GATEWAY PARK
Public Utilities (Treatment plants, Sewerage reticulation) project at Cassia Pl, Brisbane Airport, QLD 4007 for New. Bulk earthworks for a commercial development & golf course. Click for more details...

COOLOOLA SHIRE COUNCIL - IMBIL SEWERAGE TREATMENT PLANT
Public Utilities (Treatment plants, Sewerage reticulation) New project at ., Imbil, QLD 4570. This type is Sewerage Treatment Plant with Local Govt ownership. Manufacture & installation of package sewerage treatment plant. Click for more details...

ENERGEX SUBSTATION
Energex Substation is currently at the Tenders & Building stage, valued at about $ 200000 it is Earthworks, concrete foundations & associated civil works for substation. Click for more details...

KESTREL COAL OPERATIONS
Public Utilities (Water distribution systems, Drainage) project at Gordonstone (40 km north-east of Emerald), Peak Downs Mine, QLD 4744 of Reticulation type of New development. Water & sewerage reticulation for 400 person construction camp. 10 week contract period. Click for more details...

TOWNSVILLE POWER STATION
Civil Contract - For Power Station Modification project at via, Yabulu, QLD 4818 in the Public Utilities (Power stations, Substations, Windfarms, Phone exchanges). Civil works & foundations for conversion of a gas powered plant to a co generation plant for production of electricity. Click for more details...

MISSION BEACH SEWERAGE SCHEME
Currently at the Construction stage In Cassowary Coast Regional is a project estimated to be $ 14000000. This project Sewerage reticulation & collection system (including lift stations, pump stations & rising mains) to the three main catchments: Mission Beach, Wongaling Beach & South Mission Beach. Click for more details...

MABUIAG ISLAND WATER SUPPLY UPGRADE
A project in the QLD Within Torres Strait Island Regional. Works include: repairs to reservoir access track; construction of a 750 kL reinforced concrete reservoir; relocation of existing SCADA operated radio control link; replacement of pumping & filtration equipment; installatin of additional fire hydrants. Click for more details...

GOLD COAST CITY COUNCIL DESALINATION PLANT
Gold Coast City Council Desalination Plant is currently at the Construction stage, valued at about $ 1120000000 it is Development, design, construction, operation and maintain for 10 years a 125ML/d sea water desalination plant. The scope of work includes the sea water intake & discharge (twin tunnels of 2.2 & 2 km long offshore) & a 25 km long pipeline to connect the desalinated water to the SEQ network. Click for more details...

TORRES STRAIT REGIONAL AUTHORITY DESALINATION PLANT
Public Utilities (Treatment plants, Sewerage reticulation) project at Various Islands via, Thursday Island, QLD 4875 for New. Supply and delivery of a new 100 m3/day mobile reverse osmosis desalination unit, including trailer and ancillary equipment, for use on various islands in the Torres Strait. Click for more details...

ENERGEX SUBSTATION MINOR WORKS
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) New project at Various substations, ., QLD 4999. This type is Substations with State ownership. Minor building and maintainance works within Energex Substations. Click for more details...

GOLD COAST CITY COUNCIL PLANTSLUDGE DRYING BEDS REFURBISHMENT - STAGE 2
Public Utilities (Treatment plants, Sewerage reticulation) New project at Coombabah Wastewater Plant, Coombabah, QLD 4216. This type is Sludge Drying Beds - Refurbishment - Stage 2 with Local Govt ownership. Schedule of Rates contract for works to refurbish the sludge drying beds at the Coombabah Wastewater Treatment Plant, Coombabah. The works primarily involves resurfacing the beds with no fines asphalt to the required finished level. The beds require varying degrees of asphalt resurfacing from an entire resurfacing of the bed, to localised patch repairs. Some preparatory works will be required before the resurfacing can take place including, mechanical sweeping of the beds, and in some cases minor works to repair sections of the concrete bases and the under drains. The Superintendent will determine the toal number of beds to be resurfaced and the extent of the resurfacing, the availability of the beds issued ofr resurfacing and the extent of the minor works required. Works will be staged over six months to suit operational requirements of the treatment plant. Click for more details...

SCHOOL OF TODAY EARLY LEANING CENTRE
Public Utilities (Treatment plants, Sewerage reticulation) project In The Rockhampton Regional Council Area of Private ownership. Construction of early learning centre. To include classrooms & support areas. Concrete block, lightweight cladding, metal roof. Associated landscaping. Click for more details...

