List of Public Utilities Projects in NSW


NULKABA SUBSTATION
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project In The Cessnock Council Area of Electrical Substation type. Construction of a new electrical substation & overhead cables connecting new substation to existing Kurri Kurri & Cessnock substations. Click for more details...

MARDI HIGH LIFT PUMPING STATION
Pumping Station New project In The Wyong Council Area. Construction of a high lift pump station to pump treated water from Mardi water treatment plant to Tuggerah No 2 reservoir. Click for more details...


Public Utilities (Water distribution systems, Drainage) project In The Wakool Council Area of Earthworks type. Excavation of 28,000 cu m of soil & relocation of some farm channels & fences. Click for more details...

BUTTONBERRY WASTE MANAGEMENT FACILITY
Public Utilities (Water distribution systems, Drainage) project at Hue Hue Rd, Jilliby, NSW 2259 of Landfill/Leachate Barrier type of New development. Excavation of a landfill cell & construction of a leachate barrier, collection & drainage system. The work includes the excavation, haulage & stockpiling of approximately 250,000 cubic metres of natural ground, the installation of geosynthetic to act as a leachate barrier over approximately 30,000 square metres of cell floor & 6,500 square metres of cell wall, and the construction of a leachate collection & drainage system. Click for more details...

BLUE MOUNTAINS SANDSTONE AQUIFER SYSTEM
Blue Mountains area, NSW 2999 Has Blue Mountains Sandstone Aquifer System currently at Planning stage. The Status Report should contain descriptions, facts & observations on groundwater quantity & quality aspects as well as the dependency of ecosystems on the groundwater resource. Click for more details...

BOLWARRA FARLEY TRANSFER SYSTEM
Bolwarra to, Farley, NSW 2320 Has Bolwarra Farley Transfer System currently at Construction stage. Construction of: 1 km x 375 mm dia sewer rising main, including thrust bores & 1 bridge crossing; 1 x 4.6 dia wastewater pumping station, with associated mechanical & electrical works, including switchboard, pumps, SCADA & telemetry; inlet works at Farley Wastewater Treatment Plant. Click for more details...

EAST BOWRAL DRAINAGE
New project of Public Utilities (Water distribution systems, Drainage) project at Kangaloon Rd, Bowral, NSW 2576. Proposal for a series of 4 interconnecting detention basin/wetlands with natural channels to be landscaped & lined with rock revetment for scour protection Click for more details...

MALABAR SEWAGE TREATMENT PLANT
Biosolids Storage & Stabilisation Facility Supply & Install project In The Randwick Council Area. Design, supply, installation, commissioning, process proving & guarantee of facility. Work includes: provision of fully automated stabilisation plant designed to produce Grade A biosolids, with capability of also producing a Grade B product; construction of building for storage & dispatching of stabilised biosolids, including truck access, storage bays, materials handling equipment; provision of effective ventilation & odour control system for storage building & stabilisation process equipment; provision of power supply, DCS, instrumentation, civil works, associated services. Click for more details...

ORANGE WATER SUPPLY
Public Utilities (Water distribution systems, Drainage) project at Margaret St & Carramar Ave, Orange, NSW 2800 for New. Trenchless water main replacements. Click for more details...

MARDI DAM
New project of Public Utilities (Pumping Stations) project at Lot 1 Old Maitland Rd (DP 2111747), Mardi, NSW 2259. The Gosford Wyong Councils' Water Authority has identified the need to increase its capacity to deliver water from the Mardi Water Treatment Plant to its water distribution system. It is proposed to affect this increase in capacity by upgrading a number of components of its existing headwork system, including; (a) Spillway bridge, roadworks and Spillway; (b) New Transfer System from Mardi Dam to Mardi Water Treatment Plant: Including a new Inlet Tower, inlet channel, raw water pipeline, transfer pump station and associated works & (c) New High Lift Pump Station: Involving a new Pump Station at Mardi Water Treatment Plant to deliver treated water to the Gosford & Wyong Systems. Also includes High Voltage Power Ring Main and other associated works. (d) Mardi to Mangrove pump station. (e) Tuggerah diversion pipeline. Click for more details...

CHITTAWAY POINT SEWER MAIN
A project in the NSW Within Wyong. Construction of gravity sewer main, pump station & rising main. Click for more details...

PORT MACQUARIE WATER TREATMENT
A project in the NSW Within Port Macquarie-Hastings. Proposed construction of water treatment works. Click for more details...

