HORSE PARK DRIVE EXTENSION
Public Utilities (Water distribution systems, Drainage) project In The Act Council Area of Roadworks type. Horse Park drive extension from Burramarra Av to Mirrabei Dr. Construction of the final section of Horse Park Drive. These works will improve traffic flow in the north western sector of the Gungahlin area & facilitate the future development of the Moncrieff &Taylor suburbs. Scope of work involves: Construction of approximately 1,800 metres of single, two way carriageway. Construction of 2 three way intersections, one of which is signalized. Construction of 1,600 metres of 300mm diameter water main & other hydraulic services. Construction of approximately 16 metres long by 19 metres wide bridge over flood way. Construction of approximately 2,000 metres of trunk cycleway. Construction of shared services trench & installation of street lighting. Landscape works. Click for more details...

DEAKIN SHOPPING CENTRE
A project in the ACT Within Act. The proposed upgrade of the shopping centre to include: Drainage & pedestrian access between the strip shops & medical centre/Deakin Court will be improved to meet current standards & prevent stormwater runoff into individual shops. Traffic flow entering & exiting the shopping precinct to be formalised. Duff Place to be converted into a one way system. Disabled parking to be amended. Raised pedestrian crossing to Hopetoun Crescent. Car parking spaces to be rationalised on Duff Place. Loading bay facilities to be rationalised on Duff Place. Improved access, including lighting to the Hannah Place laneway. Formalised public open space to the eastern side of Deakin court will include reduced grassed area, public art, signage & seating. Click for more details...

AUSTRALIAN NATIONAL BOTANIC GARDENS
Currently at the Construction stage In Act is a project estimated to be $ 3000000. This project Construction of new nursery. Click for more details...

MT STROMLO WATER TREATMENT PLANT
Public Utilities (Treatment plants, Sewerage reticulation) project In The Act Council Area of Water Treatment Plant - Design/Construct type. Design, construction & commissioning of a new water treatment plant at Mt Stromlo. The required capacity of Mt Stromlo WTP will be 250ML/day. Project completion is required by 20 October 2004. Click for more details...

CANBERRA INTERNATIONAL ARBORETUM & GARDENS
Public Utilities (Water distribution systems, Drainage) project at Green Hills Forest Area, Canberra, ACT 2600 for New. Staged construction of an international standard arboretum & gardens, located at the western end of Lake Burley Griffin, features may include major aboretum, a mosiac of gardens, a permanent bonsai exhibition, ampitheatre, an international scroll garden, a national museum of natural history, a sclupture garden, playgarden, vertical garden, garden of seasons, wild garden, a visitors centre, restaurant & function centre, outdoor concert venue, water features, pathways & irrigation system. Click for more details...

MARKETS BUILDING LANDSCAPING
Public Utilities (Water distribution systems, Drainage) project at 27 Wentworth Ave (Blk 3 Sec 49), Kingston, ACT 2604 for Renovations, Refurbishments etc.. Landscaping of the area between Bus Depot Markets building & adjacent Gateway residential development, landscaping to Wentworth Ave, repainting of existing building facade, irrigation, associated pedestrian lighting. Click for more details...

LOWER MOLONGLO WATER QUALITY CONTROL CENTRE
Stockdill Rd, Holt, ACT 2615 Has Lower Molonglo Water Quality Control Centre currently at Construction stage. The proposed works comprise the augmentation of the existing Secondary Treatment Facility to 100 ml/day by the addition of a range of infrastructure including, Three 37m Dia by 7m deep Clarifies, an Anoxic Tank approximately 60m by 30m & 6m deep, Pumps & pumping stations. Submersible mixers, large valves & Penstocks, Aeration Systems, Methanol Dosing System, MCC's Cabling, Instrumentation, PLC's Magnetic Flowmeters, Earthworks, Concrete structures, Large & small Bore pipework, Roadworks, Structural steel works, Minor Building/Architectural works & Landscaping. Click for more details...

ACT CORRECTIONAL CENTRE - ALEXANDER MACONOCHIE CENTRE (AMC)
Public Utilities (Water distribution systems, Drainage) project at Part Blk 6 Secn 24 & Part Blk 12 Secn 18 eastern side of Monaro Hwy, Hume, ACT 2620 for New. The preliminary works include installation of traffic lights at the entrance of the Alexander Maconochie Centre site, the installation of a water main & re-alignment of an existing sewer. Click for more details...

ACT WATER & SEWER PIPES
State ownership Public Utilities (Water distribution systems, Drainage) project In The Act Council Area for New development. Provision of protective coating application services to water & sewer infrastructure located throughout the Australian Capital Territory & in New South Wales. The project comprises all works associated with the pre-treatment & renewal of protective coatings to a bundle of 10 projects involving 7 separate asset types. It is envisaged that the works will be delivered as a single contract over a 3 year period. Click for more details...

POND F PUMP STATION
A project in the ACT Within Act. Installation of pump station at Pond F Click for more details...

QUEANBEYAN STP FACILITY
A project in the ACT Within Act. Construction of a sewerage receival facility at the existing Sewerage Treatment Plant. The facility would accept discharges from the sewerage tankers trucks from Googong Township Click for more details...

FYSHWICK SEWAGE TREATMENT PLANT
Inlet Works - Upgrade project at Secn 59 Blk 10 Dairy Flat Rd, Fyshwick, ACT 2609 in the Public Utilities (Treatment plants, Sewerage reticulation). Upgrade of the North Canberra water reuse scheme. Upgrade of inlet works & construction of the EMIC switchboard building at the Fyshwick Sewage treatment plant Click for more details...

AUSTRALIAN NATIONAL BOTANIC GARDENS
A project in the ACT Within Act. A new potable water supply main inside the Australian National Botanic Gardens (ANBG)The ANBG irrigation system and buildings are supplied from one main potable water supply system. In readiness for implementing a non-potable water supply for irrigation purposes in the near future, the ANBG is required to ensure separation of the infrastructure that will require potable supply into the future, from parts of the system that will be converted to non-potable supply. The new potable main will supply water for potable use only. The existing water supply system will be disconnected from the buildings and other select connection points, and converted to a dedicated non-potable irrigation supply Click for more details...

GUNGAHLIN ENCLOSED OVAL
Public Utilities (Water distribution systems, Drainage) project at Blks 1, 7, 2 Secn 17 & 19 Crinigan Cr, Gungahlin, ACT 2912 for New. Construction of an enclosed oval. The scope of works include a D shaped playing surface, grassed spectator seating areas, site works, ground lighting & electronic scoreboard. Civil works to comprise a wetland & kick about/picnic area with landscaped surroundings, major trunk stormwater drainage lines & a carpark for 31 vehicles with associated infrastructure to serve the Oval to the north & future Leisure Centre to the east. Click for more details...

ACT STORMWATER AUGMENTATION - PACKAGE A1
A project in the ACT Within Act. Stormwater Augmentation at various sites in the ACT - Package A1 Click for more details...

ACTEWAGL PUMP STATIONS
Public Utilities (Pumping Stations) project at in the ACT region, Canberra, ACT 2600 of Pump Stations - Repairs & Maintenance type of New development. Repairs & maintenance to ActewAGL pump stations & associated facilities in the ACT region. Click for more details...

CIT - BRUCE - HORTICULTURAL FACILITY
New project of Public Utilities (Water distribution systems, Drainage) project at Haydon Dr, Battye St & Purdie St, Bruce, ACT 2617. Scope of work inlcudes: bulk excavation, construction of roads, retaining walls, storm water including retention & reuse ponds, sewer & sanitary drainage, in ground water & non-potable water, in ground gas supply, underground electrical, communications & landscape conduit Click for more details...

TRANSGRID SUBSTATION WILLIAMSDALE
State ownership Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project In The Act Council Area for New development. Construction of a new substation on Block 1674 with transformers & 200sq m services building. Construction of a new access road from Monaro Highway to the site. Construction of new sediment ponds adjacent to the substation. Click for more details...

NARRABUNDAH COLLEGE
Sewer Reticulation New project In The Act Council Area. Sewer reticulation works as part of the Department of Education & Training Capital Upgrade 2001-2010 Package 2. Click for more details...

CASEY ACTEW PUMP STATION
Casey Actew Pump Station is currently at the Construction stage, valued at about $ 3000000 it is Construction of ACTEW pump station & rising main in the new Casey 2 estate. Click for more details...

NORTHBOURNE AVE STORMWATER HARVESTING
Public Utilities (Water distribution systems, Drainage) project for New development. Construction of a stormwater harvesting system. Scope of work includes: channel off take works consisting of trash rack pipes & headwall to divert stormwater from Sullivans Creek to the new holding pons. New holding pond of approximately 1ML capacity. Click for more details...

ELMGROVE 2 JACKA RESERVOIR
Public Utilities (Reservoirs) project In The Act Council Area of State ownership. Construction of the Jacka reservoir, water supply facility which includes a pump station, rising main, water tank of 3 mega litres & associated works. The reservoir would be surrounded by a permanent security fence 2.8 metres high. Construction of the fence would require a corridor approximately 5 metres wide. A permanent security fence would be erected also around the pump station & temporary fencing would be required along the route of the inlet/outlet main during construction Click for more details...