WOORABINDA WATER SUPPLY PROJECT SUBCONTRACT
Public Utilities (Water distribution systems, Drainage) project In The Central Highlands Regional Council Area of Water Treatment Plant type. The subcontractor will be required to design and construct a conventional treatment plant (solids removal through a conventional sedimentation process followed by a gravity filtration process, followed by disinfection) capable of producing 10l/s of treated water. The Water Treatment Plant facility will also consist of a sludge handling facility and a backwash storage system. Click for more details...

GOLD COAST CITY COUNCIL PIMPAMA COOMERA WATER FUTURE PACKAGE D
Public Utilities (Pumping Stations) New project at Various Locations in, Gold Coast Mc, QLD 4217. This type is Reservoirs/Sewerage Treatment - Package D with Local Govt ownership. Includes the design and construction of potable and recycled water mains and sub-mains, pumping stations, reservoirs, wastewater gravity mains, wastewater rising mains and pumping mains. Click for more details...

BELLVIEW ON BELLMERE PUMP STATION
Pump Station project at Bishop Ln & River Dr, Bellmere, QLD 4510 in the Public Utilities (Pumping Stations). Construction of sewer pump station & associated works for a residential subdivision. Click for more details...

TARONG POWER STATION MEDIUM VOLTAGE ELECTRICAL MOTORS
Medium Voltage Electrical Motors project at Tarong Power Station, Nanango, QLD 4615 In The Council Area Of South Burnett Regional of State. For the manufacture, supply and delivery of two new medium voltage induction motors: 1 x 606kV, 4550kW, 12 pole motor and 1 x 6.6kV, 4550kW, 6 pole motor. Click for more details...

QUEENSLAND WATER LOGAN RIVER CATCHMENT EARLY WORKS REQUESTS FOR PROPOSALS DOUBLE ENTRY REFER ID 4149063
Weir project at On Logan River, Cedar Grove, QLD 4285 In The Council Area Of Logan City of Private. Request for Proposals for design/construct & commission of steel sheet pile weir, incorporating fish lock & associated works. Click for more details...

BAUHINIA SHIRE COUNCIL PUMP STATIONS
Public Utilities (Pumping Stations) project In The Central Highlands Regional Council Area of Pump Stations (2) type. For the supply, install and commissioning of two sewerage pump stations in the township of Rolleston. Click for more details...

WATER SUPPLY UPGRADE PROJECT
Public Utilities (Water distribution systems, Drainage) New project at Douglas & Kinduro, Townsville, QLD 4810. This type is Water Treatment Plants with Private ownership. Long term contract to involve: construction of various major water supply facilities; operation & maintenance of NQ Water's bulk water supply infrastructure (excluding water storages). Capital works may include: Northern Water Treatment Plant - a new 40 ML/d WTP incorporating Crystal Creek Stabilisation Facility - a new lime/CO2 dosing facility & minor work at Kindaroo ; upgrade to Douglas Water Treatment Plant - various upgrades to 232 Ml/d WTP. Click for more details...

CAIRNS PORT AUTHORITY OPEN CONCRETE DRAIN (CONTRACT CPA 0410)
Public Utilities (Water distribution systems, Drainage) project In The Cairns Regional Council Area of Open Concrete Drain type. Constructing approximately 850 metres of open concrete lined drain and associated earthworks. Click for more details...

WINTON SHIRE COUNCIL SEWER
Gravity/Rising Main project at ., Winton, QLD 4735 In The Council Area Of Winton Shire of Local Govt. Approximately 250m of 150mm dia gravity main. Approximately 66m of 40mm dia rising main. 5 Manholes. 1 Pump station. Associated works. Click for more details...

PEREGIAN SPRINGS WATERMAIN (CONTRACT C5145/07/P57W-H)
Currently at the Tenders & Building stage In Sunshine Coast Regional is a project estimated to be $ 200000. This project Installation and construction of approximately 640m of 225mm dia. water main and all associated fittings and earthworks. Click for more details...

MT STUART POWER STATION EXPANSION
Mt Stuart Power Station Expansion is currently at the Construction stage, valued at about $ 92000000 it is For a new 126MW gas turbine generator. Although the power station runs on jet fuel, the Company's existing two turbine generators on site can also be converted to run on natural gas in the future. To include substantial civil & concrete works. Click for more details...

LOCKROSE SUBSTATION UPGRADE
., Lockrose, QLD 4342 Has Lockrose Substation Upgrade currently at Tenders & Building stage. For the provision of site construction works for the substation upgrade of Lockrose. Click for more details...

