List of Public Utilities Projects in TAS


ROKEBY/TRANMERE SEWERAGE SCHEME
Currently at the Construction stage In Clarence is a project estimated to be $ 763000. This project Supply, installation & commissioning of aeration system. Click for more details...

ROKEBY/TRANMERE SEWERAGE SCHEME
, Rokeby, TAS 7019 Has Rokeby/Tranmere Sewerage Scheme currently at Construction stage. Supply of pipes for reticulation trunk main & foreshore. Click for more details...

EAST STRAHAN WASTEWATER TREATMENT PLANT
Not known, Strahan, TAS 7468 Has East Strahan Wastewater Treatment Plant currently at Construction stage. Supply, installation & commissioning of aeration equipment. Click for more details...


Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Launceston Council Area for New development. The work involves replacement of the watermain from the intersection of Wellington Street & bailey Street along Bailey Street, up Meredith Crescent Lane & along Lawrence Vale Road to Melbourne Street. The main includes substantial lengths of 100 and 150 diam PVC & 630 Od to 180 OD polythene with electrofusion couplings & short lengths of DICL in total approximately 1300 metres of watermain. Click for more details...

BEAUTY POINT EFFLUENT RE-USE SCHEME
Public Utilities (Treatment plants, Sewerage reticulation) project for New development. Design and construction of a 12 litre per second effluent pumping station at Council's wastewater treatment plant and a 1400 metre long delivery pipeline together with associated valves, fittings and structures. Click for more details...

STRAHAN SEWERAGE SCHEME
Inlet And Outfall Pipeline New project In The West Coast Council Area. Supply of materials and construction of approx 800m of DN 250/300mm OPVC PN 12 inlet rising main, 500m of DN 225 DWV gravity outfall and 250m of DN 250mm PE PN6.3 outfall pipeline, accumalator and diffuser. Click for more details...

SPUR HILL RESERVOIR ROOF
Local Govt ownership Public Utilities (Reservoirs) project In The Central Coast Council Area for New development. Design & construction of an aluminium reservoir roof & associated platforms, ladders & hatches. Click for more details...

EXETER EFFLUENT RE-USE SCHEME
Public Utilities (Pumping Stations) New project at Exeter WWTP/Exeter Golf Course, Exeter, TAS 7275. This type is Pipeline & Pump Station Construction with Local Govt ownership. Construction of pipeline & pump station. The works relate to irrigating treated effluent from the Exeter WWTP onto the Exeter Golf Course. Click for more details...

EXETER EFFLUENT RE-USE SCHEME
Public Utilities (Treatment plants, Sewerage reticulation) New project at Exeter WWTP/Exeter Golf Course, Exeter, TAS 7275. This type is Pipeline & Pump Station Construction with Local Govt ownership. Construction of pipeline & pump station. The works relate to irrigating treated effluent from the Exeter WWTP onto the Exeter Golf Course. Click for more details...

CRADLE COAST WATER RESERVOIR ROOFS
Public Utilities (Reservoirs) project for New development. Construction of reservoir roofs for eight (8) water supply reservoirs as follows: Big & little Cardigan Reservoirs (concrete, 41.8m & 23m dia respectively), Somerset. Dooleys Reservoir (concrete 43.1 dia), Latrobe. Grants Reservoir (concrete 44.8 dia), Wynyard. Murfets Reservoir (steel 41.7m dia), Heybridge. Port Sorell Reservoir (concrete 35.1m dia), Port Sorell. Stubbs Reservoir (concrete 35.1m dia), Forth. White Hills treatment plant treated water storage (concret 29.2m dia), Penguin. Click for more details...

ROSNY WASTEWATER TREATMENT PLANT
Public Utilities (Water distribution systems, Drainage) project, Rosny, TAS 7018 for New. Equalisation tank aeration, ducting no 1 odour tower to scrubber, modifications to sludge thickener inlet pipework, ducting exhaust from RAS pits & associated control work. Click for more details...

HUONVILLE WATER SUPPLY
Public Utilities (Treatment plants, Sewerage reticulation) project, Huonville, TAS 7109 for New. Construction of 150 sq m block control building & 90 sq m block pump house. Click for more details...

HUONVILLE WATER SUPPLY
Huonville Water Supply is currently at the Construction stage, valued at about $ 282000 it is A/ Construction of concrete clarifier. B/ Construction of 700 Kl clearwater storage washwater storage tank. Click for more details...

TI-TREE BEND WASTE WATER TREATMENT PLANT
Public Utilities (Treatment plants, Sewerage reticulation) project In The Launceston Council Area of Programmable Logic Controller For Treatment Plant - Stage 1 type. Supply, installation & commissioning of programmable logic controller. Click for more details...

MEANDER VALLEY WWTP UPGRADE
Civil Works (Stage 1) For Treatment Plant project at Not known, Prospect Vale, TAS 7250 in the Public Utilities (Treatment plants, Sewerage reticulation). Excavation, civil works, access road & embankment. Click for more details...

MEANDER VALLEY WWTP'S UPGRADE
Public Utilities (Treatment plants, Sewerage reticulation) project at Not known Carrick &, Deloraine, TAS 7304 of Mechanical Equipment For Treatment Plant type of New development. Supply & installation of mechanical equipment associated with the upgrading of Carrick & Deloraine Waste Water Treatment Plants effluent re-use facilities. Click for more details...

PENGUIN TO ULVERSTONE SEWER & PUMP STATION
Pipeline project at Not known Penguin &, Ulverstone, TAS 7315 in the Public Utilities (Pumping Stations). Construction of approx 11.5 klms of pipeline from Penguin to Ulverstone. Click for more details...

LILYDALE EFFLUENT RE-USE SCHEME
Waste Water Treatmemt Plant, Lilydale, TAS 7268 Has Lilydale Effluent Re-Use Scheme currently at Construction stage. Construction of a storage dam. The works relate to irrigating treated effluent from the Lilydale WWTP on to an adjacent dairy farm.. Click for more details...

LEGANA WWTP - EFFLUENT RE-USE SCHEME
Effluent Storage Dam New project In The West Tamar Council Area. Construction of a 135 Ml capacity earthern storage dam & associated pipework. Click for more details...

BERRIDALE RESERVOIR ROOF
A project in the TAS Within Glenorchy. Provision of plant, labour and materials required for the construction of a steel clad roof and aluminium internal ladder onto the existing above ground, circular, reinforced concrete reservoir. Click for more details...

LONGFORD FLOOD PROTECTION WORKS
Public Utilities (Water distribution systems, Drainage) project In The Northern Midlands Council Area of Local Govt ownership. Supply and delivery of precast concrete levee retaining walls. Click for more details...

KINGSTON CENTRAL AREA (KCA) STORMWATER - STAGE 2
A project in the TAS Within Kingborough. Supply of approximately 200 metres of 1500mm diameter reinforced concrete pipe and approximately 58 metres of 1800mm wide by 1200 high reinforced concrete box culverts. The works include the supply of pipes and culverts including delivery to site. Click for more details...

LONGWOOD AVENUE/ NEWSTEAD CRESCENT STORMWATER PIPELINE
Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Launceston Council Area for New development. The installation of two sections of new pipeline consisting of 125 metres of either 1050 diameter Class R.R.J. reinforced concrete pipes or 1000 diameter HDPE Flood Poly and 55 metres of 1000 diameter HDPE Flood Poly pipe as well as landscaping and associated works. Both sections of the pipeline are to carry stormwater flows that are currently conveyed by the open drain that runs between Longwood Avenue and Newstead Crescent. This work also involves approximately 10 metres of sewer pipeline works. Click for more details...

QUEENSTOWN/STRAHAN WATER SUPPLY SYSTEMS UPGRADE
Local Govt ownership Public Utilities (Reservoirs) project In The West Coast Council Area for New development. Provision and erection of two 2 ml reservoirs at Queenstown and one 1 ml reservoir at Strahan. Click for more details...

GILBERT STREET SEWAGE PUMP STATION
Wet Weather Storage Tank project at Gilbert Street, Latrobe, TAS 7307 in the Public Utilities (Pumping Stations). Construction of a wet weather storage tank. Click for more details...

