HORSE PARK DRIVE EXTENSION
Public Utilities (Water distribution systems, Drainage) project In The Act Council Area of Roadworks type. Horse Park drive extension from Burramarra Av to Mirrabei Dr. Construction of the final section of Horse Park Drive. These works will improve traffic flow in the north western sector of the Gungahlin area & facilitate the future development of the Moncrieff &Taylor suburbs. Scope of work involves: Construction of approximately 1,800 metres of single, two way carriageway. Construction of 2 three way intersections, one of which is signalized. Construction of 1,600 metres of 300mm diameter water main & other hydraulic services. Construction of approximately 16 metres long by 19 metres wide bridge over flood way. Construction of approximately 2,000 metres of trunk cycleway. Construction of shared services trench & installation of street lighting. Landscape works. Click for more details...

GUNGADERRA TRUNK SEWER
Public Utilities (Treatment plants, Sewerage reticulation) New project at from Gungahlin Dr to, Kaleen, ACT 2617. This type is Sewer Pipeline - Stage 1 with State ownership. Proposed construction of trunk sewer being stage 1 of proposed 3 stage project. Click for more details...

FYSHWICK STORMWATER DRAINAGE
Currently at the Construction stage In Act is a project estimated to be $ 474000. This project Construction of stormwater drainage pipes. Click for more details...

DEAKIN SHOPPING CENTRE
A project in the ACT Within Act. The proposed upgrade of the shopping centre to include: Drainage & pedestrian access between the strip shops & medical centre/Deakin Court will be improved to meet current standards & prevent stormwater runoff into individual shops. Traffic flow entering & exiting the shopping precinct to be formalised. Duff Place to be converted into a one way system. Disabled parking to be amended. Raised pedestrian crossing to Hopetoun Crescent. Car parking spaces to be rationalised on Duff Place. Loading bay facilities to be rationalised on Duff Place. Improved access, including lighting to the Hannah Place laneway. Formalised public open space to the eastern side of Deakin court will include reduced grassed area, public art, signage & seating. Click for more details...

CANBERRA INTERNATIONAL ARBORETUM & GARDENS
Public Utilities (Water distribution systems, Drainage) project at Green Hills Forest Area, Canberra, ACT 2600 for New. Staged construction of an international standard arboretum & gardens, located at the western end of Lake Burley Griffin, features may include major aboretum, a mosiac of gardens, a permanent bonsai exhibition, ampitheatre, an international scroll garden, a national museum of natural history, a sclupture garden, playgarden, vertical garden, garden of seasons, wild garden, a visitors centre, restaurant & function centre, outdoor concert venue, water features, pathways & irrigation system. Click for more details...

MARKETS BUILDING LANDSCAPING
Public Utilities (Water distribution systems, Drainage) project at 27 Wentworth Ave (Blk 3 Sec 49), Kingston, ACT 2604 for Renovations, Refurbishments etc.. Landscaping of the area between Bus Depot Markets building & adjacent Gateway residential development, landscaping to Wentworth Ave, repainting of existing building facade, irrigation, associated pedestrian lighting. Click for more details...

MURRUMBIDGEE RIVER PUMPS
Water Pumps New project In The Act Council Area. Installation of water pumps on the Murrumbidgee River near the Cotter Pump Station. Click for more details...

ACT CORRECTIONAL CENTRE - ALEXANDER MACONOCHIE CENTRE (AMC)
Public Utilities (Water distribution systems, Drainage) project at Part Blk 6 Secn 24 & Part Blk 12 Secn 18 eastern side of Monaro Hwy, Hume, ACT 2620 for New. The preliminary works include installation of traffic lights at the entrance of the Alexander Maconochie Centre site, the installation of a water main & re-alignment of an existing sewer. Click for more details...

WODEN GREEN 650 LOT SUBDIVISON
Public Utilities (Water distribution systems, Drainage) project In The Act Council Area of Civil Works type. Scope of work includes: construction of bulk earthworks; roads & carparks, stormwater drainage including large RCBC's; sewers ranging from 150mm to 600mm diameter; water mains; relocation of new electricity, gas & communication services & the upgrading of Yarralumla Creek. Proposed development incorporating 650 dwellings in 3 to 10 storey dwellings. Click for more details...

LYNEHAM PRIMARY SCHOOL
Public Utilities (Water distribution systems, Drainage) project for New development. Upgrade to the sewer & stormwater reticulation at Lyneham Primary School. Click for more details...