ORMEAU RESERVOIRS
Reservoir project at Opermann Dve, Ormeau, QLD 4208 In The Council Area Of Gold Coast City of Local Govt. Design and Construction of a 13.6ML and an 8.4ML concrete reservoir adjacent to an existing concrete reservoir and associated works. Click for more details...

HINCHINBROOK ELEVATED RESERVOIR REPAIRS
Public Utilities (Reservoirs) project In The Hinchinbrook Shire Council Area of Local Govt ownership. Relining of concrete reservoirs, Replacement of steel roofs with precast concrete roof, Replacement of external ladders and handrails, Repainting of steel tower. Click for more details...

THABEBAN WASTEWATER TREATMENT PLANT UPGRADE
Public Utilities (Treatment plants, Sewerage reticulation) project In The Bundaberg Regional Council Area of Local Govt ownership. Upgrade of Thabeban wastewater treatment plant in Bundaberg. Click for more details...

SUNSHINE COAST SEWERAGE PUMP STATIONS
Sewerage Pump Station (2) New project In The Sunshine Coast Regional Council Area. Construction of 2 sewerage pump stations. Click for more details...

GOONYELLA RIVERSIDE COAL OPERATIONS - EXPANSION PROJECT - 132KV SWITCHING STATION
Off Red Hill Rd 30km north of, Moranbah, QLD 4744 Has Goonyella Riverside Coal Operations - Expansion Project - 132kv Switching Station currently at Construction stage. A project to accommodate the Goonyella Riverside Mine's increase in electrical requirements from 50MW to 93MW by providing access to 132kV transmission capacity. Existing Feeders at the Mornabah-Stony Creek Tee North Goonyella (7122) & Moranbah-Newlands (7155) to loop in & out of the new switchyard atop concrete poles. The switching station to include 2 x 132kV busbars, 8 x 132kV double circuit breaker bays, 2 x 132kV capacitor banks & a 250kVA emergency diesel generator. Civil works expected to include site clearance & levelling, drainage, fencing, installation of cable trench & a site wide earthing mat. Buildings to include 2 demountables for a bay control building (14 x 3.2m) & communications building (7 x 3.2m) as well as a 9 x 9m, slab on ground storage shed with metal walls & roof. Up to 30 construction personnel & a similar number for the following electrical fit-off expected during the 1 year project. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - KENYA WATER TREATMENT PLANT
Water Treatment Plant - For Coal Seam Gas Water project at 20km southwest of, Chinchilla, QLD 4413 In The Council Area Of Western Downs Regional of Private. Construction near the Kenya coal seam gas processing plant of a 100megalitres a day capacity water treatment plant to process water coming to the surface from gas extraction. Associated infrastructure to include a 33MW gas fired power plant to run the reverse osmosis process, ponds & pipelines. Initial operations from October 2011 to be at 72MW. Click for more details...

MOUNT ISA CITY COUNCIL SEWERAGE UPGRADE STAGE 1
Public Utilities (Treatment plants, Sewerage reticulation) project In The Mt Isa City Council Area of Local Govt ownership. Sewerage treatment upgrade project. Click for more details...

NAMBOUR LANDFILL LEACHATE PUMP STATION & RISING MAIN
Public Utilities (Pumping Stations) project In The Sunshine Coast Regional Council Area of Landfill type. Construction of leachate pump station & rising main. To include fittings, rising main, electrical work & telemetry. Click for more details...

WOODLANDS ANDERGROVE STAGE 6 CIVIL WORK INFRASTRUCTURE WORKS
271 Bedford Rd, Andergrove, QLD 4740 Has Woodlands Andergrove Stage 6 Civil Work Infrastructure Works currently at Construction stage. Civil works infrastructure works at Stage 6 Woodlands Andergrove. Works to include subdivision of 30 lots construction of a new raod & construction of infrastructure such as stormwater drainage, water reticulation & sewerage reticulation. Click for more details...

BARALABA WATER TREATMENT PLANT UPGRADE
Public Utilities (Treatment plants, Sewerage reticulation) project for New development. Design & construction of new Baralaba Water Treatment Plant. To include raw water pumps, raw water main, treatment for manganese taste/odour removal, wastewater, sludge management & clear water storage tanks. Click for more details...

NORTHERN BEACHES TRUNK WATER MAIN & CEDAR ROAD WATER MAINS STAGE 1
Public Utilities (Water distribution systems, Drainage) project for New development. Construction works associated with the installation of a segment of the Northern Beaches Trunk Water Main & Cedar Road Water Mains to be constructed by means of Trenchless Technology. Click for more details...

