechanical & electrical works to integrate the PAC contact tank with existing Pac dosing unit & raw water system. Click for more details...

NAKARA PRIMARY SCHOOL
Public Utilities (Water distribution systems, Drainage) project In The Darwin City Council Area of School - Civil Works type. Replace, fire, potable & irrigation mains. Associated works Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect