MOUNT MILLAR (YABMANA) WIND FARM
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) New project at Yabmana btwn Cowell & Cleve, ., SA 5999. This type is Interconnection Works For Wind Farm with Private ownership. Interconnection to National Grid for wind farm. Click for more details...

BOLIVAR SEWAGE TREATMENT PLANT SITE
Public Utilities (Treatment plants, Sewerage reticulation) Supply & Install project at Bolivar Sewage Treatment Plant Hodgson Rd, Bolivar, SA 5110. This type is Odour Control Units For High Salinity Treatment Plant - Pt 3 with State ownership. Supply & install odour control units for High Salinity Treatment Plant. Click for more details...

HOPE VALLEY OVAL
Public Utilities (Water distribution systems, Drainage) project at Valley Rd, Hope Valley, SA 5090 for New. Upgrade to irrigation system. Click for more details...

COWANDILLA MILE END DRAIN
Public Utilities (Pumping Stations) project at Lipsett Av Brooklyn Park, Hounslow Av Cowandilla & Bagot Av, Mile End, SA 5031 of Drainage - Stages 6 & 7 type of New development. 1,960 m approx x large dia trunk RCP (btwn twin 1,650 mm dia & single 525 mm dia pipe), associated lateral drainage, junction boxes & reinstatement. Click for more details...

SA WATER CORPORATION
Public Utilities (Water distribution systems, Drainage) project for New development. EL401/423 pumping station to serve Littlehampton, Nairne & Wistow. Click for more details...

SA WATER CORPORATION
Public Utilities (Treatment plants, Sewerage reticulation) project at Colville Rd, Aldinga, SA 5173 for Subcontract. Construct treatment plant, associated equipment & water storage lagoons to use recycled water from plant. Scheme will initially serve population of up to 5,000 people. Works include: 1 x holding lagoon, 3 x evaporation lagoons, pump station, oxidation ditch, clarifier, filtration units & associated equipment. Click for more details...

CITY OF WHYALLA
New project of Public Utilities (Water distribution systems, Drainage) project at Within council area of City of, Whyalla, SA 5600. Preparation of irrigation management plans for open space areas. Intending to use 300 ML x recycled, B Class effluent & 70 ML approx x recycled stormwater per annum. Click for more details...

CALEB STREET, ADDISON & BATTAMS ROADS DRAINAGE
Public Utilities (Water distribution systems, Drainage) project at Caleb St, Addison & Battams Rds, Royston Park, SA 5070 of Drainage Works For Various Roads type of New development. Construct drainage works for three roads. Click for more details...

ADELAIDE METROPOLITAN CCTV SURVEY
Currently at the Construction stage In Various is a project estimated to be $ 150000. This project Survey consultants to carry out CCTV survey of 90 km approx x concrete trunk sewer for proposed future maintenance &/or upgrade work. Click for more details...


Consultants For Assessment Of Ecology Of Faecal Coliform Bacteria project at Lower Murray Reclaimed Irrigation Area, SA 5999 In The Council Area Of Various of Private. Consultants for assessment of ecology of Faecal Coliform Bacteria in irrigation drainage. Click for more details...

CHRISTIES BEACH SEWAGE TREATMENT PLANT
Public Utilities (Treatment plants, Sewerage reticulation) project In The Noarlunga Council Area of State ownership. Supply & install civil & structural works for sewage treatment plant upgrade. Click for more details...

RYMILL PARK STORMWATER CHANNEL
Stormwater Drain - Stage 1 New project In The Adelaide Council Area. Comprising upgrading of open channel in Rymill Park. Work involves flattening batter slopes, pipe work & assoc structures, modifications to irrigations, turfing of bare areas, erosion protection in creek & planting of native grasses. Click for more details...

QUALCO-SUNLANDS GROUNDWATER CONTROL SCHEME
Mechanical/Electrical New project In The Loxton Waikerie Council Area. Mechanical/electrical services. Click for more details...