QUEECHY SEWAGE PUMPING STATION
Public Utilities (Pumping Stations) project at Corner Queechy and Penquite Roads, Norwood, TAS 7250 for New. The scope of works under this contract includes the supply, delivery and installation of all materials for the construction of a new rising main, approximately 2 km long, linking the proposed new Queechy Pumping Station to Holbers Bridge Wastewater Treatment Plant. The new rising main is to be a 450 OD, PE 100, PN 10 butt fusion welded pipeline installed below ground surface in varying soil conditions. A DN 375 ductile tron cement lined, rubber ring jointed PN 35 pipeline installed at two above ground locations (attached to existing bridges that cross the North Esk River) The installation requires a number of sections to be installed using the thrust boring method (under railway lines and road pavements) The work also involves the installation of an interconnection pipeline, approximately 160 metres, linking the new rising main with the existing Norwood Rising Main and the installation of two interconnection pipelines that will link the new rising main with the existing Killafaddy Pumping Station. Click for more details...

FORTH-PALOONA TREATED WATER SUPPLY
Reservoir project at Forthside, Forth, TAS 7310 In The Council Area Of Devonport of State. Construction of a new concrete, aluminium roofed reservoir, required as part of the construction of a new bulk water supply system that will supply potable water from the Forth Water Treatment Plant to the Paloona Water Supply System. The works include but are not necessarily limited to the following, construction of an access road to the reservoir site, clearing, grubbing and excavation works, importation of structural fill, construction of a 1ML (approx) reinforced concrete water storage reservoir, construction of an aluminium clad roof, inlet, outlet, overflow and scour and drainage pipelines, platforms and ladders, hardstand/access track and open drain around the reservoir, installation of a stock proof fence, miscellaneous civil works and provision of shop and as-executed drawings. Click for more details...

HUON VALLEY REGIONAL WATER SCHEME PROJECT
Public Utilities (Water distribution systems, Drainage) project at Huon Valley Region, Huonville, TAS 7109 for New. Design, construction, installation and commissioning of a potable water treatment plant near the town of Huonville. Click for more details...

HUON VALLEY REGIONAL WATER SCHEME PROJECT
Huon Valley Regional Water Scheme Project is currently at the Tenders & Building stage, valued at about $ 2000000 it is Construction of approximately 46 kilometres of pipeline using pipes supplied by others. Click for more details...

SASSAFRAS - WESLEY VALE IRRIGATION SCHEME
Irrigation Scheme project at From SASSAFRAS to, Wesley Vale, TAS 7307 In The Council Area Of Latrobe of State. Proposal to use excess capacity in existing Australian Paper Pipeline. The new scheme will deliver 35ml/day or 5,000 ML p.a. to the farming regions of Sassafras, Moriarty, Wesley Vale, Northdown, Harford, Thirlstone and Pardoe with an irrigable area of 10,000 ha. The project will transport water from the Mersey River through the Australian Paper Pipeline and network branch lines of approximately 65 kilometres, Works include pumping, piping, meters and telemetry. Click for more details...

SOUTH EAST WATER SCHEME
Water Scheme New project In The Sorell Council Area. The new water scheme will deliver 6,000 ML p.a. to the communities of Coal River Valley, Sorell and Orielton. Click for more details...

WHITEMORE IRRIGATION SCHEME
New project of Public Utilities (Pumping Stations) project at From WHITEMORE to, Westbury, TAS 7303. The new irrigation scheme will deliver 5,500 ML p.a. to the communities of Whitemore, Liffey, Bracknell, Cluan and Westbury with an irrigable area of 10,000 ha. Works include pumping, piping, meters and telemetry. Click for more details...

