VICTOR HARBOR WASTEWATER TREATMENT PLANT
New project of Public Utilities (Water distribution systems, Drainage) project at Following inner ring road to Victor Harbor Wastewater Treatment Plant bnd by Cartwright & Greenhills Rd, Victor Harbor, SA 5211. Lay 1.2 km x pipeline for wastewater treatment plant upgrade. Click for more details...

SAHT - MOUNT GAMBIER
Public Utilities (Water distribution systems, Drainage) project In The Mount Gambier Council Area of Stormwater To Unit Complex type. Stormwater to unit complex in Mount Gambier. Click for more details...

SA WATER CORPORATION
State ownership Public Utilities (Water distribution systems, Drainage) project In The Various Council Area for New development. Provision of fencing works excluding electric fencing for various SA Water sites including sites operated by United Water. Click for more details...

SA WATER CORPORATION
Electronic Security Installations For Various Sites project at Various sites in, South Australia, SA 5999 in the Public Utilities (Water distribution systems, Drainage). Installation of electronic security including closed circuit televisin for various SA Water sites including sites operated by United Water. Click for more details...

WAIKERIE SALT INTERCEPTION SCHEME STAGE 2
Pipeline For Salt Interception Scheme - Stage 2a project at Various areas within, Waikerie, SA 5330 In The Council Area Of Loxton Waikerie of State. Pipelaying 6 km approx x various dia pipe. Click for more details...

WATERVALE SYSTEM (CLARE VALLEY SCHEME)
Public Utilities (Water distribution systems, Drainage) project at Linking Morgan-Whyalla & Swan Reach-Paskeville systems to districts in, Clare, SA 5453 of Pipelaying For Pipeline - Stage 2 type of New development. Lay 60 km approx x pipe for part of overall pipeline. Click for more details...


A project in the SA Within Barmera. Laying of 5,039 m approx x reinforced concrete & unplasticised polyvinyl chloride (UPVC), rubber jointed, various dia pipes. Click for more details...


Renovations, Refurbishments etc. project of Public Utilities (Treatment plants, Sewerage reticulation) project at Township of, Renmark, SA 5341. Siteworks & earth filled pad. Click for more details...

SA WATER CORPORATION
Public Utilities (Water distribution systems, Drainage) project for New development. EL401/423 pumping station to serve Littlehampton, Nairne & Wistow. Click for more details...

C U POWER AUSTRALIA
Underground Services For Power Station New project In The Port Adelaide Enfield Council Area. Sewer, stormwater, process drainage, fire water, cooling water tower pipelines & electrical conduits. Click for more details...


Public Utilities (Treatment plants, Sewerage reticulation) Renovations, Refurbishments etc. project at Township of, Kapunda, SA 5373. This type is Sted Reticulation Work with Local Govt ownership. Upgrade existing pump station, install new pump station, 120 m approx x 100 mm dia pvc gravity main, 500 m approx x 65 mm dia pvc rubber jointed rising main & bitumen reinstatement. New system to connect with existing gravity main system. Relocate 30 - 40 x existing gravity main line. Click for more details...

CHOWILLA FLOODPLAIN
Chowilla Floodplain is currently at the Planning stage, valued at about $ 41000 it is Create floodplain hydro-dynamic model. Click for more details...

BOLIVAR SEWAGE TREATMENT PLANT SITE
High Salinity Treatment Plant For Former Port Adelaide Sewage Treat Plant - Pt 3 New project In The Salisbury Council Area. Construct high salinity waste water treatment plant adjacent existing Bolivar treatment facilities. Click for more details...

MURRAY BRIDGE DRAINAGE SCHEME
Public Utilities (Water distribution systems, Drainage) project In The Murray Bridge Council Area of Local Govt ownership. To be main drain with lateral drainage connections from Maurice, Christian & Bremer Rds. Click for more details...

