State

Categories

Sub Categories

Click Here to Find Current Projects

List of Public Utilities Projects in SA


MOUNT MILLAR (YABMANA) WIND FARM
New project of Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at Yabmana btwn Cowell & Cleve, ., SA 5999. 35 x wind turbines, substation building, roads, cranes hard standings, infrastructure facilities. Click for more details...

NURIOOTPA STED SCHEME
Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Barossa Council Area for Supply & Install development. Supply, installation & commissioning of new rising main to serve new pump station: 1.6 km approx long x nominal 110 mm PNS polyethylene pipeline & associated ancillary works & connection to STED scheme. Click for more details...

SA WATER CORPORATION
Electronic Security Installations For Various Sites project at Various sites in, South Australia, SA 5999 in the Public Utilities (Treatment plants, Sewerage reticulation). Installation of electronic security including closed circuit televisin for various SA Water sites including sites operated by United Water. Click for more details...

NORTH STREET
Stormwater Drain For Street project at North St, Frewville, SA 5063 in the Public Utilities (Water distribution systems, Drainage). Construct 150 m approx x 375 mm concrete stormwater drain along street. Click for more details...

ANANGU PITJANTJATJARA LANDS
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project In The Far North Council Area of Generation Services Installation For Aboriginal Communities type. Provision & installation of Generation Services comprising 415 V generator sets, bulk fuel tanks, start air system, switchboard, controls & step up transformers. Click for more details...

MODBURY REGIONAL CENTRE
Automated Irrigation System For Civic Park Supply & Install project In The Tea Tree Gully Council Area. Supply & install automated irrigation system. Click for more details...

SA WATER CORPORATION
Public Utilities (Water distribution systems, Drainage) project In The Various Council Area of State ownership. Pipeline to be constructed below ground in easements & roadways. 5,000 m approx x 450 mm & 1,500 m approx x 300 mm ductile iron cement mortar-lined rubber ring jointed pipes & 220 m x 450 mm mild steel concrete-lined rubber ringed jointed pipes. Click for more details...

NARACOORTE SWIMMING LAKE
Public Utilities (Water distribution systems, Drainage) project at Moore St (North parklands), Naracoorte, SA 5271 of Filtration/Disinfectant System For Swimming Lake type of New development. Installation of sand filtration system with associated concrete tank sumps & spillovers. Also to include automatic disinfectant system. Click for more details...


Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Adelaide Council Area for Renovations, Refurbishments etc. development. Regrading & repaving of mall from King William St to Gawler Pl Intersection. Click for more details...

SCOTDESCO ABORIGINAL COMMUNITY
Currently at the Construction stage In Ceduna is a project estimated to be $ 200000. This project Installation of skid mounted pumping & control system to supply bulk water storage facility 4.3 km approx away. Additional works include installation of automatic level control system, land line, switchboard, valve chamber & power extensions. Click for more details...

CHOWILLA FLOODPLAIN
Chowilla Floodplain is currently at the Planning stage, valued at about $ 41000 it is Create floodplain hydro-dynamic model. Click for more details...

LOWER MURRAY IRRIGATION REHABILITATION
Drainage Re-Use Demo Trial Sites For Irrigation Infrastructure Rehab - Stage 1 project at Lower Muray Reclaimed Irrigation Area - Mannum to Wellington, ., SA 5999 in the Public Utilities (Water distribution systems, Drainage). Design, construct & monitor of drainage re-use demonstration trial site(s) for reclaimed area. Click for more details...

MURRAY BRIDGE DRAINAGE SCHEME
Public Utilities (Water distribution systems, Drainage) project In The Murray Bridge Council Area of Local Govt ownership. To be main drain with lateral drainage connections from Maurice, Christian & Bremer Rds. Click for more details...

LAKE BONNEY WIND FARM
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at Woakwine Range (7 km west of, Tantanoola, SA 5280 for New. 41 windmills approx overall to be spaced at 300-400 m apart along top of Woakwine Range across 8.5 km stretch of land. Individual weight: 85 tonnes approx, Individual blade length: 21 m approx. Click for more details...