CITY OF NORWOOD PAYNEHAM ST PETERS
Public Utilities (Water distribution systems, Drainage) Renovations, Refurbishments etc. project at Adj Ashbrook Av, Payneham, SA 5070. This type is Stormwater Drain with Local Govt ownership. Construction approx 80 m of 3.3 x 1.2 m reinforced concrete box culverts & associates works. Click for more details...

NETLEY POLICE PATROL STATION
Public Utilities (Treatment plants, Sewerage reticulation) project at Netley Commercial Park, Marion Rd, Netley, SA 5037 for New. Demolition of 5 major & 4 smaller buildings, diversion of existing site services & general removal of all site features to provide clear & level site for new major police facility after works. Works also include - provision of chain wire security fence to perimeter of new site. Services to be diverted include fire sprinkler mains to new fire pump house, telephone, water & electrical. Click for more details...

BARCOO OUTLET
Currently at the Construction stage In Holdfast Bay is a project estimated to be $ 100000. This project 1.5 km underground pipeline to discharge stormwater out to sea. Click for more details...

QUEEN ELIZABETH HOSPITAL
Public Utilities (Water distribution systems, Drainage) Addition project at Woodville Rd, Woodville South, SA 5011. This type is Enabling Works/Services Relocation/Demolition For Hospital - Redevelopment with State ownership. Work includes diversion of stormwater, sewer, domestic & fire water, steam & condensate, natural gas, high & low voltage electrical & communications inground services in staged program. Nurses Education annex of CDRC building will be demolished with services decommissioned & made safe. Services including air conditioning, refrigeration systems, domestic hot, cold & fire water, electrical & communications between Nurses Education & CDRC buildings will be diverted. New air conditioning & domestic hot water systems will be installed in CDRC building. Structural strengthening of services tunnel from boiler house under roadway to Maternity building & structural works to CDRC demolition facade are also required. Click for more details...

MURRAY BRIDGE SHOWGROUNDS
A project in the SA Within Murray Bridge. Installation new pumping station & rising main for irrigation. Variable speed pump, sump, pipe & shed. Click for more details...

ROYAL ADELAIDE HOSPITAL
T/Package For Plumbing-Hospital-Redev-Stage 2/3a Phase A-Pack 3-Multi Storey Subcontract project In The Adelaide Council Area. Plumbing associated with hospital redevelopment. Click for more details...

SNOWTOWN WIND FARM (BARUNGA RANGES WIND FARM) - STAGE 1
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project In The Snowtown Council Area of Wind Farm - Stage 1 type. Stage 1 comprising 47 of total 130 x wind turbines, underground electrical cable network, access tracks, crane hardstandings, wind monitoring masts, small switchgear buildings & appropriate site signs. Click for more details...

ONKAPARINGA CATCHMENT WATER MANAGEMENT BOARD REGION
Currently at the Construction stage In Various is a project estimated to be $ 150000. This project Operation & maintenance of surface water gauging stations in Onkaparinga Catchment Water Management Board region of South Australia. Click for more details...

MANNUM WATER MAIN
A project in the SA Within Mid Murray. Supply & construct 1,000 m approx x 100 mm PVC water mains. Click for more details...

REMOTE AREAS ENERGY SUPPLIES SCHEME - CONSULTANTS
Professional Engineering/Procurement Services For Energy Supplies Scheme project at Various remote areas in, South Australia, SA 5999 In The Council Area Of Various of State. Consultants to provide professional engineering & procurement services to support continuing development of remote areas energy supplies scheme. Click for more details...

G6 IRRIGATION CONSULTANCY
Public Utilities (Water distribution systems, Drainage) project for New development. Irrigation consultancy services for G6 council areas. Click for more details...