ACT WATER & SEWER PIPES
State ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Act Council Area for New development. Provision of protective coating application services to water & sewer infrastructure located throughout the Australian Capital Territory & in New South Wales. The project comprises all works associated with the pre-treatment & renewal of protective coatings to a bundle of 10 projects involving 7 separate asset types. It is envisaged that the works will be delivered as a single contract over a 3 year period. Click for more details...

PHILLIP OVAL
Public Utilities (Water distribution systems, Drainage) project for New development. Stage 1A comprising rejuvenation of Phillip Oval to include bulk earthworks, drainage, irritation, topsoil & turf. Associated roadworks to include a partial extension of Irving St along road reserve & temporary carparking with safety lights Click for more details...

BONNER 1B RESIDENTIAL ESTATE STAGE 2
Residential Subdivision (215) Lots New project In The Act Council Area. Construction of a 215 lot residential subdivision, 2 multi-unit sites & construction of approximately 1.5km of 600 diameter water main connecting Elmgrove Reservoir to the water main in Bonner Stage 1B, lowflow concrete pipe & pits, 600m long section of floodway which will include bulk earthworks, topsoiling & grassing. Click for more details...

ACT STORMWATER AUGMENTATION - PACKAGE A1
A project in the ACT Within Act. Stormwater Augmentation at various sites in the ACT - Package A1 Click for more details...

ACTEWAGL PUMP STATIONS
Public Utilities (Pumping Stations) project at in the ACT region, Canberra, ACT 2600 of Pump Stations - Repairs & Maintenance type of New development. Repairs & maintenance to ActewAGL pump stations & associated facilities in the ACT region. Click for more details...

ACT STORMWATER AUGMENTATION - PACKAGE A2
Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Act Council Area for New development. Stormwater Augmentation at various sites in the ACT - Package A2 Click for more details...

ACTEWAGL CNG REFUELLING STATION
Pump Station New project In The Act Council Area. Proposed construction of a major utility installation which will operate as a major pump station for compressed natural gas. Installation of a pylon/column sign & canopy sign. Installation of a 5000l water tank. Associated site works. Click for more details...

CASEY ACTEW PUMP STATION
Casey Actew Pump Station is currently at the Construction stage, valued at about $ 3000000 it is Construction of ACTEW pump station & rising main in the new Casey 2 estate. Click for more details...

CANBERRA INTEGRATED URBAN WATERWAYS
Canberra Integrated Urban Waterways is currently at the Construction stage, valued at about $ 13870000 it is Design of 2 new wetlands ponds & reticulation systems at Dickson & Lyneham. Reticulation systems at 8 existing ponds at Tuggeranong, Isabella, Ginninderra, Lower Stranger, Gungahlin, West Belconnen, Yerrabi, Dunlop 1 & Dunlop 2. The development includes: Construction of wetlands pond including the following characteristics: Earthworks excavation of approx 54,000m3 with the majority being removed from the site. Creation of a deep pond area to promote settling of coarse to medium sized sediments. Shallow vegetated marsh areas around the perimeter to absorb finer particles. Shallow slopes around all pond edges, planted with indigenous macrophytes. Associated infrastructure. New pathways. Associated landscaping. Click for more details...

CIVIC SUBSTATION
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at 20 (Blk 3 Secn 85) Frith Rd, Acton, ACT 2601 of Substation - Upgrade type of New development. Demolition of the existing fence & part of the control room building. Upgrade of the Civic substation to comprise: expansion of the existing switchyard, expansion of existing substation, modification to 132kV line termination into switchyard, installation of new electrical equipment in the switchyard, new security fence around the facility. Click for more details...

ELMGROVE 2 JACKA RESERVOIR
Public Utilities (Reservoirs) project In The Act Council Area of State ownership. Construction of the Jacka reservoir, water supply facility which includes a pump station, rising main, water tank of 3 mega litres & associated works. The reservoir would be surrounded by a permanent security fence 2.8 metres high. Construction of the fence would require a corridor approximately 5 metres wide. A permanent security fence would be erected also around the pump station & temporary fencing would be required along the route of the inlet/outlet main during construction Click for more details...