BREAK O'DAY COUNCIL PERIODIC CONSTRUCTION CONTRACTS 2012-2014
Public Utilities (Water distribution systems, Drainage) New project at Various Locations with the Municipality of Break O'Day, St Helens, TAS 7216. This type is Civil Construction Works with Local Govt ownership. Civil construction works for Break O'Day Council up to the value of $100,000 (excluding GST) per project for a three year period, between 31 January 2012 and 31 December 2014. Tenderers may submit prices for any of the work categories and may tender for more than one category provided that the company has the experience and capacity to carry out the works. Works under this tender would involves the following *Asphalt works *Road and footpaths *Kerb and Channel *Traffic islands *Drainage works *Landscaping *Pipe Cracking *Pipe Relining *Line Marking *Day Works *Communication conduit. Click for more details...

TAMAR STREET PUMP STATION
Currently at the Tenders & Building stage In Launceston is a project estimated to be $ 110000. This project Supply, delivery and supervision of installation of pumping equipment. Two large submersible centrifugal pumpsets and one small submersible centrifugal pumpset, to be installed in the Tamar Street pumping station. The pump station is to be modified under a separate contract prior to the installation. Click for more details...

SIMMONS PARK DRAINAGE UPGRADE
Simmons Park Drainage Upgrade is currently at the Construction stage, valued at about $ 902000 it is Supply and installation of a gross pollutant trap, footpaths, siteworks and upgrading of associated stormwater. Click for more details...

RINGAROOMA VALLEY WATER SCHEME, RINGAROOMA & BRANXHOLM RESERVOIRS
Public Utilities (Water distribution systems, Drainage) project at Branxholm &, Ringarooma, TAS 7263 of Reservoirs (2) - Construction type of New development. Construction of treated water storage reservoirs at the towns of Ringarooma & Branxholm in north east Tasmania. This contract involves the civil, mechanical & electrical engineering works associated. Click for more details...

KING STREET WATER MAIN UPGRADE
King Street Water Main Upgrade is currently at the Construction stage, valued at about $ 135000 it is Construction of a replacement water main in King Street, Scottsdale. The work includes supply and installation of 667 metres of 200 diameter water main, supply and installation of 20 metres of 250 OD pipe by trenchless methods, installation of 8 fire plugs, installation of 8 stop valves and other associated works. Click for more details...

NORTHERN NRM REGION STORMWATER MANAGEMENT PLAN
Public Utilities (Water distribution systems, Drainage) project In The Launceston Council Area of Private ownership. Expressions of interest invited from consultants to develop a Stormwater Management Plan for participating Councils in Tasmania?s Northern NRM Region. Click for more details...

DERWENT PARK ROAD WATER TREATMENT PLANT
Public Utilities (Treatment plants, Sewerage reticulation) project at 129 Derwent Park Rd, Derwent Park, TAS 7009 of Mechanical Services Stage 2 type of New development. Design, supply, installation, testing and commissioning of Mechanical Services Stage 2 for the water treatment plant for the Derwent Park Stormwater Harvesting and Industrial Re Use Project. Click for more details...

RESERVOIR ACCESS UPGRADES PACKAGE 3
New project of Public Utilities (Reservoirs) project at Various Locations Tasmania Wide, Hobart, TAS 7000. Design, supply and installation works associated with the OH&S reservoir access upgrades. Works include ladders, ramps and platforms. Click for more details...

SOUTHERN HIGHLANDS IRRIGATION SCHEME
Public Utilities (Reservoirs) project at Various locations within the municipality of the Southern Highlands, Hamilton, TAS 7140 for New. The Southern Highlands Irrigation Scheme (SHIS) is one of five schemes which comprises Tasmanian Irrigation?s (TI) second suite of schemes known as ?Tranche Two?. The SHIS will deliver 7,215 ML of high reliability irrigation water from a holding dam approximately 17km north-west of Bothwell to scheme participants via a 58km underground pipeline distribution network. Stripping of the embankment footprint & excavation of the keyway of Southernfield Dam. Construction of Shannon River Pump Station to be located to the south of Waddamana Road on the banks of the Shannon River. Construction of 1MW pump station & construction of the access road. Construction of 58km-long scheme distribution pipeline to run from Waddamana Road, south to Bothwell and on to Hollow Tree. The pipe diameter will range from DN180mm up to DN710mm. Pipeline spurs will provide water to farms along Nant Lane and to the east of Bothwell along Highland Lakes Road. Two small booster pump stations are required in the scheme. One located on the eastern edge of Bothwell and the other along Hollow Tree Road at Montacute. Click for more details...