SA WATER CORPORATION - ENGINEERING/CADASTRAL SURVEYING SERVICES
Public Utilities (Water distribution systems, Drainage) project at Various SA Water Corporation sites within, South Australia, SA 5999 for New. Consultants to provide engineering & cadastral surveying services if & when required. Click for more details...

DASHWOOD GULLY RESERVE STORMWATER DRAINAGE
Stormwater Drainage project at Cnr Dashwood & Duncan Rds, Beaumont, SA 5066 in the Public Utilities (Water distribution systems, Drainage). Construction of IPLEX HDPE Black Max stormwater drainage, approx 145 linear m at Dashwood Gully Reserve. Click for more details...

PATERSON DRIVE DRAINAGE PIPES & SURFACE SWALES
A project in the SA Within Onkaparinga. Installation of drainage pipes & surface swales. Work to include: clearing & grubbing, earthworks, erosion control, site preparation, pipe drainage (RC, FRC, steel, uPC), general stormwater drainage, drainage mats, drainage structures (including headwalls, wingwalls, pits, gully pits/side entry pits, inspection pits, junction boxes/pits, drop structures, inlet & outlet structures, energy dissipators, batter drains & other supplementary structures), open drains (including channels, catch drains, contour drains, diversion drains, table drains, batter drains, swales, spoon drains, grated drains, kerbs & gutters), minor concrete works & landscaping. Click for more details...

TUMBY BAY WASTEWATER MANAGEMENT SCHEME UPGRADE
A project in the SA Within Tumby Bay. Construction of rising & irrigation mains, major pump station refits; install two new chambers. Click for more details...

OUTER METROPOLITAN ADELAIDE WATER & WASTE WATER EXTENSIONS
Public Utilities (Treatment plants, Sewerage reticulation) project for New development. Schedule of rates contract for contract term of two years with one year extension option. Area 1 - Balaclava, Roseworthy, Nuriootpa. Area 2 - Mannum, Murray Bridge. Area 3 - Woodside & Port Elliott. Click for more details...

LONSDALE POWER STATION EXPANSION
Lot 100 Dyson Rd, Lonsdale, SA 5160 Has Lonsdale Power Station Expansion currently at Construction stage. Expansion of installed capacity of power station from current 18 generator 20 MW to 50 MW. Click for more details...

ELECTRANET CITY WEST SUBSTATION
Substation/Underground Connections New project In The West Torrens Council Area. Work to include concrete footings, precast concrete panel walls to house transformers & equipment & infrastructure for the overall project. The $250 million overall project involves increase of the supply for Adelaide Central region, required to be achieved by 31 December 2011: Establish a new double bus GIS substation comprising one 300MVA 275/66kV transformer dedicated to the provision, of N-1 continuous transformer capacity to the Adelaide Central region, in conjunction with the single 225 MV.A 275/66kV transformer at the existing East Terrace substation. To provide 275 kV supply to the new substation from TIPS 275kV switchyard via approx 17 km of underground cable rated at 750 MV.A continuous cyclic capacity. ETSA Utilities to establish a new 66 kV GIS bus at Whitmore Square comprising one section breaker & 5 exits & tie this new bus to the existing 66 kV bus. ETSA Utilities to provide a 300MVA capacity 66kV underground connection from ElectraNet's City West substation to ETSA Utilities' existing 66kV Whitmore Square substation in the CBD & modify the distribution network to manage the increased capacity. To include switchgear building, amenities building. Extensive landscaping. Click for more details...

TORRENS ISLAND POWER STATION CONTROL ROOM FITOUT
Currently at the Construction stage In Port Adelaide Enfield is a project estimated to be $ 2000000. This project Fitout of control room at power station. Click for more details...