UNITING CARE GORDON AGED CARE FACILITY OFFSITE WORKS
Blk 19 Secn 410 cnr Tharwa & Woodcock Dr, Gordon, ACT 2906 Has Uniting Care Gordon Aged Care Facility Offsite Works currently at Construction stage. Offsite works for the Gordon Aged Care Facility to comprise: Landscaping, sewer, water & stormwater infrastructure, pedestrian footpaths & verge crossings. Click for more details...

GREENWAY SEWER VENT
A project in the ACT Within Act. Rehabilitation of the existing sewer vent to improve sewer ventilation in the Greenway network to reduce corrosion & to provide maintenance vehicle access to the site. Work to include replacement of the existing vent stack with a stainless steel vent stack & installation of security fencing around the stack. Click for more details...

INNER NORTH RETICULATION NETWORK
A project in the ACT Within Act. Reticulation work in stormwater/drainage in Dickson & Lyneham. Ponds with the existing stormwater ponds located adjacent to Flemington Road in Mitchell/Gungahlin & associated spur lines to adjacent properties along the main trunk route. The proposed works include construction of a raising main from Lyneham Wetland Pond to Flemington Rd No. 2 Pond. Small pump stations at Flemington Road No#1 & No#2 Ponds. Pipe reticulation network through Hackett, Dickson , Lyneham, Mitchell & Gunghalin. Pipe connections to end users along the pipeline route. Click for more details...

CRAVENS CREEK
Water Quality Control Pond project at Molonglo 2 to DENMAN PROSPECT, Weston, ACT 2611 In The Council Area Of Act of Local Govt. Construction of Cravens Creek Water Quality Control Pond (WQCP) & N1 WQCP. Scope of work includes construction a earth filled with clay core embankment across Cravens Creek to form a water quality control pond to protect the Molonglo River from the urban development in the valley. & associated infrastructure. A low flow diversion from pond N1 to Cravens Creek pond. Primary & secondary spillways. Gross pollutant traps, access tracks. Minor landscaping Click for more details...

TRANSACT SUBSTATION
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project In The Act Council Area of Private ownership. Construction of a new 2 storey building which will be an extension to the existing building to comprise a new substation & generator room at ground level & new switch room & UPS room at first floor. Natural slatted timber screen oiled, face brickwork to match existing, stainless steel exhaust racks, fixed full height louvres, brick screen feature walls. Carparking for 15 vehicles. Associated landscaping Click for more details...

MOLONGLO 2 LINK BRIDGE
Public Utilities (Water distribution systems, Drainage) New project at Molonglo River, Weston, ACT 2611. This type is Bridge/Sewer with Local Govt ownership. Scope of work is to provide a high elevation combined sewer, pedestrian & cycleway bridge crossing of the Molonglo River. The link bridge will be across the Molonglo River & the connecting sewer from the bridge to the Molonglo Valley Interceptor Sewer (MVIS) on the north side of the river. The bridge will also provide for pedestrian & cycleway access to link future development & playing fields on the north side of the river to the Group Centre & Molonglo 2 development on the south side of the river. The width of the bridge is preferred to be 4.0m. The sewer work includes: an integral 600mm sewer within the bridge; the connection of the 600mm sewer to the MVIS (approximately 425m) & connection of the sewer draining to Coppins Crossing sewer pumping station to the sewer across the bridge. Construction of Sewer 3 Central - scope of work includes: construction of a 2.2km long trunk sewer man from MH C24 to D1 near the link bridge abutment; the sewer will range in sizes from 300mm to 525mm diameter & the typical depth of the sewer main is between 1.6m & 4.3m. Click for more details...

SHELL SERVICE STATION HAWKER
Public Utilities (Water distribution systems, Drainage) project at 20 (Blk 3 Secn 34) Springvale Dr & Coniston St, Hawker, ACT 2614 for New. Work to the existing service station to include forecourt drainage works through the installation of a puracepto/SPEL system. Replacement of signage. Click for more details...

SHELL COLES EXPRESS SERVICE STATION FYSHWICK
Public Utilities (Water distribution systems, Drainage) project at 12 (Blk 6 Secn 9) Ipswich St, Fyshwick, ACT 2609 for New. Work to comprise forecourt drainage works to the existing service station through installation of a Puraceptor/SPEL system, Erection of new signs Click for more details...

GOLD CREEK HOMESTEAD SITE SERVICES
Public Utilities (Water distribution systems, Drainage) project for New development. Site servicing to comprise all adjustments to existing services, temporary traffic arrangements, stormwater servicing with a new stormwater drain. New access including slip lanes, turning head & bus stops. A signalized pedestrian crossing linking the 2 bus stops. Repairs & reinstatement of existing verge paths. Landscaping Click for more details...