WATSON - STORMWATER
Public Utilities (Water distribution systems, Drainage) project for New development. Upgrade the stormwater infrastructure in Antill St to convey stormwater flows from Antill St to the Federal Highway Click for more details...

UNITING CARE GORDON AGED CARE FACILITY OFFSITE WORKS
Blk 19 Secn 410 cnr Tharwa & Woodcock Dr, Gordon, ACT 2906 Has Uniting Care Gordon Aged Care Facility Offsite Works currently at Construction stage. Offsite works for the Gordon Aged Care Facility to comprise: Landscaping, sewer, water & stormwater infrastructure, pedestrian footpaths & verge crossings. Click for more details...

EXHIBITION PARK IN CANBERRA - EPIC
Public Utilities (Treatment plants, Sewerage reticulation) New project at Flemington Dr, Mitchell, ACT 2911. This type is Water Plant with Local Govt ownership. Construction of a water plant which will reuse effluent water for irrigation of the grounds at Exhibition Park in Canberra therefore reducing reliance on potable water for irrigation. Trade package for supply & installation of water distribution system, pump sets, filtration systems & irrigatin works (15884.502) closes 16 August 2011. Trade package for supply & installation of T2,T3, T4 & T10 water tanks (15884.501) closes 9th August 2011 Click for more details...

INNER NORTH RETICULATION NETWORK
A project in the ACT Within Act. Reticulation work in stormwater/drainage in Dickson & Lyneham. Ponds with the existing stormwater ponds located adjacent to Flemington Road in Mitchell/Gungahlin & associated spur lines to adjacent properties along the main trunk route. The proposed works include construction of a raising main from Lyneham Wetland Pond to Flemington Rd No. 2 Pond. Small pump stations at Flemington Road No#1 & No#2 Ponds. Pipe reticulation network through Hackett, Dickson , Lyneham, Mitchell & Gunghalin. Pipe connections to end users along the pipeline route. Click for more details...

CRAVENS CREEK
Water Quality Control Pond project at Molonglo 2 to DENMAN PROSPECT, Weston, ACT 2611 In The Council Area Of Act of Local Govt. Construction of Cravens Creek Water Quality Control Pond (WQCP) & N1 WQCP. Scope of work includes construction a earth filled with clay core embankment across Cravens Creek to form a water quality control pond to protect the Molonglo River from the urban development in the valley. & associated infrastructure. A low flow diversion from pond N1 to Cravens Creek pond. Primary & secondary spillways. Gross pollutant traps, access tracks. Minor landscaping Click for more details...

TRANSACT SUBSTATION
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project In The Act Council Area of Private ownership. Construction of a new 2 storey building which will be an extension to the existing building to comprise a new substation & generator room at ground level & new switch room & UPS room at first floor. Natural slatted timber screen oiled, face brickwork to match existing, stainless steel exhaust racks, fixed full height louvres, brick screen feature walls. Carparking for 15 vehicles. Associated landscaping Click for more details...

HUME PRIMARY MAIN
Private ownership Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project In The Act Council Area for New development. Construction of the Hume Primary main. Construct & operate a new primary regulating station, below ground high-pressure pipeline & associated infrastructure works. The high-pressure gas pipeline route extends from the Jerrabomberra POTS (an existing asset) north of Hindmarsh Dr, Symonston & runs generally within the Monaro Highway road reserve south to the PRS location. The proposed pipeline route also crosses several major roads, which will be underbored, including Hindmarsh Dr & the Monaro Hwy, some private access ways & includes potentially mature native trees, by micro-tunnelling or directional drilling. A 250 mm diameter (273 mm external diameter) pipeline is proposed, with a total length of approximately 5 km. The pipeline will be installed below ground, generally by standard trenching methods. The pipeline construction corridor will be approximately 12m wide, comprised of the pipeline trench, laydown for pipe lengths, spoil stockpiling & access for machinery Click for more details...

GOLD CREEK HOMESTEAD SITE SERVICES
Public Utilities (Water distribution systems, Drainage) project for New development. Site servicing to comprise all adjustments to existing services, temporary traffic arrangements, stormwater servicing with a new stormwater drain. New access including slip lanes, turning head & bus stops. A signalized pedestrian crossing linking the 2 bus stops. Repairs & reinstatement of existing verge paths. Landscaping Click for more details...

HUME RESOURCE RECOVERY ESTATE
State ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Act Council Area for New development. Relocation of the existing sewer, stormwater & electricity services. Click for more details...