MORPHETTVILLE RACECOURSE WETLANDS
A project in the SA Within Marion. Inlet/Outlet diversions for wetland & crossing of Morphett Rd & Bray Sts. Works include: civil works associated with connections into wetlands, laying stormwater pipes under Morphett Rd & tram tracks, connections into existing stormwater system along Bray St & cut in into Sturt River. Click for more details...

SA WATER CORPORATION
Currently at the Construction stage In Various is a project estimated to be $ 99000000. This project Build/own & operate up to 13 water filtration plants & associated works on separate water supply systems. Click for more details...

SA WATER CORPORATION
State ownership Public Utilities (Water distribution systems, Drainage) project In The Adelaide Hills Council Area for New development. Design & construct sewage pumping station, control manholes, pipework & siteworks. Click for more details...

SA WATER CORPORATION
Sa Water Corporation is currently at the Construction stage, valued at about $ 600000 it is Pipeline to be constructed below ground in easements & roadways. 5,520 m approx x 450 mm mild steel concrete-lined rubber ring pipe. Click for more details...

LAKE BONNEY WIND FARM
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at Woakwine Range (7 km west of, Tantanoola, SA 5280 for New. 41 windmills approx overall to be spaced at 300-400 m apart along top of Woakwine Range across 8.5 km stretch of land. Individual weight: 85 tonnes approx, Individual blade length: 21 m approx. Click for more details...

WAIKERIE COMBINED SPORTING FACILITY
Public Utilities (Water distribution systems, Drainage) project for New development. Work comprises irrigation for playing fields. Click for more details...

LOXTON IRRIGATION AREA
Public Utilities (Water distribution systems, Drainage) Supply & Install project at Irrigation area of, Loxton, SA 5333. This type is Booster Pumping Station For Irrigation - Stage 1c with State ownership. Supply & install booster pumping station, control system modification & ancillary works for Loxton Irrigation District. Click for more details...

BOLIVAR SEWAGE TREATMENT PLANT
Public Utilities (Treatment plants, Sewerage reticulation) project at Hodgson Rd, Bolivar, SA 5110 for Renovations, Refurbishments etc.. Civil works for odour control. Click for more details...

HART STREET PUMP STATION
Drainage/Pump Station - Upgrade - Stage 1 Renovations, Refurbishments etc. project In The Port Adelaide Enfield Council Area. Upgrade drains, relief drains, & possible pump station upgrade. Click for more details...

BARCOO OUTLET
Currently at the Construction stage In Holdfast Bay is a project estimated to be $ 100000. This project 1.5 km underground pipeline to discharge stormwater out to sea. Click for more details...

QUEEN ELIZABETH HOSPITAL
Public Utilities (Water distribution systems, Drainage) Addition project at Woodville Rd, Woodville South, SA 5011. This type is Enabling Works/Services Relocation/Demolition For Hospital - Redevelopment with State ownership. Work includes diversion of stormwater, sewer, domestic & fire water, steam & condensate, natural gas, high & low voltage electrical & communications inground services in staged program. Nurses Education annex of CDRC building will be demolished with services decommissioned & made safe. Services including air conditioning, refrigeration systems, domestic hot, cold & fire water, electrical & communications between Nurses Education & CDRC buildings will be diverted. New air conditioning & domestic hot water systems will be installed in CDRC building. Structural strengthening of services tunnel from boiler house under roadway to Maternity building & structural works to CDRC demolition facade are also required. Click for more details...

SAHT - PORT AUGUSTA - STORM WATER DRAINAGE
Public Utilities (Water distribution systems, Drainage) project In The Port Augusta Council Area of State ownership. Stormwater drainage for 26 properties within Port Augusta. Click for more details...

SAHT - ELIZABETH REGION - STORMWATER
Currently at the Tenders & Building stage In Playford is a project estimated to be $ 100000. This project Stormwater for 32 properties within Elizabeth region. Click for more details...

REMOTE AREAS ENERGY SUPPLIES SCHEME - CONSULTANTS
Professional Engineering/Procurement Services For Energy Supplies Scheme project at Various remote areas in, South Australia, SA 5999 In The Council Area Of Various of State. Consultants to provide professional engineering & procurement services to support continuing development of remote areas energy supplies scheme. Click for more details...

