LEWISHAM SEWERAGE SCHEME
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at Not known, Lewisham, TAS 7173. The work involves the design, construction, commissioning and then 6 month operation of a nominal 60kl/day waste water treatment plant. Click for more details...

ROKEBY/TRANMERE SEWERAGE SCHEME
Currently at the Construction stage In Clarence is a project estimated to be $ 763000. This project Supply, installation & commissioning of aeration system. Click for more details...

ROKEBY/TRANMERE SEWERAGE SCHEME
Public Utilities (Treatment plants, Sewerage reticulation) project for New development. Construction of buildings, pipework, holding ponds, carparking & roads. Click for more details...

EAST STRAHAN WASTEWATER TREATMENT PLANT
Not known, Strahan, TAS 7468 Has East Strahan Wastewater Treatment Plant currently at Construction stage. Supply, installation & commissioning of aeration equipment. Click for more details...

LEGANA WWTP - EFFLUENT RE-USE SCHEME
Legana Wwtp - Effluent Re-Use Scheme is currently at the Construction stage, valued at about $ 202000 it is Supply & installation of an irrigation system. The works comprise the supply & installation of pumps, pipework, centre pivot irrigator & associated electrics to irrigate an area of about 50 hectares. Click for more details...

STRAHAN SEWERAGE SCHEME
Inlet And Outfall Pipeline New project In The West Coast Council Area. Supply of materials and construction of approx 800m of DN 250/300mm OPVC PN 12 inlet rising main, 500m of DN 225 DWV gravity outfall and 250m of DN 250mm PE PN6.3 outfall pipeline, accumalator and diffuser. Click for more details...

RENISON BELL TIN OPERATIONS - RENDEEP
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) New project at 136 km south of, Burnie, TAS 7320. This type is Mine - Underground - Crushing Station - Design & Construct Package with Private ownership. Design, supply & installation of an underground crushing facility. Contract to incorporate all facets of construction for this 700,000tpa plant including electrical services & structural requirements. Production from new shaft development is expected to commence by mid 1996. Click for more details...

TURNERS BEACH WASTEWATER LAGOONS
Turners Beach Wastewater Lagoons is currently at the Construction stage, valued at about $ 82000 it is Construction of a concrete wave wall & installation of minor pipework. Click for more details...

EXETER EFFLUENT RE-USE SCHEME
Public Utilities (Treatment plants, Sewerage reticulation) New project at Exeter WWTP/Exeter Golf Course, Exeter, TAS 7275. This type is Pipeline & Pump Station Construction with Local Govt ownership. Construction of pipeline & pump station. The works relate to irrigating treated effluent from the Exeter WWTP onto the Exeter Golf Course. Click for more details...

RENISON BELL TIN OPERATIONS - RENDEEP
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project In The Burnie Council Area of Private ownership. Supply & installation contract for construction of underground winder for this 700,000tpa operation. Work to include all mechanical, structural & electrical components. Some design work also forms part of this tender. Click for more details...

STRAHAN SEWERAGE SCHEME
Public Utilities (Treatment plants, Sewerage reticulation) project at Regatta Point, Strahan, TAS 7468 of Wastewater Treatment Plant type of New development. Supply of materials and construction of an aerated lagoon wastewater treatment plant at East Strahan, including inlet screen, siteworks, control; building and electrical installation including floating surface aerators as a nominated sub-contract. Click for more details...

DOVER WATER SUPPLY
, Dover, TAS 7117 Has Dover Water Supply currently at Construction stage. Construction of concrete storage tanks (2 x 9,000 L & 1 x 45,000 L) & pipeworks, including 220 m of 150 mm dia PVC rising mains, DICL pipeworks, dosing & cable pits & electrical conduits. Click for more details...

UNITED MILK TASMANIA LTD
Currently at the Construction stage In Devonport is a project estimated to be $ 500000. This project Roadway, water & fencing. Click for more details...