SYDNEY WATER
Public Utilities (Treatment plants, Sewerage reticulation) project In The Various Council Area of State ownership. Emergency restoration & repair services in Sydney Water's operational areas. Click for more details...

BRINDABELLA & WHITSUNDAY DRS SEWERAGE PUMPING STATION
Public Utilities (Pumping Stations) New project at Lot 1126 Brindabella Dr & Lot 7300 Whitsunday Dr, Shell Cove, NSW 2529. This type is Sewerage Pumping Station with Private ownership. Construction of a sewer pump station at Shell Cove in the Shellharbour LGA. The sewer pump station will replace an existing temporary sewer pump station. The works comprise construction of 10m dia well, installation of pumps & electrical systems, above ground structures including a small building for the purpose of housing a Telstra mini exchange & decommissioning of an existing sewer pump station. Click for more details...

SYDNEY WATER MECHANICAL & ELECTRICAL MAINTENANCE/RENEWALS PROGRAM - MEMRP
Public Utilities (Water distribution systems, Drainage) project at various within NSW, ., NSW 2999 of Mechanical & Electrical - Maintenance/Renewals type of Renovations, Refurbishments etc. development. Mechanical & electrical maintenance of Sydney Water's assets is carried out by a combination of internal resources (60 percent) & external contractors (40 percent), while contractors selected on a project-by-project basis carry out mechanical & electrical equipment renewals. Sydney Water seeks to engage an organisation or consortium of organisations to deliver the portion of work that is currently externally sourced & to identify strategies to improve the efficiency & effectiveness of maintenance & renewals delivery. Click for more details...

TARALGA WIND FARM
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at 4-5 kilometres east of, Taralga, NSW 2580 of Wind Farm type of New development. Construction of a wind farm consisting of a total of 61 turbines of capacity 1.5-3MW. Associated infrastructure including access tracks, underground & over ground electrical cabling, electrical substation, control building & TV re-transmitter. Click for more details...

BEGA SEWERAGE TREATMENT PLANT UPGRADE
Public Utilities (Treatment plants, Sewerage reticulation) New project at Taronga Crs, Bega, NSW 2550. This type is Sewerage Treatment Plant - Addns with Local Govt ownership. Upgrade of existing sewerage treatment facility with the addition of an additional sewerage treatment plant comprising of a sequencing batch reactor process supported by new inlet works (screening & grit removal), odour control system, new stormwater tank, new control building, new switchboard & automatic control system, aerobic sludge lagoons for enhanced stabilisation & storage & new sludge drying beds. Reclaimed water from the treatment plant will be used on an adjoining dairy property. Click for more details...

WARRINGAH CIVIL WORKS
Public Utilities (Water distribution systems, Drainage) project In The Warringah Council Area of Civil Works/Roadworks - Upgrade type. Construction of civil infrastructure works, including construction of stormwater drainage, footpaths, traffic devices & road works. Click for more details...

CITY NORTH ZONE SUBSTATION
New project of Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at 51-59 (Lots 1,5 & 11) Sussex St (DP433434,DP573083,DP707526,DP725721), Sydney, NSW 2000. Construction of an 8 level electrical zone substation housing electrical infrastructure to supply the northern CBD. Click for more details...

SOLDIERS BEACH DESALINATION PLANR PROJECT NOW INCLUDED IN PROJECT ID 665577
Public Utilities (Water distribution systems, Drainage) project In The Wyong Council Area of Desalination Plant type. Proposed construction of a mobile desalination plant to produce between 1 to 3 megalitres of water. Click for more details...

AUSTRALIAN RAILROAD GROUP TRAIN MAINTENANCE WORKSHOP
Australian Railroad Group Train Maintenance Workshop is currently at the Construction stage, valued at about $ 1000000 it is Construction of a train maintenance workshop, associated office building, fuel storage facility, carparking for 11 vehicles, fire services, sewerage & drainage & systems upgrade Click for more details...

INTEGRAL ENERGY SUBSTATION
Electrical Substation project at 1-3 Potter Close, Wetherill Park, NSW 2164 in the Public Utilities (Power stations, Substations, Windfarms, Phone exchanges). Construction of an electrical substation building Click for more details...

FLINDERS INDUSTRIAL ESTATE - STAGE 9
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project In The Shoalhaven Council Area of Local Govt ownership. The works comprise the supply & installation of HV & LV reticulation network. street lighting & substations Click for more details...