CITY OF UNLEY - URBAN STORMWATER MASTERPLAN
A project in the SA Within Unley. Consultants to carry out urban stormwater masterplan - stage 1. Click for more details...

SA WATER CORPORATION - WATER MAINS
Currently at the Construction stage In Various is a project estimated to be $ 500000. This project Relay 1,300 m approx x 100 mm uPVC, 250 mm DICL & 300 mm DICL within Prospect, Ingle Farm & Northfield. Click for more details...

SA WATER CORPORATION ARCHITECT PANEL
New project of Public Utilities (Water distribution systems, Drainage) project at Various sites through Regional & Outer Metropolitan, South Australia, SA 5999. Panel of architects for providsion of Regional Accommodation design, refurbishment & surveying services. Click for more details...

FIRST CREEK FLOOD MITIGATION WORKS STAGE 2
A project in the SA Within Norwood & Payneham & St Peters. Stage 2 flood mitigation works. Drainage works in two secns: Elizabeth St culvert road crossing upgrade & downstream channel works at 31 Elizabeth St Norwood (secn one), & within Hutchinson Park & at 5 Free St Norwood (secn two). Work to include (but not limited to): replace existing culvert under Elizabeth St, including realignment, construction of in-situ base slabs, in-situ concrete head-walls, wing-walls & aprons around Elizabeth St crossing, excavation of new culvert creek alignment in Hutchinson Park, partial removal & backfilling of existing concrete channel in Hutchinson Park, removal of existing brick arch culvert in Hutchinson Park, construction of new concrete channel wall, removal of trees & vegetation, pavement, kerb & footpath rehabilitation. Work does not include: replacement of brush fences & timber decking at 31 Elizabeth St, removal & reinstatement of playground equipment at Hutchinson Park or supply & installation of new bridge at Hutchinson Park. Click for more details...

TUMBY BAY WASTEWATER MANAGEMENT SCHEME UPGRADE
A project in the SA Within Tumby Bay. Construction of rising & irrigation mains, major pump station refits; install two new chambers. Click for more details...

BEACHPORT COMMUNITY WASTE WATER MANAGEMENT SYSTEMS (CWMS) TREATMENT LAGOONS
Public Utilities (Treatment plants, Sewerage reticulation) New project at ., Beachport, SA 5280. This type is Treatment Lagoons with Local Govt ownership. Construction of new Community Waste Water Management System (CWMS) for the township of Beachport - Treatment Lagoon component only excluding the gravity drains, rising mains & pump stations. Click for more details...

TORRENS ISLAND POWER STATION CONTROL ROOM FITOUT
Currently at the Construction stage In Port Adelaide Enfield is a project estimated to be $ 2000000. This project Fitout of control room at power station. Click for more details...

TINTINARA OVAL COMMUNITY WASTEWATER MANAGEMENT SYSTEM WASTEWATER RE-USE CIVIL WORKS
New project of Public Utilities (Water distribution systems, Drainage) project at Emu Springs Rd & Filmer St, Tintinara, SA 5266. Construction of civil works comprises: An extension to an existing rising main. New irrigation main from treatment plant to the town oval. A 3 way motor activated valved & valve chamber. Two new storage tanks at the oval. New irrigation system & irrigation pump. Shed along with a reclaimed water standpipe at the town oval. Click for more details...

FREELING & KAPUNDA PUMP STATION & PIPELINE CONSTRUCTION CONTRACT 2
Pump Station project at Dutton Park Pumping Station, Kapunda, SA 5373 in the Public Utilities (Pumping Stations). Supply & installation of pumping stations at Freeling & Kapunda delivering recycled water from new reinforced concrete storage tanks to recycled water distribution main including provision of power supply, suction pipework from tanks, pump shed to house the pumping stations, all metering & commissioning as specified. Supply & install recycled water distribution main including all fittings, valves, combination air valves, water meters & backflow prevention valving enabling supply of recycled water to new tanks. Supply & installation of distribution main pipework, valves, fittings, combination air valves, water meters & backflow prevention valving & all associated works. Click for more details...