FRANKLIN SEWERAGE SCHEME
New project of Public Utilities (Water distribution systems, Drainage) project, Franklin, TAS 7113. Supply & construction of a 150 dia rising main from Franklin to Huonville (5,556 m), includes supply of all materials (including pipes, valve, fittings & other miscellaneous items) & excavation, laying, testing & backfilling of 150 dia class 9 UPVC pressure main & sections of 150 cement lined Ductile iron. Alternative tenders will be accepted. Click for more details...

MEANDER VALLEY WWTP UPGRADE
Public Utilities (Treatment plants, Sewerage reticulation) project for New development. Remainder of civil works associated with the upgrading of Prospect Vale Waste Water Treatment Plant. Click for more details...

MEANDER VALLEY WWTP UPGRADE
Civil Works (Stage 1) For Treatment Plant project at Not known, Prospect Vale, TAS 7250 in the Public Utilities (Treatment plants, Sewerage reticulation). Excavation, civil works, access road & embankment. Click for more details...

WATER SUPPLY RESERVOIR ROOFS
Public Utilities (Reservoirs) project In The Central Coast Council Area of Roofs For Reservoirs (4) type. Construction of four (4) aluminium reservoir roofs at:- * Camac Court, Smithton - 16.4 mtr diameter * Gawler Treatment Plant Treated Water Storage, ulverstone - 56.3 mtr x 32.3 mtr * Von Bibras Reservoir, Ulverstone - 20.7 mtr diameter * Hearps Reservoir, Ulverstone - 45.0 mtr diameter. Click for more details...

PATERSON STREET CENTRAL (PERIMETER) ROAD AND FOOTPATH WORKS
New project of Public Utilities (Water distribution systems, Drainage) project at Paterson St, Launceston, TAS 7250. Construction of a road, footpath and relocation of services around the perimeter of Paterson Street Central Carpark. Scope of works include construction of 100m of 225mm diameter sewer main, manholes and gully pits, 85m of 100mm watermain, installing street lighting conduits and posts, building demolition, pavement construction, asphalt sealing and miscellaneous associated works. Click for more details...

LONGFORD FLOOD PROTECTION WORKS
Public Utilities (Water distribution systems, Drainage) project In The Northern Midlands Council Area of Local Govt ownership. Supply and delivery of precast concrete levee retaining walls. Click for more details...

ROSNY WASTE WATER TREATMENT PLANT UPGRADE
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at 90 Esplanade, Rosny, TAS 7018. Design, supply and installation of a filter for helminth removal at the Rosny Waste Water Treatment Plant. Click for more details...

UTAS/TASMANIAN AQUACULTURE AND FISHERIES INSTITUTE
Public Utilities (Water distribution systems, Drainage) New project at Nubeena Cr, Taroona, TAS 7053. This type is Seawater Intake Lines Extension - Design & Construction with State ownership. Design and construction of an extension to the seawater intake lines. Click for more details...

CAMBRIDGE WASTE WATER TREATMENT PLANT REPLACEMENT
Sewage Pumping Station And Gravity Mains New project In The Clarence Council Area. The project has two separable portions. Portion A involves the construction of a sewage pumping station at Kennedy Drive and Portion B involves constructing one section of approximately 900 metres of 150mm diameter gravity sewer main and constructing one section of approximately 3300 meters of 300mm diameter gravity main between Maxwells Road and Kennedy Drive. Click for more details...

SOUTH EAST TASMANIA RECYCLED WATER SCHEME
A project in the TAS Within Clarence. Supply of approximately 6000 metres of DN630mm polyethylene pressure pipe for construction of a future pipeline. Click for more details...

GILBERT STREET SEWAGE PUMP STATION
New project of Public Utilities (Pumping Stations) project at Gilbert Street, Latrobe, TAS 7307. Provision of electrical and mechanical services for wet weather storage tank. Click for more details...