ROSNY ZONE SUBSTATION
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at 124 Cambridge Rd, Rosny Park, TAS 7018 for New. Construction works for Rosny Zone Substation. Works to include civil and building works. Click for more details...

LAUNCESTON WASTE CENTRE
Launceston Waste Centre is currently at the Construction stage, valued at about $ 500000 it is Preparative works for the landfill extension Launceston Waste Centre. Works Include: - Removal of Vegetation - Undertake earthworks to achieve specified sub-grade & sub-soil drain - Supply & install drainage layer - Supply & Construct composite leachate barrier - Supply & install leachate subsoil drains including manholes and inspection shafts and tubes - Supply & installation of a steel shed - Compliance testing & reporting Click for more details...

TAROONA PRIMARY SCHOOL STORM WATER UPGRADE
Public Utilities (Water distribution systems, Drainage) project for New development. Supply & Installation of new storm water pipe & associated infrastructure in the vicinity at Taroona Primary School. Work includes but not limited to the installation of approximately 40 metres of new piped drainage, including provision of 1 new manhole, rock pitched outfall basin & swale drain & vegetation removal. Click for more details...

GRAY STREET STORMWATER UPGRADE STAGE 2
Public Utilities (Water distribution systems, Drainage) project at Gray St, Riverside, TAS 7250 for New. Installation of 3 SEP's, 9 MH's & approximately 250m of DN600 corrugated poly pipe within the road reserve on Gray Street, Riverside. Click for more details...

CARLTON BEACH ROAD FOOTPATH/STORMWATER WORKS
Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Sorell Council Area for New development. Supply & delivery of footpath, kerb & gutter & stormwater works for Carlton Beach Rd (Rotuli St ? Kuneeamee St), Dodges Ferry. Click for more details...

LACHLAN PARADE STORMWATER UPGRADE
Public Utilities (Water distribution systems, Drainage) project In The West Tamar Council Area of Stormwater - Upgrade type. Stormwater upgrade to 43-59 Lachlan Parade, Riverside. The work of the contract is detailed on the drawings & schedule, & includes the following, Supply & installation of 2 DN1200 precast manholes. Supply & installation of 7 DN1050 precast manholes. Supply & installation of approximately 64 m DN525 corrugated poly pipe. Supply & installation of approximately 54 m DN600 corrugated poly pipe. Supply & installation of approximately 43 m DN900 corrugated poly pipe. Supply & installation of approximately 54 m DN900 corrugated poly pipe. Removal & reinstatement of fencing, vegetation, concrete or any other structures along the stormwater route. Connection of existing stormwater connections into the new stormwater line. General reinstatement. 6 month maintenance period. Click for more details...

TINDERBOX RESERVE STORMWATER UPGRADE STAGE 1
Tinderbox Reserve Stormwater Upgrade Stage 1 is currently at the Construction stage, valued at about $ 350000 it is Tinderbox Stormwater Upgrade Stage 1 - construct approximately 46 metres of stormwater pipeline, reshaping of open drains & provision of manholes & other miscellaneous civil works & site reinstatement. Click for more details...

PEARSALL AVENUE STORMWATER UPGRADE
Pearsall Ave, Blackmans Bay, TAS 7052 Has Pearsall Avenue Stormwater Upgrade currently at Construction stage. Construct approximately 75 metres of DN600 diameter stormwater pipeline, together with associated minor civil works & site reinstatement, at Pearsall Avenue & Sunny Avenue, at Blackmans Bay. Click for more details...

CARELLA STREET STORMWATER DRAINAGE
Stormwater Drainage - Upgrade project at Carella St, Howrah, TAS 7018 In The Council Area Of Clarence of Local Govt. Construction of stormwater drainage upgrade at Carella Street, Howrah. Works to include construction of new 20m long box culvert & 160m long DN600 pipelines from 182 Carella Street to 24 Anulka Street, Howrah. Click for more details...