TONSLEY PARK REDEVELOPMENT CIVIL ENGINEERING CONSULTANCY
Consultancy For Civil Engineering Design New project In The Marion Council Area. Engineering design for all civil construction including site remediation & minor demolition; road & footpath reconstruction & new road & footpath construction; stormwater management including Water Sensitive Urban Design works; new & replacement sewer drainage; potable & non-potable water supply & headworks; common service trench including tri-generation fluid reticulation network & pit & pipe for communications services & electrical works including electrical networks & the undergrounding of existing cables. Click for more details...

GLENELG WASTEWATER TREATMENT PLANT UPGRADE
Military Rd, West Beach, SA 5024 Has Glenelg Wastewater Treatment Plant Upgrade currently at Construction stage. Replace concrete screen structure & building to ensure reliability. This is a mechanical & electrical upgrade. Click for more details...

NARACOORTE STORMWATER UPGRADE FOR CENTRAL BUSINESS DISTRICT STAGE 1
Stormwater - Upgrade project at Naracoorte Creek to Robertson St/Jones St Intersection, Naracoorte, SA 5271 in the Public Utilities (Water distribution systems, Drainage). Naracoortes drainage system is aging & with significant development since the system was installed, is now inadequate to cater for even moderate rainfall events, resulting in businesses and Council infrastructure being inundated. Council has completed studies of the town & has plans for a system that caters for the current level of development plus future expansion. The project will be delivered over multiple years with the first section from Naracoorte Creek to the Robertson St/Jones St intersection to be constructed as Stage One in 2014/15. Click for more details...

MOUNT COMPASS COMMUNITY WASTEWATER MANAGEMENT SYSTEM
Public Utilities (Treatment plants, Sewerage reticulation) project for New development. The township of Mt Compass is located approximately 60km south of Adelaide on Victor Harbor Rd. The township consists of approximately 400 houses & a small commercial area. Wastewater is collected by a system of gravity drains, pump stations & rising mains. Wastewater, which includes septic tank effluent & full sewer, is currently discharged to the wastewater treatment plant located at Sand Mine Rd. The existing plant has reached its capacity & a new plant has to be constructed. A storage lagoon to discharge the treated effluent & to balance water for reuse has been recently installed at an old mine site west of the existing treatment plant. Project will deliver a reuse water balance lagoon to buffer additional flows from this expansion. The Principal invites tenders from Tenderers for the provision of the Wastewater Treatment Plant at Mount Compass. The project will deliver the Wastewater Treatment Plant at Mount Compass as part of the Mount Compass Community Wastewater Management System (CWMS). The project includes: 1) Construction of two concrete tanks 10m diameter & 4m deep each; 2) Construction of Control Shed including adjacent veranda & concrete pad; 3) Construction of screen support platform & installation of screen; 4) Supply & Installation of Waste Activated Sludge (WAS) tank (50kL); 5) Supply & Installation of two chlorine contact tanks (50 kL each); 6) Supply & Installation of treated water balance tank (50 kL); 7) Supply & Installation of treated water screen filter; 8) Supply & Installation of chlorine dosing system; 9) Supply & Installation of rainwater tank & rainwater reuse system; 10) Supply & Installation of all process pipework including valves, actuators, fittings, supports & flush systems; 11) Supply & Installation of all pumping & process equipment; 12) Supply & Installation of all specified instrumentation; 13) Supply & Installation of all electrical conduits; 14) Testing & Commissioning; 15) As constructed drawings. The project does not include electrical connection & control system. These items will be delivered by the Principal. The following list indicates the main elements of the Works sufficient to ensure that the Tenderer is aware of the scope of the Tender. It does not detail duties, actions or items of supply on minor works which are self evident or inherent to the satisfactory completion of the scheme as described within the tender documents. Preliminaries: These include - a) The transportation of all personnel, plant & materials to & from the site & the provision of temporary site accommodation; b) The provision of all personnel, facilities & amenities for the administration of the works of the scheme including temporary connections to Telstra/NBN, ETSA & SA Water; c) All setting out of the works, including locating services, survey for identifying boundary locations, connection points & temporary bench marks etc; d) Provision of office facilities for the Superintendents Representative for the duration of the works; e) Provision for quality control & assurance, environmental controls & traffic management; f) Provision for all site security; g) Obtaining all licenses & payment of fees where required for conduct of the Works & compliance with all regulations relating to the Works; h) Compaction testing of trench backfill; & i) Other preliminaries as required by the Tenderer as outlined in the tender schedule. Click for more details...