FREELING & KAPUNDA WATER TANK CONSTRUCTION CONTRACT 1
Public Utilities (Water distribution systems, Drainage) project In The Light Regional Council Area of Local Govt ownership. Design, construction & commissioning of 300kL nominal reinforced concrete water storage tank in Kapunda complete with steel roof, all pipework penetrations for overflow, inlet (1) & outlets (3) & final site preparation at Gundry's Hill Reserve & design, construction & commissioning of 130kL nominal reinforced concrete water storage tank in Freeling complete with steel roof, all pipework penetrations for overflow, inlet & outlet & final site preparation at Freeling Community Recreation Park. Click for more details...

ETSA MT BARKER SUBSTATION UPGRADE
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project for Renovations, Refurbishments etc. development. Internal & external refurbishment of existing building. Click for more details...

WILLUNGA BASIN PIPELINE & WATER TANKS - STAGE 3
Public Utilities (Water distribution systems, Drainage) project at 3905 Main South Rd, Sellicks Hill, SA 5174 of Pipeline/Water Tanks - Stage 3 type of New development. Extension to Willunga Basin Pipeline & 2 water tank sites. Click for more details...

OAKLANDS PARK STORMWATER REUSE SCHEME MECHANICAL & ELECTRICAL CONSTRUCTION WORKS
Public Utilities (Pumping Stations) New project at Bounded by Oaklands Rd, The Parade, Sturt River & Noarlunga Railway, Oaklands Park, SA 5046. This type is Mechanical/Electrical Works with Local Govt ownership. Mechanical & electrical works associated with construction of 3 pump stations & 6 submersible pumps in ground water ASR wells. Supply & install pipes & cables into Common Services Trench. Install conduits for consumer mains to new transformer. Design, supply & install sub-boards & buried power distribution cables from transformer to new metering board, pump station & ASR wells. Convert portion of existing steel shed to secure building & demolish remaining portion. Click for more details...

TONSLEY PARK REDEVELOPMENT CADASTRAL SURVEYING SERVICES
Public Utilities (Water distribution systems, Drainage) project In The Marion Council Area of Consultancy For Cadastral Surveying Services type. The cadastral surveying services consultant will be engaged as the nominated surveying sub-contractor for civil & environmental works contracts. Services to include: land development feasibility estimates; advice on land division process from pre-lodgement to receiving DAC land division certificate of approval; prepare plans to assist in master planning & rezoning phase; on-going detail & level surveys; overall site survey control; preparation of post demolition plans; as constructed surveys for earthworks, service infrastructure, roads, retaining wall, building grid lines, sewer, water supply mains, recycled water supply mains & connection to each allotment & nominated reserves. Click for more details...

CITY OF PORT ADELAIDE ENFIELD PUMP STATION
City Of Port Adelaide Enfield Pump Station is currently at the Construction stage, valued at about $ 4500000 it is Installation of pump station & 3.5 m high fence along rear & side boundaries. Click for more details...

NEUROODLA SUBSTATION REPLACEMENT
A project in the SA Within Port Augusta. Rebuild a new substation alongside the existing substation & install a new 10 MVA transformer. Click for more details...