MAWSON LAKES
Sewerage Scheme/Rising Main project at Mawson Lakes, The Levels, SA 5095 in the Public Utilities (Water distribution systems, Drainage). Comprising new sewer pump & rising main. Click for more details...

BRUKUNGA STED SCHEME
Addition project of Public Utilities (Treatment plants, Sewerage reticulation) project at ., Brukunga, SA 5252. Pumping station & rising main. Click for more details...

PORT VINCENT EFFLUENT TREATMENT DISPOSAL SYSTEM
Pumping Station/Treatment Plant & Irrigation Area project at Lot 4, Hd Ramsey, Marine Pde (Pt Vincent Caravan Park), Port Vincent, SA 5581 In The Council Area Of Yorke Peninsula of Local Govt. Effluent treatment disposal system comprising pumping station, treatment plant & Irrigation area. Click for more details...

ANGASTON CREEK WATERCOURSE MANAGEMENT & LINEAR PARK PROJECT
Currently at the Construction stage In Barossa is a project estimated to be $ 200000. This project Murray St to Hill St flood mitigation work including gross pollutant trap. To incorporate linear park. Click for more details...

LAKE BONNEY WIND FARM
Woakwine Ranges, Brownes Flat Rd Hund Benara near, Port Macdonnell, SA 5291 Has Lake Bonney Wind Farm currently at Construction stage. Construction of 53 x 79 m high turbine towers. Click for more details...

LOXTON IRRIGATION
Pipeline For Irrigation - Rehabilitation - Stage 2a project at Irrigation area of, Loxton, SA 5333 in the Public Utilities (Water distribution systems, Drainage). Construct 3.6 km approx x pipelines for stage 2a rehabilitation of irrigation district. Click for more details...

BARCOO OUTLET
Subcontract project of Public Utilities (Treatment plants, Sewerage reticulation) project at Glenelg Sewage Treatment Works West of Military Rd, Glenelg, SA 5045. 1.5 km underground pipeline to discharge stormwater out to sea, to install concrete culverts 6 m x 6 m in dia & 11 m in depth. Click for more details...

BARCOO OUTLET
Public Utilities (Treatment plants, Sewerage reticulation) project In The Holdfast Bay Council Area of Trade Package - Electrical Control Works type. 1.5 km underground pipeline to discharge stormwater out to sea. Also a component of operations & maintenance for 3 years. Click for more details...

MURRAYLINK
Murraylink is currently at the Construction stage, valued at about $ 6000000 it is Construct new sub-station set back from road & screened by trees. Click for more details...

SAHT - SALISBURY
A project in the SA Within Salisbury. Storm water for 11 properties within Salisbury region. Click for more details...

SA WATER CORPORATION - HOLDFAST BAY RECLAIMED WATER PLANT CHLORINATOR
Public Utilities (Water distribution systems, Drainage) project In The Holdfast Bay Council Area of Chlorinator type. Construct chlorinator for Class A Reclaimed Water Plant. Click for more details...

COMMERCIAL ROAD VALVES UPGRADE
Public Utilities (Water distribution systems, Drainage) project at Commercial Rd, Salisbury, SA 5108 of Pressure Reducing Valves - Upgrade type of New development. Upgrade pressure reducing valves. Click for more details...

SA WATER CORPORATION HAPPY VALLEY WATER TREATMENT PLANT CHLORINATOR
A project in the SA Within Onkaparinga. Supply & install trim chlorinator for water treatment plant. Click for more details...

SA WEIR POOL MANIPULATION PROJECT SECONDARY REGULATING STRUCTURES ASSESSMENT
A project in the SA Within Various. Assessments of secondary water regulating structures (embankments, weirs, culverts on anabranch creeks, wetlands) to identify their ability to sustainaby withstand weir pool raising & options for upgrade or replacement where required (develop scoping plans of works). Consultant to collate/review information on secondary regulating structures to identify number & location of structures, physical features, dimensions, construction & condition. Structures to be assessed include: 1 structure each in Lock 1, 2 & 3 weir pools, 2 structures in Lock 4 weir pool, 4 structures in Lock 5 weir pool & 12 structures in Lock 6 weir pool. Click for more details...