KINGSCOTE COMMUNITY WASTE MANAGEMENT SYSTEM UPGRADE STAGE 2
Currently at the Construction stage In Kangaroo Island is a project estimated to be $ 600000. This project The Principal wishes to replace an existing 200mm concrete Septic Tank Effluent Disposal (STED) that has reached the end of its operational life. The drain runs along Buller St, up Giles St & along Todd St in the township of Kingscote. The drain is in service & must remain operational, as necessary, while a new 150mm PVC drain is installed. Branches of the drain are also planned to be replaced during the project (typically 100mm PVC). It is noted that the drain services approximately 160 connections. The project is separated into two phases outlined as follows. The first phase shall physically verify the design while the second phase shall consist of all works associated with the construction, testing & commissioning of the works. it is noted that the scope of the second phase is subject to outcomes of the first phase. It is noted that the drain typically services lots on one side of the road only. The Tenderer shall confirm that all such lots are provided with a connection. If it is found that no connection exists, the Tenderer shall construct a connection ensuring maximum serviceability of the allotment with the existing level constraints. Where the new main passes between the existing main & serviced allotments, connections shall typically be picked up as the main is laid. In this situation the drain shall be live & the break-in point to the existing connection shall be as near as practicable to the new main. Where the new main is beyond the existing main from the serviced allotment, stubs for connection shall be installed as the main is laid with plungers or caps as necessary. The Tenderer shall continue laying the main until the next upstream diversion point. At this stage, the drain shall be pressure tested. When testing has been certified, the existing drain shall be diverted into the new. Connections shall then be completed progressively back down the main. The Tenderer shall allow to regrade connections back to the lot boundary & install a new connection IP in this situation. Where the Tenderer intends to block flow on a live STED approval of Council must first be obtained. The Tenderer shall detail the proposed construction procedure, expected duration, bypass method (if necessary) & safe guards. A rate for reinstatement of the road pavement should be provided allowing to leave the road pavement proud. The Principal will then complete a final trim & spray seal at a later date. Phase 1: Physical Verification: 1) Level survey including invert & NSL of manholes, flushing points, connection inspection openings. 2) Peg alignment on site. 3) Confirm connection locations & mark on adjacent kerb. 4) Locate & mark all underground services & depth any potential clashes (including pothole on existing drain to confirm depth were necessary). 5) Coordinate alignment inspection with Council & Designer. 6) Attend alignment inspection with Council & Designer to confirm alignment. 7) Prepare detailed work method statement, specifically addressing the construction process for all interconnections, & submit for Council & Designer for approval. 8) Maintain establishment for 1 week while any modifications are made to alignment or long sections. Phase 2: Construction: 9) Construct approved STED Drains as shown on the drawings. Please note: Only the following sections of work will be completed for this stage of the works: a) 150mm dia Gravity Main on Giles St; b) 150 dia Gravity Main on Buller St (East of Giles St: The Tenderer shall supply all materials & equipment required for the tender. Click for more details...