FORTH-PALOONA TREATED WATER SUPPLY
Currently at the Construction stage In Devonport is a project estimated to be $ 1400000. This project Construction of a new rising main, a new gravity main and other associated works, required as part of the construction of a new bulk water supply system that will supply potable water from the Forth Water Treatment Plant and to the Paloona Water Supply System. The works include but are not necessarily limited to the following, construction of a new DN 375 PN 35 DICL rising main (approx 3700m) using pipes, valves and fittings issued free by the principal to the contractor. Associated works include, modification of the existing pumping station building and pipeline manifold to accommodate the installation of the new rising main, construction of a new reinforced concrete flow meter pit, aerial crossings to carry the pipeline across waterways, scour and air valve pits and property connection(s). The rising main will interface with two new pumps in the Pumping Station Building at the Forth Water Treatment Plant and the new pipe work at the Forthside Hill Reservoir. Construction of a new DN 300stormwater pipeline. Construction of a new DN 450 PN 20 DICL gravity main (approx 5200m) using pipes, valves and fittings issued free by the principal to the contractor. Associated works include, aerial crossings to carry the pipeline across waterways, construction of a new reinforced concrete flow control valve pit, scour, air valve, fore hydrant and property connections, connection to the existing Paloona Trunk main. The Gravity main will interface with new pipe work at the proposed Forthside Hill reservoir (to be constructed under separate contract). Click for more details...

HUON VALLEY REGIONAL WATER SCHEME PROJECT
Reservoirs - Design And Construct New project In The Huon Council Area. Design and construction of fit for purpose above ground water storage reservoirs (tanks) for the Huon Valley Region. Click for more details...

SOUTH EAST WATER SCHEME
Water Scheme New project In The Sorell Council Area. The new water scheme will deliver 6,000 ML p.a. to the communities of Coal River Valley, Sorell and Orielton. Click for more details...

WHITEMORE IRRIGATION SCHEME
New project of Public Utilities (Pumping Stations) project at From WHITEMORE to, Westbury, TAS 7303. The new irrigation scheme will deliver 5,500 ML p.a. to the communities of Whitemore, Liffey, Bracknell, Cluan and Westbury with an irrigable area of 10,000 ha. Works include pumping, piping, meters and telemetry. Click for more details...

KINGS MEADOWS FLOOD MITIGATION PROJECT
Public Utilities (Water distribution systems, Drainage) project at Ernest St to Janet St, Kings Meadows, TAS 7249 of Road - Upgrade - Stage 1 type of New development. Construction of a headwall, box culverts, gabion walls, manholes/chambers, open drain reprofiling, kerb and channel replacement and associated minor road works. Click for more details...

NORTHERN TASMANIA CRICKET ASSOCIATION (NTCA) SPORTS COMPLEX
Public Utilities (Water distribution systems, Drainage) project at 55 Racecourse Cr, Launceston, TAS 7250 for New. Design and construction of the redevelopment works to include the extension of the existing playing field, drainage and irrigation at the number two ground at the NTCA Sports Complex. Click for more details...

TAMAR STREET PUMP STATION
Currently at the Tenders & Building stage In Launceston is a project estimated to be $ 110000. This project Supply, delivery and supervision of installation of pumping equipment. Two large submersible centrifugal pumpsets and one small submersible centrifugal pumpset, to be installed in the Tamar Street pumping station. The pump station is to be modified under a separate contract prior to the installation. Click for more details...

ST HELENS POINT ROAD KERB AND STORMWATER WORKS
Public Utilities (Water distribution systems, Drainage) project at St Helens Point Rd, Stieglitz, TAS 7216 for New. Installation of new kerb including various levels of road widening and associated work along with the installation of stormwater infrastructure. Click for more details...

CORNWALL ROAD KERB AND STORMWATER WORKS
Cornwall Rd, Cornwall, TAS 7215 Has Cornwall Road Kerb And Stormwater Works currently at Construction stage. Installation of new kerb including various levels of road widening and associated work along with the installation of stormwater infrastructure. Click for more details...

GREEN POINT ROAD DWELLINGS
A project in the TAS Within Brighton. Construction of services associated with a Stratum Title development (20 dwellings) roads, water, sewerage and drainage. Click for more details...

DOCTORS HILL PUMP STATION
Public Utilities (Treatment plants, Sewerage reticulation) project for New development. Construction of a chlorination building. Construction will include a pre-fabricated shipping container with minimal civil works. Supporting infrastructure includes a chemical bulk tanker, chemical waster holding tank and absorption trench. Click for more details...