MOLONGLO INFRASTRUCTURE STAGE 1D/2A OVERLAP
Public Utilities (Treatment plants, Sewerage reticulation) project at Blocks 18,23,24 & 25, Molonglo Valley, Weston, ACT 2611 of Sewer/Stormwater type of New development. Proposed Molonglo trunk sewer to enable development in Molonglo Stage 2 & associated stormwater works for Molonglo 1 (North Wright). Scope of work involves: Molonglo Trunk Sewer (MTS) or Sewer 1 from MH31 to John Gorton Drive (JGD) in Molonglo Stage 2 a distance of approximately 1.3km & stormwater main (450mm to 1200mm diameter) to divert the following peak discharges to the Holden's Creek Pond. Click for more details...

MOLONGLO INFRASTRUCTURE STAGE 1D/2A OVERLAP
Public Utilities (Water distribution systems, Drainage) project at Blocks 18,23,24 & 25, Molonglo Valley, Weston, ACT 2611 of Sewer/Stormwater type of New development. Proposed Molonglo trunk sewer to enable development in Molonglo Stage 2 & associated stormwater works for Molonglo 1 (North Wright). Scope of work involves: Molonglo Trunk Sewer (MTS) or Sewer 1 from MH31 to John Gorton Drive (JGD) in Molonglo Stage 2 a distance of approximately 1.3km & stormwater main (450mm to 1200mm diameter) to divert the following peak discharges to the Holden's Creek Pond. Click for more details...

INNER NORTH IRRIGATION TANKS PROJECT
New project of Public Utilities (Pumping Stations) project at Lyneham, Hackett &, Downer, ACT 2602. Construction of tanks, pumps & associated infrastructure as required at Southwell Park in Lyneham, Hackett Neighbourhood Oval & Downer Neighbourhood Oval. The tanks are to be installed to connect to the Inner North Stormwater Reticulation Project. Click for more details...

CANBERRA SUBSTATION
New project of Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at 105 (Blk 1559) Parkwood Rd, Belconnen, ACT 2616. Replacement of the existing shunt capacitor & installation of a new 132kv 120MVar shunt capacitior. Installation of noise walls around 4 transfomers on all 4 sides 6 metre high, around capacitor 3 x 4 metres high, capacitor 1 & new capacitor x 5 metres high. Click for more details...

INNER NORTH IRRIGATION TANKS PROJECT
Currently at the Tenders & Building stage In Act is a project estimated to be $ 1000000. This project Trade package - Civil Works - excavation & associated earthworks for the installation of a series of semi underground water storage tanks & pumps - (20608.310). Hydraulics - supply & installation of hydraulic equipment to service a series of semi-underground water storage tanks - (20608.320). Prefabricated Pump houses - Supply and installation of a series of prefabricated concrete housings to enclose water pump & irrigation equipment - (20608.330). Underground Concrete tanks -supply & installation of a series of cast in-situ, semi-underground concrete water storage tanks & sumps - (20608.340) Click for more details...

ZHENFA SOLAR FARM ONE - MUGGA LANE SOLAR PARK
New project of Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at Block 1692 off Monaro Hwy & Mugga Lne Tuggeranong &, Hume, ACT 2620. Construction of a solar farm of 13MV photovoltaic to comprise 50,000 solar PV modules raised off the ground to provide visibility & mobility of the tracking system of the panel as well as allowing wind flow Click for more details...

LIQUID WASTE RECEIVAL FACILITY
State ownership Public Utilities (Pumping Stations) project In The Act Council Area for New development. Construction of a new Liquid Waster Facility located on current vacant land to the east of the existing water treatment infrastructure & within the broader Lower Molonglo Water Quality Control Centre. The facility has been designed to accommodate 2 modes of receival for wastes. Bay 1 - liquid - septic & portaloo wastes. Bay 2 - liquid & solid wastes. Galvanised structural steel frame, lysaght trimdeck roof sheeting, masonry block retaining wall, galvanised chain link security fence, heavy duty galvanised powdercoated motorised sliding gate. Click for more details...

HORSE PARK DRIVE WATER QUALITY CONTROL POND (HPDWQCP)
Public Utilities (Water distribution systems, Drainage) project at Horse Park & Mirrabei Dr JACKA &, Gungahlin, ACT 2912 of Wetlands/Waterway - Remediation type of Renovations, Refurbishments etc. development. Construction of the Horse Park Drive WQCP. These works form part of the overall water management strategy for the area. Work involves: Construction of a 65 ML WQCP (approximate detention storage volume) & various earthworks. Construction of inlet & outlet structures & channels. Stabilization of approximately 400m of downstream channel up to the RCBC culverts under Horse Park Drive. Landscape works Click for more details...