CLEARVIEW RISE CIVIL WORKS STAGE 3
Public Utilities (Water distribution systems, Drainage) project at Bowen St, Roma, QLD 4455 for New. Works to include earthworks, roads, stormwater drainage, water & sewer reticulation, electriacl & telecommuncations reticulation. Stage 3A (23 lots) & 3B (21 lots) can be delievered as separable portions to facilitate settlements if needed however the contract is offered as a single contract of 44 lots. Click for more details...

CALOUNDRA SEWER TRANSPORT SYSTEM
Currently at the Construction stage In Sunshine Coast Regional is a project estimated to be $ 2000000. This project Investigate options for upgrading the Caloundra Sewage Transport System. The upgrades will improve the overall efficiency of the system & lower maintenance costs, while catering for projected population growth in the Caloundra area. Click for more details...

THAGOONA FLOOD MITIGATION WORKS
Public Utilities (Water distribution systems, Drainage) project at Thagoona, Thagoona, QLD 4306 for New. Thagoona Flood Mitigation Works. To include construction of a flood levee & drainage channel adjacent to Karrabin Rosewood Road Thagoona. Upgrade of Amaroo Road intersection to include a box culvert structure. Alteration to a Cul-de-sac of a local road. Relocation of water main infrastructure. The use of onsite materials to construct a future playing field. Certification of the levee works. Construction of earthworks, pavements, drainage infrastructure, road furniture, landscaping & water main relocation works. Click for more details...

SURFERS PARADISE SEWAGE PUMP STATION A03 UPGRADE
Surfers Paradise Sewage Pump Station A03 Upgrade is currently at the Construction stage, valued at about $ 997000 it is Upgrade to the sewage pump station at Lionel Perry Park, Surfers Paradise. To include the design, manufacture, install, inspect, test & commission of replacement switchboards. Supply & replacement of pumps & valves & install new suction pipe. Internal/external refurbishment of the pump station building. Disposal of waste. Associated mechanical, electrical & civil works. Click for more details...

CANUNGRA WATER TREATMENT PLANT UPGRADE
Public Utilities (Treatment plants, Sewerage reticulation) project In The Scenic Rim Regional Council Area of Water Treatment Plant - Upgrade type. Upgrade to the Canungra Water Treatment Plant on Lamington National Park Road, Canungra. To include decommissioning, demolition & removal of all existing site plant & structures. Construction of plant building. Raw water intake pumps. Chemical dosing systems & CIP. Membrane filtration plant (vendor package). Clarifier (vendor package). Clear water tank (design & construct package). Backwash recycle pump station. Sewer pump station. New interconnecting pipework & fittings. Switchboards, control centres, distribution boards, PLC and SCADA. Electrical cabling & conduits. Sewer & stormwater drainage. Metalled access road & surrounding hardstand. Site landscaping. Associated mechanical, electrical & civil works. Click for more details...

ANDREW AVENUE DRAINAGE UPGRADE
Currently at the Construction stage In Moreton Bay Regional is a project estimated to be $ 180000. This project Upgrades of approximately 150m of drainage channel & adjoining pathway on Andrew Avenue, Deception Bay. To include installation of concrete liner to an existing open channel (approximately 4.5m wide), new fence on the top of the proposed block wall & minor longitudinal re-grading. Replacement of damaged existing footpath & existing stormwater headwall, wingwall, & apron. Construction of new maintenance driveway & gate into the drainage channel from Banfield Court. Click for more details...

PALM ISLAND WATER & SEWER TREATMENT PLANTS UPGRADE
Water Treatment & Sewer Treatment Plants - Upgrade project at ., Palm Island, QLD 4816 in the Public Utilities (Treatment plants, Sewerage reticulation). Upgrade of water & sewer infrastructure to increase capacity of water & sewer treatment plants to accommodate the increasing population on Palm Island. Click for more details...