MICHELMORE ROAD & GREENWAYS ROAD WASTE WATER TREATMENT PLANT
Michelmore Road & Greenways Road Waste Water Treatment Plant is currently at the Construction stage, valued at about $ 1008000 it is 120 megalitre waste water treatment plant with associated concrete tanks, booster pipeline, buffer landscaping & 2.1 m high fencing. Click for more details...

ETSA SUBSTATION VICTOR HARBOR
Substation project at Anzac Hwy, Victor Harbor, SA 5211 in the Public Utilities (Power stations, Substations, Windfarms, Phone exchanges). Construction of new substation. Click for more details...

LAKE BONNEY WIND FARM STAGE 3
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at Brownes Flat Rd & Wattle Range, Benara, SA 5290 for New. Construction of 8 wind turbines, underground cabling & access to turbine sites. Click for more details...

DUNCAN AVENUE CIVIL WORKS
Civil Works project at Duncan Ave, Park Holme, SA 5043 In The Council Area Of Marion of Private. The Principal invites tenders for construction of roadworks, drainage & services & includes the following: 1) liaison & cooperation with Council & the service authorities; 2) liaison & cooperation with building contractors that will be on site during civil works; 3) setting out the works from established bench marks & boundaries; 4) maintenance of access & service to existing private dwellings within the project area at all times; 5) site clearance of all vegetation, rubbish & internal fencing; 6) allotment filling/regrading; 7) roadworks construction; 8) trenching & pavement reinstatement; 9) footpath construction; 10) kerb & gutter & driveway invert construction; 11) stormwater reticulation; 12) bioretention swales; 13) sewerage reticulation; 14) water main reticulation & new connection off new mains; 15) common service trenching; 16) electrical & road lighting reticulation; 17) communications pit & conduit installation; 18) service conduits; 19) line marking & signage; 20) block paving. Work by Others: The Principal intends to let separate contracts for the construction of other work both during & after the end of this Tender. It is essential that the Tenderer liaise & cooperate with any other contractors on site to minimise interference & delay in carrying out their respective works. The Superintendents instruction as to priority & scheduling of works shall be adhered to, if so given at any time. The following items of works shall be carried out by others: a) sewer service connection from existing live mains; b) water service connections from existing live mains; c) gas services installation; d) housing construction; e) landscaping; & f) other works as required. Click for more details...

BEACHPORT COMMUNITY WASTE WATER MANAGEMENT SYSTEMS (CWMS) GRAVITY DRAINS & RISING MAINS
Public Utilities (Treatment plants, Sewerage reticulation) project at ., Beachport, SA 5280 of Gravity Drains/Rising Mains type of New development. Construction of a new Community Waste Water Management System (CWMS) for the township of Beachport - Collection system component only including gravity drains & rising mains. Excluding pump stations & treatment lagoons. Click for more details...

HINDMARSH VALLEY POWER PLANT
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project In The Victor Harbor Council Area of Private ownership. Proposed construction of backup power plant. To include 3 simple cycle gas turbines, 3 exhaust stacks, 4 self-contained fuel storage tanks to handle biodiesel. Click for more details...

TONSLEY PARK REDEVELOPMENT CADASTRAL SURVEYING SERVICES
Public Utilities (Treatment plants, Sewerage reticulation) project In The Marion Council Area of Consultancy For Cadastral Surveying Services type. The cadastral surveying services consultant will be engaged as the nominated surveying sub-contractor for civil & environmental works contracts. Services to include: land development feasibility estimates; advice on land division process from pre-lodgement to receiving DAC land division certificate of approval; prepare plans to assist in master planning & rezoning phase; on-going detail & level surveys; overall site survey control; preparation of post demolition plans; as constructed surveys for earthworks, service infrastructure, roads, retaining wall, building grid lines, sewer, water supply mains, recycled water supply mains & connection to each allotment & nominated reserves. Click for more details...