PARKWOOD SEWER
New project of Public Utilities (Water distribution systems, Drainage) project at Blks 993 & 1622 Parkwood Rd, Belconnen, ACT 2616. Proposed construction of a new gravity bypass sewer. Bypass will run from the existing pump station in a north easterly direction to link with th existin sewerage infrastructure adjacent to West MacGregor. Click for more details...

NEW WEST INDUSTRIAL LAND
Public Utilities (Water distribution systems, Drainage) project for New development. Proposed vegetation removal, installation of sub soil drainage to the perimeter of the block, earthworks to create a level grade. Click for more details...

LAWSON STAGE 2 SEWER LINE
Sewer Line project at Blks 2 & 3 Secns 5 & 13 Ginninderra Drive, Lawson, ACT 2617 in the Public Utilities (Treatment plants, Sewerage reticulation). Cosntruction of a sewer line that connects from Lawson Stage 2 to the University of Canberra Public Hospital Click for more details...

HIGGINS SITE SERVICING
Stormwater/Sewer New project In The Act Council Area. Stormwater, water & sewer upgrade. Scope of work includes: site establishment. Clearing & grubbing of areas. Installation of underground services (stormwater, sewer, sanitary drain & water). Construction of sewer & stormwater manholes. Removal/capping of existing underground services. Site reinstatement works. Miscellaneous works Click for more details...

FEDERAL HIGHWAY
Public Utilities (Water distribution systems, Drainage) project for New development. Federal Highway truck laybys. Scope of work consists of: pavement works, kerbing & other concrete works (such as medians & footpaths) & pavement removal. Drainage/stormwater treatments. Stone wall treatments. Garbage/waste facilities. Tree removal/retention, landscaping. Cycle facilities. Streetlighting & electrical works. Temporary fencing, site compound establishment & removal (including temporary accesses), sediment & erosion control, TCD works (including removal & installation of signage & delineation treatments), wire rope barrier removal/reinstating/installation Click for more details...

MUGGA CULVERTS & PONDS
Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Act Council Area for New development. Scope of work involves: construction of a pond, pipes, headwalls & associated works. Approximately 60m x 1500mm stormwater mains, 15m x 525m diameter stormwater mains. A pond. Upgrade to swales & other incidental works Click for more details...

FISKEN CR STORMWATER WORKS
Public Utilities (Treatment plants, Sewerage reticulation) project for New development. Construction of stormwater improvements at a site near Fisken Crescent. Remediation of existing cut off drain, providing grass to batters, construction of a new box culvert to allow water to pass underneath a track across the cut off drain. Click for more details...

POINT HUT POND PLAYSPACE
Public Utilities (Water distribution systems, Drainage) project for New development. Removal & disposal of an existing double flying fox and rubber softfall as well as the installation of new play equipment & impact attenuation surfacing. Scope of work includes but may not be limited to : temporary traffic management and site fencing; services location; modifications to existing irrigation. Demolition of existing rubber softfall, base courses & edgings. Earthworks - excavation, minor cut/fill. Concrete paths & edging. Drainage. Organic & rubber softfall. Proprietary play equipment. Proprietary seating. Grassing reinstatement. Establishment & consolidation of grassing Click for more details...

GREVILLEA PARK INFRASTRUCTURE WORKS
New project of Public Utilities (Water distribution systems, Drainage) project at Blks 24,26,27 & 28 Secn 33, Barton, ACT 2600. Grevillea park infrastructure works. Scope of work includes: removal of trees & vegetation. Stormwater main, ties & swale. Sewer gravity main, ties, sewer pump station & maintenance access & sewer rising main. Water main & ties. Path restoration. Verge restoration grassing. Shared trench consisting of electrical & communications conduits. Streetlights - new & relocation. Electricity connection to sewer pump station & streetlights. Telecommunication services to the sewer pump station. Carparking & signage. Click for more details...

HUME DRAINAGE WORKS
Public Utilities (Water distribution systems, Drainage) New project at Blks 9, 10 & 11 Secn 21 Couranga Cr, Hume, ACT 2620. This type is Drainage Works with Local Govt ownership. Installation of subsoil drainage. Scope of work includes: trenching. Placement & laying of subsoil drainage. Backfilling & compaction around pipe. Reinstate of all disturbed grassed areas Click for more details...

STORMWATER IMPROVEMENT PROGRAM 2016/17 - PACKAGE E
Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Act Council Area for New development. Construction of flood mitigation works in the verge along part of Wilkins Street and in the urban open space Mawson Block 21, Section 47 behind the Belmont Units including construction of stormwater drainage works, reinforced block work wall, earthen berms and swale and reinstatement of concrete paving. Click for more details...