MACKAY REGIONAL SEWERAGE PUMP STATION RESILIENCE UPGRADES
Public Utilities (Pumping Stations) Renovations, Refurbishments etc. project at Various location across, Mackay, QLD 4740. This type is Sewerage Pump Statons - Upgrade with Local Govt ownership. Upgrades to 42 identified sewerage pump stations across Mackay region. Project includes installation & construction of new ventpoles, new switchboards including slabs or elevated structures, electrical conduits & relining of wet wells. Access improvements including driveways, culvert crossings & retaining wall, pump station structural modifications including removal of 3 buildings & construction of new well cover slabs, minor concrete pit & wet well condition assessments of existing sewage pump stations. Associated civil & construction works. Locations include Carbeen Street, Hargreaves Street, McMahon Street, Monique Court, Tramontana Street, Apsley Way & Renae Street, Andergrove. Parkview Court & Beaconsfield Road No 2, Beaconsfield. Dewars Road, Bakers Creek. Backs Beach Road, Camilleri Street, Eimeo Road No 1 & 2 & Shann Street, Eimeo. Caroline Street, Mirani. Downie Avenue, Ellis Avenue, Geoffrey Thomas Drive, Griffin Avenue, Shoal Point Road No. 1, Waverley St & Williams Avenue, Bucasia. Malcomson Street No 2, Suncrest Court & Flors Avenue, Mount Pleasant. Burgess Street, Forgan Street, Hamilton Street, Malcomson Street No 1 & Willetts Road, North Mackay. Farrellys Road, South Mackay. Nebo Road, Hart Street& Cullen Street, Mackay. Blackwood Street, David Muir Street No 1 & 2 & Pacific Esplanade, Slade Point. Pugsley Street No.2 & Saunders Street, Walkerston. Denman Avenue, Shoal Point. Click for more details...

WEIPA WATER & SEWERAGE PUMP STATIONS UPGRADE
Water & Sewerage Pump Stations - Upgrade project at ., Weipa, QLD 4874 in the Public Utilities (Water distribution systems, Drainage). Upgrade of sewerage pump stations A & E & disinfecting potable bore water for Lorim Point/Evans Landing. Click for more details...

CALOUNDRA PUMP STATION UPGRADE
Public Utilities (Pumping Stations) New project at Various locations in, Caloundra, QLD 4551. This type is Pump Station - Upgrade with Private ownership. Mechanical & electrical works at 3 pump stations in Caloundra. Works to include retrofit of Well 1 (SPS-LMT002) for a high lift pump station with 3 duty pumps each 263 L/s variable speed capacity. Conversion of existing Well 2 (SPS-LMT001) pump station to a low lift station. To include construction electrical switchboard building. Construction of new DN450 sewage rising main from Well 1 to Well 2 inlet. Replacement with higher head pumps at SPS-CAL001 pump station. Click for more details...

WAPPA DAM UPGRADE LHS ABUTMENT WORKS
A project in the QLD Within Sunshine Coast Regional. Abutment works for the Wappa Dam upgrade. To include dam crest filter & reinstatement. Embankment toe filter trench & weighing zone. Auxiliary spillway remedial works. Associated access & drainage works. Click for more details...

AUBINVILLE WASTE WATER TREATMENT PLANT INLET WORKS
Public Utilities (Treatment plants, Sewerage reticulation) project at 95 Errol St, Maryborough, QLD 4650 of Design Consultancy For Waste Water Treatment Plant - Inlet Works type of New development. Aubinville waste water treatment plant inlet works & plant improvements. To include preparation of design drawings & tender documentation for the supply & construction of inflow attenuation, inlet pump station, screens & degritting equipment, septage reception, odour control equipment, facilities & process improvements. Click for more details...

INGHAM ROAD INTERSECTION
Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Townsville City Council Area for New development. Ingham Rd/Everett St/Weston St Intersection works. Construction of a roundabout & water main replacement Click for more details...

SOUTH LIVERPOOL CREEK
Public Utilities (Water distribution systems, Drainage) New project at ., Innisfail, QLD 4860. This type is Creek with Local Govt ownership. Supply, construction & commissioning of a fully operational raw water intake, pump station & supply pipeline into the existing supply system. Click for more details...

GREGORY WATER TREATMENT PLANT SOLAR POWER PROJECT
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project for New development. Supply & installation of Solar Power array & energy storage system for Gregory Water Treatment Plant. Scope of work includes: design and construction of PV system. Complete standalone PV/battery system including; PV modules; battery banks; ground mounted fixed tilt PV system; controllers (load measurement, chagrining, and discharging controls, etc); inverters/chargers; associated earthing and surge protection systems; electrical reticulation system comprising DC and AC cabling as required to connect the new solar PV and battery storage systems; cable access system including underground conduits and cable pits, services ducts, cable trays, and in-wall and under-slab conduits as required to accommodate the electrical services; new distribution switchboard(s)/alterations & additions to existing distribution switchboard(s); control & communications system; generator interface; plant controller and SCADA interface. Design & construction of battery bank storage facility including: ocoordination of the electrical installation with other trades and with the existing installation & programming and configuration of hardware & software including any HMI Click for more details...