CITY OF MITCHAM KERB & WATERTABLE RECONSTRUCTION
New project of Public Utilities (Water distribution systems, Drainage) project at Burbank Ave, Maidstone Rd & Lincoln Rd, Bedford Park, SA 5042. The City of Mitcham invites tenders for the provision of kerb & watertable reconstruction & associated minor civil works at Burbank Avenue, Maidstone Road & Lincoln Road Bedford Park. Click for more details...

PENNESHAW COMMUNITY WASTE WATER SCHEME
Public Utilities (Water distribution systems, Drainage) project at Binneys Track, Penneshaw, SA 5222 of Treated Water Storage Lagoon/Pump Stations/Connections type of New development. The Principal invites tenders from suitably qualified & experienced Tenderers for the provision of Plant & Labour for construction of Community Wastewater Management System at Penneshaw. The proposed scheme shall be separated into a Defined Collection Area & an Expansion (Separable) Area, as identified on the drawings. The Expansion Area includes gravity drains that provide connection to approximately 54 allotments. This portion of the works shall form a separable portion to the Tender & shall be built as the last programmed works pending project funding. The Defined Catchment provides approximately 141 connections & shall include all other works associated with the scope. Currently, wastewater treatment of the township's sewage is achieved by onsite septic or aerobic systems with disposal via soakage trenches or on-lot irrigation systems. The proposed CWMS will provide a full sewer gravity or pressure connection to each allotment. The proposed scheme is a gravity sewerage system with pump stations taking sewage to the wastewater treatment plant (WWTP). Gravity networks in the township shall drain to two pump stations. One located adjacent to the marina at Christmas Cove & the other on the foreshore at Hog Bay. The Christmas Cove pump station lifts sewage u into the Hog Bay catchment where it flows to the Hog Bay pump station. The Hog Bay Pump Station then forms the first of a three stage daisy chain lift up Wright Rd where sewage is pumped out to the southern fringe of the town for treatment, storage & irrigation. The second & third pump stations are located approximately half way & at the top of Wright St respectively. The WWTP (by others) will be an extended aeration & activated sludge type plant with a decant cycle of treated water into the 13.5ML storage lagoon. The construction of the storage lagoon, including ancillary works, is part of the Tender. Chlorination of the treated wastewater (by others) will occur post storage, prior to irrigation of adjacent land. The irrigation infrastructure is excluded from the Tender. For the purpose of this Tender, all works associated with the construction of the Penneshaw CWMS includes but is not limited to the following main items: Preliminaries: 1) Service locating, survey setout including locating boundary pegs sufficient for the setout of construction works, site establishment & mobilisation of equipment, storage compounds, machinery, fuels & lubricants & similar; 2) Provision of site office & ablution facilities; 3) Provision of temporary connections to Telstra, SAPN & SA Water for the site compound & site office; 4) Site Security including fencing & lockable gates around site compounds, equipment & material storage areas. Collection system (including): a) Supply & installation of gravity drain & pressure pipelines required for the collection of raw sewage from each allotment within the scheme boundary; b) Supply & installation of gravity or pumped boundary connection assemblies to every allotment within the scheme boundary; c) Supply & installation of all sewage maintenance shafts & manholes, including all fittings & materials, backfill & reinstatement as required; d) Supply & installation of packaged pump station chambers & storage chambers complete with pumps & motors, knife gate valves on all inlets, extended spindles, lockable mesh & galvanised lids, all valves, flow meters, emergency pump out connection points, control panels, conduits, wiring, connection to SAPN service points, communications installation & commissioning; e) Supply & installation of rising main pipelines from pump stations, including detectable marker tape, valves, fittings & jointing materials; f) Hydraulic & air testing of all gravity drain pipelines & connections, rising mains, chambers etc. Click for more details...

NARACOORTE STORMWATER UPGRADE FOR CENTRAL BUSINESS DISTRICT STAGE 2
Public Utilities (Water distribution systems, Drainage) project In The Naracoorte Lucindale Council Area of Stormwater - Upgrade type. The Principal invites tenders from Tenderers for the upgrade of stormwater drainage in the Naracoorte CBD. Naracoortes drainage system is ageing & with significant development since the system was installed , in now inadequate to cater for even moderate rainfall events, resulting in businesses & Council infrastructure being inundated. Council has completed studies of the town & has plans for a system that cats for the current level of development plus future expansion. The project will be delivered over multiple years with the second section being Robertson St & Smith St/Jones St intersection to Rolland/Hinckley Sts to be constructed as Stage Two in 2015/16. Click for more details...