BLACKTOWN OLYMPIC PARK
Public Utilities (Water distribution systems, Drainage) project at Eastern & Reginald Sts, Rooty Hill, NSW 2766 for New. Supply & installation of irrigation, subsoil drainage, soil profiles & turf for 2 first class AFL & Cricket ovals Click for more details...

PERISHER RANGE ROADS
State ownership Public Utilities (Water distribution systems, Drainage) project In The Snowy River Council Area for New development. Perisher Range roads Stage 5. This work involves minor regrading, the construction of concrete pavement at existing gravel roadway including the installation of utilities (water, gas, electricity, telecommunications) & the construction of associated retaining structures, barriers and drainage infrastructure. The construction works can only be undertaken within the summer construction season spanning from October each year to the following May Click for more details...

DUBBO STORMWATER TRUNK DRAINAGE
Public Utilities (Water distribution systems, Drainage) project at Railway Lands, Dubbo, NSW 2830 for New. Construction of a stormwater trunk drainage. Click for more details...

CAMDEN HILLS GOLF PRACTICE RANGE
Currently at the Planning stage In Camden is a project estimated to be $ 2500000. This project Removal of approximately 17.300³ of contaminated fill currently stockpiled on Lot 100 DP1153216 & transportation to Lot 10 DP1086849. Construction of a temporary haulage route approximately 250m in length across Lot 1 DO795836. Construction of drainage swales & installation of sediment & erosion control plans. Drain & desilt the existing dam on Lot 10. Stockpile silt & clay from darn for reuse in capping over contaminated full. Remediate the site. Earthworks & associated landscaping for the construction & use for a golf practice range. Click for more details...

WET 'N' WILD SYDNEY
Water Theme Park - Stage 1 New project In The Blacktown Council Area. Demolition of 4 existing dwellings. Bulk earthworks. Construction of a world-class water theme park to include a range of rides & attractions that can be separated into 3 broad categories or themes for children, families and teenager thrills.Stage 1 rides comprise the following: 'Boomerang Bay' Surf Wave Pool; Lazy/Adventure River; Giant Rainfortress Waterplay on Wet Deck; Whizzard Mat Racer (6 lanes); Duelling Master Blaster Tube Ride; Zip Line; Double Flowrider; Innertube Slides with Superbowl/Rattler/High-Speed Drop/Constrictor; Family Boomerango and Abyss Raft Ride; Sky Coaster. A wide range of building structures & facilities will be constructed comprising entry plaza, turnstiles, guest support, ticketing/group sales (under canopy), park entry overview, fencing, guest services/first aid, retail shop/park exit, change rooms/showers/lockers, life guards & security, sails fabric shade structure, beer garden, fast food, terraced sand beach lounging, rental cabanas, smoking area, restrooms, plaza with iconic giant geyser, dining area under shade canopy, sloping lawn, mechanical space, administration & staff buildings, maintenance/storage/service area, central plaza, tube storage. The water theme park will reuse stormwater collected from a stormwater detention pond and rainwater tanks to achieve 90% of the water requirements of landscape irrigation, toilets and washdown areas. Main visitor car park with 1,857 sealed car spaces including 42 spaces for the disabled, plus 12 bus coach spaces, 6 mini-bus spaces, 20 motorcycles spaces, bicycle parking and drop-off/ pick-up zone on the west side of the site, staff carpark (unsealed) on the north east corner of the site; loading/back-of-house area on the north east side of the site. Landscaping. Click for more details...

NORTH WEST GROWTH CENTRE - PACKAGE 2
State ownership Public Utilities (Pumping Stations) project In The Various Council Area for New development. Construction & operation of drinking water & wastewater infrastructure to service the North West Growth Centre second release precincts (Box Hill, Box Hill Industrial & Schofields). Construction of new trunk lines for drinking water & wastewater. New pumping station. New reservoir site. Drinking water will comprises approximately 14 km of pipelines; 2 x storage reservoirs, including one surface reservoir & one elevated reservoir (Box Hill Reservoir); 2 x water pumping stations (Nelson Water Pumping Station & Box Hill Reservoir) & ancillary works. Wastewater infrastructure comprises approximately 10 km of pipelines to transfer wastewater to Riverstone Wastewater Treatment Plant and Rouse Hill Water Recycling plant & ancillary works Click for more details...

EUROBODALLA SHIRE COUNCIL SEWERS
Public Utilities (Water distribution systems, Drainage) project In The Eurobodalla Council Area of Local Govt ownership. In situ relining of approximately 3,600 metres per year of gravity sewer mains throughout Eurobodalla Shire Click for more details...