FRANKLIN HARBOUR ROADWORKS & INFRASTRUCTURE
Roadworks/Infrastructure project at .Various locations within the Boundaries of Port Gibbon & Cedar Ave, Cowell, SA 5602 in the Public Utilities (Treatment plants, Sewerage reticulation). Preparation of a concept design for sealed roads, kerb & water table, stormwater, sewer & potable water reticulation system for the township of Port Gibbon & also the design of road & associated infrastructure for Cedar Ave in the Township of Cowell. The Port Gibbon Township is situated on the east coast of the Eyre Peninsula approx 20 km southwest of Cowell. The settlement currently consists of 21 developed freehold allotments (mostly coastal shacks) & 25 council owned undeveloped freehold allotments, that are serviced by unsealed sheeted roads. There is a 5 year old EWS Go Treat Wastewater Treatment Plant installed that services the existing shacks that also has the capacity to serve the ultimate development of the town. Council intends to develop the 25 allotments on the western side of the settlement for sale. Engineering surveys of the Port Gibbon Township & Cedar Ave have been undertaken. A 10cm aerial survey with high definition imagery has also been carried out in 2012. The standards for design of infrastructure shall be consistent with Councils Land Development Policy, July 2013. Any deviation from standards therein shall be in consultation with & agreed in writing by Council. This brief for design at Port Gibbon shall be a (2) staged project whereas in Stage 1, the Design Engineer shall: a) Develop concept designs of road infrastructure to service the (approx) 50 allotments (developed & undeveloped) including kerb & water table. b) Assess stormwater flows & provide concept designs (in consultation with Council) for stormwater infrastructure to cater for the developed & undeveloped allotments; c) Prepare concept design sewer collection system & property connections between the undeveloped allotments on Barden St & Hennessy Tce & the WWTP on Ocean Blvd; d) Assess effluent disposal system & (if required) concept design extension to cater for waste water flows undeveloped lots; e) Consult with council on issues arising from concept design. The completion of Stage 1 (Port Gibbon) shall constitute a hold point where Council will consider the concept designs. Following a decision to proceed with Stage 2 the design engineer shall: 1) Prepare engineering drawings for construction of road & associated infrastructure as detailed above (including cut/fill volume calculation); 2) Design a reticulated potable water supply for the allotments adjacent to Barden St & Hennessy Tce to connect to councils existing supply; 3) Prepare & submit applications to Department of Health/EPA for sewer/disposal extensions; 4) Advise council on issues arising during construction. The brief for the design of Cedar Ave, Cowell shall be as follows: Prepare engineering drawings for construction of road, kerb & water table & associated infrastructure in consultation with council. Click for more details...

PENNESHAW WASTE WATER TREATMENT PLANT
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Binneys Track, Penneshaw, SA 5222. The Council invites tenders from suitably qualified & experienced Tenderers for the provision of Plant & Labour for construction of Wastewater Treatment Plant at Penneshaw. There are currently in the order of 235 existing houses in the township of Penneshaw, including the Seafront Hotel, Penneshaw Hotel, Backpackers & Youth Hostel & the newly redeveloped Caravan Park. The ultimate development within the township boundary specified by Council is approximately 435 allotments. Currently wastewater treatment from the existing houses is achieved by on-site treatment via septic tanks or aerobic systems & discharge to soakage trenches or irrigation Council proposes constructing a full sewage collection scheme with connections provided to each property within the scheme limits. Sewage will be collected by a combination of gravity drains & rising main & discharged to the treatment plant site, some 3 kilometres south east of the town. Construction of the collection network being full sewer is expected to be completed in stages in order to service fully developed parts of the township initially & expanded as the township develops. Treated wastewater will be stored in the lagoon at the WWTP site. Class B effluent, as outlined in the SA Reclaimed Water Guidelines shall be achieve. Filtration & disinfection is to be undertaken after the lagoons & recycled water will be used for irrigation. The treatment requirement is to achieve a mean value BOD not greater than 20 mg/L & a mean value of suspended solids not greater than 30 mg/L. A median termotolerant coliform (E coli) prior to irrigation shall be not greater than 100/100 mL. Scope of Works: This tender is for the supply & installation of a WWTP & adjacent irrigation system to service the ultimate development level for the Township of Penneshaw, Kangaroo Island. Works Included: The tendered contract is performance based & will provide: a) Power connection; b) Inlet screen (if required by Process Design); c) Extended aeration treatment plant capable of producing Class B treated effluent; d) Gravity discharge of effluent to Storage Lagoon; e) Lagoon water pumps; f) Filtration equipment; g) Disinfection system; h) Irrigation system at the nearby site (including wobbler sprinklers); i) Control equipment housed in a shed; j) All other works required for the completion of the scheme. The treatment plant will be constructed on a hardstand pad adjacent the storage lagoon. The construction works are to start once the lagoon civil works are completed, which is expected to be 12 months away subject to approvals. The Contractor shall coordinate its works with the civil contractor. Click for more details...