PLAYFORD RURAL ROAD UPGRADES
Public Utilities (Water distribution systems, Drainage) project at Huxtable & Quintrell Rds,, Virginia, SA 5120 of Roadworks - Construction/Drainage type of New development. The Principal invites tenders from Tenderers for the construction upgrades of the following rural roads: 1) Huxtable Rd, Virginia & 2) Quintrell Rd, Virginia. The works involve the construction of road pavements, drainage systems, road sealing & traffic control. The Tenderer shall be responsible for the supply of all materials, supervision, labour & machinery necessary for the design, demolition, construction, laying, compaction, finishing & cleaning up of the identified site(s) & works will be conducted in accordance with the Specifications & Drawings supplied by Fyfe. Click for more details...

BLUFF BOAT RAMP - CAR PARK EXTENSION
Currently at the Construction stage In Victor Harbor is a project estimated to be $ 750000. This project The Principal has the care, control & management of the Bluff Boat Ramp Car Park land & proposes to extend the existing car park in front of Eat@Whalers restaurant at Encounter Bay to accommodate an additional 34 parking spaces. In board terms, the scope of works comprise: 1) Demolition; 2) Earthworks; 3) Glacial Erratics; 4) Rock Revetment Wall; 5) Floating Silt Curtain; 6) Stormwater Drainage; including CCTV footage; 7) Gross Pollutant Traps; 8) Roadworks; 9) Concrete Works; 10) Linemarking & Signage; 11) Electrical Installations; 12) Communication Installations; 13) Landscaping; 14) Construction Environmental Management Plan; & 15) As Constructed Survey. Click for more details...

ALEXANDRINA COUNCIL MANHOLE & PUMP STATION REHABILITATION
Public Utilities (Water distribution systems, Drainage) New project at Various locations within the townships of Strathalbyn, Port Elliot &, Goolwa, SA 5214. This type is Drainage - Manholes (30)/Pump Stations (2) Rehabilitation with Local Govt ownership. The Principal invites tenders for the provision of services relating to manhole & pump station rehabilitation. Council is seeking work to be undertaken on approximately 30 existing manholes & 2 pump stations within the townships of Goolwa, Port Elliot & Strathalbyn which in the main are to be rehabilitated to provide a new smooth, durable & watertight internal surface. some manholes will also require lid replacement, ladder removal & condition assessment. This work forms part of Alexandrina Councils SWMS Asset Management Plan for the 2015/16 financial year. The Tenderer is to provide a warranty against the breakdown or failure of the workmanship of the surfacing treatment applied to the manholes. Council expects that the warranty should be for a minimum of 10 years. Click for more details...