HUME RESOURCE RECOVERY ESTATE
State ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Act Council Area for New development. Relocation of the existing sewer, stormwater & electricity services. Click for more details...

INNER NORTH IRRIGATION TANKS PROJECT
Currently at the Tenders & Building stage In Act is a project estimated to be $ 1000000. This project Trade package - Civil Works - excavation & associated earthworks for the installation of a series of semi underground water storage tanks & pumps - (20608.310). Hydraulics - supply & installation of hydraulic equipment to service a series of semi-underground water storage tanks - (20608.320). Prefabricated Pump houses - Supply and installation of a series of prefabricated concrete housings to enclose water pump & irrigation equipment - (20608.330). Underground Concrete tanks -supply & installation of a series of cast in-situ, semi-underground concrete water storage tanks & sumps - (20608.340) Click for more details...

LIQUID WASTE RECEIVAL FACILITY
State ownership Public Utilities (Pumping Stations) project In The Act Council Area for New development. Construction of a new Liquid Waster Facility located on current vacant land to the east of the existing water treatment infrastructure & within the broader Lower Molonglo Water Quality Control Centre. The facility has been designed to accommodate 2 modes of receival for wastes. Bay 1 - liquid - septic & portaloo wastes. Bay 2 - liquid & solid wastes. Galvanised structural steel frame, lysaght trimdeck roof sheeting, masonry block retaining wall, galvanised chain link security fence, heavy duty galvanised powdercoated motorised sliding gate. Click for more details...

HORSE PARK DRIVE WATER QUALITY CONTROL POND (HPDWQCP)
Public Utilities (Water distribution systems, Drainage) project at Horse Park & Mirrabei Dr JACKA &, Gungahlin, ACT 2912 of Wetlands/Waterway - Remediation type of Renovations, Refurbishments etc. development. Construction of the Horse Park Drive WQCP. These works form part of the overall water management strategy for the area. Work involves: Construction of a 65 ML WQCP (approximate detention storage volume) & various earthworks. Construction of inlet & outlet structures & channels. Stabilization of approximately 400m of downstream channel up to the RCBC culverts under Horse Park Drive. Landscape works Click for more details...

PUBLIC WORKS SCULLIN
Sewer/Water Pipes project at 1-3 (Blks 27 & 28 Secn 43) Ross Smith Cr, Scullin, ACT 2614 in the Public Utilities (Treatment plants, Sewerage reticulation). Public Works installation of a stormwater sewer & water pipelines in Frewin Place & Chewings St Scullin Click for more details...

NEW WEST INDUSTRIAL LAND
Public Utilities (Water distribution systems, Drainage) project for New development. Proposed vegetation removal, installation of sub soil drainage to the perimeter of the block, earthworks to create a level grade. Click for more details...

GUNGAHLIN DRIVE AUGMENTATION
Public Utilities (Water distribution systems, Drainage) New project at Gungahlin Dr, Gungahlin, ACT 2912. This type is Roadworks - Stage 1 - Early Works with Local Govt ownership. Early Works package mostly comprising of relocation of streetlights, demolition of existing & installation of new stormwater infrastructure, construction of new pavement & kerbs, adjustment of line marking & traffic signal upgrade on Gungahlin Dr between Well Station Dr & Barton Highway. Click for more details...

LAWSON STAGE 2 SEWER LINE
Sewer Line project at Blks 2 & 3 Secns 5 & 13 Ginninderra Drive, Lawson, ACT 2617 in the Public Utilities (Pumping Stations). Cosntruction of a sewer line that connects from Lawson Stage 2 to the University of Canberra Public Hospital Click for more details...

HIGGINS SITE SERVICING
Stormwater/Sewer New project In The Act Council Area. Stormwater, water & sewer upgrade. Scope of work includes: site establishment. Clearing & grubbing of areas. Installation of underground services (stormwater, sewer, sanitary drain & water). Construction of sewer & stormwater manholes. Removal/capping of existing underground services. Site reinstatement works. Miscellaneous works Click for more details...

WODEN PUBLIC REALM IMPROVEMENTS
Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Act Council Area for New development. Works package 1 comprises: removal of the roof slab & disconnection of the existing structure from the Churches Centre and the Cosmopolitan Building. Removal of the overhead walkway and disconnection of the existing structure from the Cosmopolitan Building, Churches Centre & old ticket kiosk. Demolition and removal of the café, public toilets & 2 hidden abandoned change rooms. Demolition & removal of existing 'Snake Pit' area including stairs, ramp & singular dead tree. Existing paving/concrete to be removed & replaced. Disconnection/relocation & modification of existing services. Lowering of existing storm water, sewer and service pit lids where required. Approved disposal of potentially contaminated materials (asbestos is identified in the provided Hazmat assessments); Reconstruction of stairs from the Bus Interchange to the Woden Town Square to provide improved pedestrian access & visual amenity. Construction of frame, cladding, mechanical services & installation of new external public lift. Installation of new street lighting. Installation of new communications conduit including provisions for Wifi. Installation of new drainage pits and subsoil drainage within the garden beds. Installation of precast concrete panels. Installation of Tactile indicators. Installation of high quality handrails. Supply & installation of precast elements. Adjustments to utility services. Temporary traffic management during demolition works. Undertake a dilapidation survey of all surrounding Click for more details...

JOHN GORTON BUILDING
Public Utilities (Water distribution systems, Drainage) project for New development. John Gorton carpark upgrade involves construction of flexible pavements, kerbs, footpath & other landscape elements. Scope of work includes but I not limited to: construction of flexible pavements. Construction of new & modifications to existing kerb, pavement & slabs. Construction of a new public precinct with high quality materials & finishes. Installation of signage & traffic control devices. Erection of street light poles. Construction of new & protection or relocation of existing, underground services. Installation of stormwater harvesting tree planting beds & associated mature tree plantings. High quality landscaping works including irrigation. Pavement marking. Remediation of exiting surfaces damaged as a result of the works Click for more details...

COMMONWEALTH AV PUMP STATION (CAPS)
A project in the ACT Within Act. Additions to existing pump station Click for more details...

DOWNER SEWER
Public Utilities (Water distribution systems, Drainage) project In The Act Council Area of Sewer Relocation type. Relocation & upgrade of the existing sewer main from within Downer to the verges of Bradfield & Melba Streets. Construction of an overflow diversion of the existing sewer main from Melba St to Swinden St. All works to be carried out with boring Click for more details...

FEDERAL HIGHWAY
Public Utilities (Water distribution systems, Drainage) project for New development. Federal Highway truck laybys. Scope of work consists of: pavement works, kerbing & other concrete works (such as medians & footpaths) & pavement removal. Drainage/stormwater treatments. Stone wall treatments. Garbage/waste facilities. Tree removal/retention, landscaping. Cycle facilities. Streetlighting & electrical works. Temporary fencing, site compound establishment & removal (including temporary accesses), sediment & erosion control, TCD works (including removal & installation of signage & delineation treatments), wire rope barrier removal/reinstating/installation Click for more details...

FISKEN CR STORMWATER WORKS
Public Utilities (Treatment plants, Sewerage reticulation) project for New development. Construction of stormwater improvements at a site near Fisken Crescent. Remediation of existing cut off drain, providing grass to batters, construction of a new box culvert to allow water to pass underneath a track across the cut off drain. Click for more details...

HUME DRAINAGE WORKS
Public Utilities (Water distribution systems, Drainage) New project at Blks 9, 10 & 11 Secn 21 Couranga Cr, Hume, ACT 2620. This type is Drainage Works with Local Govt ownership. Installation of subsoil drainage. Scope of work includes: trenching. Placement & laying of subsoil drainage. Backfilling & compaction around pipe. Reinstate of all disturbed grassed areas Click for more details...

HUME - STAGE 2
Public Utilities (Water distribution systems, Drainage) project at Blocks 67, 68, 73 & 81 Secn 22, Hume, ACT 2620 of Roadworks type of New development. Demolition & construction works to deliver the adjustment of the existing turning head at the of Paspaley St. Scope of work includes: demolition of existing pavements & services. Construction of underground services. Earthworks. Construction of kerbs. Construction of pavements. Click for more details...

ALIVIO TOURIST PARK
Public Utilities (Water distribution systems, Drainage) project In The Act Council Area of Stormwater - Improvements type. Stormwater improvement program 2016/2017 - package B. Construction of gabion walls & upgrading the existing swale, table drain & culverts in the vicinity of Alivio Tourist Park Click for more details...