CAMPBELL STREET UPGRADE
New project of Public Utilities (Water distribution systems, Drainage) project at Campbell St, Naracoorte, SA 5271. The Principal invites tenders for the provision of upgrade, sealing & associated works of Campbell St, Naracoorte. The Tenderers Scope of Works includes but is not limited to, the provision of supervision, labour, materials, transport, plant & equipment necessary to complete the planning, set out, removal, supply, installation, certification & maintenance of the civil, asphalt, concrete works, excavation, reinstatement, line marking & storm water works. Click for more details...

REYNOLDS AVENUE DRAINAGE UPGRADE
Drainage - Stormwater project at Reynolds Ave, Dernancourt, SA 5075 In The Council Area Of Tea Tree Gully of Local Govt. This tender is for the construction of a new storm water system at Reynolds Ave, Dernancourt. General Scope of Works: The scope of works includes, but is not limited to, the provision of supervision, labour, materials, transport, plant & equipment necessary to complete the planning, removal, set out, supply, installation & certification of the civil, asphalt, concrete works, excavation, reinstatement & storm water works as required. This is inclusive of traffic control, reinstatement of all pavements, verges, footpaths, kerbs & other areas affected by the works, together with supply of As Constructed Drawings & documentation. Click for more details...

YORKE PENINSULA UNSEALED ROAD CONSTRUCTION
North Coast Rd, Corny Point Rd, Melton South Rd, Pine Point Rd, Yorke Peninsula, SA 5999 Has Yorke Peninsula Unsealed Road Construction currently at Construction stage. The Principal invites tenders for unsealed road construction, including the supply & construction of works associated with the resheeting works associated with : 1) North Coast Rd (11 klm); 2) Corny Point Rd (8.7 klm); 3) Melton South Rd (15.5 klm); & 4) Pine Point Rd (15 klm). This tender shall comprise the whole of the plant, labour & materials necessary to execute the works, including any obvious items for the proper completion of the work comprising but not limited to: a) All earthworks including fill works required to form subgrade including tyne of existing material to achieve a 10m formation width; b) Supply of all fill material; c) Subgrade preparation; d) Granular pavement construction associated with resheeting works to achieve a 9m sheeting carriageway width; & e) Traffic control & other traffic control devices. Work Not Included: The following works & materials are not included in this tender - Clearing & disposal of existing vegetation. Such works shall be carried out by others & shall not form part of the tender. The Tenderer shall allow others carrying out such works access to the site & shall co-operate in the programming & execution of the tender works for the proper co-ordination of the Tenderers & others works. Click for more details...

PARK 21 (VEALE GARDENS/WULYA YARTA) HORTICULTURAL HUB BUILDING EXTENSION
Public Utilities (Water distribution systems, Drainage) project at Veale Gardens Horticulture Hub, South Tce,, Adelaide, SA 5000 for New. The Principal invites tenders for an extension to the existing horticulture hub building located in Park 21 (Veale Gardens / Wulya Yarta), South Terrace, Adelaide plus associated works. Click for more details...