TONSLEY CIVIL WORKS STAGE 3
Public Utilities (Water distribution systems, Drainage) project for New development. The Principal invites tenders for the following: SCOPE OF WORK: The Contract is for the construction of subdivisional roadworks, drainage & services including sequencing to prioritise the works for site traffic & pedestrian management purposes. In conjunction with the civil works associated with the subdivisional works, SAPN will separately be undergrounding the existing overhead power lines within the boundary of the site works & in the vicinity of these works. The civil works associated with the undergrounding of the power lines & removal of poles shall be undertaken by the civil contractor under this contract & works coordinated under the direction of SAPN & the Superintendent. The scope of work shall include the following: 1) liaison & cooperation with Council & the service authorities (including SAPN for undergrounding of 66kV works & removal of existing stobie poles & SAPN infrastructure); 2) liaison & cooperation with Renewal SA & Superintendent on matters relating to vehicular & pedestrian access to other stakeholders on the site including but not limited to the DPTI Park n Ride car Park, SIEC car park, Mitsubishi Spare Parts Building, SIEC commercial vehicles, access for SAPN at all times to the existing SAPN substation & general public movements & site tenants; 3) liaison, cooperation & approval from DPTI rail services regarding the proposed boring & pipe jacking of pipes/conduits beneath the railway line for 66kV, stormwater & recycled water; 4) liaise with Renewal SA environmental consultant regarding contamination issues, existing groundwater monitoring wells; 5) setting out the works from established bench marks & boundaries; 6) site clearance of all vegetation, rubbish, pavement material, internal services, fences & structures (including stockpiling on site where indicated); 7) demolition of existing infrastructure as marked on the drawings &/or required to facilitate construction of new roads & infrastructure contained within the stage boundary. Contractor to prepare a surveyed plan showing the location of all underground services that were removed & submit to Superintendent prior to Practical Completion; 8) remove all stobie pole footings & recompact in accordance with specification; 9) demolition of steel structure at northern end of Western Plant building including gantry; 10) disposal of material (including but not limited to concrete pavement, kerbs, asphalt etc) shall be to an approved recycling depot (where possible). Contractor to provide documentation as proof; 11) stripping, excavation & removal off site of all existing granular pavement material & spoil material from the stage boundary including but not limited to trenching, formation of roadworks & earthworks; 12) soil erosion & drainage management including drainage from external of the site boundary including but not limited to the existing adjacent buildings; 13) maintain access & live services to the existing buildings & parking facilities within & surrounding the project area at all times. Staging, sequencing & after hours construction works shall be required to facilitate this; 14) earthworks including filling & compaction of demolished & excavated areas to finished levels (includes all necessary soil moisture conditioning); 15) road works construction including the final vehicular access points into the DPTI Park N Ride car park & SIEC car park; 16) road works associated with the Drill Core fire access near the Mitsubishi Administration building between CH00-CH74; 17) road works (kerbing) & line marking associated with the closure of the existing temporary northern access road from the Ring Road constructed previously as part of Stage 2 works; 18) kerb & gutter, spoon drain & driveway invert construction; 19) installation of underground services a) sewerage reticulation; b) potable water reticulation; c) stormwater Click for more details...

SOMERTON PARK DRAINAGE WORKS
Drainage Works project at Whyte & Tarlton Sts, Somerton Park, SA 5044 in the Public Utilities (Water distribution systems, Drainage). The City of Holdfast Bay (& the City of Marion) Stormwater Management Plan requires major drainage works (outfall) to be undertaken at Whyte & Tarlton Sts, Somerton Park. Detailed design for the construction of this drain work has been developed. Works included, but not limited to: a) Service Depthing; b) Preparation of management plans & QA; c) Traffic control; d) Setting out of the works; e) Removal of spoil & rubbish; f) Stormwater drainage construction including pits, pipes, culverts, headwalls; & g) Road reinstatement, including: i) Sub-grade preparation, road sub-base & base course construction; & ii) Asphaltic concrete (hotmix) wearing course. h) Provision of As Constructed survey & QA documentation. Click for more details...

PG DAWSON RESERVE NATURAL PLAYGROUND UPGRADE
New project of Public Utilities (Water distribution systems, Drainage) project at 44 Main Rd, Mclaren Flat, SA 5171. The Principal invites tenders for provision of the following Works: Objectives: General - Provide labour, materials, plant & equipment to construct the Works. Outline of the Works: 1) Demolition & removal of existing play equipment & park furniture (by Council); 2) Installation of screw piles for Tree Fort & V-net Climber (arranged by Council); 3) Supply & Install; a) Sideways Tree Climber - not part of contract; b) V-net Climber - to be supplied; Cargo Net Climber - to be supplied; d) Tree Fort. 4) Earthworks including excavation, grading & mounding; 5) Minor concrete; 6) Supply & installation of rocks; 7) Supply & install logs, timber seats for: a) Forest settings; b) Obstacle course; c) Sand play & swing areas. 8) Supply & install hand water pump; 9) Supply& install rocks for water play; 10) Supply & install landscape furniture including: a) shelter; b) drink fountain; c) seats & picnic tables. 11) Supply & install play equipment (swings); 12) Supply & install softfall sand; 13) Supply & install pine chip softfall; 14) Supply & install living softfall; 15) Design, supply & install irrigation system; 16) Supply & installation of organic mulch; 17) supply & planting of trees & shrubs; 18) Supply & install instant turf; & 19) Landscape maintenance. Click for more details...