MURRAY-DARLING BASIN
Murray Darling Basin, ., NSW 2999 Has Murray-Darling Basin currently at Planning stage. Scope of works may include combinations of pump stations, bores, piped reticulation systems, stock watering points, electrical controls & telemetry. The extent of reticulation systems may vary from about 20km to several hundred kilometres in total. Installation &/or construction of pipelines, valves, tanks, troughs & all associated equipment to ensure efficient operation & supply Click for more details...

ENDEAVOUR ENERGY WESTMEAD
Redbank Rd, Westmead, NSW 2145 Has Endeavour Energy Westmead currently at Construction stage. Upgrade of existing substation Click for more details...

BALLINA SHIRE COUNCIL SWIFT STREET RISING MAIN SP2001 REHABILITATION
Ballina Shire Council Swift Street Rising Main Sp2001 Rehabilitation is currently at the Planning stage, valued at about $ 100000 it is Funding approved for rehabilitation to Swift Street Rising Main. Click for more details...

MAITLAND TRANSPORT INTERCHANGE & ATHEL D'OMBRAIN DR ROADWORKS
Interchange/Roadworks New project In The Maitland Council Area. Construction of the upgrade of Maitland Transport Interchange. Upgrade of Athel D'Ombrain Drive. Scope of works which is expected to be undertaken by 2 contracts but may be a single contract includes: Contract 1 - new roundabout on the corner of Elgin & Railway streets to facilitate traffic flow and create a new entrance to the carpark; realignment of Athel D'Ombrain Dr with Railway St; improvements to the existing stormwater system; upgrade the current carpark & graveled areas to a more formal hub as well as allow for significant interchanges between modes of transport; installation of power & lighting to the carpark & installation of CCTV & connection to Maitland railway station. Possible Contract 2 - upgrade the intersection of Sparke Street & High Street with traffic signals; realign & re build Sparke street; extend Athel D'Ombrain Dr from Abbott St to the end of Spark street parallel to the rail corridor; install drainage facilities; improve intersections alignments with current cross streets; installation of share pathways and improved on road cycleways; lighting installation & utility relocations Click for more details...

ERSKINEVILLE PERCHED GROUNDWATER REMEDIATION SYSTEM
45A MacDonald St adjacent to 36-66 Flora St, Erskineville, NSW 2043 Has Erskineville Perched Groundwater Remediation System currently at Construction stage. Construction & operation of a perched-water remediation system. The remediation system will include: construction of a cut-off wall, in the form of an impermeable barrier and interception trench to re-direct impacted perched groundwater away from the residential property towards a water treatment plant. Installation & operation of a water treatment plant located within a 20 foot shipping container. Construction & operation of discharge pipe work to direct treated water to the sewer outlet in McDonald St for discharge. Associated earthworks, vegetation removal & landscaping. Click for more details...

YAMBA SEWERAGE SCHEME - PACKAGE 2
Public Utilities (Treatment plants, Sewerage reticulation) project at Angourie Rd, Yamba, NSW 2464 of Reticulation/Transfer Systems type of New development. Design & construct the upgrade to the existing Yamba Sewerage Reticulation & Transfer Systems. Proposed works involve: upgrading sewage pump stations & rising mains; installation of potable water mains; stormwater inflow reduction works. Design & construction of a recycled water ebb tide river release system & associated works Click for more details...

CENTENNNIAL PARK
Public Utilities (Water distribution systems, Drainage) project In The Randwick Council Area of State ownership. Construction of synthetic multiuse surfaced including: removal of existing floodlights, earthworks, drainage, synthetic surface installation, new path installation, lightning, fencing, dividing netting & other associated works Click for more details...

CABBAGE TREE ISLAND SEWER PUMP STATION REFURBISHMENT
Cabbage Tree Island Sewer Pump Station Refurbishment is currently at the Construction stage, valued at about $ 900000 it is Refurbishment of 2 sewer pumps at Cabbage Tree Island Sewer Pump Station. Click for more details...

TOCAL RD CULVERT
A project in the NSW Within Maitland. Undertake repairs to a drainage culvert & reinstate road pavement at Tocal Rd Click for more details...

CHAPEL RD SOUTH RESURFACING DRAINAGE & CONCRETE WORKS
Public Utilities (Water distribution systems, Drainage) project at Chapel Rd South, Bankstown, NSW 2200 of Drainage/Concrete Works type of New development. Chapel Rd South Resurfacing, drainage & concrete works only between Canterbury & Eldridge Rds. Scope of work includes but is not limited to: reconstruction of sections of footpath & kerb & gutter, vehicular crossings & kerb ramps. Minor stormwater drainage, reconstruction of traffic islands & landscaping. Click for more details...