NEIL AVENUE COMMUNITY WASTEWATER MANAGEMENT SYSTEM
Public Utilities (Water distribution systems, Drainage) project In The Light Regional Council Area of Local Govt ownership. The Principal invites tenders for the supply installation of wastewater infrastructure, subsequent testing & connection to an existing wastewater system. Neil Avenue is located on the eastern border of the Council area, in Nuriootpa. The rear property boundary of the eastern properties share the boundary between the Light Regional Council & The Barossa Council. There are 26 residential properties within Neil Avenue than have on site disposal systems. The majority of systems are not performing satisfactorily to met Public & Environmental health standards. appropriate methods of disposal are limited given the soil conditions are not conducive for the provision of soakage trenches. As a result, the Council in consultation with property owners has deemed the most appropriate method to deal with any issues of non-compliance with the Public & Environmental Health (Waste Water) Regulations is o install appropriate infrastructure within the road for existing systems from each property to connect to. Council requires the installation of a gravity CWMS main within the road along Neil Ave & Greenock Rd Nuriootpa. Given the proximity to the council boundary & location of appropriate pump stations & treatment plants, the new CWMS main is to be connected to a pump station owned by The Barossa Council. The Works include: a) Installation of CWMS gravity main; b) Connection to each property boundary (x26) along the length of Neil Avenue; c) Connection of the main line to the Flushing point on Samuel Rd Nuriootpa (owned by The Barossa Council); d) Reinstatement of the road & verge as it existed prior to the work commencing; e) Flushing points & inspection points for the infrastructure as per Local Government Association standards. Click for more details...

WHYALLA SOLAR FARM
Private ownership Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project In The Whyalla Council Area for New development. Proposed construction of 100-140 MW solar farm North of Whyalla. Electrical installation & commissioning works. Click for more details...

PORT ROAD DRAINAGE PROJECT - RAIL CORRIDOR WORKS
Public Utilities (Water distribution systems, Drainage) project at Port Rd, Woodville, SA 5011 for New. The Principal invites to construct the proposed new stormwater trunk mains along the Port Road median strip. This Separate Early Works - Rail Corridor Works package pertains only to a section of the trunk mains of approximately 50 m in length to cross the Grange-Adelaide rail line, note that there are no lateral pipes connecting to the section of stormwater main that are to be constructed in the Rail Corridor Separate Works package. The scope will be to install 1500 mm diameter twin parallel trunk mains across the rail corridor using open trenched excavation. with the railway track, subgrades & all associated infrastructure & services reinstated immediately following the works. A DN375 reinforced concrete sleeve will also be installed parallel to the trunk mains which will be used for a future irrigation line. The Contractor shall supply all labour, plant & materials required to complete all demolition, earthworks & excavations, installation of assets & reinstatement, as well as any temporary works necessary. The work includes all clearing, topsoil removal, tree protection, erosion control, disposal of surplus spoil, bulk excavation, trench excavation & boring, filling, compaction, placing topsoil, grading, site restoration, import fill from existing spoil stock pile & all associated work. Click for more details...

CLAXTON ROAD SOLAR FARM
Solar Farm - Small Scale project at Lot 35 Claxton Rd, Cadell, SA 5321 in the Public Utilities (Power stations, Substations, Windfarms, Phone exchanges). Construction of building for a small scale solar farm, inclusive of change of use. This application comprises the construction of a solar panel array with the intention to provide electricity for the land owner, but also to export energy directly to the grid. The solar panel arrange will comprise the following elements: 1) 800 solar panel (8 rows of 100 panels on a steel tilt frame); 2) Shipping container to be used as the control room; 3) Perimeter security fencing (1.8m high cyclone mesh fencing); & 4) Perimeter landscaping. The solar panel compound will measure 119.6 metres x 32 metres, some 3827.2 square meters. The area will be fenced off using security fencing & 2 rows of evergreen trees planted around the outside of the security fence to screen the proposed solar panels. The landscaping will comprise medium height trees so as not to obscure the sun from the panels. The solar panels will measure 2 metres above the existing ground level & be on a 25 degree tilt. The shipping container will be position to the south (rear) of the solar panels & measure 14.88 square metres in area (6.1 m x 2.44 m) with a height of 3 metres. Click for more details...

MONUMENT CORNER CRESCENT ROADWORKS
Roadworks/Stormwater Drainage project at Monument Corner Cr (formerly Parker St), Mannum, SA 5238 In The Council Area Of Mid Murray of Local Govt. The Principal invites tenders for the construction of Road & Stormwater Drainage Works. The Works will be undertaken on Monument Corner Cr (formerly Parker St), Mannum SA 5238. Click for more details...