NEW ECCLESTONE ROAD RIVERSIDE STORMWATER REPLACEMENT
Stormwater Replacement project at 74 & 76 New Ecclestone Rd, Riverside, TAS 7250 In The Council Area Of West Tamar of Local Govt. Stormwater replacement and associated works - site establishment, traffic management and general reinstatement within a 6 month maintenance period. PART A: - Supply and installation of; 78m of DN300 'Black Max' class SN8 or equivalent pipe, two (2) Precast Hewadwall to suit DN300 pipe and one (1) DN1050 Manhole. PART B: - Supply and installation of 55 m DN450 'Profiled Polyethylene Pipe' pipe, three (3) DN 1050 Benched M/H w/ Heavy Duty Tops, one (1) DIER Precast Driveable Headwall for DN450 pipe, one (1) Precast Headwall for DN450 pipe, supply & install DN300 Concrete pipe length w/ Precast Headwall and two (2) Precast Headwalls on relayed DN375 Concrete pipe. Reconstruction and sealing of two (2) Rural Driveways, and construction of 35 m2 of new Concrete/Rock 'Rip-rap'. Click for more details...

MOUNT BARROW COMMUNICATIONS TOWER REPLACEMENT
New project of Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at Mt Barrow, Nunamara, TAS 7259. The Mt Barrow Tower Replacement Project primary objectives is to replace the existing communications tower and necessary related infrastructure to increase the existing capacity and assure the ongoing provision of communication and navigation services from the Mt Barrow site. The project is to manufacture, fabricate, site install, commission of the new Telecommunications Tower and the associated Civil Works on site at Mt Barrow, Tasmania in accordance with the requirements as set out in the Statement of Requirement. Before receiving the Confidential Information referenced in Annexure 1 of the Statement of Requirement to this RFT (Principal Supplied Documents), Tenderers are required to submit a signed copy of the Confidentiality Undertaking provided at Annexure B to the Contact Officer as advised in Annexure A of this RFT. In the first instance Tenderers are to provide scanned signed copies of the Undertaking to the email address provided with hard copies with original signatures to follow by post to the Tender Lodgement address detailed in Annexure A. Conditions for Participation The following are conditions for participation for this RFT: (a) The Tenderer and any subcontractors proposed in the Tender must not be named as not complying with the Workplace Gender Equality Act 2012 (Cth); (b) At the time of lodgement of the Tender, the Tenderer must not be: - precluded from tendering for Australian Government funded work; or - subject to a judicial decision against them relating to employee entitlements, not including decisions under appeal and have not paid the claim. (c)Tenderers must request from the Airservices Australia Contact Person a CD containing the referenced documents/diagrams and photos that pertain to the Mt Barrow Communications Tower Replacement Project, this must be done in order for the Tenderer to gain a better understanding of the complexities surrounding the logistics and remote location of the site. (d) Tenderers are to attend the Briefing Session followed by the Site Visit on 11th March 2015. If a Tenderer?s Response fails to meet the above conditions for participation for this RFT Airservices Australia will exclude the Response from further consideration. Click for more details...

SANDOWN PARK DRAINAGE AND IRRIGATION UPGRADE
Sandown Park Drainage And Irrigation Upgrade is currently at the Construction stage, valued at about $ 250000 it is Drainage and Irrigation Upgrade of Sandown Park No.1 Click for more details...

SOUTHERN HIGHLANDS IRRIGATION SCHEME
Public Utilities (Reservoirs) project at Various locations within the municipality of the Southern Highlands, Hamilton, TAS 7140 for New. The Southern Highlands Irrigation Scheme (SHIS) is one of five schemes which comprises Tasmanian Irrigation?s (TI) second suite of schemes known as ?Tranche Two?. The SHIS will deliver 7,215 ML of high reliability irrigation water from a holding dam approximately 17km north-west of Bothwell to scheme participants via a 58km underground pipeline distribution network. Stripping of the embankment footprint & excavation of the keyway of Southernfield Dam. Construction of Shannon River Pump Station to be located to the south of Waddamana Road on the banks of the Shannon River. Construction of 1MW pump station & construction of the access road. Construction of 58km-long scheme distribution pipeline to run from Waddamana Road, south to Bothwell and on to Hollow Tree. The pipe diameter will range from DN180mm up to DN710mm. Pipeline spurs will provide water to farms along Nant Lane and to the east of Bothwell along Highland Lakes Road. Two small booster pump stations are required in the scheme. One located on the eastern edge of Bothwell and the other along Hollow Tree Road at Montacute. Click for more details...

PUNCHBOWL ROAD WATER MAIN UPGRADE
Public Utilities (Water distribution systems, Drainage) project at Punchbowl Rd, Punchbowl, TAS 7249 for New. Upgrade of the existing stormwater main which runs along side the fence line between properties in Punchbowl Rd and Arundel Street to increase the drainage capacity by replacing the existing 150mm and 225mm diameter vitrified clay pipe. The works include re-connection of all properties. Directional drilling is the preferred method of installation. Click for more details...

DELORAINE SEWERAGE AND STORMWATER DRAINAGE
Local Govt ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Meander Valley Council Area for New development. Construction of new sewerage and stormwater drainage infrastructure to service industrial land at East Goderich Street, Deloraine. Click for more details...

TASWATER CAPITAL WORKS PROGRAM INDUSTRY BRIEFING 2015
Capital Works Program project at Various locations throughout Tasmania, Hobart, TAS 7000 in the Public Utilities (Water distribution systems, Drainage). All current & prospective TasWater consultants & contractors are invited to attend an Industry Briefing which will be held at three locations around the State. Click for more details...

ROSNY ZONE SUBSTATION
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at 124 Cambridge Rd, Rosny Park, TAS 7018 for New. Construction works for Rosny Zone Substation. Works to include civil and building works. Click for more details...

WINDSOR PRECINCT OLYMPIC SOCCER FIELD
Public Utilities (Water distribution systems, Drainage) project at Windsor Dr, Riverside, TAS 7250 of Soccer Field Drainage - Design/Construct type of New development. Windsor Precinct - Design & Construct Drainage for Olympic 1 & 2 Soccer Field. Click for more details...

PITT AVENUE STORMWATER UPGRADE
Public Utilities (Water distribution systems, Drainage) project In The West Tamar Council Area of Local Govt ownership. Stormwater Upgrade - Pitt Avenue (Snake Gully) Riverside Work includes: - Supply and installation of 4 side entry pits - Supply and installation of 4 DN1200 precast manholes - Supply and installation of 4 DN1800 precast manholes - Supply and installation of 1 Gully Pit - Construction of 1 Headwall to outlet DN1350, DN900 & DN450 - Supply and installation of approximately 24 m DN300 corrugated poly pipe - Supply and installation of approximately 26 m DN450 corrugated poly pipe - Supply and installation of approximately 17 m DN750 corrugated poly pipe - Supply and installation of approximately 54 m DN900 corrugated poly pipe - Supply and installation of approximately 20 m DN900 FJ RCP Class 2 - Supply and installation of approximately 11 m DN1050 FJ RCP Class 2 - Supply and installation of approximately 100 m DN1350 FJ RCP Class 2 - Bulk earthworks - General reinstatement Click for more details...

BOM NORTH SWITCH REMEDIATION
Public Utilities (Water distribution systems, Drainage) project at Various Locations throughout Northern Tasmania, Moonah, TAS 7009 of Switch Remediation type of New development. A vendor is required to supply hardware to replace obsolete network switches as part of the SCADA Program of Work. Click for more details...

CARLTON BEACH ROAD FOOTPATH/STORMWATER WORKS
Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Sorell Council Area for New development. Supply & delivery of footpath, kerb & gutter & stormwater works for Carlton Beach Rd (Rotuli St ? Kuneeamee St), Dodges Ferry. Click for more details...

ELINGA STREET DRAINAGE
Elinga St, Howrah, TAS 7018 Has Elinga Street Drainage currently at Construction stage. Works to include the upgrade of the Elinga Street Stormwater Main. Associated civil works. Click for more details...