BELBORA CREEK
Public Utilities (Water distribution systems, Drainage) project for New development. Belbora Creek Rd causeway upgrade works. Scope of work includes: construction of a new 'waffle pod' causeway over the existing causeway with approaches (gravel & concrete) & construct a fish ladder Click for more details...

ARGYLE STREET WATER MAIN UPGRADE
Currently at the Construction stage In Byron is a project estimated to be $ 351000. This project Installation of a new 225DN trunk water main along Argyle Street, Mullumbimby. To include 780 metres of new trunk water main to link existing water trunk mains & replace an existing water main, connection of the new water trunk main to existing water mains, new residential service connections for approximately 61 residences in Argyle Street, Mullumbimby, replacement of approximately 500 meters of existing concrete footpath. Associated civil works. Click for more details...

WARD OVAL
Maidens Av, Cobar, NSW 2835 Has Ward Oval currently at Construction stage. Refurbishment of the Sewer Pump station at Ward Oval. Click for more details...

MT VICTORIA RAIL SYSTEMS
Currently at the Construction stage In Blue Mountains is a project estimated to be $ 495000. This project The scope of the rail systems remodelling works at Mt Victoria includes design, supply & installation, construction & testing/commissioning of a multi-disciplinary range of equipment & facilities. Replacement of the existing life expired signalling system with a new colour light signalling system with remote control capability via a computer based interlocking system (ie, a new signalling system). Civil work. Track work. Overhead wiring. Drainage. Low & high voltage power supply upgrade. Communications Click for more details...

SOMERSBY BALANCE TANKS
Public Utilities (Treatment plants, Sewerage reticulation) New project at ., Somersby, NSW 2250. This type is Pac Plant with Local Govt ownership. Construction of a Powdered Activated Carbon (PAC) Unloading, storage & dosing system at the Somersby Balancing Tanks site. The PAC system will provide additional pre-treatment upstream of the existing water treatment system at the Somersby Water Treatment Plant. Click for more details...

HAY LEONARD STREET RESERVOIR
Hay Leonard Street Reservoir is currently at the Construction stage, valued at about $ 500000 it is Internal & external repainting of the Reservoir. Scope of work includes: Internal - removal of internal surface coating - Taubmans Val Chem Tank Lining High Build Epoxy; removal of the internal ladder system; remove existing AC overflow pipe and replace with ductile iron pipe & fitting including a footstep bend to support the weight of the DI pipe; remove AC stilling tube & support brackets; remove level indicator guy wire pipe & fittings; repair of all surface defects; & surface preparation and repainting of the internal surface areas. External - removal of external ladder system and associated platforms & landings; removal of all external extraneous fittings & attachment not required for the functioning of the reservoir & repair of all surface defects Undertake cleaning of the external coating system, perform spot repairs where required & apply a full decorative coat to the external surface Click for more details...

GUNNEDAH WASTE FACILITY
Public Utilities (Treatment plants, Sewerage reticulation) project at ., Gunnedah, NSW 2380 for New. Construction of leachate & surface water controls & ancillary works at the Gunnedah Waste Management Facility. Click for more details...

MERIMBULA AIRPORT
Public Utilities (Water distribution systems, Drainage) project at Arthur Kaine Dr, Merimbula, NSW 2548 of Domestic Main/Fire Service Supply type of New development. Construction of a domestic main & fire service supply to service the Merimbula Airport. Scope of works include installation of 2 x 366.5KL tanks. Installation of all valves, tees, hydrants & other fittings. Construction of concrete pads. Construction of a pump shed. Construction of tank filling inlets, overflows & suction outlets. Construction of a water main from Fishpen Merimbula to the Airport for fire service purposes. Construction of a water main from Fishpen Merimbula to the Airport for domestic water supply purposes. Construction of a ring main through the airport site for firefighting requirements. Installation of booster pump set. Click for more details...

EDWARD RIVER COUNCIL TRUNK MAIN
Public Utilities (Water distribution systems, Drainage) project at Barham Rd, Deniliquin, NSW 2710 for New. Construction (augmentation) of the potable water trunk main within the existing potable water reticulation system Click for more details...

PROCTOR PARK
Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Bathurst Council Area for New development. Construction of two stormwater outlets including a gabion retaining wall into Queen Charlottes Vale Creek at Proctor Park. Click for more details...