JANZ STREET UPGRADE
Public Utilities (Water distribution systems, Drainage) project at Janz St, Naracoorte, SA 5271 of Roadworks type of New development. The Principal invites tenders for the upgrade, sealing & associated works of Janz St, Naracoorte, South Australia. The Janz St project is part of Councils program to seal all remaining unsealed streets in the Naracoorte Township. The Contractors scope of works includes but is not limited to, the provision of supervision, labour, materials, transport, plant & equipment necessary to complete the planning, set out, removal, supply, installation, certification & maintenance of the civil, asphalt, concrete works, excavation, reinstatement, line marking & storm water works. Click for more details...

WELLINGTON STREET STORMWATER PUMP STATION WORKS
Currently at the Construction stage In Port Adelaide Enfield is a project estimated to be $ 450000. This project The Principal invites tenders for the following: Project Description: Council owns & operates the Wellington Street stormwater pump station, which was constructed in the early 1970s. The pump station includes one pump with a DN300 pipework outlet (Pump 1) & two pumps with DN600 pipework outlets (Pump 2 & Pump 3). These pumps discharge into a DN1000 (1016mm OD) manifold. This existing manifold, which is part of the original installation, is made of mild steel pipework & has reached the end of its design life. council has resolved to replace the manifold, inclusive of the manifold supports & branch non-return valve supports. A new valved bypass inlet & new DN300 non-return valve is also to be provided. The work is to include construction of the bypass inlet with temporary connection of the Pump 1 discharge to allow for a reduced pumping capacity to be retained by the pump station as the main manifold is replaced. Temporary thrust restraint is to be provided for the bypass inlet until the remainder of the manifold is completed. Click for more details...

LAURA STORM WATER DRAINAGE CONSTRUCTION
Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Northern Areas Council Area for New development. The Principal invites tenders for the provision of works to include the construction of 300m of various size stormwater main, associated pits, kerb & channel in the road reserve a GPT & detention basin. Click for more details...

NINE MILE ROAD UPGRADE STAGE 6
Public Utilities (Water distribution systems, Drainage) project In The Alexandrina Council Area of Local Govt ownership. The Principal invites tenders for the provision of construction of the Nine Mile Road Upgrade Stage 6. Nine Mile Road is a rural collector that runs between Strathalbyn & Milang. The upgrade work is to be undertaken at the Milang end with 5.7 km length of unsealed road to be reconstructed & sealed. Work includes earthworks, sealing, line marking, signage, vegetation removal & stormwater. Click for more details...

OSMOND TERRACE IRRIGATION UPGRADE
Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Norwood & Payneham & St Peters Council Area for New development. The Principal invites tenders for provision of a new irrigation system in Osmond Tce, Norwood. Click for more details...

TONSLEY MAB MECHANICAL EXPANSION SCOPE 1
Currently at the Construction stage In Marion is a project estimated to be $ 500000. This project The Principal invites tenders from suitably qualified Mechanical Services Contractors to deliver the Mechanical Services Expansion Scope 1 Package for the Supply& Installation of Mechanical Pipework & associated building works comprising structural supports within the Main Assembly Building (MAB) at Tonsley. The package comprises: 1) Mechanical Services Pipework - Stage 1 Mechanical Pipework has already been installed. This package extends the existing Mechanical Services Chilled & Hot Water Flow & Return Pipework to serve new tenancies planned within the MAB at Tonsley including all valves, expansion bellows, connecting to existing, insulation, pipe labelling, testing & commissioning. 2) Associated Building Works & Structural Supports - supply & installation of necessary structural supports for the pipework & other building works in connection with the works including seismic restraints, off site fabrication, site welding, bolting, painting, preparation of steel & welds, prime paint & touch up with top coat specified. The contractor shall include for all carnage, lifting equipment, elevated work platforms, setting up & managing appropriate work zones. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect