Click Here to Find Current Projects

List of Public Utilities Projects


COOLOOLA SHIRE COUNCIL - IMBIL SEWERAGE TREATMENT PLANT
Public Utilities (Treatment plants, Sewerage reticulation) New project at ., Imbil, QLD 4570. This type is Sewerage Treatment Plant with Local Govt ownership. Manufacture & installation of package sewerage treatment plant. Click for more details...

NELSON PLACE RETICULATION SEWER REHABILITATION - STAGE 1
Reticulation Sewer Rehabilitation project at Nelson Plc, Williamstown, VIC 3016 In The Council Area Of Hobsons Bay of Local Govt. Rehabilitation of 1124 m of 225 mm & 271 m of 150 mm concrete sewers by pipebursting & lining including rebuilding of approx 92 no property branches in Williamstown. Click for more details...

AUSTRALIND WATER PIPELINE & PUMPING STATION
Public Utilities (Water distribution systems, Drainage) project at From Australind to Brunswick Junction via Victoria Rd, Burekup &, Roelands, WA 6226 of Water Pipeline/Pump Station type of New development. Construction of new pipeline to Brunswick Junction, Burekup & Roelands that will deliver water from Australind. Works will include construction of 700 mm nominal diameter pipeline (approximately 1.2 km long), 200 mm nominal diameter pipeline (approximately 12.8 km long) & associated works, including valves, meters & concrete pits. Pipelines will generally be below-ground & constructed using open trench excavation, which will be backfilled & restored. Project will also include booster pump station. Click for more details...

WATER CORPORATION - GENERATORS
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) New project at Within State of Western Australia, ., WA 6999. This type is 36 Kw Transportable Generators (4) For Various Locations with State ownership. Supply & delivery of four 36 kW transportable generators. Click for more details...

ALCOA REFINERIES
Co-Generation Power Plants project at At Pinjarra, Kwinana & Wagerup, ., WA 6999 In The Council Area Of Various of Private. The first of these plants is to be at Pinjarra. The facility is being built in two stages, each comprising a gas-fired co-generation facility. Click for more details...


is currently at the Construction stage, valued at about $ 60000 it is Period contract for general repairs & maintenance of electrical services on PAWA installations. Click for more details...


Civil Works For Substation H18 project at 150 km north west of Brisbane, Tarong, QLD 4615 in the Public Utilities (Power stations, Substations, Windfarms, Phone exchanges). Minor earthworks & roadworks, construction of shallow concrete foundations, concrete cable trenches & pits; the supply & installation of drainage pipes, electrical conduits, underground copper earthing grid & security fencing for the establishment of three 275 kV bays. 16-18 week contract. Click for more details...

WOODMAN POINT WASTEWATER TREATMENT PLANT
Public Utilities (Water distribution systems, Drainage) project for New development. Supply & delivery of vacuum pumps for tanker receival facility at Woodman Point Wastewater Treatment Plant. Click for more details...

SYNDEY WATER
Wastewater/Stormwater Conduits - Maintenance project at various, ., NSW 2999 in the Public Utilities (Treatment plants, Sewerage reticulation). The intent of this contract is to determine the structural & service conditions of wastewater & stormwater conduits using Closed Circuit Television (CCTV), including root-cutting, dredging, plus removal & disposal of slit & debris. Click for more details...

FOX WORKING STUDIO
Central Plant Building Subcontract project In The Sydney Council Area. Concrete slab, concrete block work. Click for more details...

ROSNY WASTEWATER TREATMENT PLANT
Public Utilities (Water distribution systems, Drainage) project, Rosny, TAS 7018 for New. Equalisation tank aeration, ducting no 1 odour tower to scrubber, modifications to sludge thickener inlet pipework, ducting exhaust from RAS pits & associated control work. Click for more details...

ADELAIDE DENTAL HOSPITAL
Trade Package For Plumber - Orthodontic Clinic - Redevelopment - Level 4 project at Frome Rd, Adelaide, SA 5000 in the Public Utilities (Water distribution systems, Drainage). For refurbishment to level 4. Click for more details...

ASTLEY STREET & BURSLEM DRIVE STORMWATER POLLUTANT TRAPS
Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Gosnells Council Area for Supply & Install development. Works comprise survey, design, supply & installation of two stormwater pollutant traps at Astley St & Burslem Dr. Click for more details...

SAHT - NOARLUNGA
Public Utilities (Water distribution systems, Drainage) project In The Onkaparinga Council Area of Stormwater Replacement For Properties (44) type. Stormwater replacement for 44 properties within Noarlunga region. Click for more details...

HALLS CREEK WATER & SEWER MAINS EXTENSION
A project in the WA Within Halls Creek. Works comprise extension of water main by 570 m utilising 100 mm diameter pipe, extension of sewer line by 210 m of 150 mm diameter pipe & other minor associated works. Click for more details...

PEPPIMENARTI WATER STORAGE TANK
Water Storage Tank - Supply & Install project at Peppimenarti Community 280 km approx south west of, Darwin, NT 0800 in the Public Utilities (Water distribution systems, Drainage). Supply & install one 1,000 kl (1.0 ml) nett working capacity water storage tank. Click for more details...

HENRY KENDALL AGRICULTURE FARM
Public Utilities (Pumping Stations) project at Faunce St, Gosford, NSW 2250 for New. Installation of pumping station & effluent line to Gosford City rising main Click for more details...

WILLIAM STREET SEWAGE PUMPING STATION
Public Utilities (Pumping Stations) New project at William St, Perth, TAS 7300. This type is Sewage Pumping Station with Local Govt ownership. construction of a new sewage pumping station. The works include construction of a new 3 metre diameter wet well, supply and installation of 2 submersible sewage pumps, construction of a detention storage, supply and installation of a new electrical switchboard and controls and associated minor road works, pits and pipework. Click for more details...

FRANKFORD MAIN ROAD WATER MAIN RECONSTRUCTION
Frankford Main Road Water Main Reconstruction is currently at the Construction stage, valued at about $ 60000 it is Installation by trenchless technology of 324 metres of DN200 polyethylene pipe and associated works. Click for more details...

POWER & WATER CORPORATION ALL CENTRES ENGINEERING SERVICES CONSULTANCY
Public Utilities (Treatment plants, Sewerage reticulation) New project at Various locations within Northern Territory, ., NT 8999. This type is Engineering Services Consultancy with State ownership. Engineering services consultancy for 36 month period panel contract for all Power & Water Corporation centres. Click for more details...

HARDING DAM WATER TREATMENT PLANT
Currently at the Construction stage In City Of Karratha is a project estimated to be $ 658000. This project Works to comprise of construction of Sulphuric Acid Dosing System upgrade at Harding Dam Water Treatment Plant. Click for more details...

NORTON STREET STREETSCAPE
Norton Street Streetscape is currently at the Early Planning stage, valued at about $ 600000 it is Pedestrian improvements & main street works including roadworks, lighting, footpath extensions, undergrounding of power lines, installation of 15 pairs of smart poles, bench seating, drainage, railings & balustrades, landscaping. Click for more details...

DORA CREEK WASTEWATER TREATMENT PLANT (WWTW)
Marconi Rd, Morisset, NSW 2264 Has Dora Creek Wastewater Treatment Plant (Wwtw) currently at Construction stage. Dora Creek WWTW - construction of new inlet works, new septage receival facilities, new soil bed filter, new switch room; 2 new 26.5m diameter secondary clarifiers; modification of the existing aeration tanks; new pump stations; all associated mechanical & electrical equipment; new access roads; demolition & removal of various buildings/structures; site rehabilitation & landscaping & design/development & construction of screenings & grit handling systems Click for more details...

CAMP JUNGAI SEWAGE SYSTEM UPGRADE/REPLACEMENT
Public Utilities (Treatment plants, Sewerage reticulation) project In The Murrindindi Council Area of Sewage System - Upgrade type. Registrations of Interest are invited from suitably qualified contractors for the proposed Upgrade/Replacement and all associated siteworks at Camp Jungai, Rubicon. Click for more details...

BUSSELTON WATER - WATER TREATMENT PLANT (6)
Public Utilities (Treatment plants, Sewerage reticulation) project In The Busselton Council Area of Steel Potable Water Storage Tank/Pipework/Associated Outbuildings - Upgrade type. Construction of a 4.9 ML steel potable water storage tank, pipework & associated outbuildings for the uprgarade of Busselton Water's water treatment plant (plant 6) located on Bussell Hwy Near Vasse. Click for more details...

AUBURN STABLING FACILITY
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project for New development. Transport Infrastructure Development Corporation invited experienced consultancies to tender for the role of Planning Approvals Contractor for the environmental Impact assessment to the Auburn Stabling Project Click for more details...

CENTRAL WEST COLLEGE OF TAFE - GERALDTON CAMPUS
Water Storage Tanks - Supply & Install project at Cnr Fitzgerald St & Port Wy, Geraldton, WA 6530 in the Public Utilities (Treatment plants, Sewerage reticulation). Works to include the supply & installation of water storage tanks for the TAFE campus. Click for more details...

WEST HORSLEY EARLY WORKS PROJECT
New project of Public Utilities (Water distribution systems, Drainage) project at West Horsley Precinct, Dapto, NSW 2530. Construction, operation, maintenance of drinking water & wastewater lead-in infrastructure, including a 1 kilometre long water pipeline & 1.5km long wastewater pipeline to service the release of the West Horsley precinct Click for more details...

KALKALLO, COBURG AND DONCASTER RECYCLED WATER TREATMENT PLANT CONSTRUCTION PANEL
Construction Panel project at COBURG, DONCASTER and, Kalkallo, VIC 3064 in the Public Utilities (Treatment plants, Sewerage reticulation). Expressions of Interst are invited from suitably qualified contractors to be included on a Construction Panel for the construction of three separate recycled water treatment plants at Kalkallo, Coburg and Doncaster. Click for more details...

FITZPATRICK INDUSTRIAL ESTATE
Fitzpatrick Industrial Estate is currently at the Construction stage, valued at about $ 384000 it is Construction of a bioretention & detention basin to be located on the eastern boundary of the Fitzpatrick Industrial Estate Click for more details...

GOSFORD CITY COUNCIL WATER MAIN RENEWALS
New project of Public Utilities (Water distribution systems, Drainage) project at Willoughby Rd, Terrigal & Pine Av, Davistown, NSW 2251. Schedule of rates contract for the replacement of approximately 475m of 150mm diameter water main in Willoughby Rd Terrigal & 280m of 100mm diameter plus 320m of 150mm diameter water main in Pine Av Davistown Click for more details...

WODONGA PUMP STATION
Currently at the Tenders & Building stage In Wodonga is a project estimated to be $ 200000. This project Design, supply and construction of additional pump for Wodonga No 1 Pump Station, Wodonga. Wodonga No. 1 Pump Station is a critical pump station in the Wodonga sewage network. The station consists of an inlet into two wet wells from which three pumps feed into three rising mains, two 300 mm and one 450 mm. The maximum capacity of the station is 330 l/s. Following recent wet weather events North East Water (NEW) has found the requirement to retrofit a permanent diesel pump to the pump station. The pump shall have suction from wet well 1 and feed into the 450 mm rising main. The pump shall be connected to the existing control system and automatically start at a high level in the wet wells. Click for more details...

WATER CORPORATION - PLANTAGENET PRESSURE MAIN PIPELINE WORKS - STAGE 1
Public Utilities (Water distribution systems, Drainage) project In The Plantagenet Council Area of State ownership. Works proposed to include upgrade of the water supply pipeline between the Chorkerup Pump Station & Mt Barker comprising of: construction of approximately 27km of pipeline with fittings & connections. Click for more details...

LACHLAN ROAD STORMWATER
Public Utilities (Water distribution systems, Drainage) project at Lachlan Rd, New Norfolk, TAS 7140 of Stormwater And Associated Works type of New development. Installation of stormwater, kerb and gutter and retaining walls on the left hand side and pavement sealing of Lachlan Road, between Black Hall Gully Road and Fosters Gully Road. Click for more details...

WHITEMAN PARK - FIRE HYDRANT/HOSE REEL SYSTEM
Public Utilities (Water distribution systems, Drainage) Renovations, Refurbishments etc. project at Bnd by Beechboro, Marshall & Gnangara Rds, Whiteman, WA 6068. This type is Fire Hydrant/Hose Reel System - Upgrade & Install with State ownership. Works to include upgrade of the Fire Hydrant & Hose Reel System within Whiteman Park & Caversham Wildlife Parks. Works to the fire hydrant & hose reel systems as follows: existing supply mains to be capped & sealed below ground, a number of twin head fire hydrant valves to be upgraded to incorporate lockable anti-vandal valve covers, existing fire pump at the Transport Heritage Centre & at the Tractor Museum to be decommissioned & removed at completion of the works, existing 190,000 litre fire storage tanks that serve the Tractor museum & Transport Heritage Centre to be upgraded & the existing brigade booster assembly & enclosure serving the Transport Heritage Centre is to be modified & upgraded. Works also to include Fire Hydrant & Hose Reel Services for the B2 area as follows: new signage at 3 public entrances, new fire pump set, new structural slab & concrete support plinth, provision of a new twin head fire hydrant to be located of the new ring site, provision of a new secondary sub ring main in Caversham Park. All below ground services in hard surfaces & soft landscaping & paving to be maintain at a depth of 600mm, all pipe services that will be below access roads to be installed within PVC sleeves. Premises will be occupied during the contract, The contractor must ensure minimal inconvenience & disturbance to the occupants. Click for more details...

MURRAY IRRIGATION
Currently at the Construction stage In Berrigan is a project estimated to be $ 200000. This project Replacement of seven road culverts & one subway within Murray Irrigation's Finley area of operation. Click for more details...

PINE RIVERS PARK AMPHITHEATRE GRADING & DRAINAGE WORKS
125 Gympie Rd, Strathpine, QLD 4500 Has Pine Rivers Park Amphitheatre Grading & Drainage Works currently at Construction stage. Design & construction of grading & drainage works at the Pine Rivers Park ampitheatre. Works to include renovation of the existing turf surface. Supply, delivery & install of a new automated underground irrigation system & laying of turfgrass. Minor earthworks. Associated landscaping. Click for more details...

POWER PARK INDUSTRIAL ESTATE SEWC BRANCH SEWER WORKS
Sewer Works New project In The Greater Dandenong Council Area. Construction of SEWC branch sewer works in Dandenong South. Works include the construction of approx 255 m of 375 mm dia sewer at a depth of up to 8 m from finished surface levels. Click for more details...

CAMP ROAD SEWAGE PUMP STATION
New project of Public Utilities (Water distribution systems, Drainage) project at Camp Rd, Dubbo, NSW 2830. Scope of work includes: supply & installation of an electrical switchboard & connection via underground cables to the power pole which is just outside the north east corner of the site; no new power pole is required. Supply & installation of 2 electric submersible sewage pumps in a duty/standby arrangement. Arrange connection to the electricity reticulation via the existing power pole arrangement to the site & electrical reticulation within the pump station site. Supply, installation & commissioning of a 3436 metre long sewage rising main of PN 12.5 PE 100 DN 250 OD (IO 212mm) in all classes of material, including rock. Underboring where required. Connection to the discharge pipeline into an existing in-service sewerage manhole upstream of the existing Cootha Sewage Pump Station. Pipeline crossings at the Tracker Riley cycleway. Supply, installing & commissioning of a ferrous chloride odour control system. Click for more details...

MELTON TOWN CENTRE REDEVELOPMENT PALMERSTON STREET CIVIL WORKS - STAGE 2
A project in the VIC Within Melton. Civil works in Palmerston Street between High Street & McKenzie Street, Melton. Works include: demolition of existing road between back of kerbs, earthworks, deep lift flexible pavement, concrete pavement, kerb & channel, drainage, asphalt overlay, public lighting, traffic signals & other ancillary works. Click for more details...

ROY LITTLE PUMP STATION
Public Utilities (Treatment plants, Sewerage reticulation) project at Located 3 km west of, Merredin, WA 6415 of Pump Station - Upgrade & Modification type of Renovations, Refurbishments etc. development. Tenders are being sought from civil contractors for modification works to an existing discharge pump station, reconfiguring pipework at the Roy Little Pump station & reconfiguring pipework & fountain in the Roy Little Pond. Works also to include the construction of a new feed pump station. Click for more details...