ALEXANDRINA COUNCIL MANHOLE & PUMP STATION REHABILITATION
Public Utilities (Water distribution systems, Drainage) New project at Various locations within the townships of Strathalbyn, Port Elliot &, Goolwa, SA 5214. This type is Drainage - Manholes (30)/Pump Stations (2) Rehabilitation with Local Govt ownership. The Principal invites tenders for the provision of services relating to manhole & pump station rehabilitation. Council is seeking work to be undertaken on approximately 30 existing manholes & 2 pump stations within the townships of Goolwa, Port Elliot & Strathalbyn which in the main are to be rehabilitated to provide a new smooth, durable & watertight internal surface. some manholes will also require lid replacement, ladder removal & condition assessment. This work forms part of Alexandrina Councils SWMS Asset Management Plan for the 2015/16 financial year. The Tenderer is to provide a warranty against the breakdown or failure of the workmanship of the surfacing treatment applied to the manholes. Council expects that the warranty should be for a minimum of 10 years. Click for more details...

ILLYARRIE RESERVE IRRIGATION UPGRADE
Currently at the Construction stage In Tea Tree Gully is a project estimated to be $ 400000. This project The Principal is seeking tenders from suitably qualified organisation that can supply, install, commission & maintain the irrigation system at both ovals at Illyarrie Baseball Reserve, Illyarrie Ave, Surrey Downs. Illyarrie Reserve (home of the Golden Grove Central District Baseball Club) is undergoing a major upgrade to both baseball fields (as part of a capital project), with the installation of a new irrigation system to improve the existing turf surface throughout the summer sporting months. The existing system was updated twenty five years ago & is now at the end of its life. The new system will result in a high quality turf surface for all end users to enjoy. The construction of the system will include all materials, relevant services, machinery, labour & freight of materials & machinery to cover the scope of the project, which includes but is not limited by the following: 1) Pipe work; 2) Main Line; 3) Control cables; 4) Trenching; 5) Drip Lines; 6) Valves; 7) Control Equipment; 8) Drainage; 9) PVC Conduit Sleeve(s); 10) Cleaning of site at end of each day - Paths, car parks etc., & 11) Making good, any paths or roadways damaged during the construction period. Any existing irrigation controller cabinets & 240 AC irrigation controllers are to be utilised. Council will supply new 240 AC controller if required. These locations are as indicated by the Council. All works shall be carried out in compliance with all relevant Australian & Industry Standards & Best Practice models. Click for more details...

PINDEE STREET DRAINAGE PROJECT
Public Utilities (Water distribution systems, Drainage) project In The Marion Council Area of Local Govt ownership. No.30 Pindee St, Hallett Cove, is a privately owned allotment straddling the suburb boundary with Marino. The boundary itself traverses a watercourse alignment running through the property. Upstream, the watercourse extends nearly 3 kilometres to the east, resulting in a rather significant stormwater catchment area comprised of quarry & rural space. A combination pipe/culvert collects this runoff on the eastern side of the rail corridor, carries it under the rail corridor & The Cove Road & then discharges in 30 Pindee St. Other minor Council drains collect stormwater run-off from The Cove Road & discharge into Council land/verge abutting 30 Pindee St. Their discharge is uncontrolled & ultimately across the private property of 30 Pindee St, finally reaching the watercourse at the bottom. These smaller pipes are in relatively poor condition, displaying deformation, cracking, joint displacement & prone to blockage. One of the minor drains comprises of two very shallow side entry pits located in a sag on The Cove Road. The shallow pit depths are a product of the Councils previous efforts to avoid interfering with underground SAPN & APA services. This drain has previously blocked, resulting in street stormwater overtopping the kerb, causing serious undermining of the Council footpath & guardrail, & scouring of the embankment. The other minor drain comprises a side entry pit in Pindee Street discharging its stormwater in to the south end of the Council land via a RIBLOC pipe. This appears to have been installed to intercept stormwater entering Pindee St from the southern approach of The Cove Road. Whilst it would generally be more appropriate to install the side entry pit in the source street, its location suggests that once again the Council selected to take an easier approach to avoid services in The Cove Road. Currently, the stormwater must cross Pindee St in an uncontrolled manner to reach the side entry pit. The owner of 30 Pindee St has attempted to control much of this discharge with the creation of various channels & pipe installations. However, the Council believes it is more appropriate to take responsibility/control to effectively manage this stormwater by way of acquiring an easement & installing new infrastructure. A large culvert crossing the rail corridor & The Cove Road is assumed to be owned by The Department of Planning, Transport & Infrastructure. The Marion Council will not be touching or interfering with this infrastructure as part of this project. Like the rail corridor, The Cove Road has been constructed on fill, although it appears likely to be unconsolidated. In more recent years, this section of The Cove Road was subject to a leaking water main, which created massive subterranean voids, ultimately leading to a road collapse. This incident essentially alludes to the conclusion of poorly consolidated fill. The condition of the road & its supporting fill is the principal reason for the Council electing the new infrastructure to take the shortest route through to the watercourse in 30 Pindee St. By doing so, this will essentially minimise our excavation in the road & batter area & hence reduce the risk of de-stabilisation & instability in the embankment. Council is therefore seeking a suitably qualified Contractor to undertake the necessary works to rectify the situation, as described in the Tender for the Pindee St Stormwater Drainage project. Click for more details...

FERN STREET ROADWORKS - STAGE 2
New project of Public Utilities (Water distribution systems, Drainage) project at Fern St, Naracoorte, SA 5271. The Principal invites tenders for the upgrade, sealing & associated works of a portion of Fern St, Naracoorte, South Australia. The Fern St project is part of Councils program to seal all remaining unsealed streets in the Naracoorte Township. The Contractors scope of works includes but is not limited to, the provision of supervision, labour, materials, transport, plant & equipment necessary to complete the planning, set out, removal, supply, installation, certification & maintenance of the civil, asphalt, concrete works, excavation, reinstatement, line marking & storm water works. The Contractor is to carry out works from Chainage 0 to 310 only. Click for more details...

TOWN OF GAWLER NEW KERB & GUTTER PROGRAM 2016/17
New project of Public Utilities (Water distribution systems, Drainage) project at Various locations within the township of, Gawler, SA 5118. The Town of Gawler has a requirement to carry out kerb & gutter works for capital improvement & upgrading of existing infrastructure within the Council area. Click for more details...

LEADER STREET STREETSCAPE CONSTRUCTION
Currently at the Construction stage In Unley is a project estimated to be $ 1000000. This project Works to include a streetscape renewal project. The existing footpaths, road, kerb & water table, & street trees are reaching the end of their useful asset lives. Council is looking to capitalise on this opportunity & undertake a total streetscape renewal project. This will include road & footpath replacement, kerb & footpath realignment & the removal & replacement of street trees. Council is seeking to enhance the presentation of the streetscape, as well as encouraging greater pedestrian & cycle movement along Leader St & connecting with other local networks. Leader St provides important connections between Anzac Highway & Goodwood Rd, Unley Swimming Centre, Forestville Reserve, & the Royal Adelaide Showgrounds. The scope for this project is approximately 600 m from Anzac Hwy to the railway line adjacent to Nairne Tce. Existing underground stormwater infrastructure discharges flow to Keswick Creek & to Brownhill Creek. Click for more details...

PROSPECT ROAD REVITALISATION STAGE 3
Public Utilities (Water distribution systems, Drainage) project at Prospect Rd (between Gordon Rd & Regency Rd), Prospect, SA 5082 for New. The Principal invites tenders for the Revitalisation of the streetscape along Prospect Road between Gordon Road & Regency Road, Prospect to continue on from works completed last year. Works will include the reconstruction of kerb & gutter, inverts & pram ramps, reconstruction of footpaths & crossovers, construction of irrigated landscaped garden beds, reconstruction of side entry pits & other associated works. Click for more details...

MONUMENT CORNER CRESCENT ROADWORKS
Roadworks/Stormwater Drainage project at Monument Corner Cr (formerly Parker St), Mannum, SA 5238 In The Council Area Of Mid Murray of Local Govt. The Principal invites tenders for the construction of Road & Stormwater Drainage Works. The Works will be undertaken on Monument Corner Cr (formerly Parker St), Mannum SA 5238. Click for more details...