ELIZABETH QUAY DEVELOPMENT LOTS INTERIM SURFACE WORKS
Public Utilities (Water distribution systems, Drainage) New project at Lots 2, 3, 5 & 6 The Esplanade, Elizabeth Quay, Perth, WA 6000. This type is Civil/Hydraulic Works - Design, Supply & Install with State ownership. Elizabeth Quay Development Lots Interim Surface Works to include the provision of interim surfaces for vacant development lots 2, 3, 5 & 6 at Elizabeth Quay. Works to include all civil & hydraulic works including site grading & contouring, construction of hard landscaped perimeter for service vehicle access, pipe drainage works, installation of gravel mulch, erection of site fencing & bollards & design, manufacture, supply, installation, testing & commissioning of irrigation reticulation & control systems & installation of turf. Click for more details...

ST JOHN PLACE & INCE PLACE COURT BOWL RECONSTRUCTION
Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Melton Council Area for New development. Reconstruction at St John Place & Ince Place, Melton West including asphalt, concrete, earthworks, drainage, kerb, footpath & ancillary works. Click for more details...

WALTER GORS PARK
New project of Public Utilities (Water distribution systems, Drainage) project at Howard Av, Dee Why, NSW 2099. Carrying out & completion of major works for the construction of the new Walter Gors Park. Scope of work includes but is not limited to: removal of site contamination. Earthworks required to achieve the design finished surface levels. Construction of new drainage infrastructure including pipes, pits, irrigation storage tanks & water recycling system. Construction of all hard landscape works including concreting, fencing, paving, stone elements paths, walls & retaining structures. Installation of all play equipment including play structures, water play features, fitness apparatus & playground surfacing. Design, supply & installation of irrigation system. Installation of water play features & associated infrastructure. Supply & installation of toilet block & Pump Room. Supply & installation of new park/street furniture including lighting, shade structures, picnic settings & other furniture. Supply & installation of all soft landscaping including soils, mulches, plants, understorey vegetation & turfing. Installation of Council supplied tree stock. Supply & installation of lighting & electrical Click for more details...

INFILL SEWERAGE AREA CITY BEACH 2A
New project of Public Utilities (Water distribution systems, Drainage) project at West Coast Hwy, Floreat, WA 6014. Construction of City Beach 2A infill sewerage, pumping station & pressure main. Works to include approximately 8.5km of pvc gravity sewers to be installed by a combination of open trench & trenchless methods, a type 40 wastewater pumping station & 1.8km of PE sewer pressure main. Click for more details...

GRATTAN STREET WATER MAIN RENEWAL
Public Utilities (Water distribution systems, Drainage) project for New development. Construction of Grattan Street water main renewal on Wreckyn Street, Grattan Street & Flemington Road in North Melbourne. Click for more details...

MOUNT MORGAN SEWAGE TREATMENT PLANT ARTIFICIAL FLOATING WETLAND
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Via, Mount Morgan, QLD 4714. Construction of an artificial floating wetland at the Mount Morgan Sewage Treatment Plant. Click for more details...

DIGGERS RD
Roadworks project at Diggers Rd from Reservoir Rd to Oliver St, Lavington, NSW 2641 In The Council Area Of Albury of Local Govt. Reconstruction of Diggers Rd, from Reservoir Rd to Oliver St. Scope of work includes: approximately 360 metres of new pavement with kerb & gutter. Shared footpaths - approximately 630sq m. Drainage - approximately 70 metres of piped drainage. Ancillary works. Click for more details...

LINCOLN OVAL
Irrigation System New project In The Sutherland Council Area. Construction of an irrigation system, including design & installation of tank. Re-turfing of playing surface & perimeter & drainage Click for more details...

WAUCHOPE PUBLIC SCHOOL
Transformer - Upgrade project at Waugh St, Wauchope, NSW 2446 In The Council Area Of Port Macquarie-Hastings of State. Upgrade of Essential Energy 315KVa pole mount transformer to 500kVa pole mount transformer Click for more details...